This document is a draft presentation for an Industry Day event by the U.S. Army Corps of Engineers (USACE) Baltimore District regarding the Unaccompanied Enlisted Personnel Housing (UEPH) Barracks project at Joint Base Myer-Henderson Hall (JBM-HH) in Virginia. The project involves constructing two new barracks buildings to house 200 soldiers, with approximately 167,712 square feet of space, following the Army Center of Standardization Guidance for Barracks. The proposed construction aims to enhance living conditions for The Old Guard, support their ceremonial duties at Arlington National Cemetery, decrease local traffic by providing on-base housing, and increase morale and mission retention.
The Industry Day will be held on 12 May 2025, featuring a presentation, Q&A session, and six one-on-one meetings. The project will use a Design-Bid-Build process with a planned FY26 Construction Contract Award. Three primary Courses of Action (COA) are proposed for relocating existing Relocatable Buildings (RLBs): COA #1 involves moving four RLBs, COA #2 involves moving two RLBs, and COA #3 involves moving three RLBs to an alternate site. Key considerations include cost efficiency, schedule risks, personnel coordination, and minimizing disruption to existing operations. Interested contractors must submit a capability statement and bonding information by 06 May 2025 to be considered for the one-on-one sessions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Sign In Sheet 5.12.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE NAB
12MAY2025
INDUSTRY DAY
UEPH BARRACKS
JOINT BASE MYER
– HENDERSON HALLDRAFT
12MAY2025
OPENING REMARKSDRAFT
Agenda
• Introductions & Disclaimer
• UEPH Barracks Project Overview
• Existing Conditions
• Site Discussion
• Problem Definition
• Courses of Action (COA)
• Discussion/Considerations
• Questions & Closing
0900 – Opening Remarks
0915 – Presentation
1030– One-on-One Team Coffee
1045 – One-on-One Meeting #1
1145 - One-on-One Meeting #2
1230 – 1315 – LUNCH BREAK
1330 - One-on-One Meeting #3
1430 - One-on-One Meeting #4
1530 - One-on-One Meeting #5
1630 - One-on-One Meeting #6
1730 – END OF ALL ONE-ON-ONES
DRAFT
Disclaimer
This Industry Day is not a Request for Proposal, Request for Quote, or Invitation for Bid.
There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice. The purpose of this
Industry Day is to survey interest, discuss capabilities and incorporate innovation from industry.
All information shared in the course of this Industry Day shall be considered preliminary and tentative. The only definitive source of information regarding this potential effort is on https://sam.gov under Related Notice ID W912DR25R15SR.
Introductions USACE Team
Paul White, PE
Design Manager
Michael Miskimon, AIA
Design Manager
Laura Putnam, PMP
Project Manager, PPMD
Tamara Bonomolo
Contracting Officer
Amber Rose
Contract Specialist
SCOPE & LOCATIONDRAFT
PROJECT SCOPE, PROGRAM, AND GOALS
The UEPH Barracks Project will create two new barracks buildings to house 200- Unaccompanied Enlisted Personnel (UPEH) on the Joint Base Meyer – Henderson Hall
(JBM-HH)
UEPH Building Program:
USACE to implement Design-Bid-Build Process with FY26 Construction Contract Award
• Approximate Square Footage: 167,712 square feet
• 200 beds
• Follow Army Center of Standardization Guidance for Barracks
PROJECT SCOPE, PROGRAM, AND GOALS
Project Goals:
Construct permanent party barracks facilities that will:
• Provide 200 new beds for soldiers on Joint Base Myer – Henderson Hall.
• Enhance, improve and replace deteriorate sub-standard barracks.
• Improve quality of life for The Old Guard and support their mission supporting ceremonial duties at Arlington National Cemetery.
• Decrease local traffic demands by providing on base housing for soldiers (live-work setting).
• Increase morale, mission and retention for The Old Guard of the U.S. Army.
12MAY2025
EXISTING
CONDITIONSDRAFT
Source: Fort Myer-Henderson Hall District Area Development Plan (2017)
Fort Myer –
Henderson Hall
Fort McNair
VICINITY MAP
PHOTO LEGEND
Existing Site Features
Existing structures TO BE REMOVED
PHOTO LEGENDDRAFT
SITE DISCUSSIONDRAFT
Site
• The site is approximately 8 acres, with previously developed areas.
• Seven two-story residences, access road, playground, two brick one-story garages, two one-story siding storage sheds, pool complex
• Greenspace is currently being used for the Bldg. 416
Renovation Swing Space project.
• Topography generally falls from northwest to southeast, with the high point being as shown. There is a 12-foot elevation drop to the site’s low point, on the south side.
• All utilities are available on site.
HIGH POINT
Final Site Solution
Summerall Field
Arlington Blvd
Sheridan Ave
McNair Rd
251250248
A&B
A&B
A&B
419 421
416A 416B
A&B
S c h o o lh o u s e R o a dDRAFT
UEPH Barracks at JBM-HH – Birds Eye – revised Submission
Site Overlay
Existing Site vs. Final condition
Proposed Plan
Current Existing Conditions
Problem Definition
Current Challenge: Occupied RLBs are present on new barracks site.
Need: RLBs need to be relocated.
Logistical Planning: Identifying COA that will minimizing disruption.
Impact Considerations: Ensuring continued accommodation and operational readiness for JBH-HH personnel.
Next Steps: Discuss alternate location, COAs and alternative, organizing relocation efforts, and coordinating a smooth transition.
Considerations
USACE
• One General Contractor to execute DBB and DB construction.
• 3 tasks – 1 project
• UEPH DBB MILCON
• Abatement and Demolition of existing Facilities.
• Relocatable Buildings - DB
• FY26 Construction Award
JBM-HH
• Limit displacement of existing personnel.
CONSTRUCTION CONTRACT
• Solicitation to be Best Value Trade Off. Firm Fixed Price
• Design Build Component for RLBs
• UEPH Construction Documents, RLB Relocation DB RFP
• Government partnership for Site design of DB effort.
BID SCHEDULE
1. Base and Options to encompass all work associated with UEPH construction.
2. Design Build Option
• All work associated with relocation of RLBs to permit the construction of the UEPH Barracks.
COA Proposals
COA #1 – Provide four (4) RLBs at alternate site
COA #2 – Provide two (2) RLBs at alternate site
COA #3 – Provide three (3) RLBs at alternate siteDRAFT
Overall Site
Propose RLB Site
Propose Location for RLBs
COA #1
COA #1 – Provide four (4) RLBs at alternate site
1A – Install four (4) new RLBs at alternate site then remove existing four RLBs
1B – Phased approach
1B-a – Install two (2) new RLBs, relocate personnel, move two existing RLBs, remove remaining two existing RLBs
1B-b – Relocate four existing, phase two at a time, requires alternate housingDRAFT
COA #1A
1A – Install four (4) new RLBs at alternate site then remove existing four RLBs
COA #1A
1A – Install four (4) new RLBs at alternate site then remove existing four RLBs
COA #1Ba Install two (2) new RLBs, Relocated two existing RLBs
COA #1Ba Install two (2) new RLBs, Relocated two existing RLBs
COA #1Bb Relocated (4) existing RLBs
COA #2
COA #2 – Provide two (2)RLBs at alternate site.
2A – Install two (2) new RLBs at alternate site, relocate personnel, remove vacated existing RLBs, two (2) existing RLBs will remain on UEPH site.
2B – Relocate two (2) existing RLBs to the alternate site, two existing RLBs to remain, alternate housing is required.DRAFT
COA #2A
Install two (2) new RLBs at alternate site, two (2) existing RLBs will remain on UEPH site.
COA #2A
Install two (2) new RLBs at alternate site, two (2) existing RLBs will remain on UEPH site.
COA #2B
Relocate two (2) existing RLBs to the alternate site, two existing RLBs to remain.
COA #2B
Relocate two (2) existing RLBs to the alternate site, two existing RLBs to remain
COA #3
COA #3 – Provide three (3)RLBs at alternate site.
3A – Install three (3) new RLBs at alternate site, relocate personnel, remove three at existing UEPH site, one to remain at UEPH site. DRAFT
Relocate two (2) existing RLBs to the alternate site, two existing RLBs to remain.
Relocate two (2) existing RLBs to the alternate site, two existing RLBs to remain
Discussions
USACE Site Partnership
Cost Efficiencies
Schedule Constraints/Risks
New RLB Lead Time
Pros
Cons
Risk Mitigations
Personnel Coordination
Critical Path & Schedule
UEPH BARRACKS AT JBM-HH – VIEW FROM NORTH-WEST ALONG SHERIDAN AVENUE – REVISED SUBMISSION
QUESTIONS?
UEPH BARRACKS AT JBM-HH – VIEW FROM SOUTH-EAST – REVISED SUBMISSION
BACKUPDRAFT
Move RLBs to alternate location
• Marines vacate RLBs, leaseholder disassembles RLBs, transport to alternate location, reassemble RLBs, refurbish?, Marines reoccupy. Alternate location site work to be completed by MILCON contractor.
• PROS
Cost efficient
Can award UEPH on time
No lead time for fabricating new RLBs
• CONS
Schedule risk for impacting contractor(s)
Marines displaced in alternate housing while
• RLBs are moved.
• RISK MITIGIATION
• Government and contractors agree to meet milestone dates.
o RLB Move out date for Marines. Vacate by TBD o Site work completion date. TBD o New RLB BOD date TBD
Need to find out:
1. How long Demo abatement and demo will take?
2. What is the cost to move the RLBs?
3. How long will it take to move and reestablish
RLBs?
4. How long will RLB site work take?
5. What is the current condition of RLBs? Does
JBMHH want the RLBs to be refurbished?
NEW RLBs to alternate location (MILCON)
Revise the 95% design to include a Design Build element to provide new RLBs at the alternate site location and associated site work.
Extend the Current RLB contract past March 2026 until new RLBs are ready for BOD.
• PROS
Marines will not be displaced
• CONS
Schedule risk: due to additional design, there
• will be a delay to UEPH award date
Added cost ____ of new RLBs not included in
• DD1391/PA
Added lead time to fabricate RLBs
• RISK MITIGIATION
Need to find out:
1. How will RLBs remaining on site affect contractor site operations? If two RLBs remain on site how will that affect contactor operations?
2. How long will new RLB site work and installation take?
3. Is JBMHH open to providing additional contractor lay down area?
4. How to configure RLBs to best fit onsite?
File details come from the government source that posted it. Updated .