This document is a Pre-Solicitation Notice for a federal contract opportunity. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 4 is seeking to award a single Firm Fixed Price Contract for Construction Period Services for the renovation of Building 1, 2nd East at the Pittsburgh VA Medical Center. The contract will be set-aside for 100% Service-Disabled Veteran-Owned Small Businesses capable of performing the work under NAICS code 541330, with a small business standard of $22.5 million. Interested firms must submit a Standard Form 330 by December 6, 2024. The key evaluation criteria are professional qualifications, specialized experience, technical competence, past performance, and experience in construction period services. The Government intends to select the most highly qualified firm based on these criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24425R0027 0001 11.20.2024.pdf | ||
| 36C24425R0027.docx | DOCX document | |
| WG 7.22.2024.pdf | ||
| 2E Revised Bid Drawings_Walkway_200930.pdf | ||
| UD B1 Reno 2East_BidSet_Specifications.pdf | ||
| SOW AE CPS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NOT FOR
CONSTRUCTIO
N 1
Project Number Scale 15-001
NOT FOR
CONSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:3
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, GTS, DGC
COVER SHEET
GI001
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
1 7
VA PITTSBURGH HEALTHCARE SYSTEM,
UNIVERSITY DRIVE DIVISION
PITTSBURGH, PA 15240
AREA OF WORK
VA PROJECT # 646-14-102
SHEET LIST
SHEET
NO. SHEET NAME DWG
OF
DWG
EP111 2ND FLOOR POWER PLAN - VASCULAR
CLINIC
15 32
EM101 2ND FLOOR MECHANICAL POWER PLAN -
2E WEST
16 32
EM102 2ND FLOOR MECHANICAL POWER PLAN -
2E EAST
17 32
EL101 2ND FLOOR LIGHTING PLAN - 2E WEST 18 32
EL102 2ND FLOOR LIGHTING PLAN - 2E EAST 19 32
EL111 2ND FLOOR LIGHTING PLAN - VASCULAR
CLINIC
20 32
EP501 ELECTRICAL DETAILS 21 32
EP502 ELECTRICAL DETAILS 22 32
EP503 ELECTRICAL DETAILS 23 32
EP601 ELECTRICAL SINGLE-LINE RISER DIAGRAM 24 32
EP602 PANEL SCHEDULES 25 32
EP603 PANEL SCHEDULES 26 32
EP604 PANEL SCHEDULES 27 32
ET101 2ND FLOOR TECHNOLOGY PLAN - 2E
WEST
28 32
ET102 2ND FLOOR TECHNOLOGY PLAN - 2E EAST 29 32
ET111 2ND FLOOR TECHNOLOGY PLAN -
VASCULAR CLINIC
30 32
ET501 TECHNOLOGY DETAILS 31 32
ET502 TECHNOLOGY DETAILS 32 32
FIRE ALARM
FA001 FIRE ALARM NOTES, LEGENDS, AND
RISER
1 4
FA101 2ND FLOOR FIRE ALARM PLAN - 2E WEST 2 4
FA102 2ND FLOOR FIRE ALARM PLAN - 2E EAST 3 4
FA111 2ND FLOOR FIRE ALARM PLAN -
VASCULAR CLINIC
4 4
SHEET LIST
SHEET
NO. SHEET NAME DWG
OF
DWG
MP101 2ND FLOOR MECHANICAL PIPING PLAN -
2E WEST
13 26
MP102 2ND FLOOR MECHANICAL PIPING PLAN -
2E EAST
14 26
M-401 ENLARGED 2ND FLOOR MECHANICAL
PLAN - 2E EAST - MECHANICAL ROOM
15 26
M-402 MECHANICAL SECTIONS 16 26
M-403 MECHANICAL SECTIONS 17 26
M-501 MECHANICAL DETAILS 18 26
M-502 MECHANICAL DETAILS 19 26
M-503 MECHANICAL DETAILS 20 26
M-504 CONTROL DETAILS 21 26
M-601 MECHANICAL SCHEDULES 22 26
M-602 MECHANICAL SCHEDULES 23 26
MH901 MECHANICAL DUCTWORK ISOMETRIC - 2E
WEST
24 26
MH902 MECHANICAL DUCTWORK ISOMETRIC - 2E
EAST
25 26
MH911 MECHANICAL DUCTWORK ISOMETRIC -
VASCULAR LAB
26 26
ELECTRICAL
E-001 ELECTRICAL NOTES AND LEGENDS 1 32
ED101 2ND FLOOR ELECTRICAL DEMOLITION
PLAN - 2E WEST
2 32
ED102 2ND FLOOR LIGHTING DEMOLITION PLAN -
2E WEST
3 32
ED103 2ND FLOOR ELECTRICAL DEMOLITION
PLAN - 2E EAST
4 32
ED104 2ND FLOOR LIGHTING DEMOLITON PLAN -
2E EAST
5 32
ED111 2ND FLOOR ELECTRICAL DEMOLITION
PLAN - VASCULAR CLINIC
6 32
ED112 2ND FLOOR LIGHTING DEMOLITION PLAN -
VASCULAR CLINIC
7 32
ED601 EXISTING AND DEMO SINGLE-LINE RISER
DIAGRAM
8 32
ED602 EXISTING AND DEMO PANEL SCHEDULES 9 32
ED603 EXISTING AND DEMO PANEL SCHEDULES 10 32
ED604 EXISTING AND DEMO PANEL SCHEDULES 11 32
ED605 EXISTING AND DEMO PANEL SCHEDULES 12 32
EP101 2ND FLOOR POWER PLAN - 2E WEST 13 32
EP102 2ND FLOOR POWER PLAN - 2E EAST 14 32
SHEET LIST
SHEET
NO. SHEET NAME DWG
OF
DWG
PD104 2ND FLOOR WATER & GAS DEMOLITION
PLAN - 2E EAST
6 18
PP101 2ND FLOOR SANITARY PLAN - 2E WEST 7 18
PP102 2ND FLOOR SANITARY PLAN - 2E EAST 8 18
PP103 2ND FLOOR DOMESTIC WATER PLAN - 2E
WEST
9 18
PP104 2ND FLOOR DOMESTIC WATER PLAN - 2E
EAST
10 18
PG101 2ND FLOOR MEDICAL GAS PLAN - 2E
WEST
11 18
PP111 2ND FLOOR PLUMBING PLANS -
VASCULAR LAB
12 18
P-501 PLUMBING DETAILS 13 18
PP902 SANITARY ISOMETRIC - 2E EAST 14 18
PP901 SANITARY ISOMETRIC - 2E WEST 15 18
PP903 DOMESTIC WATER ISOMETRIC - 2E WEST 16 18
PP904 DOMESTIC WATER ISOMETRIC - 2E EAST 17 18
PP911 PLUMBING ISOMETRICS - VASCULAR LAB 18 18
MECHANICAL
M-001 MECHANICAL GENERAL NOTES,
ABBREVIATIONS AND LEGEND
1 26
MD101 2ND FLOOR MECHANICAL DUCTWORK
DEMOLITION PLAN - 2E WEST
2 26
MD102 2ND FLOOR MECHANICAL DUCTWORK
DEMOLITION PLAN - 2E EAST
3 26
MD103 2ND FLOOR MECHANICAL PIPING
DEMOLITION PLAN - 2E WEST
4 26
MD104 2ND FLOOR MECHANICAL PIPING
DEMOLITION PLAN - 2E EAST
5 26
MD111 2ND FLOOR MECHANICAL DEMOLITION
PLAN - VASCULAR LAB
6 26
MD401 ENLARGED 2ND FLOOR MECHANICAL
DEMOLITION PLAN - 2 EAST - MECHANICAL
ROOM
7 26
MD402 MECHANICAL DEMOLITION SECTIONS 8 26
MD501 CONTROL DEMOLITION DETAILS 9 26
MH101 2ND FLOOR MECHANICAL DUCTWORK
PLAN - 2E WEST
10 26
MH102 2ND FLOOR MECHANICAL DUCTWORK
PLAN - 2E EAST
11 26
MH111 2ND FLOOR MECHANICAL PLAN -
VASCULAR LAB
12 26
SHEET LIST
SHEET
NO. SHEET NAME DWG
OF
DWG
AI402 ENLARGED PLANS, INTERIOR ELEVATIONS
AND DETAILS
20 28
AI403 CASEWORK DETAILS 21 28
AI601 WINDOW SCHEDULE, TYPES & DETAILS 22 28
AI602 INTERIOR DOOR AND WINDOW SCHEDULE
& DETAILS
23 28
AF101 2ND FLOOR FLOORING PATTERN PLAN &
ROOM FINISHES - 2E WEST
24 28
AF102 2ND FLOOR FLOORING PATTERN PLAN &
ROOM FINISHES - 2E EAST
25 28
AF111 2ND FLOOR FLOORING PATTERN PLAN &
ROOM FINISHES - VASCULAR CLINIC
26 28
AF201 2ND FLOOR FURNITURE PLAN - 2E EAST &
WEST
27 28
AF211 2ND FLOOR FURNITURE PLAN - VASCULAR
CLINIC
28 28
FIRE PROTECTION
FS001 FIRE PROTECTION LEGEND,
ABBREVIATIONS, AND GENERAL NOTES
1 8
FD101 2NF FLOOR FIRE PROTECTION
DEMOLITION PLAN - 2E WEST
2 8
FD102 2ND FLOOR FIRE PROTECTION
DEMOLITION PLAN - 2E EAST
3 8
FD103 2ND FLOOR FIRE PROTECTION
DEMOLITION PLAN - VASCULAR LAB
4 8
FS102 2ND FLOOR FIRE PROTECTION PLAN - 2E
EAST
5 8
FS101 2ND FLOOR FIRE PROTECTION PLAN - 2E
WEST
6 8
FS103 2ND FLOOR FIRE PROTECTION PLAN -
VASCULAR LAB
7 8
FS501 FIRE PROTECTION DETAILS 8 8
PLUMBING
P-001 PLUMBING GENERAL NOTES,
ABBREVIATIONS AND LEGEND
1 18
PD101 2ND FLOOR SANITARY DEMOLITION PLAN
- 2E WEST
2 18
PD102 2ND FLOOR SANITARY DEMOLITION PLAN
- 2E EAST
3 18
PD103 2ND FLOOR WATER & GAS DEMOLITION
PLAN - 2E WEST
4 18
PD111 2ND FLOOR PLUMBING DEMOLITION PLAN
- VASCULAR LAB
5 18
SHEET LIST
SHEET
NO. SHEET NAME DWG
OF
DWG
GENERAL
GI001 COVER SHEET 1 7
GI002 INFECTION AND DUST CONTROL PLANS
AND NOTES
2 7
GI003 1ST FLOOR PHASING & ICRA PLAN - WEST
SIDE
3 7
GI004 2ND FLOOR PHASING & ICRA PLAN - WEST
SIDE
4 7
GI005 2ND FLOOR PHASING & ICRA PLAN - EAST
SIDE
5 7
GI006 2ND FLOOR PHASING & ICRA PLAN -
VASCULAR CLINIC AREA
6 7
GI101 2ND FLOOR PARTIAL LIFE SAFETY PLAN 7 7
ARCHITECTURAL
AI001 GENERAL ARCHITECTURAL NOTES,
LEGEND & ABBREVIATIONS
1 28
AI002 PARTITION TYPES 2 28
AI003 2ND FLOOR COMPOSITE PLAN 3 28
AI004 CONSTRUCTION STAGING PLAN 4 28
AD101 2ND FLOOR DEMOLITION PLAN - 2E WEST 5 28
AD102 2ND FLOOR DEMOLITION PLAN - 2E EAST 6 28
AD111 2ND FLOOR DEMOLITION PLAN -
VASCULAR CLINIC
7 28
AD201 2ND FLOOR DEMOLITION REFLECTED
CEILING PLAN - 2E WEST
8 28
AD202 2ND FLOOR DEMOLITION REFLECTED
CEILING PLAN - 2E EAST
9 28
AD211 2ND FLOOR DEMOLITION REFLECTED
CEILING PLAN - VASCULAR CLINIC EXAM
ROOMS
10 28
AI101 2ND FLOOR RENOVATION PLAN - 2E WEST 11 28
AI102 2ND FLOOR RENOVATION PLAN - 2E EAST 12 28
AI111 2ND FLOOR PLAN - VASCULAR CLINIC 13 28
AI121 2ND FLOOR RENOVATION CEILING PLAN -
2E WEST
14 28
AI122 2ND FLOOR RENOVATION CEILING PLAN -
2E EAST
15 28
AI131 2ND FLOOR RENOVATION CEILING PLAN -
VASCULAR CLINIC
16 28
AI201 INTERIOR ELEVATIONS 17 28
AI202 INTERIOR ELEVATIONS 18 28
AI401 ENLARGED PLANS 19 28
RENOVATE BUILDING 1, SECOND FLOOR, 2E AT UD
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA
AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND
LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL
BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR
FLOWS.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION
ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF
DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
3. USE CORRIDORS C3N2 AND C3N6 AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED.
EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED
DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO
ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY
FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN
AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL
BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF ELEVATORS
WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL
BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT
DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR
MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND NOTIFY CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS. CARTS NEED TO BE CLEANED, WIPED DOWN AND
COVERED BEFORE LEAVING CONSTRUCTION SITE.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE
NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE
HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE
TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL
BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND
ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION
AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE
FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE
SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS
NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL
BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF
PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING
BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION
UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A
TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED
THE CLEANING.
6B. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSABLE PRIOR TO REVIEW AND
APPROVAL OF EXTENSIVE "CONSTRUCTION CLEAN" BY THE CONTRACTOR.
POLICY LETTER EC-51
7. REFER TO SPEC SECTION 01 01 10 FOR EC-51 SAFETY AND HEALTH POLICY AND
PROCEDURES DURING CONSTRUCTION ACTIVITIES.
FIRE ALARMS
8. FIRE ALARMS AND OTHER LIFE SAFETY FIXTURES WITHIN THE ICRA BARRIERS OF THE
CONSTRUCTION AREAS SHALL BE TEMPORARILY RELOCATED TO THE OUTSIDE OF BARRIRES.
ICRA NOTES
1. SEE ICRA NOTES FROM SHEETS GI003 TO
GI005 FOR EACH CONTRUCTION PHASE.
2. INSTALL ILSM EGRESS SIGNAGE AND
INDICATION OF EXIT ACCESS ROUTE FOR EACH
CONSTRUCTION PHASE.
ICRA
ICRA REFERENCE CODES
2018 NFPA 101 LIFE SAFETY CODE
NFPA 99 HEALTH CARE FACILITIES CODE
2018 INTERNATIONAL BUILDING CODE
2014 NEC ELECTRICAL CODE
OCCUPATIONAL SAFETY & HEALTH
ADMINISTRATION (OSHA)
UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY (USEPA)
EXISTING WALL
TEMPORARY
1-HOUR SLAB-TO-
SLAB BARRIERS
LEGEND
NEW WALLS
CONST. ROUTE
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATION BUILDING 1,
SECOND FLOOR, 2E AT UD
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
WALL RATING LEGEND
1 HOUR FIRE RATED BARRIER
2 HOUR FIRE RATED BARRIER
3 HOUR FIRE RATED WALL
SMOKE BARRIER
SMOKE RESISTANT
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NOT FOR
CONSTRUCTIO
N 1
Project Number Scale 15-001
NOT FOR
CONSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:3
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, DGC
INFECTION AND DUST CONTROL PLANS AND
NOTES
GI002
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
2 7
3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
"FOR REFERENCE ONLY"
SEE DIV 1 SPECIFICATIONS FOR OFFICIAL ICRA, ILSM AND ASSOCIATED FORMS AND REQUIREMENTS
NO.
NO.
UP
DOWN
STAIR
#1
DOWN
STAIR
PIPE SPACEPIPE SPACE
1W104
1N143 1N144 1N145 1N146 1N147
1N103
1N101
C1C3
C 1C
1A113
1A112
1A111 C1-3
1A109
1A117
1A117A 1A108
1C115
1C114
1C1C3 1C109 1C108 1C107 1C106 1C105
1C118
1C117
1N205
1N204
1N206
1C1C2
SOILED
HOLD & DIST.
CONFERENCE RM "B"
CORRIDOR
C O
RR
ID
O R
PRE-PACKING
& STORAGEAMB. CARE
SUPV.
PATIENT
REP.
CLASS
ROOM
CHIEF'S
OFFICE
CORRIDOR 1N-1A
OFFICE
STO.
SOILED STO. CORRIDOR
UNEXPOSED FILM
CHEM. STO.
CART
LIFT
W/C TLT. HAC
EL
EC
CL
O.
STO.
PATIENT ADVOC
MCCR (CUST. SVC)
PATIENT WAITING MEANS TESTING DECEDENT ID CARDS SERVICE
PAT PROC CHECK-IN/
M. TOILET
PIPE SPACE
OFFICE
PATIENT WAITING
CAFE
SHIPPING &
RECEIVING
MECH. SPACE
FLAMMABLE
STORAGE
CAMERA 4
EXAM
EXAM
CORRIDOR
CORRIDOR
UPS/FLEX
CORRIDOR
DISK ST.
WAITING
OUTPATIENT
CHECK IN
RECEPT./
TOILET
STAFF
TOILET
PATIENT
ROOM 'B'
CONFERENCE
DRESS RM.DRESS RM.
CORRIDOR
READING
OFFICE 5
WELL COUNT
UPTAKE PROBE/
1W151 1W105
1W106
1W172
1W104
1W109
1W178
1W150
1W102
1W103
1W171
1W100
1W100A
1W101
1N102
CORRIDOR
H H
H
DF DF
H
S
16 17 19 21 24 25 26
D
F
G
H
J.
J
16.1
C
ICRA REFERENCE CODES
2018 NFPA 101 LIFE SAFETY CODE
NFPA 99 HEALTH CARE FACILITIES CODE
2018 INTERNATIONAL BUILDING CODE
2014 NEC ELECTRICAL CODE
OCCUPATIONAL SAFETY & HEALTH
ADMINISTRATION (OSHA)
UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY (USEPA)
EXISTING WALL
TEMPORARY
1-HOUR SLAB-TO-
SLAB BARRIERS
LEGEND
NEW WALLS
CONST. ROUTE
WALL RATING LEGEND
1 HOUR FIRE RATED BARRIER
2 HOUR FIRE RATED BARRIER
3 HOUR FIRE RATED WALL
SMOKE BARRIER
SMOKE RESISTANT
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NO
T F
O R
CO
NSTRUCTIO
N 1
Project Number Scale 15-001
SHEET NOTES:
NO
T F
O R
CO
NSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:3
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KC DGC
1ST FLOOR PHASING & ICRA PLAN - WEST SIDE
GI003
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
3 7
1/8" = 1'-0"
ICRA PLAN 2E EAST - 1ST FLOOR (1178'-0")
UP
ICRA REFERENCE CODES
2018 NFPA 101 LIFE SAFETY CODE
NFPA 99 HEALTH CARE FACILITIES CODE
2018 INTERNATIONAL BUILDING CODE
2014 NEC ELECTRICAL CODE
OCCUPATIONAL SAFETY & HEALTH
ADMINISTRATION (OSHA)
UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY (USEPA)
EXISTING WALL
TEMPORARY
1-HOUR SLAB-TO-
SLAB BARRIERS
LEGEND
NEW WALLS
CONST. ROUTE
16 17 19 21 24 25 26 30
D
F
G
H
J.
J
16.1
C
PHASE 4A
PHASE 3A (DEMOLITION WORK) AND 3B (NEW WORK)
PHASE 3B
ANTEROOM
MECH/ELEC
2E104
WAIT
2E133
RECEPT.
2E134
MEN
2E135
WOMEN
2E136
SOILED
2E139
WORK
2E140
CLEAN
2E138
WORK
2E141
BREAK RM.
2E142
TECH.
2W171
STOR
2W172
CORR.
2W170
TECH.
2W175
CLEAN
2W176
EEG
2W177
EEG
2W173
TOILET
2W174
CORRIDOR
C2E1
C L R
PHASE 4A
C L R
/2
C L R
RETAIN THIS PORTION OF
ICRA WALL FROM PHASES
2 AND 3 AS NEW WALL
M A
T C
H L
IN
E
M A
T C
H L
IN
E
S E
E S
H E
E T
G I0
8A
8B
S E
E S
H E
E T
G I0
3A
C L R
C L R
1111 11
S E
E S
H E
E T
G I0
S E
E S
H E
E T
G I0
CONSTRUCTION ACCESS
BETWEEN PHASES 2 AND 3A
PHASES 2 AND 3A ANTEROOM MUST
BE REMOVED PRIOR TO ERECTING
PHASE 3B ANTEROOM. COORDINATE
SCHEDULE WITH VA COR
1 1
PHASE 4A
PHASE 4B
CONSTRUCT PHASE 4B
WORK IS AFTER HOURS
AND ON WEEKENDS.
COORDINATE SCHEDULE
WITH VA COR PRIOR TO
STARTING WORK
COORDINATE SCHEDULE FOR PHASE 4A
WITH VA COR PRIOR TO STARTING WORK
COORDINATE SCHEDULE FOR PHASE 4A
WITH VA COR PRIOR TO STARTING WORK
COORDINATE SPECIAL
ACCESS FOR DELIVERY
FROM ELEVATOR #7 TO THE
LAB AND STORAGE AREAS
DURING PHASE 4A AND 4B
CONSTRUCTION
ELEVATOR
#11 #10
STAIR
#1
#9
#1
(SHAFT)
#2 #3 #4 #5 #6
#8 #7
WHEELCHAIR
TELEPHONE
RESEARCH
A/C ROOM
RECEPTION
2A238
WAITING
2A202
TLT
2A203
EXIST ELEC
CLOSET
2A239
WALK-IN
COOLER
SNW102A
BIO-WASTE
2W104
H.A.C.
2W105
TOILET
2W107
TOILET
2W108
ELEC. ROOM
2W106
STORAGE
2NW102
BREAK ROOM
2NE101
W/C SPEC.
2NE101A
PHLEBOTOMY
STORAGE
2NE102
TELE. CO.
2NE102A
C2N1
CORRIDOR
2NW101
CORE LAB
C2W1
CORRIDOR
WALL FROM RECENT VA
PROJECT TO REMAIN,
WALL SHALL TOP OFF
UNDERSIDE OF FLOOR
DECK ABOVE.
DATA CLOSET
2NE100A
PHASE 4A
DATA
CLOSET
2C106
1. PROVIDE TEMPORARY 1-HOUR RATED
SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"
METAL STUD FRAMING WITH 5/8" GYPSUM
BOARD ON BOTH SIDES. BARRIERS SHALL BE
INSPECTED BY VA LIFE SAFETY AND ICRA
STAFF PRIOR TO START OF CONSTRUCTION IN
SPACE. MAINTAIN NEGATIVE PRESSURE
VENITLATION IN THE CONSTRUCTION SPACE.
2. PROVIDED OUTER DOOR TO THE
CONSTRUCTION AREA ANTEROOM SHALL BE
45 MIN. RATED HARD DOOR IN A RATED FRAME
WITH CLOSER.
3. CONSTRUCTION ACCESS ROUTE
3A. USE ISOLATION CART FOR ALL WORK IN
THIS AREA.
4. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL
PHASES.
5. PERFORM WORK REQUIRED BY VA
INFECTION CONTROL PERSONNEL REGARDING
ICRA FORM. SEE ICRA FORM FOR
REQUIREMENTS. ALL ICRA AND ILSM WORK
ITEMS MUST BE COMPLETED PRIOR TO
BEGINNING ANY NEW CONSTRUCTION WORK
OR DEMOLITION.
6. VA REQUIRES THAT ALL APPLICABLE
PERMITS BE COMPLETED AND APPROVED
PRIOR TO BEGINNING ANY WORK ON STATION.
PERMITS INCLUDE: ICRA, ILSM, ABOVE CEILING,
FIRE / SMOKE WALL, UTILITY, FIRE SPRINKLER,
FIRE ALARM SYSTEM, MEDICAL GASES AND
CONFINED SPACE.
7. PROVIDE STAGING AREA FOR PPE
(PERSONAL PROTECTIVE EQUIPMENT) FOR
HAZMAT SUITS UNLESS NOTED OTHERWISE.
8. TEMPORARILY REMOVE EXISTING
WINDOW AND INSTALL EXHAUST THRU.
(CONTRACTOR TO COORDINATE WITH NEW
WINDOW WORK SCHEDULE.)
8A. CONTRACTOR TO DETERMINE NUMBER
OF EXHAUST FAN REQUIRED TO MAINTAIN
NEGATIVE PRESSURE LEVEL INSIDE
CONSTRUCTION AREA.
8B. TURN UP EXHAUST ON EXTERIOR SIDE,
CONTRACTOR SHALL VERIFY LOCATION OF
AIR INTAKES AT THE PROPER DISTANCE
FROM EXHAUST. VERIFY LOCAL JURISDICTION
CODE AND CA REQUIREMENTS FOR DISTANCE
PRIOR STARTING WORK.
9. TEMPORARY DIGITAL MANOMETER FOR
NEGATIVE PRESSURE MONITORING
10. SHORT TERM BARRIER EXTEND TO
UNDERSIDE OF CEILING TO REMOVE FRAME
AND PATCH WALL. COORDINATE SCHEDULE
WITH VA COR PRIOR TO ERECTING THE
BARRIER.
11. TEMPORARY VINYL CORNER GUARD
12. PROVIDE CONSTRUCTION SIGNAGE FOR
DOOR ACCESS DURING PHASE 4A CONST.
WORK. COORDINATE DOOR ACCESS AND
SCHEDULE WITH VA COR.
LIFE SAFETY/ICRA
ALTERNATE NOTES
OMIT THE EXTERIOR WINDOW REPLACEMENT.
EXISTING WINDOW TO REMAIN.
SCHEDULE OF WORK FOR PHASE 4 OMIT
WORK IN THE CORRIDORS AROUND THE
ELEVATOR ON THE ICRA PLAN AND RELATED
FLOOR PATTERN / INTERIOR FINISHES SHEETS
1.
2.
WALL RATING LEGEND
1 HOUR FIRE RATED BARRIER
2 HOUR FIRE RATED BARRIER
3 HOUR FIRE RATED WALL
SMOKE BARRIER
SMOKE RESISTANT
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NOT FOR
CONSTRUCTIO
N 1
Project Number Scale 15-001
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:3
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, DGC
2ND FLOOR PHASING & ICRA PLAN - WEST SIDE
GI004
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
4 7
1/8" = 1'-0"
2ND FLOOR PHASING & ICRA PLAN WEST SIDE
DN
UP UP
DN
EXISTING WALL
TEMPORARY
1-HOUR SLAB-TO-
SLAB BARRIERS
LEGEND
NEW WALLS
CONST. ROUTE
4039 42 433830 32 34 35 35.1 37
D
F
G
H
J.
33 36
C
MECH/ELEC
2E104
WAIT
2E133
RECEPT.
2E134
TOILET
2E105
STOR
2E106
EXAM 1
2E107
EXAM 2
2E108
EXAM 3
2E109
EXAM 4
2E110
EXAM 5
2E111
EXAM 6
2E112
EXAM 7
2E113
CLEAN STOR
2E114
OTBC:
TREATMENT AREA
(EDEMA)
2E115
HAC
2E117A
WEP: EQUIP.
STOR.
2E118PRIVATE
TREATMENT
2E119
HAND CLINIC
2E121
PT EXERCISE/
CLINCIAL SPACE
2E120
CLEAN STOR
2E122
TOILET
2E123
PRIVATE
TREATMENT
2E125
PRIVATE
TREATMENT
2E126
CARDIAC/
PULMONARY
2E124
EXAM 8
2E127
EXAM 9
2E128
EXAM 10
2E129
EXAM 11
2E130
EXAM 12
2E131
ANTI-COAG
2E132
CORRIDOR
C2E1PHASE 2
ROOF
LOWER ROOF
ROOF
ROOF
ROOF
M A
T C
H L
IN
E
M A
T C
H L
IN
E
C L R
RETAIN THIS PORTION OF
ICRA WALL FROM PHASES
2 AND 3 AS NEW WALL
PHASES 2 AND
3A ANTEROOM
8A
8B
S E
E S
H E
E T
G I0
S E
E S
H E
E T
G I0
F.2
F.1
TEMPORARY
RELOCATE FIRE
EXTINGUISHER
FOR PHASE 2
CONSTRUCTION
EXISTING FIRE
EXTINGUISHER
INSTALL TEMPORARY CONSTRUCTION
SIGN IN STAIR #3 TO INDICATE NO
ACCESS THRU 2E CLINICAL SPACE
DURING CONSTRUCTION.
COORDINATE WITH VA COR ABOUT
SECURING EGRESS DOOR
STAIR #3
ROOF
3A
PHASES 2 AND 3A
ANTEROOM MUST BE
REMOVED PRIOR TO
ERECTING PHASE 3B
ANTEROOM. COORDINATE
SCHEDULE WITH VA COR
CONSTRUCTION
ACCESS BETWEEN
PHASES 2 AND 3A
S E
E S
H E
E T
G I0
S E
E S
H E
E T
G I0
SEAL AROUND DOOR COMPLETELY. INSTALL
YELLOW CROSS TAPES AND CONSTRUCTION SIGN
STATING 'TEAR OFF TAPES EMERGENCY EXIT ONLY'
BULK STORAGE
2NE100
M. TOILET
2NE100BDATA
CLOSET
2C106
DATA CLOSET
2NE100A
ALTAR
2M203D
CHAPEL
2M203
SACRISTY
2M203B
BLESSED
SACRAMENT
2M203A
BREAK ROOM
2NE101
W/C SPEC.
2NE101A
PHLEBOTOMY
STORAGE
2NE102
TELE. CO.
2NE102A
#7
WHEELCHAIR
TELEPHONE
2C108
BLOOD BANK
2NE105
STORAGE
2NE105A
THERAPEUTIC
PHLEBOTOMY
2NE104
ENTRY
2NE200
ROOF
OPEN TO
BELOW
MECH.
2E116A
MECH.
2E116B
EXISTING ROOF TOP PENTHOUSE
1. PROVIDE TEMPORARY 1-HOUR RATED
SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"
METAL STUD FRAMING WITH 5/8" GYPSUM
BOARD ON BOTH SIDES. BARRIERS SHALL BE
INSPECTED BY VA LIFE SAFETY AND ICRA
STAFF PRIOR TO START OF CONSTRUCTION IN
SPACE. MAINTAIN NEGATIVE PRESSURE
VENITLATION IN THE CONSTRUCTION SPACE.
2. PROVIDED OUTER DOOR TO THE
CONSTRUCTION AREA ANTEROOM SHALL BE
45 MIN. RATED HARD DOOR IN A RATED FRAME
WITH CLOSER.
3. CONSTRUCTION ACCESS ROUTE
3A. USE ISOLATION CART FOR ALL WORK IN
THIS AREA.
4. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL
PHASES.
5. PERFORM WORK REQUIRED BY VA
INFECTION CONTROL PERSONNEL REGARDING
ICRA FORM. SEE ICRA FORM FOR
REQUIREMENTS. ALL ICRA AND ILSM WORK
ITEMS MUST BE COMPLETED PRIOR TO
BEGINNING ANY NEW CONSTRUCTION WORK
OR DEMOLITION.
6. VA REQUIRES THAT ALL APPLICABLE
PERMITS BE COMPLETED AND APPROVED
PRIOR TO BEGINNING ANY WORK ON STATION.
PERMITS INCLUDE: ICRA, ILSM, ABOVE CEILING,
FIRE / SMOKE WALL, UTILITY, FIRE SPRINKLER,
FIRE ALARM SYSTEM, MEDICAL GASES AND
CONFINED SPACE.
7. PROVIDE STAGING AREA FOR PPE
(PERSONAL PROTECTIVE EQUIPMENT) FOR
HAZMAT SUITS UNLESS NOTED OTHERWISE.
8. TEMPORARILY REMOVE EXISTING
WINDOW AND INSTALL EXHAUST THRU.
(CONTRACTOR TO COORDINATE WITH NEW
WINDOW WORK SCHEDULE.)
8A. CONTRACTOR TO DETERMINE NUMBER
OF EXHAUST FAN REQUIRED TO MAINTAIN
NEGATIVE PRESSURE LEVEL INSIDE
CONSTRUCTION AREA.
8B. TURN UP EXHAUST ON EXTERIOR SIDE,
CONTRACTOR SHALL VERIFY LOCATION OF
AIR INTAKES AT THE PROPER DISTANCE
FROM EXHAUST. VERIFY LOCAL JURISDICTION
CODE AND CA REQUIREMENTS FOR DISTANCE
PRIOR STARTING WORK.
9. TEMPORARY DIGITAL MANOMETER FOR
NEGATIVE PRESSURE MONITORING
10. SHORT TERM BARRIER EXTEND TO
UNDERSIDE OF CEILING TO REMOVE FRAME
AND PATCH WALL. COORDINATE SCHEDULE
WITH VA COR PRIOR TO ERECTING THE
BARRIER.
11. TEMPORARY VINYL CORNER GUARD
12. PROVIDE CONSTRUCTION SIGNAGE FOR
DOOR ACCESS DURING PHASE 4A CONST.
WORK. COORDINATE DOOR ACCESS AND
SCHEDULE WITH VA COR.
LIFE SAFETY/ICRA
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NO
T F
O R
CO
NSTRUCTIO
N 1
Project Number Scale 15-001
SHEET NOTES:
NO
T F
O R
CO
NSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:3
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, DGC
2ND FLOOR PHASING & ICRA PLAN - EAST SIDE
GI005
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
5 7
1/8" = 1'-0"1
2ND FLOOR PHASING & ICRA PLAN - EAST SIDE
TO ELEVATOR
#11
K-4329KINGSTON C_TOILETS VITREOUS CHINA
K-2007KING STO NC_LAVATO RYVITREO US CHINA
WH
UP
UP
EXISTING WALL
TEMPORARY
1-HOUR SLAB-TO-
SLAB BARRIERS
LEGEND
NEW WALLS
CONST. ROUTE
11 12 13 14 16 17 19 21 24 25 26
D
F
G
H
J.
J
16.115
C
L
N
P
EXAM V3
2A102D
EXAM V4
2A102E
WORK
2A102C
EXAM V5
2A102F
EXAM V1
2A102A
EXAM V2
2A102B
CORRIDOR
2A102
TECH.
2W175
CLEAN
2W176
CORR.
2W170
TECH.
2W171
STOR
2W172
BREAK RM.
2E142
EEG
2W177
EEG
2W173
TOILET
2W174
WORK
2E141
WORK
2E140
CLEAN
2E138
SOILED
2E139
WOMEN
2E136
MEN
2E135
RECEPT.
2E134
FILL WALL AFTER
DOOR REMOVAL
ELEVATOR
#11
3A
M
IN
C
LR
5'
0"
PHASE 1
8B
8A
PROVIDE 3'-0" (W) X 7'-0"
(H) WALL OPENING TO
ALLOW CONSTRUCTION
ACCESS
STAFF
BREAK
2W111A
2A107
PSYCHOLOGY
OFFICE
2A108
PSYCHOLOGY
OFFICE
2A109
PSYCHOLOGY
OFFICE
2A106
PSYCHOLOGY
OFFICE
2A104
SECT /
WAIT
C2W1A
CORR.
C2W2
CORR.
2W125
TELEHEALTH
EDUCATION
TRAINING
2W167B
TELEHEALTH/
PROVIDER
OFFICE
2W110A
WAITING
C2W09
CHECK
IN/OUT
C2W1
CORR.
2A201
LOBBY
2A200
CORRIDOR 2A202
WAITING
2A203
RESTROOM
2A238
RECEPTION
2A234
DOUBLE
OFFICE
2A235
DOUBLE
OFFICE
2A231
EXAM #5
2A230
EXAM #4
2A232
PRECEPTOR
2A228
CORRIDOR 2A229
UROFLOW
RESTROOM
2A225
EXAM #3
2A226
EXAM #2
2A227
EXAM #1
2A224
MEDICAL
SUPPLY
2A223
CLEAN
AREA/
HOLDING
2W167A
PROVIDER
WORK
ROOM
2W164
H.A.C.
2A109
PSYCHOLOGY
OFFICE
2A135B
STAFF
PHYSICIAN
2A135A
STAFF
PHYSICIAN
2A135
CLERICAL
STAFF
2A135
CLERICAL
STAFF 2A221
PROCEDURE
ROOM
2A220
CYSTOLOGY
ROOM
2A218
DIRTY
ROOM
2A219
CONTROL
ROOM
2A217
CORRIDOR
2A134
TELE.
CLOSET
2A133
ELECTRICAL
CLOSET
CORRIDOR
2A209
CORRIDOR
2A208
EXAM 6
2A207
RESIDENT OFFICE
2A205
CONSULT.
2A210 CHANGING
RM #1
2A211
CHANGING
RM #2
2A212
CHANGING
RM #3
2A213
STOR.
2A216
UTIL.
2A215
W. TLT
2A135C
STAFF
PHYSICIAN
2A135DPHYSICIAN
2A135E
STAFF BREAK RM
2A204
TLT
2A233
CORRIDOR
2A237
STORAGE
2NW102
ELEC. ROOM
2W106
TOILET
2W107
TOILET
2W108
H.A.C.
2W105
BIO-WASTE
2W104
MOLECULAR
BIOLOGY
2NW103
EXIST ELEC
CLOSET
2A239
WALK-IN
COOLER
SNW102A
1. PROVIDE TEMPORARY 1-HOUR RATED
SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"
METAL STUD FRAMING WITH 5/8" GYPSUM
BOARD ON BOTH SIDES. BARRIERS SHALL BE
INSPECTED BY VA LIFE SAFETY AND ICRA
STAFF PRIOR TO START OF CONSTRUCTION
IN SPACE. MAINTAIN NEGATIVE PRESSURE
VENITLATION IN THE CONSTRUCTION SPACE.
ALL PENETRATIONS REQUIRE DAMPERS.
2. PROVIDED OUTER DOOR TO THE
CONSTRUCTION AREA ANTEROOM SHALL BE
45 MIN. RATED HARD DOOR IN A RATED
FRAME WITH CLOSER.
3. CONSTRUCTION ACCESS ROUTE
3A. USE ISOLATION CART FOR ALL WORK IN
THIS AREA.
4. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL
PHASES.
5. PERFORM WORK REQUIRED BY VA
INFECTION CONTROL PERSONNEL
REGARDING ICRA FORM. SEE ICRA FORM
FOR REQUIREMENTS. ALL ICRA AND ILSM
WORK ITEMS MUST BE COMPLETED PRIOR
TO BEGINNING ANY NEW CONSTRUCTION
WORK OR DEMOLITION.
6. VA REQUIRES THAT ALL APPLICABLE
PERMITS BE COMPLETED AND APPROVED
PRIOR TO BEGINNING ANY WORK ON
STATION.
PERMITS INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE / SMOKE
WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM
SYSTEM, MEDICAL GASES AND CONFINED
SPACE.
7. PROVIDE STAGING AREA FOR PPE
(PERSONAL PROTECTIVE EQUIPMENT) FOR
HAZMAT SUITS UNLESS NOTED OTHERWISE.
8. INSTALL HARD DUCT WITH NON-FLANGE
HANGER HANGER HUNG FROM CEILING
ABOVE. BOTTOM OF DUCT SHALL BE A
MINIMUM OF 7'-2" ABOVE FINISH FLOOR.
HARD DUCT SHALL BE ROUTED THRU
EXISTING MECHANICAL EQUIPMENT ROOM'S
EXTERIOR WINDOW.
TEMPORARILY REMOVE EXISTING WINDOW
AND INSTALL EXHAUST THRU (CONTRACTOR
TO REINSTALL WINDOW AFTER PHASE 2
CONSTRUCTION COMPLETION.)
8A. CONTRACTOR TO DETERMINE NUMBER
OF EXHAUST FAN REQUIRED TO MAINTAIN
NEGATIVE PRESSURE LEVEL INSIDE
CONSTRUCTION AREA.
8B. TURN UP EXHAUST ON EXTERIOR SIDE,
CONTRACTOR SHALL VERIFY LOCATION OF
AIR INTAKES AT THE PROPER DISTANCE
FROM EXHAUST. VERIFY LOCAL
JURISDICTION CODE AND CA REQUIREMENTS
FOR DISTANCE PRIOR STARTING WORK.
9. TEMPORARY DIGITAL MANOMETER FOR
NEGATIVE PRESSURE MONITORING
10. USE PORTABLE DUCT EXTRACTOR AND
AIR SCRUBBER WITH HEPA FILTRATION
SYSTEM FOR THIS AREA.
11. CONTRACTOR TO ENSURE ALL
EXISTING PERIMETER WALLS TOP OFF AND
MEET ONE-HOUR FIRE RATING AS PART OF
THE LIFE SAFETY/ICRA BARRIER.
SHEET KEY NOTES:
LIFE SAFETY/ICRA
WALL RATING LEGEND
1 HOUR FIRE RATED BARRIER
2 HOUR FIRE RATED BARRIER
3 HOUR FIRE RATED WALL
SMOKE BARRIER
SMOKE RESISTANT
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NO
T F
O R
CO
NSTRUCTIO
N 1
Project Number Scale 15-001
SHEET NOTES:
NO
T F
O R
CO
NSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:4
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, DGC
2ND FLOOR PHASING & ICRA PLAN - VASCULAR
CLINIC AREA
GI006
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
6 7
1/8" = 1'-0"GI006
1 2ND FLOOR PHASING & ICRA PLAN - VASCULAR CLINIC AREA
1. SPRINKLER HEADS, FIRE ALARMS AND OTEHR
FIRE PROTECTION ELEMENTS SHALL BE TEMPORARILY
RELOCATED FROM THE CONSTRUCTION AREAS
WITHIN THE ICRA BARRIERS TO THE OUTSIDE OF THE
BARRIERS.
PROTECT EXISTING HARD DOOR FOR CONSTRUCTION. CONTRACTOR TO ENSURE IT
MEETS 45 MIN. RATING. REPAIR DAMAGED AREAS CAUSED BY CONSTRUCTION WORK
ANTEROOM
CONSTRUCTION ANTEROOM
EXISTING ROOF TOP PENTHOUSEUP UP
MECH LOUVER
K-4329KINGSTON C_TOILETS VITREOUS CHINA
K-2007KING STO NC_LAVATO RYVITREO US CHINA
WH
UP
DN
DN
UP
STAIRS
#9
DN
UP
UP
DN
UP UP
UP
UP
UP
DN
DN
EXISTING ROOF TOP PENTHOUSEUP UP
MECH LOUVER
174 5 7 8 10 12 13 14 16
Q
S
38.1
3735.1
3432302726252421 4443424039121198754321
24222018 27 29 31 33
V
U
T
P
O
N
L
K
J
V
T
U
R
Q
P
J
L
N
E
F
G
D
C
MC
MK
ML
M5.2M4.3M1.7M1.1 M7.1 M7.7 M8.3
MO
40393734
754321
V
T
U
V
U
T
R R
Q Q
P
4 5 7
K-4329KING
STO
N
C_TO
ILETS
VITREO
US CHINA
K-4329KING
STO
N
C_TO
ILETS
VITREO
US CHINA
K-4329KINGSTON C_TOILETS VITREOUS CHINA
K-4329KING STO NC_TO ILETSVITREO US CHINA
K-2007KING STO NC_LAVATO RYVITREO US CHINA
WH
U P D O W N
UP
U P
D O W N
DN
DN
UP
2W151 2W152
2W116A
2W116 2W115
2W115B
2W115A
2W114A
2W114 2W113
2W158 2W157
2W167
2W155
2W159
2W166
2W112
2W111
2W110
2W109
2W1082W109A
2C110
W
W
2W105 2W104
C2W1 C2C3A-1
C2W58
C2C1
C W
2E126
2W200
2W152A
2NW110
2NW107B
C C
C2C25
C C
C C
C2C28
C2C29
C C
2N E105
2NE126
2NE125
2NE111
2NE1202NE112
2NE113
2NE113A
N E E
2A 135G
2A 135 2A 135A
2A 103D
2A 104
2A 106
2A 1072A 108
2A 109
2A 110
2A 111
2A 112
2A 112E
2A 112A
2A 113
2A 114
2A 115
2A 116
2A 117
2A 117A
2A 118
2A 119 2A 120
2A 121A
2A 122
C2-8
2A 123
2A 124
2A 1252A 1262A 127
2A 128
2A 129
2A 130
2A 130A
2A 130B
2A 130C
2A 130D
2A 131
2A 131A
2A 131B
2A 132
2W133A 2W117
2W118
2W119
2W121
2W133 2W143
2W147
2W146
2W144
C2W32W143A
2W148
2W148A 2W149A
2W149
2W150
2A 121
2A 119A
2A 112B
2A 112C
2A 112D
2A 224
2A 2252A 2262A 227
2A 215
2A 214
2A 2302A 231
2A 228
STAIR
#2
TREAT. M.T.
STO.BATH
STO.
DAILY LIVING
EVAL./TRAINING
OFFICE
STO.
OCCUPATIONAL
THERAPY-CLINIC
OCCUPATIONAL
THERAPY-CLINIC
ADMIN.
SECT./WAITING M.T. ELECTROMYO-
GRAPHY ROOM
F.T.
CHECK-IN DESK
HAC
TREAT. RM.
PASSAGE
STAFF
PHYSICIAN SECT.
ADMIN.
ASSIST.
RECEPT.
AREA
CLERK
CHIEF'S
OFFICE
RESEARCH
A/C ROOM
2C108
WHEELCHAIR
TELEPHONE
F.
T. M .T
TOILET BIO WASTE
CORRIDOR CORRIDOR
CORRIDOR
CO
RR
ID
O R
STAIR
#3
OFFICE2E104
MECH. ROOM
DN 12+12R
W/C SPEC.
48. 0
2NE101A
MECHANICAL
ROOM
MECHANICAL
ROOM
ROOF
ROOF
ROOF
2C106
DATA CLO
STAIRS
#6
#1 #2 #3 #4 #5 #6
#7#8#9#10#11
(SHAFT)
CARPENTER
PM SHOP
PM SHOP
ELECTRIC
TELE. CLO.
2A 134
TELE. CLO.
BREAK RM.
341. 3
2NE101
CO
RR
ID
O R
C N
2N E129
CLERICAL
CHEM. SUPV.
2NW1212NW122
CHEM. TECH.
2NW100
STO.
2NE131
LOCKERS
2NE131A
M. TOILET
2NE130A
F. TOILET
2NE130
LOCKERS
2NW120
CHEMISTRY
SPECIAL
SCOPE
2NW119
VISITOR'S
2NW118
BIO-WASTE
H.A.C.
2NW1172NW116
GLASSWARE
ICE /
SUPERVISOR
2NW115
HEMATOLOGY
CH. MEDICAL
TECHNOLOGIST
2NW114
P & LM
2NW113
SECRETARY
PROGRAM LEADER
2NW112
P & LM
VIDAS
MICROSCOPY
2NW109
SUPERVISOR
MICROBIOLOGY
2NW108
MICROBIOLOGY
ANTE ROOM
2NW107
BSL 3
2NW107A
TB
BSL 3
MYCOLOGY
STERI. RM.
38. 3
2NW106A
STORAGE
CONFERENCE
2NW105
MOLECULAR BIO.
2NW104
REAGENT PREP.
2NW103
BIOLOGY
MOLECULAR
CORE LAB
2NW101
COOLER
WALK-IN
2NW102A
STORAGE
2NW102
C2N1A
CORRIDOR
C N W
CO
RR
ID
O R
CO
RR
ID
O R
C C
CO
RR
ID
O R
CORRIDOR
C2C4
CORRIDOR
CORRIDOR
CO
RR
ID
O R
CO
RR
ID
O R
CORRIDOR
CORRIDOR
CO
RR
ID
O R
2NE102
STORAGE
PHLEBOTOMY
12. 8
2NE102A
TELE. CLO. ENTRY
233. 3
2NE200
48. 4
2NE100A
DATA CLO.
2NE100B
M. TOILET
279. 3
2NE100
STORAGE
BULK
202. 7
2NE104
THERAPEUTIC
PHLEBOTOMY
BLOOD BANK
32. 6
2NE105A
STORAGE
SUPERVISOR
2NE106
BLOOD BANK
2NE107
FUTURE OFFICE
RELAX /
2NE128
OFFICER
ADMIN
2NE127
TECH.
ACCOUNTING
SIGN - OUT
RESIDENTS
TESTING
2NE124
ANCILLARY
STORAGE
2NE108
FILES /
2NE109
BLOCK STORAGE
SLIDE / PARAFFIN
2NE123
ADPAC
SUPERVISOR
ANATOMIC
2NE110
NEUROPATH
2NE122
CHIEF
MICROSCOPY
ELECTRON
HEMATOLOGY
2NE121
CHIEF
ANATOMIC PATH
CHIEF
CYTOLOGY
SECTIONING
GROSS
2NE119
STAINS
SPECIAL
2NE114
STORAGE
2NE118
HISTOLOGY
2NE115
STORAGE
2NE116
LABORATORY
DENTAL
2NE117
LABORATORY
HISTOLOGY
EL. CLO.
2NE100C
CO
RR
ID
O R
STAFF
2A 135C
TOILET
WOMEN
2A 135B
SECT / WAIT
OFFICE
PSYCHOLOGY
PSYCHOLOGY
OFFICEOFFICE
PSYCHOLOGY
PSYCHOLOGY
OFFICE
CLOSET
ELECTRICAL
PURPOSE
MULTI-
OPEN OFFICE
CONTROL RM.
BIO-FEEDBACK
TRAINEE
TRAINEE
TRAINEE
STO.
COORD.
V.I.S. TEAM
TREAT
EXAM /
OFFICE
CORRIDOR
MECHANICAL
EQUIPMENT
ELECT.
EQUIP.
TELE.
EQUIP.
MECHANICAL
EQUIPMENT
TELE. EQ.
ROOM
CHILLER
CLOSET
ELECTRICAL ELECTRICAL
CLOSET
2A 133
PASSAGE TOILET
STO.
OFFICE
COLD ROOM
RESEARCH LAB RESEARCH LAB
OFFICE
CORRIDOR
OFFICE
CORRIDORPASSAGE
VOLUNTEER
OFFICE
IRM
ENTRY
STORAGE
PHYSICIAN
PHYSICIAN
STAFF
PHYSICIAN
STAFF
PHYSICIAN
STAFF
CLERICAL
ROOF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
STO
OFFICE
STAIR
#1
2A 219
ROOM
CONTROL
2A 218
ROOM
DIRTY
2A 220
ROOM
CYSTOLOGY
2A 221
ROOM
PROCEDURE
SUPPLY
MEDICAL
EXAM #3EXAM #2EXAM #1
2A 217
CORRIDOR
2A 222
CORRIDOR
2A 216
STORAGE
UTIL.
STERILIZER
EXAM #4EXAM #5
CORRIDOR
SER VI CE
ELEV. 4
SER VI CE
ELEV. 3
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
UP 10+9R
STAIRS
#9
STAIRS
#10
DN
UP
RD
RD
RD
DN
DN
EXISTING ROOF TOP PENTHOUSEUP UP
MECH LOUVER
174 5 7 8 10 12 13 14 16
Q
S
38.1
3735.1
3432302726252421 4443424039121198754321
24222018 27 29 31 33
V
U
T
P
O
N
L
K
J
V
T
U
R
Q
M1.7
P
J
L
N
E
F
G
D
C
MC
MK
ML
M5.2M4.3M1.7M1.1 M7.1 M7.7 M8.3
MO
40393734
754321
V
T
U
V
U
T
R R
Q Q
P
4 5 7
K-4329KINGSTON C_TOILETS VITREOUS CHINA
K-4329KING STO NC_TO ILETSVITREO US CHINA
K-2007KING STO NC_LAVATO RYVITREO US CHINA
WH
UP
U P
D O W N
DN
DN
UP
2W151 2W152
2W116A
2W116 2W115
2W115B
2W115A
2W114A
2W114 2W113
2W158 2W157
2W167
2W155
2W159
2W166
2W112
2W111
2W110
2W109
2W1082W109A
2C110
W
W
2W105 2W104
C2W1 C2C3A-1
C2W58
C2C1
C W
2E126
2W200
2W152A
2NW110
2NW107B
C C
C2C25
C C
C C
C2C28
C2C29
C C
2N E105
2NE126
2NE125
2NE111
2NE1202NE112
2NE113
2NE113A
N E E
2A 135G
2A 135 2A 135A
2A 103D
2A 104
2A 106
2A 1072A 108
2A 109
2A 110
2A 111
2A 112
2A 112E
2A 112A
2A 113
2A 114
2A 115
2A 116
2A 117
2A 117A
2A 118
2A 119 2A 120
2A 121A
2A 122
C2-8
2A 123
2A 124
2A 1252A 1262A 127
2A 128
2A 129
2A 130
2A 130A
2A 130B
2A 130C
2A 130D
2A 131
2A 131A
2A 131B
2A 132
2W133A 2W117
2W118
2W119
2W121
2W133 2W143
2W147
2W146
2W144
C2W32W143A
2W148
2W148A 2W149A
2W149
2W150
2A 121
2A 119A
2A 112B
2A 112C
2A 112D
2A 224
2A 2252A 2262A 227
2A 215
2A 214
2A 2302A 231
2A 228
STAIR
#2
TREAT. M.T.
STO.BATH
STO.
DAILY LIVING
EVAL./TRAINING
OFFICE
STO.
OCCUPATIONAL
THERAPY-CLINIC
OCCUPATIONAL
THERAPY-CLINIC
ADMIN.
SECT./WAITING M.T. ELECTROMYO-
GRAPHY ROOM
F.T.
CHECK-IN DESK
HAC
TREAT. RM.
PASSAGE
STAFF
PHYSICIAN SECT.
ADMIN.
ASSIST.
RECEPT.
AREA
CLERK
CHIEF'S
OFFICE
RESEARCH
A/C ROOM
2C108
WHEELCHAIR
TELEPHONE
F.
T. M .T
TOILET BIO WASTE
CORRIDOR CORRIDOR
CORRIDOR
CO
RR
ID
O R
STAIR
#3
2E104
MECH. ROOM
DN 12+12R
W/C SPEC.
48. 0
2NE101A
MECHANICAL
ROOM
MECHANICAL
ROOM
ROOF
ROOF
ROOF
2C106
DATA CLO
STAIRS
#6
#1 #2 #3 #4 #5 #6
#7#8#9#10#11
(SHAFT)
CARPENTER
PM SHOP
PM SHOP
ELECTRIC
TELE. CLO.
2A 134
TELE. CLO.
BREAK RM.
341. 3
2NE101
CO
RR
ID
O R
C N
2N E129
CLERICAL
CHEM. SUPV.
2NW1212NW122
CHEM. TECH.
2NW100
STO.
2NE131
LOCKERS
2NE131A
M. TOILET
2NE130A
F. TOILET
2NE130
LOCKERS
2NW120
CHEMISTRY
SPECIAL
SCOPE
2NW119
VISITOR'S
2NW118
BIO-WASTE
H.A.C.
2NW1172NW116
GLASSWARE
ICE /
SUPERVISOR
2NW115
HEMATOLOGY
CH. MEDICAL
TECHNOLOGIST
2NW114
P & LM
2NW113
SECRETARY
PROGRAM LEADER
2NW112
P & LM
VIDAS
MICROSCOPY
2NW109
SUPERVISOR
MICROBIOLOGY
2NW108
MICROBIOLOGY
ANTE ROOM
2NW107
BSL 3
2NW107A
TB
BSL 3
MYCOLOGY
STERI. RM.
38. 3
2NW106A
STORAGE
CONFERENCE
2NW105
MOLECULAR BIO.
2NW104
REAGENT PREP.
2NW103
BIOLOGY
MOLECULAR
CORE LAB
2NW101
COOLER
WALK-IN
2NW102A
STORAGE
2NW102
C2N1A
CORRIDOR
C N W
CO
RR
ID
O R
CO
RR
ID
O R
C C
CO
RR
ID
O R
CORRIDOR
C2C4
CORRIDOR
CORRIDOR
CO
RR
ID
O R
CO
RR
ID
O R
CORRIDOR
CORRIDOR
CO
RR
ID
O R
2NE102
STORAGE
PHLEBOTOMY
12. 8
2NE102A
TELE. CLO. ENTRY
233. 3
2NE200
48. 4
2NE100A
DATA CLO.
2NE100B
M. TOILET
279. 3
2NE100
STORAGE
BULK
202. 7
2NE104
THERAPEUTIC
PHLEBOTOMY
BLOOD BANK
32. 6
2NE105A
STORAGE
SUPERVISOR
2NE106
BLOOD BANK
2NE107
FUTURE OFFICE
RELAX /
2NE128
OFFICER
ADMIN
2NE127
TECH.
ACCOUNTING
SIGN - OUT
RESIDENTS
TESTING
2NE124
ANCILLARY
STORAGE
2NE108
FILES /
2NE109
BLOCK STORAGE
SLIDE / PARAFFIN
2NE123
ADPAC
SUPERVISOR
ANATOMIC
2NE110
NEUROPATH
2NE122
CHIEF
MICROSCOPY
ELECTRON
HEMATOLOGY
2NE121
CHIEF
ANATOMIC PATH
CHIEF
CYTOLOGY
SECTIONING
GROSS
2NE119
STAINS
SPECIAL
2NE114
STORAGE
2NE118
HISTOLOGY
2NE115
STORAGE
2NE116
LABORATORY
DENTAL
2NE117
LABORATORY
HISTOLOGY
EL. CLO.
2NE100C
CO
RR
ID
O R
STAFF
2A 135C
TOILET
WOMEN
2A 135B
SECT / WAIT
OFFICE
PSYCHOLOGY
PSYCHOLOGY
OFFICEOFFICE
PSYCHOLOGY
PSYCHOLOGY
OFFICE
CLOSET
ELECTRICAL
PURPOSE
MULTI-
OPEN OFFICE
CONTROL RM.
BIO-FEEDBACK
TRAINEE
TRAINEE
TRAINEE
STO.
COORD.
V.I.S. TEAM
TREAT
EXAM /
OFFICE
CORRIDOR
MECHANICAL
EQUIPMENT
ELECT.
EQUIP.
TELE.
EQUIP.
MECHANICAL
EQUIPMENT
TELE. EQ.
ROOM
CHILLER
CLOSET
ELECTRICAL ELECTRICAL
CLOSET
2A 133
PASSAGE TOILET
STO.
OFFICE
COLD ROOM
RESEARCH LAB RESEARCH LAB
OFFICE
CORRIDOR
OFFICE
CORRIDORPASSAGE
VOLUNTEER
OFFICE
IRM
ENTRY
STORAGE
PHYSICIAN
PHYSICIAN
STAFF
PHYSICIAN
STAFF
PHYSICIAN
STAFF
CLERICAL
ROOF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
STO
OFFICE
STAIR
#1
2A 219
ROOM
CONTROL
2A 218
ROOM
DIRTY
2A 220
ROOM
CYSTOLOGY
2A 221
ROOM
PROCEDURE
SUPPLY
MEDICAL
EXAM #3EXAM #2EXAM #1
2A 217
CORRIDOR
2A 222
CORRIDOR
2A 216
STORAGE
UTIL.
STERILIZER
EXAM #4EXAM #5
CORRIDOR
SER VI CE
ELEV. 4
SER VI CE
ELEV. 3
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
STAIRS
#9
STAIRS
#10
DN
UP
RD
RD
RD
DN
4039 42 43 44388 9 11 12 13 14 16 17 19 21 24 25 26 30 32 34 35 35.1 37
D
F
G
H
J.
J
3316.1 3615
C
TOILET
2E123
HAND CLINIC
2E121
EXAM 1
2E107
EXAM 2
2E108
EXAM 3
2E109
EXAM 4
2E110
EXAM 5
2E111
EXAM 6
2E112
EXAM 7
2E113
CLEAN STOR
2E114
OTBC:
TREATMENT AREA
(EDEMA)
2E115
EXAM 12
2E131
EXAM 11
2E130
EXAM 10
2E129
EXAM 8
2E127
EXAM 9
2E128
HAC
2E117A
PRIVATE
TREATMENT
2E119
TOILET
2E105
MECH/ELEC
2E104
ANTI-COAG
2E132
WAIT
2E133
MEN
2E135
WOMEN
2E136
SOILED
2E139
CLEAN
2E138
WORK
2E140
WORK
2E141
BREAK RM.
2E142
EEG
2W177
TOILET
2W174
EEG
2W173
STOR
2W172
CLEAN
2W176
TECH.
2W175
TECH.
2W171
CORR.
2W170
EXAM V4
2A102E
EXAM V1
2A102A
EXAM V2
2A102B
WORK
2A102C
EXAM V3
2A102D
CLEAN STOR
2E122
PRIVATE
TREATMENT
2E126
PRIVATE
TREATMENT
2E125
PT EXERCISE/
CLINCIAL SPACE
2E120
STAIR
#2
STAIR
#6
STAIR #9
STAIR #
STAIR #3
MECH.
2E116A
STAIR
#1
MAXIMUM TRAVEL DISTANCE = 142 FT
MAXIMUM TRAVEL DISTANCE = 179 FT MAXIMUM TRAVEL DISTANCE = 128 FTMAX. TRAVEL
DISTANCE = 98 FT
MAXIMUM TRAVEL DISTANCE = 132 FT
EXISTING ELEVATOR SHAFTS
EXISTING
EXISTING
AREA
(N.I.C)
EXISTING
AREA
(N.I.C)
EXISTING
AREA
(N.I.C)
MAX. TRAVEL
DISTANCE = 118 FT
EXIST'G
34"
EXISTING
68"
EXIST'G.
F.E.C.
EXIST'G.
F.E.C.
EXISTING AREA
(N.I.C)
EXAM V5
2A102F
EXIST'G
34"
EXIST'G
34"
L
N
P
MAX. TRAVEL
DISTANCE = 192 FT
WEP: EQUIP.
STOR.
2E118
CARDIAC/
PULMONARY
2E124
SMOKE ZONE
(EAST)
SMOKE ZONE
(WEST)
F.2
F.1
2W138
EXAM 4
2W139
EXAM 5
2W140
EXAM 6
2W142
EXAM 8
2W141
EXAM 7
2W143
PROVIDER
2W148
EXAM 13
2W149
EXAM 12
2W151
STORAGE
2W150
EXAM 11
C2W3
CORRIDOR
2W110A
WAITING
2W112
TELE.
COM.
2W123
STAFF W.
TLT
C2W2
CORRIDOR
2W124/5
TELEHEALTH
EDUCATION
TRAINING
2W200
MECHANICAL
RM
2W111C
LOCKER
AREA
2W111A
STAFF
BREAK
2W111B
ALCOVE
2W110B
WAITING
C2W1A
CORRIDOR
2W109
CHECK
IN/OUT
C2W1
CORRIDOR
2W108
W. TLT
2W107
M. TLT
2W106
ELEC RM
2W105
TLT
2W104
BIO
WASTE
I
RESEARCH
A/C RM
C2C1
CORRIDOR
2C108
WHEELCHAIR
TELEPHONE
#1
SHAFT
#2
SHAFT
#3
SHAFT
#4
SHAFT
#5
SHAFT
#6
SHAFT
#9
SHAFT
#8
SHAFT
#7
SHAFT
#11
SHAFT
#10
SHAFT
C C
C O
R R
ID
O
R
2C106
DATA CLO.
2NE100A
DATA CLO.
2NE200
ENTRY
2NE100B
M. TLT
2NE100
BULK
STORAGE
2NE104
THERAPEUTIC
PHLEBOTOMY
2NE105A
STORAGE
2NE103
PHLEBOTOMY
STORAGE
2NE101A
W/C SPEC.
2NE101
BREAK RM
C2C4
CORRIDOR
C C
C O
R R
ID
O
R
2NE102A
TELE CLO.
2NW102
STORAGE
2NW102A
WALK-IN
COOLER 2NW101
CORE LAB
C2N1
CORRIDOR
2NE105
BLOOD
BANK
2NE128
ADMIN
OFFICER
2NE127
ACCOUNTING
TECH
2NE126
SIGN-OUT
2NE107
OFFICE
2NE106
BLOOD
BANK
SUPERVISOR
2NE129
CLERICAL
2NE125
RESIDENTS
2N3124
ANCILLARY
TESTING
2NE123
ADPAC
2NE130
LOCKERS
2NE108
FILES/
STORAGE
2NE109
SLIDE/PARAFFIN
BLOCK
STORAGE
2NE110
ANATOMIC
SUPERVISOR
2NE122
CHIEF
NEUROPATH
2NE130A
F. TLT
2NE131A
M. TLT
2NW120
SPECIAL
CHEMISTRY
2NE131
LOCKERS
I
2NW100
STO.
2NW121
CHEM.
SUP.
2NW122
CHEM.
TECH
2NE100C
ELEC.
CLO.
2NE121
CHIEF
HEMATOLOGY
2NE120
CHIEF
ANATOMIC
PATH
2NE111
ELECTRON
MICROSCOPY
2NE112
CYTOLOGY
2NE113
GROSS
SECTIONING
2MS104
STAIRS
#M4
2M225
SHARED
OFFICE
N
E E
C O
R R
ID
O
R
2A104
SECT/WAIT
2A110
ELEC CLO.
C C
C O
R R
ID
O
R
2A111
MULTI-
PURPOSE
2A114
BIO-FEEDBACK
2A113
CONTROL
RM
2A115
TRAINEE
C2C28
CORRIDOR
2A117
TRAINEE
2A117A
STO.
2A118
V.I.S.
TEAM
COORD
2A119A
OFFICE 2A112
OPEN
OFFICE
2A119
EXAM/
TREAT
2A120
OFFICE
2A121
OFFICE
2A112B
OFFICE
2A112A
OFFICE
C C
C O
R R
ID
O
R
2A112E
OFFICE
2A124
OFFICE
2A112C
OFFICE
2A123
OFFICE
2A122
OFFICE
C2-8
CORRIDOR
2A121A
OFFICE
2A128
OFFICE
2A129
OFFICE
2A127
OFFICE
2A126
OFFICE
2A125
OFFICE
C S
C
C O
R R
ID
O
R
C N
W
C O
R R
ID
O
R
CH. MEDICAL
TECHNOLOGIST
2NW114
PROGRAM
LEADER P&LM
2NW112
VISITOR'S
SCOPE
2NW119
MOLECULAR
BIOLOGY
MOLECULAR BIO.
REAGENT PREP.
2NW104
CONTROL
2A219
CYSTOLOGY
2A220
PROCEDURE
2A221
MEDICAL
SUPPLY
2A224
EXAM 3
2A225
EXAM 2
2A226
CLEAN AREA/
HOLDING
2A223
EXAM 1
2A227
CORRIDOR
2A228
TLT
2A229
EXAM 4
2A230
EXAM 5
2A231
OFFICE
2A234
DOCTOR
OFFICE
2A235
CORRIDOR
2A237
TLT
2A233
RESIDENT OFFICE
2A205
EXAM 6
2A207
CLEAN
LINEN
2A206
CORRIDOR
2A209
CONSULT.
2A210
STERILIZER
2A214
STOR.
2A216
UTIL.
2A215
W. TLT
2A135C
STAFF PHYSICIAN
2A135B
ELEC RM
2A133
TELE. CLO.
2A134
STAFF
PHYSICIAN
2A135A
CLERICAL STAFF
2A135
STAFF
PHYSICIAN
2A135D
PHYSICIAN
2A135E
STAFF BREAK RM
2A204
LOBBY
2A201
RECEPTION
2A238
WAITING
2A202
TLT
2A203
HAC
2NW117
BIO-WASTE
2NW118
HEMATOLOGY
SUPERVISOR
2NW115
ICE/
GLASSWARE
2NW116
ROOF
DIRTY RM
2A218
STERL. RM
2NW105
P&LM
SECRETARY
2NW113
2A131B
CHILLER
ROOM
LIFE SAFETY LEGEND
TRAVEL DISTANCE
25'-0"
EXIT WIDTH
FIRE EXTINGUISHER
CABINET
FEC
EXIT SIGN
0 1
0"
EGRESS WIDTH
ACTUAL OCCUPANT LOAD
MAX. OCCUPANT LOAD
AREA OF WORK
NORTH
SMOKE COMPARTMENT
LEGEND
ZONE 1PT02-04
ZONE 1PT02-05
ZONE 1PT02-06
BUILDING INFORMATION
I-2 OCCUPANCY
CONSTRUCTION TYPE: II (222) ~ NFPA
SPRINKLED BUILDING
ZONE 1PT02-06
11,810 SQ FT
ZONE 1PT02-05
7,097 SQ FT
ZONE 1PT02-04
14,570 SQ FT
ZONE 1PT02-06
12,295 SQ FT
ZONE 1PT02-04
14,570 SQ FT
EXISTING SMOKE ZONES
ZONE 1PT02-05
7,582 SQ FT
WALL RATING LEGEND
1 HOUR FIRE RATED BARRIER
2 HOUR FIRE RATED BARRIER
3 HOUR FIRE RATED WALL
SMOKE BARRIER
SMOKE RESISTANT
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Drawing Title
Location
Project Title
Date
Approved: Project Director
Checked
Building Number
VA Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: PROJECT MANAGER:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
E
D
C
B
A of
FULLY SPRINKLERED
3 4 5 6 7
2 3 4 5 6 7
E
D
C
B
A
NOT FOR
CONSTRUCTIO
N 1
Project Number Scale 15-001
NOT FOR
CONSTRUCTIO
N
Revisions: Date
AS INDICATED
/2
/2
:0
:5
P
M
RENOVATE BLDG. 1, SECOND
FLOOR, 2E AT UD
KMN, KC KC, GTS, DGC
2ND FLOOR PARTIAL LIFE SAFETY PLAN
GI101
May 1, 2019
100% CORRECTED FINAL
UNIVERSITY DRIVE, PITTSBURGH, PA 15240
646-14-102
7 7
1/16" = 1'-0"1
2ND FLOOR COMPOSITE PLAN
1" = 60'-0"2
2ND FLOOR 'EXISTING' SMOKE ZONES AT 2 EAST WING
1" = 60'-0"3
2ND FLOOR 'NEW' SMOKE ZONES AT 2 EAST WING
SYMBOL LEGEND
SECTIONS
SPRAY-ON FIREPROOFING
FIRE SAFING
ACOUSTICAL TILE
CERAMIC OR QUARRY TILE
STONE: GRANITE OR MARBLE
MEDIUM DENSITY FIBERBOARD
SHIM
FACE BRICK
CONCRETE
CRUSHED STONE OR GRAVEL
CONCRETE MASONRY UNIT
EARTH
STEEL (3/4 SCALE OR LARGER)
PLYWOOD VENEER
BATT OR BLANKET INSULATION
RIGID INSULATION
FINISHED WOOD (FOR LARGE SCALE DETAILS)
ROUGH WOOD (ALL BLOCKING AND FRAMING LUMBER)
PLASTER, CEMENT, MORTAR OR G.W.B.
BRASS OR BRONZE (3/4 SCALE OR LARGER)
ALUMINUM (3/4 SCALE OR LARGER)
MATERIAL LEGEND
ELEVATION INDICATION
FIRE EXTINGUISHER CABINET
SITE PLAN NORTH ARROW
REVISION INDICATION
BUILDING WALL SECTION INDICATION
DETAIL INDICATION
GENERAL DIMENSIONING
ROOM NAME
ROOM NUMBER
AREA DETAILED
STARTING POINT
NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.
(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF
IT IS GREATER THAN 1")
NOTE: DIMENSIONS ARE TAKEN FROM/TO
FINISH SURFACE, UNLESS OTHERWISE
NOTES.
STARTING POINT
ON ELEVATION
NORTH ARROW
DOOR SYMBOL
WINDOW SYMBOL
ELEVATION TAG
F.E.C
NORTH
ALIGN WITH EXISTING CONSTRUCTION
CENTER LINE / ELEVATION LINE
PROPERTY LINE
COLUMN GRID
LIMIT OF WORK
EXISTING COLUMN GRID
DENOTED WITH AN E/
PREFIX
FINISH SYMBOLS
CEILING HEIGHT
MATCHLINE
LINETYPE SYMBOLS
IN PLAN
NEW DOOR DESIGNATION
PARTITION TYPE SYMBOL
EQUIPMENT DESIGNATION
WORK ABOVE, BEYOND
OR TO BE REMOVED
BREAK LINE
SECTION NUMBER
SHEET WHERE SHOWN
SHEET WHERE SHOWN
REVISION NUMBER
DETAIL NUMBER
DENOTES CORNER GUARD
LOCATION
PARTITION TYPE
EQUIPMENT TYPE
(SEE EQUIPMENT MANUAL)
COLUMN GRID CENTERLINE INDICATOR
KEYNOTE INDICATOR
WINDOW TYPE
OR VISION PANEL
CG
INTERIOR
AND/OR
EXTERIOR
MULTIPLE INTERIOR
NEW DOOR
EMERGENCY DOOR DESIGNATION
EMERGENCY SWING
DOUBLE EGRESS DOOR DESIGNATION
ROOM NAME
1t 1t
A.F.F.10' 6"
D2
A101
SIM
RM #
CEILING:
WALL:
FLOOR:
BASE:
NAME
CEILING FINISH
WALL FINISH
FLOOR FINISH
BASE FINISH
ROOM FINISH TAG
N
NEW DOOR
BUMPER GUARD, CHAIR RAIL, HAND RAIL
FOR LOCATION SEE PLANS
NOTE: EXISTING DIMENSIONS INDICATED AS [0'-0"] OR WITH (VIF)
ARE SUPPLIED TO THE ARCHITECT BY OTHERS AND SHALL BE
FIELD VERIFIED BY THE CONTRACTOR. (SEE "GENERAL
CONTRACTOR RESPONSIBILITIES WITH RESPECT TO EXISTING
CONDITION NOTES")
ROOM INDICATION
KEYNOTE SYMBOL
O'-O"
FACE OF SURFACE INDICATORO'-O"
O'-O" ±
VIF
O'-O"
NEW DOOR
A101
F2
A201
A1
A3
A4 A2A201
EXISTING DOOR DESIGNATION
EXISTING DOOR
A
1 1
A
A102
AREA A
INDICATOR OF AREA SHOWN ON DRAWING
SHEET NUMBER OF ADJACENT DRAWING
A
DBL DOUBLE
DEFS DIRECT APPLIED EXTERIOR FINISH
SYSTEM
DEMO DEMOLITION, DEMOLISH
DET DETAIL
DFG DOOR FRAME GUARD
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVIDE, DIVISION
DP DOOR PROTECTION
DR DRAIN
DT DRAIN TILE
DW DISHWASHER
DWG DRAWING (S)
DWTR DUMBWAITER
E EAST
EA EACH
EF EACH FACE
EG END GUARD
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPS EXPANDED POLYSTYRENE BOARD
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EW EACH WAY
EXIST EXISTING
EXP EXPANSION / EXPOSED
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FA FIRE ALARM
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FIN FINISH (ED)
FLR FLOOR (ING)
FO FACE OF
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FR FIRE RESISTANT / FRAME
FT FOOT, FEET / FIRE TREATED / FILM
TINT
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
FW FIRE WALL
FWC FABRIC WALL COVERING
GA GAGE, GAUGE
GB GRAB BAR
GC GENERAL CONTRACTOR
GALV GALVANIZED
GC GENERAL CONTRACTOR
GLU LAM GLUE LAMINATED (BEAM)
GR GROUT
GRTG GRATING
GYP GYPSUM
HC HANDICAP / HOLLOW CORE
HD HEAVY DUTY
HDBD HARDBOARD
HDR HEADER
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
ID INSIDE DIAMETER/DIMENISON
INCL INCLUDE (D), INCLUDING
INSUL INSULATE (D), INSULATION
INT INTERIOR
SYMBOLS USED AS ABBREVIATIONS:
& AND
L ANGLE
LL DOUBLE ANGLE
@ AT
d PENNEY
# POUND OR NUMBER
CENTER LINE
ABBREVIATIONS:
A&E ARCHITECTURAL AND ENGINEERING
AB ANCHOR BOLT/ROD
ABV ABOVE
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT, ADJOINING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AGGR AGGREGATE
AHR ANCHOR, ANCHORAGE
ALT ALTERNATE
ALUM ALUMINUM
ACT ACOUSTICAL CEILING TILE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASI ARCHITECTURAL SUPPLEMENTAL
INFORMATION
AWP ACOUSTICAL WALL PANEL
BD BOARD
BEV BEVELED
BFF BELOW FINISH FLOOR
BG BUMPER GUARD
BL BRICK LEDGE / BLINDS
BLK BLOCK (ING)
BM BEAM
BOT BOTTOM
BO BOTTOM OF
BOC BOTTOM OF CONCRETE
BOF BOTTOM OF FOOTING
BOH BOTTOM OF HEADER
BRG BEARING
BRK BRICK
BSMT BASEMENT
BTWN BETWEEN
C CHANNEL
CAB CABINET
CB CERAMIC BASE
CC CUBICLE CURTAIN
CD CONSTRUCTION DOCUMENTS
CF CUBIC FEET OR FOOT
CG CORNER GUARD
CHFR CHAMFER
CIPC CAST-IN-PLACE CONCRETE
CJ CONTROL/CONSTRUCTION JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR, CLEARANCE
CMP CAST MARBLE PANEL
CMU CONCRETE MASONRY UNIT
CO CHANGE ORDER
COL COLUMN
CONC CONCRETE
CONN CONNECT (ION)
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACT (OR)
COORD COORDINATE
CORR CORRUGATED
CR…