UD B1 Reno 2East_BidSet_Consolidated.pdf

PDF 27 MB Posted

Attached to
C1DA--646-14-102 Renovate B1 2E for Clinics | John Mignogna | NCO 4 Construction West (VA-25-00022309)
Solicitation number
36C24425R0027
Issued by

About this file

This document is a Pre-Solicitation Notice for a federal contract opportunity. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 4 is seeking to award a single Firm Fixed Price Contract for Construction Period Services for the renovation of Building 1, 2nd East at the Pittsburgh VA Medical Center. The contract will be set-aside for 100% Service-Disabled Veteran-Owned Small Businesses capable of performing the work under NAICS code 541330, with a small business standard of $22.5 million. Interested firms must submit a Standard Form 330 by December 6, 2024. The key evaluation criteria are professional qualifications, specialized experience, technical competence, past performance, and experience in construction period services. The Government intends to select the most highly qualified firm based on these criteria.

View the file

Other files

File Type Posted
36C24425R0027 0001 11.20.2024.pdf PDF
36C24425R0027.docx DOCX document
WG 7.22.2024.pdf PDF
2E Revised Bid Drawings_Walkway_200930.pdf PDF
UD B1 Reno 2East_BidSet_Specifications.pdf PDF
SOW AE CPS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NOT FOR

CONSTRUCTIO

N 1

Project Number Scale 15-001

NOT FOR

CONSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:3

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, GTS, DGC

COVER SHEET

GI001

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

1 7

VA PITTSBURGH HEALTHCARE SYSTEM,

UNIVERSITY DRIVE DIVISION

PITTSBURGH, PA 15240

AREA OF WORK

VA PROJECT # 646-14-102

SHEET LIST

SHEET

NO. SHEET NAME DWG

OF

DWG

EP111 2ND FLOOR POWER PLAN - VASCULAR

CLINIC

15 32

EM101 2ND FLOOR MECHANICAL POWER PLAN -

2E WEST

16 32

EM102 2ND FLOOR MECHANICAL POWER PLAN -

2E EAST

17 32

EL101 2ND FLOOR LIGHTING PLAN - 2E WEST 18 32

EL102 2ND FLOOR LIGHTING PLAN - 2E EAST 19 32

EL111 2ND FLOOR LIGHTING PLAN - VASCULAR

CLINIC

20 32

EP501 ELECTRICAL DETAILS 21 32

EP502 ELECTRICAL DETAILS 22 32

EP503 ELECTRICAL DETAILS 23 32

EP601 ELECTRICAL SINGLE-LINE RISER DIAGRAM 24 32

EP602 PANEL SCHEDULES 25 32

EP603 PANEL SCHEDULES 26 32

EP604 PANEL SCHEDULES 27 32

ET101 2ND FLOOR TECHNOLOGY PLAN - 2E

WEST

28 32

ET102 2ND FLOOR TECHNOLOGY PLAN - 2E EAST 29 32

ET111 2ND FLOOR TECHNOLOGY PLAN -

VASCULAR CLINIC

30 32

ET501 TECHNOLOGY DETAILS 31 32

ET502 TECHNOLOGY DETAILS 32 32

FIRE ALARM

FA001 FIRE ALARM NOTES, LEGENDS, AND

RISER

1 4

FA101 2ND FLOOR FIRE ALARM PLAN - 2E WEST 2 4

FA102 2ND FLOOR FIRE ALARM PLAN - 2E EAST 3 4

FA111 2ND FLOOR FIRE ALARM PLAN -

VASCULAR CLINIC

4 4

SHEET LIST

SHEET

NO. SHEET NAME DWG

OF

DWG

MP101 2ND FLOOR MECHANICAL PIPING PLAN -

2E WEST

13 26

MP102 2ND FLOOR MECHANICAL PIPING PLAN -

2E EAST

14 26

M-401 ENLARGED 2ND FLOOR MECHANICAL

PLAN - 2E EAST - MECHANICAL ROOM

15 26

M-402 MECHANICAL SECTIONS 16 26

M-403 MECHANICAL SECTIONS 17 26

M-501 MECHANICAL DETAILS 18 26

M-502 MECHANICAL DETAILS 19 26

M-503 MECHANICAL DETAILS 20 26

M-504 CONTROL DETAILS 21 26

M-601 MECHANICAL SCHEDULES 22 26

M-602 MECHANICAL SCHEDULES 23 26

MH901 MECHANICAL DUCTWORK ISOMETRIC - 2E

WEST

24 26

MH902 MECHANICAL DUCTWORK ISOMETRIC - 2E

EAST

25 26

MH911 MECHANICAL DUCTWORK ISOMETRIC -

VASCULAR LAB

26 26

ELECTRICAL

E-001 ELECTRICAL NOTES AND LEGENDS 1 32

ED101 2ND FLOOR ELECTRICAL DEMOLITION

PLAN - 2E WEST

2 32

ED102 2ND FLOOR LIGHTING DEMOLITION PLAN -

2E WEST

3 32

ED103 2ND FLOOR ELECTRICAL DEMOLITION

PLAN - 2E EAST

4 32

ED104 2ND FLOOR LIGHTING DEMOLITON PLAN -

2E EAST

5 32

ED111 2ND FLOOR ELECTRICAL DEMOLITION

PLAN - VASCULAR CLINIC

6 32

ED112 2ND FLOOR LIGHTING DEMOLITION PLAN -

VASCULAR CLINIC

7 32

ED601 EXISTING AND DEMO SINGLE-LINE RISER

DIAGRAM

8 32

ED602 EXISTING AND DEMO PANEL SCHEDULES 9 32

ED603 EXISTING AND DEMO PANEL SCHEDULES 10 32

ED604 EXISTING AND DEMO PANEL SCHEDULES 11 32

ED605 EXISTING AND DEMO PANEL SCHEDULES 12 32

EP101 2ND FLOOR POWER PLAN - 2E WEST 13 32

EP102 2ND FLOOR POWER PLAN - 2E EAST 14 32

SHEET LIST

SHEET

NO. SHEET NAME DWG

OF

DWG

PD104 2ND FLOOR WATER & GAS DEMOLITION

PLAN - 2E EAST

6 18

PP101 2ND FLOOR SANITARY PLAN - 2E WEST 7 18

PP102 2ND FLOOR SANITARY PLAN - 2E EAST 8 18

PP103 2ND FLOOR DOMESTIC WATER PLAN - 2E

WEST

9 18

PP104 2ND FLOOR DOMESTIC WATER PLAN - 2E

EAST

10 18

PG101 2ND FLOOR MEDICAL GAS PLAN - 2E

WEST

11 18

PP111 2ND FLOOR PLUMBING PLANS -

VASCULAR LAB

12 18

P-501 PLUMBING DETAILS 13 18

PP902 SANITARY ISOMETRIC - 2E EAST 14 18

PP901 SANITARY ISOMETRIC - 2E WEST 15 18

PP903 DOMESTIC WATER ISOMETRIC - 2E WEST 16 18

PP904 DOMESTIC WATER ISOMETRIC - 2E EAST 17 18

PP911 PLUMBING ISOMETRICS - VASCULAR LAB 18 18

MECHANICAL

M-001 MECHANICAL GENERAL NOTES,

ABBREVIATIONS AND LEGEND

1 26

MD101 2ND FLOOR MECHANICAL DUCTWORK

DEMOLITION PLAN - 2E WEST

2 26

MD102 2ND FLOOR MECHANICAL DUCTWORK

DEMOLITION PLAN - 2E EAST

3 26

MD103 2ND FLOOR MECHANICAL PIPING

DEMOLITION PLAN - 2E WEST

4 26

MD104 2ND FLOOR MECHANICAL PIPING

DEMOLITION PLAN - 2E EAST

5 26

MD111 2ND FLOOR MECHANICAL DEMOLITION

PLAN - VASCULAR LAB

6 26

MD401 ENLARGED 2ND FLOOR MECHANICAL

DEMOLITION PLAN - 2 EAST - MECHANICAL

ROOM

7 26

MD402 MECHANICAL DEMOLITION SECTIONS 8 26

MD501 CONTROL DEMOLITION DETAILS 9 26

MH101 2ND FLOOR MECHANICAL DUCTWORK

PLAN - 2E WEST

10 26

MH102 2ND FLOOR MECHANICAL DUCTWORK

PLAN - 2E EAST

11 26

MH111 2ND FLOOR MECHANICAL PLAN -

VASCULAR LAB

12 26

SHEET LIST

SHEET

NO. SHEET NAME DWG

OF

DWG

AI402 ENLARGED PLANS, INTERIOR ELEVATIONS

AND DETAILS

20 28

AI403 CASEWORK DETAILS 21 28

AI601 WINDOW SCHEDULE, TYPES & DETAILS 22 28

AI602 INTERIOR DOOR AND WINDOW SCHEDULE

& DETAILS

23 28

AF101 2ND FLOOR FLOORING PATTERN PLAN &

ROOM FINISHES - 2E WEST

24 28

AF102 2ND FLOOR FLOORING PATTERN PLAN &

ROOM FINISHES - 2E EAST

25 28

AF111 2ND FLOOR FLOORING PATTERN PLAN &

ROOM FINISHES - VASCULAR CLINIC

26 28

AF201 2ND FLOOR FURNITURE PLAN - 2E EAST &

WEST

27 28

AF211 2ND FLOOR FURNITURE PLAN - VASCULAR

CLINIC

28 28

FIRE PROTECTION

FS001 FIRE PROTECTION LEGEND,

ABBREVIATIONS, AND GENERAL NOTES

1 8

FD101 2NF FLOOR FIRE PROTECTION

DEMOLITION PLAN - 2E WEST

2 8

FD102 2ND FLOOR FIRE PROTECTION

DEMOLITION PLAN - 2E EAST

3 8

FD103 2ND FLOOR FIRE PROTECTION

DEMOLITION PLAN - VASCULAR LAB

4 8

FS102 2ND FLOOR FIRE PROTECTION PLAN - 2E

EAST

5 8

FS101 2ND FLOOR FIRE PROTECTION PLAN - 2E

WEST

6 8

FS103 2ND FLOOR FIRE PROTECTION PLAN -

VASCULAR LAB

7 8

FS501 FIRE PROTECTION DETAILS 8 8

PLUMBING

P-001 PLUMBING GENERAL NOTES,

ABBREVIATIONS AND LEGEND

1 18

PD101 2ND FLOOR SANITARY DEMOLITION PLAN

- 2E WEST

2 18

PD102 2ND FLOOR SANITARY DEMOLITION PLAN

- 2E EAST

3 18

PD103 2ND FLOOR WATER & GAS DEMOLITION

PLAN - 2E WEST

4 18

PD111 2ND FLOOR PLUMBING DEMOLITION PLAN

- VASCULAR LAB

5 18

SHEET LIST

SHEET

NO. SHEET NAME DWG

OF

DWG

GENERAL

GI001 COVER SHEET 1 7

GI002 INFECTION AND DUST CONTROL PLANS

AND NOTES

2 7

GI003 1ST FLOOR PHASING & ICRA PLAN - WEST

SIDE

3 7

GI004 2ND FLOOR PHASING & ICRA PLAN - WEST

SIDE

4 7

GI005 2ND FLOOR PHASING & ICRA PLAN - EAST

SIDE

5 7

GI006 2ND FLOOR PHASING & ICRA PLAN -

VASCULAR CLINIC AREA

6 7

GI101 2ND FLOOR PARTIAL LIFE SAFETY PLAN 7 7

ARCHITECTURAL

AI001 GENERAL ARCHITECTURAL NOTES,

LEGEND & ABBREVIATIONS

1 28

AI002 PARTITION TYPES 2 28

AI003 2ND FLOOR COMPOSITE PLAN 3 28

AI004 CONSTRUCTION STAGING PLAN 4 28

AD101 2ND FLOOR DEMOLITION PLAN - 2E WEST 5 28

AD102 2ND FLOOR DEMOLITION PLAN - 2E EAST 6 28

AD111 2ND FLOOR DEMOLITION PLAN -

VASCULAR CLINIC

7 28

AD201 2ND FLOOR DEMOLITION REFLECTED

CEILING PLAN - 2E WEST

8 28

AD202 2ND FLOOR DEMOLITION REFLECTED

CEILING PLAN - 2E EAST

9 28

AD211 2ND FLOOR DEMOLITION REFLECTED

CEILING PLAN - VASCULAR CLINIC EXAM

ROOMS

10 28

AI101 2ND FLOOR RENOVATION PLAN - 2E WEST 11 28

AI102 2ND FLOOR RENOVATION PLAN - 2E EAST 12 28

AI111 2ND FLOOR PLAN - VASCULAR CLINIC 13 28

AI121 2ND FLOOR RENOVATION CEILING PLAN -

2E WEST

14 28

AI122 2ND FLOOR RENOVATION CEILING PLAN -

2E EAST

15 28

AI131 2ND FLOOR RENOVATION CEILING PLAN -

VASCULAR CLINIC

16 28

AI201 INTERIOR ELEVATIONS 17 28

AI202 INTERIOR ELEVATIONS 18 28

AI401 ENLARGED PLANS 19 28

RENOVATE BUILDING 1, SECOND FLOOR, 2E AT UD

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS

PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL

ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA

AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND

LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA

AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL

BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON

COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED

CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.

A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR

FLOWS.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

2. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION

ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF

DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

3. USE CORRIDORS C3N2 AND C3N6 AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED.

EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED

DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO

ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY

FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN

AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL

BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED

COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF ELEVATORS

WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL

BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT

DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE

CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY

ADJACENT EXCAVATION DEBRIS.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND NOTIFY CONTRACTOR WHETHER THE

CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE

ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR

MUST FLOW FROM CLEAN TO DIRTY AREAS. CARTS NEED TO BE CLEANED, WIPED DOWN AND

COVERED BEFORE LEAVING CONSTRUCTION SITE.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE

NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR

SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE

ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE

HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE

TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED

BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL

BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL

VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND

ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION

AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE

FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE

SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS

NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL

BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF

PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL

EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED

AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING

BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION

UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A

TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED

THE CLEANING.

6B. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSABLE PRIOR TO REVIEW AND

APPROVAL OF EXTENSIVE "CONSTRUCTION CLEAN" BY THE CONTRACTOR.

POLICY LETTER EC-51

7. REFER TO SPEC SECTION 01 01 10 FOR EC-51 SAFETY AND HEALTH POLICY AND

PROCEDURES DURING CONSTRUCTION ACTIVITIES.

FIRE ALARMS

8. FIRE ALARMS AND OTHER LIFE SAFETY FIXTURES WITHIN THE ICRA BARRIERS OF THE

CONSTRUCTION AREAS SHALL BE TEMPORARILY RELOCATED TO THE OUTSIDE OF BARRIRES.

ICRA NOTES

1. SEE ICRA NOTES FROM SHEETS GI003 TO

GI005 FOR EACH CONTRUCTION PHASE.

2. INSTALL ILSM EGRESS SIGNAGE AND

INDICATION OF EXIT ACCESS ROUTE FOR EACH

CONSTRUCTION PHASE.

ICRA

ICRA REFERENCE CODES

2018 NFPA 101 LIFE SAFETY CODE

NFPA 99 HEALTH CARE FACILITIES CODE

2018 INTERNATIONAL BUILDING CODE

2014 NEC ELECTRICAL CODE

OCCUPATIONAL SAFETY & HEALTH

ADMINISTRATION (OSHA)

UNITED STATES ENVIRONMENTAL

PROTECTION AGENCY (USEPA)

EXISTING WALL

TEMPORARY

1-HOUR SLAB-TO-

SLAB BARRIERS

LEGEND

NEW WALLS

CONST. ROUTE

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION BUILDING 1,

SECOND FLOOR, 2E AT UD

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

WALL RATING LEGEND

1 HOUR FIRE RATED BARRIER

2 HOUR FIRE RATED BARRIER

3 HOUR FIRE RATED WALL

SMOKE BARRIER

SMOKE RESISTANT

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NOT FOR

CONSTRUCTIO

N 1

Project Number Scale 15-001

NOT FOR

CONSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:3

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, DGC

INFECTION AND DUST CONTROL PLANS AND

NOTES

GI002

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

2 7

3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

"FOR REFERENCE ONLY"

SEE DIV 1 SPECIFICATIONS FOR OFFICIAL ICRA, ILSM AND ASSOCIATED FORMS AND REQUIREMENTS

NO.

NO.

UP

DOWN

STAIR

#1

DOWN

STAIR

PIPE SPACEPIPE SPACE

1W104

1N143 1N144 1N145 1N146 1N147

1N103

1N101

C1C3

C 1C

1A113

1A112

1A111 C1-3

1A109

1A117

1A117A 1A108

1C115

1C114

1C1C3 1C109 1C108 1C107 1C106 1C105

1C118

1C117

1N205

1N204

1N206

1C1C2

SOILED

HOLD & DIST.

CONFERENCE RM "B"

CORRIDOR

C O

RR

ID

O R

PRE-PACKING

& STORAGEAMB. CARE

SUPV.

PATIENT

REP.

CLASS

ROOM

CHIEF'S

OFFICE

CORRIDOR 1N-1A

OFFICE

STO.

SOILED STO. CORRIDOR

UNEXPOSED FILM

CHEM. STO.

CART

LIFT

W/C TLT. HAC

EL

EC

CL

O.

STO.

PATIENT ADVOC

MCCR (CUST. SVC)

PATIENT WAITING MEANS TESTING DECEDENT ID CARDS SERVICE

PAT PROC CHECK-IN/

M. TOILET

PIPE SPACE

OFFICE

PATIENT WAITING

CAFE

SHIPPING &

RECEIVING

MECH. SPACE

FLAMMABLE

STORAGE

CAMERA 4

EXAM

EXAM

CORRIDOR

CORRIDOR

UPS/FLEX

CORRIDOR

DISK ST.

WAITING

OUTPATIENT

CHECK IN

RECEPT./

TOILET

STAFF

TOILET

PATIENT

ROOM 'B'

CONFERENCE

DRESS RM.DRESS RM.

CORRIDOR

READING

OFFICE 5

WELL COUNT

UPTAKE PROBE/

1W151 1W105

1W106

1W172

1W104

1W109

1W178

1W150

1W102

1W103

1W171

1W100

1W100A

1W101

1N102

CORRIDOR

H H

H

DF DF

H

S

16 17 19 21 24 25 26

D

F

G

H

J.

J

16.1

C

ICRA REFERENCE CODES

2018 NFPA 101 LIFE SAFETY CODE

NFPA 99 HEALTH CARE FACILITIES CODE

2018 INTERNATIONAL BUILDING CODE

2014 NEC ELECTRICAL CODE

OCCUPATIONAL SAFETY & HEALTH

ADMINISTRATION (OSHA)

UNITED STATES ENVIRONMENTAL

PROTECTION AGENCY (USEPA)

EXISTING WALL

TEMPORARY

1-HOUR SLAB-TO-

SLAB BARRIERS

LEGEND

NEW WALLS

CONST. ROUTE

WALL RATING LEGEND

1 HOUR FIRE RATED BARRIER

2 HOUR FIRE RATED BARRIER

3 HOUR FIRE RATED WALL

SMOKE BARRIER

SMOKE RESISTANT

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

# SHEET KEY NOTES:

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NO

T F

O R

CO

NSTRUCTIO

N 1

Project Number Scale 15-001

SHEET NOTES:

NO

T F

O R

CO

NSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:3

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KC DGC

1ST FLOOR PHASING & ICRA PLAN - WEST SIDE

GI003

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

3 7

1/8" = 1'-0"

ICRA PLAN 2E EAST - 1ST FLOOR (1178'-0")

UP

ICRA REFERENCE CODES

2018 NFPA 101 LIFE SAFETY CODE

NFPA 99 HEALTH CARE FACILITIES CODE

2018 INTERNATIONAL BUILDING CODE

2014 NEC ELECTRICAL CODE

OCCUPATIONAL SAFETY & HEALTH

ADMINISTRATION (OSHA)

UNITED STATES ENVIRONMENTAL

PROTECTION AGENCY (USEPA)

EXISTING WALL

TEMPORARY

1-HOUR SLAB-TO-

SLAB BARRIERS

LEGEND

NEW WALLS

CONST. ROUTE

16 17 19 21 24 25 26 30

D

F

G

H

J.

J

16.1

C

PHASE 4A

PHASE 3A (DEMOLITION WORK) AND 3B (NEW WORK)

PHASE 3B

ANTEROOM

MECH/ELEC

2E104

WAIT

2E133

RECEPT.

2E134

MEN

2E135

WOMEN

2E136

SOILED

2E139

WORK

2E140

CLEAN

2E138

WORK

2E141

BREAK RM.

2E142

TECH.

2W171

STOR

2W172

CORR.

2W170

TECH.

2W175

CLEAN

2W176

EEG

2W177

EEG

2W173

TOILET

2W174

CORRIDOR

C2E1

C L R

PHASE 4A

C L R

/2

C L R

RETAIN THIS PORTION OF

ICRA WALL FROM PHASES

2 AND 3 AS NEW WALL

M A

T C

H L

IN

E

M A

T C

H L

IN

E

S E

E S

H E

E T

G I0

8A

8B

S E

E S

H E

E T

G I0

3A

C L R

C L R

1111 11

S E

E S

H E

E T

G I0

S E

E S

H E

E T

G I0

CONSTRUCTION ACCESS

BETWEEN PHASES 2 AND 3A

PHASES 2 AND 3A ANTEROOM MUST

BE REMOVED PRIOR TO ERECTING

PHASE 3B ANTEROOM. COORDINATE

SCHEDULE WITH VA COR

1 1

PHASE 4A

PHASE 4B

CONSTRUCT PHASE 4B

WORK IS AFTER HOURS

AND ON WEEKENDS.

COORDINATE SCHEDULE

WITH VA COR PRIOR TO

STARTING WORK

COORDINATE SCHEDULE FOR PHASE 4A

WITH VA COR PRIOR TO STARTING WORK

COORDINATE SCHEDULE FOR PHASE 4A

WITH VA COR PRIOR TO STARTING WORK

COORDINATE SPECIAL

ACCESS FOR DELIVERY

FROM ELEVATOR #7 TO THE

LAB AND STORAGE AREAS

DURING PHASE 4A AND 4B

CONSTRUCTION

ELEVATOR

#11 #10

STAIR

#1

#9

#1

(SHAFT)

#2 #3 #4 #5 #6

#8 #7

WHEELCHAIR

TELEPHONE

RESEARCH

A/C ROOM

RECEPTION

2A238

WAITING

2A202

TLT

2A203

EXIST ELEC

CLOSET

2A239

WALK-IN

COOLER

SNW102A

BIO-WASTE

2W104

H.A.C.

2W105

TOILET

2W107

TOILET

2W108

ELEC. ROOM

2W106

STORAGE

2NW102

BREAK ROOM

2NE101

W/C SPEC.

2NE101A

PHLEBOTOMY

STORAGE

2NE102

TELE. CO.

2NE102A

C2N1

CORRIDOR

2NW101

CORE LAB

C2W1

CORRIDOR

WALL FROM RECENT VA

PROJECT TO REMAIN,

WALL SHALL TOP OFF

UNDERSIDE OF FLOOR

DECK ABOVE.

DATA CLOSET

2NE100A

PHASE 4A

DATA

CLOSET

2C106

1. PROVIDE TEMPORARY 1-HOUR RATED

SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"

METAL STUD FRAMING WITH 5/8" GYPSUM

BOARD ON BOTH SIDES. BARRIERS SHALL BE

INSPECTED BY VA LIFE SAFETY AND ICRA

STAFF PRIOR TO START OF CONSTRUCTION IN

SPACE. MAINTAIN NEGATIVE PRESSURE

VENITLATION IN THE CONSTRUCTION SPACE.

2. PROVIDED OUTER DOOR TO THE

CONSTRUCTION AREA ANTEROOM SHALL BE

45 MIN. RATED HARD DOOR IN A RATED FRAME

WITH CLOSER.

3. CONSTRUCTION ACCESS ROUTE

3A. USE ISOLATION CART FOR ALL WORK IN

THIS AREA.

4. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL

PHASES.

5. PERFORM WORK REQUIRED BY VA

INFECTION CONTROL PERSONNEL REGARDING

ICRA FORM. SEE ICRA FORM FOR

REQUIREMENTS. ALL ICRA AND ILSM WORK

ITEMS MUST BE COMPLETED PRIOR TO

BEGINNING ANY NEW CONSTRUCTION WORK

OR DEMOLITION.

6. VA REQUIRES THAT ALL APPLICABLE

PERMITS BE COMPLETED AND APPROVED

PRIOR TO BEGINNING ANY WORK ON STATION.

PERMITS INCLUDE: ICRA, ILSM, ABOVE CEILING,

FIRE / SMOKE WALL, UTILITY, FIRE SPRINKLER,

FIRE ALARM SYSTEM, MEDICAL GASES AND

CONFINED SPACE.

7. PROVIDE STAGING AREA FOR PPE

(PERSONAL PROTECTIVE EQUIPMENT) FOR

HAZMAT SUITS UNLESS NOTED OTHERWISE.

8. TEMPORARILY REMOVE EXISTING

WINDOW AND INSTALL EXHAUST THRU.

(CONTRACTOR TO COORDINATE WITH NEW

WINDOW WORK SCHEDULE.)

8A. CONTRACTOR TO DETERMINE NUMBER

OF EXHAUST FAN REQUIRED TO MAINTAIN

NEGATIVE PRESSURE LEVEL INSIDE

CONSTRUCTION AREA.

8B. TURN UP EXHAUST ON EXTERIOR SIDE,

CONTRACTOR SHALL VERIFY LOCATION OF

AIR INTAKES AT THE PROPER DISTANCE

FROM EXHAUST. VERIFY LOCAL JURISDICTION

CODE AND CA REQUIREMENTS FOR DISTANCE

PRIOR STARTING WORK.

9. TEMPORARY DIGITAL MANOMETER FOR

NEGATIVE PRESSURE MONITORING

10. SHORT TERM BARRIER EXTEND TO

UNDERSIDE OF CEILING TO REMOVE FRAME

AND PATCH WALL. COORDINATE SCHEDULE

WITH VA COR PRIOR TO ERECTING THE

BARRIER.

11. TEMPORARY VINYL CORNER GUARD

12. PROVIDE CONSTRUCTION SIGNAGE FOR

DOOR ACCESS DURING PHASE 4A CONST.

WORK. COORDINATE DOOR ACCESS AND

SCHEDULE WITH VA COR.

LIFE SAFETY/ICRA

ALTERNATE NOTES

OMIT THE EXTERIOR WINDOW REPLACEMENT.

EXISTING WINDOW TO REMAIN.

SCHEDULE OF WORK FOR PHASE 4 OMIT

WORK IN THE CORRIDORS AROUND THE

ELEVATOR ON THE ICRA PLAN AND RELATED

FLOOR PATTERN / INTERIOR FINISHES SHEETS

1.

2.

WALL RATING LEGEND

1 HOUR FIRE RATED BARRIER

2 HOUR FIRE RATED BARRIER

3 HOUR FIRE RATED WALL

SMOKE BARRIER

SMOKE RESISTANT

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

# SHEET KEY NOTES:

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NOT FOR

CONSTRUCTIO

N 1

Project Number Scale 15-001

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:3

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, DGC

2ND FLOOR PHASING & ICRA PLAN - WEST SIDE

GI004

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

4 7

1/8" = 1'-0"

2ND FLOOR PHASING & ICRA PLAN WEST SIDE

DN

UP UP

DN

EXISTING WALL

TEMPORARY

1-HOUR SLAB-TO-

SLAB BARRIERS

LEGEND

NEW WALLS

CONST. ROUTE

4039 42 433830 32 34 35 35.1 37

D

F

G

H

J.

33 36

C

MECH/ELEC

2E104

WAIT

2E133

RECEPT.

2E134

TOILET

2E105

STOR

2E106

EXAM 1

2E107

EXAM 2

2E108

EXAM 3

2E109

EXAM 4

2E110

EXAM 5

2E111

EXAM 6

2E112

EXAM 7

2E113

CLEAN STOR

2E114

OTBC:

TREATMENT AREA

(EDEMA)

2E115

HAC

2E117A

WEP: EQUIP.

STOR.

2E118PRIVATE

TREATMENT

2E119

HAND CLINIC

2E121

PT EXERCISE/

CLINCIAL SPACE

2E120

CLEAN STOR

2E122

TOILET

2E123

PRIVATE

TREATMENT

2E125

PRIVATE

TREATMENT

2E126

CARDIAC/

PULMONARY

2E124

EXAM 8

2E127

EXAM 9

2E128

EXAM 10

2E129

EXAM 11

2E130

EXAM 12

2E131

ANTI-COAG

2E132

CORRIDOR

C2E1PHASE 2

ROOF

LOWER ROOF

ROOF

ROOF

ROOF

M A

T C

H L

IN

E

M A

T C

H L

IN

E

C L R

RETAIN THIS PORTION OF

ICRA WALL FROM PHASES

2 AND 3 AS NEW WALL

PHASES 2 AND

3A ANTEROOM

8A

8B

S E

E S

H E

E T

G I0

S E

E S

H E

E T

G I0

F.2

F.1

TEMPORARY

RELOCATE FIRE

EXTINGUISHER

FOR PHASE 2

CONSTRUCTION

EXISTING FIRE

EXTINGUISHER

INSTALL TEMPORARY CONSTRUCTION

SIGN IN STAIR #3 TO INDICATE NO

ACCESS THRU 2E CLINICAL SPACE

DURING CONSTRUCTION.

COORDINATE WITH VA COR ABOUT

SECURING EGRESS DOOR

STAIR #3

ROOF

3A

PHASES 2 AND 3A

ANTEROOM MUST BE

REMOVED PRIOR TO

ERECTING PHASE 3B

ANTEROOM. COORDINATE

SCHEDULE WITH VA COR

CONSTRUCTION

ACCESS BETWEEN

PHASES 2 AND 3A

S E

E S

H E

E T

G I0

S E

E S

H E

E T

G I0

SEAL AROUND DOOR COMPLETELY. INSTALL

YELLOW CROSS TAPES AND CONSTRUCTION SIGN

STATING 'TEAR OFF TAPES EMERGENCY EXIT ONLY'

BULK STORAGE

2NE100

M. TOILET

2NE100BDATA

CLOSET

2C106

DATA CLOSET

2NE100A

ALTAR

2M203D

CHAPEL

2M203

SACRISTY

2M203B

BLESSED

SACRAMENT

2M203A

BREAK ROOM

2NE101

W/C SPEC.

2NE101A

PHLEBOTOMY

STORAGE

2NE102

TELE. CO.

2NE102A

#7

WHEELCHAIR

TELEPHONE

2C108

BLOOD BANK

2NE105

STORAGE

2NE105A

THERAPEUTIC

PHLEBOTOMY

2NE104

ENTRY

2NE200

ROOF

OPEN TO

BELOW

MECH.

2E116A

MECH.

2E116B

EXISTING ROOF TOP PENTHOUSE

1. PROVIDE TEMPORARY 1-HOUR RATED

SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"

METAL STUD FRAMING WITH 5/8" GYPSUM

BOARD ON BOTH SIDES. BARRIERS SHALL BE

INSPECTED BY VA LIFE SAFETY AND ICRA

STAFF PRIOR TO START OF CONSTRUCTION IN

SPACE. MAINTAIN NEGATIVE PRESSURE

VENITLATION IN THE CONSTRUCTION SPACE.

2. PROVIDED OUTER DOOR TO THE

CONSTRUCTION AREA ANTEROOM SHALL BE

45 MIN. RATED HARD DOOR IN A RATED FRAME

WITH CLOSER.

3. CONSTRUCTION ACCESS ROUTE

3A. USE ISOLATION CART FOR ALL WORK IN

THIS AREA.

4. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL

PHASES.

5. PERFORM WORK REQUIRED BY VA

INFECTION CONTROL PERSONNEL REGARDING

ICRA FORM. SEE ICRA FORM FOR

REQUIREMENTS. ALL ICRA AND ILSM WORK

ITEMS MUST BE COMPLETED PRIOR TO

BEGINNING ANY NEW CONSTRUCTION WORK

OR DEMOLITION.

6. VA REQUIRES THAT ALL APPLICABLE

PERMITS BE COMPLETED AND APPROVED

PRIOR TO BEGINNING ANY WORK ON STATION.

PERMITS INCLUDE: ICRA, ILSM, ABOVE CEILING,

FIRE / SMOKE WALL, UTILITY, FIRE SPRINKLER,

FIRE ALARM SYSTEM, MEDICAL GASES AND

CONFINED SPACE.

7. PROVIDE STAGING AREA FOR PPE

(PERSONAL PROTECTIVE EQUIPMENT) FOR

HAZMAT SUITS UNLESS NOTED OTHERWISE.

8. TEMPORARILY REMOVE EXISTING

WINDOW AND INSTALL EXHAUST THRU.

(CONTRACTOR TO COORDINATE WITH NEW

WINDOW WORK SCHEDULE.)

8A. CONTRACTOR TO DETERMINE NUMBER

OF EXHAUST FAN REQUIRED TO MAINTAIN

NEGATIVE PRESSURE LEVEL INSIDE

CONSTRUCTION AREA.

8B. TURN UP EXHAUST ON EXTERIOR SIDE,

CONTRACTOR SHALL VERIFY LOCATION OF

AIR INTAKES AT THE PROPER DISTANCE

FROM EXHAUST. VERIFY LOCAL JURISDICTION

CODE AND CA REQUIREMENTS FOR DISTANCE

PRIOR STARTING WORK.

9. TEMPORARY DIGITAL MANOMETER FOR

NEGATIVE PRESSURE MONITORING

10. SHORT TERM BARRIER EXTEND TO

UNDERSIDE OF CEILING TO REMOVE FRAME

AND PATCH WALL. COORDINATE SCHEDULE

WITH VA COR PRIOR TO ERECTING THE

BARRIER.

11. TEMPORARY VINYL CORNER GUARD

12. PROVIDE CONSTRUCTION SIGNAGE FOR

DOOR ACCESS DURING PHASE 4A CONST.

WORK. COORDINATE DOOR ACCESS AND

SCHEDULE WITH VA COR.

LIFE SAFETY/ICRA

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

# SHEET KEY NOTES:

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NO

T F

O R

CO

NSTRUCTIO

N 1

Project Number Scale 15-001

SHEET NOTES:

NO

T F

O R

CO

NSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:3

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, DGC

2ND FLOOR PHASING & ICRA PLAN - EAST SIDE

GI005

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

5 7

1/8" = 1'-0"1

2ND FLOOR PHASING & ICRA PLAN - EAST SIDE

TO ELEVATOR

#11

K-4329KINGSTON C_TOILETS VITREOUS CHINA

K-2007KING STO NC_LAVATO RYVITREO US CHINA

WH

UP

UP

EXISTING WALL

TEMPORARY

1-HOUR SLAB-TO-

SLAB BARRIERS

LEGEND

NEW WALLS

CONST. ROUTE

11 12 13 14 16 17 19 21 24 25 26

D

F

G

H

J.

J

16.115

C

L

N

P

EXAM V3

2A102D

EXAM V4

2A102E

WORK

2A102C

EXAM V5

2A102F

EXAM V1

2A102A

EXAM V2

2A102B

CORRIDOR

2A102

TECH.

2W175

CLEAN

2W176

CORR.

2W170

TECH.

2W171

STOR

2W172

BREAK RM.

2E142

EEG

2W177

EEG

2W173

TOILET

2W174

WORK

2E141

WORK

2E140

CLEAN

2E138

SOILED

2E139

WOMEN

2E136

MEN

2E135

RECEPT.

2E134

FILL WALL AFTER

DOOR REMOVAL

ELEVATOR

#11

3A

M

IN

C

LR

5'

0"

PHASE 1

8B

8A

PROVIDE 3'-0" (W) X 7'-0"

(H) WALL OPENING TO

ALLOW CONSTRUCTION

ACCESS

STAFF

BREAK

2W111A

2A107

PSYCHOLOGY

OFFICE

2A108

PSYCHOLOGY

OFFICE

2A109

PSYCHOLOGY

OFFICE

2A106

PSYCHOLOGY

OFFICE

2A104

SECT /

WAIT

C2W1A

CORR.

C2W2

CORR.

2W125

TELEHEALTH

EDUCATION

TRAINING

2W167B

TELEHEALTH/

PROVIDER

OFFICE

2W110A

WAITING

C2W09

CHECK

IN/OUT

C2W1

CORR.

2A201

LOBBY

2A200

CORRIDOR 2A202

WAITING

2A203

RESTROOM

2A238

RECEPTION

2A234

DOUBLE

OFFICE

2A235

DOUBLE

OFFICE

2A231

EXAM #5

2A230

EXAM #4

2A232

PRECEPTOR

2A228

CORRIDOR 2A229

UROFLOW

RESTROOM

2A225

EXAM #3

2A226

EXAM #2

2A227

EXAM #1

2A224

MEDICAL

SUPPLY

2A223

CLEAN

AREA/

HOLDING

2W167A

PROVIDER

WORK

ROOM

2W164

H.A.C.

2A109

PSYCHOLOGY

OFFICE

2A135B

STAFF

PHYSICIAN

2A135A

STAFF

PHYSICIAN

2A135

CLERICAL

STAFF

2A135

CLERICAL

STAFF 2A221

PROCEDURE

ROOM

2A220

CYSTOLOGY

ROOM

2A218

DIRTY

ROOM

2A219

CONTROL

ROOM

2A217

CORRIDOR

2A134

TELE.

CLOSET

2A133

ELECTRICAL

CLOSET

CORRIDOR

2A209

CORRIDOR

2A208

EXAM 6

2A207

RESIDENT OFFICE

2A205

CONSULT.

2A210 CHANGING

RM #1

2A211

CHANGING

RM #2

2A212

CHANGING

RM #3

2A213

STOR.

2A216

UTIL.

2A215

W. TLT

2A135C

STAFF

PHYSICIAN

2A135DPHYSICIAN

2A135E

STAFF BREAK RM

2A204

TLT

2A233

CORRIDOR

2A237

STORAGE

2NW102

ELEC. ROOM

2W106

TOILET

2W107

TOILET

2W108

H.A.C.

2W105

BIO-WASTE

2W104

MOLECULAR

BIOLOGY

2NW103

EXIST ELEC

CLOSET

2A239

WALK-IN

COOLER

SNW102A

1. PROVIDE TEMPORARY 1-HOUR RATED

SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8"

METAL STUD FRAMING WITH 5/8" GYPSUM

BOARD ON BOTH SIDES. BARRIERS SHALL BE

INSPECTED BY VA LIFE SAFETY AND ICRA

STAFF PRIOR TO START OF CONSTRUCTION

IN SPACE. MAINTAIN NEGATIVE PRESSURE

VENITLATION IN THE CONSTRUCTION SPACE.

ALL PENETRATIONS REQUIRE DAMPERS.

2. PROVIDED OUTER DOOR TO THE

CONSTRUCTION AREA ANTEROOM SHALL BE

45 MIN. RATED HARD DOOR IN A RATED

FRAME WITH CLOSER.

3. CONSTRUCTION ACCESS ROUTE

3A. USE ISOLATION CART FOR ALL WORK IN

THIS AREA.

4. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL

PHASES.

5. PERFORM WORK REQUIRED BY VA

INFECTION CONTROL PERSONNEL

REGARDING ICRA FORM. SEE ICRA FORM

FOR REQUIREMENTS. ALL ICRA AND ILSM

WORK ITEMS MUST BE COMPLETED PRIOR

TO BEGINNING ANY NEW CONSTRUCTION

WORK OR DEMOLITION.

6. VA REQUIRES THAT ALL APPLICABLE

PERMITS BE COMPLETED AND APPROVED

PRIOR TO BEGINNING ANY WORK ON

STATION.

PERMITS INCLUDE:

ICRA, ILSM, ABOVE CEILING, FIRE / SMOKE

WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM

SYSTEM, MEDICAL GASES AND CONFINED

SPACE.

7. PROVIDE STAGING AREA FOR PPE

(PERSONAL PROTECTIVE EQUIPMENT) FOR

HAZMAT SUITS UNLESS NOTED OTHERWISE.

8. INSTALL HARD DUCT WITH NON-FLANGE

HANGER HANGER HUNG FROM CEILING

ABOVE. BOTTOM OF DUCT SHALL BE A

MINIMUM OF 7'-2" ABOVE FINISH FLOOR.

HARD DUCT SHALL BE ROUTED THRU

EXISTING MECHANICAL EQUIPMENT ROOM'S

EXTERIOR WINDOW.

TEMPORARILY REMOVE EXISTING WINDOW

AND INSTALL EXHAUST THRU (CONTRACTOR

TO REINSTALL WINDOW AFTER PHASE 2

CONSTRUCTION COMPLETION.)

8A. CONTRACTOR TO DETERMINE NUMBER

OF EXHAUST FAN REQUIRED TO MAINTAIN

NEGATIVE PRESSURE LEVEL INSIDE

CONSTRUCTION AREA.

8B. TURN UP EXHAUST ON EXTERIOR SIDE,

CONTRACTOR SHALL VERIFY LOCATION OF

AIR INTAKES AT THE PROPER DISTANCE

FROM EXHAUST. VERIFY LOCAL

JURISDICTION CODE AND CA REQUIREMENTS

FOR DISTANCE PRIOR STARTING WORK.

9. TEMPORARY DIGITAL MANOMETER FOR

NEGATIVE PRESSURE MONITORING

10. USE PORTABLE DUCT EXTRACTOR AND

AIR SCRUBBER WITH HEPA FILTRATION

SYSTEM FOR THIS AREA.

11. CONTRACTOR TO ENSURE ALL

EXISTING PERIMETER WALLS TOP OFF AND

MEET ONE-HOUR FIRE RATING AS PART OF

THE LIFE SAFETY/ICRA BARRIER.

SHEET KEY NOTES:

LIFE SAFETY/ICRA

WALL RATING LEGEND

1 HOUR FIRE RATED BARRIER

2 HOUR FIRE RATED BARRIER

3 HOUR FIRE RATED WALL

SMOKE BARRIER

SMOKE RESISTANT

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NO

T F

O R

CO

NSTRUCTIO

N 1

Project Number Scale 15-001

SHEET NOTES:

NO

T F

O R

CO

NSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:4

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, DGC

2ND FLOOR PHASING & ICRA PLAN - VASCULAR

CLINIC AREA

GI006

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

6 7

1/8" = 1'-0"GI006

1 2ND FLOOR PHASING & ICRA PLAN - VASCULAR CLINIC AREA

1. SPRINKLER HEADS, FIRE ALARMS AND OTEHR

FIRE PROTECTION ELEMENTS SHALL BE TEMPORARILY

RELOCATED FROM THE CONSTRUCTION AREAS

WITHIN THE ICRA BARRIERS TO THE OUTSIDE OF THE

BARRIERS.

PROTECT EXISTING HARD DOOR FOR CONSTRUCTION. CONTRACTOR TO ENSURE IT

MEETS 45 MIN. RATING. REPAIR DAMAGED AREAS CAUSED BY CONSTRUCTION WORK

ANTEROOM

CONSTRUCTION ANTEROOM

EXISTING ROOF TOP PENTHOUSEUP UP

MECH LOUVER

K-4329KINGSTON C_TOILETS VITREOUS CHINA

K-2007KING STO NC_LAVATO RYVITREO US CHINA

WH

UP

DN

DN

UP

STAIRS

#9

DN

UP

UP

DN

UP UP

UP

UP

UP

DN

DN

EXISTING ROOF TOP PENTHOUSEUP UP

MECH LOUVER

174 5 7 8 10 12 13 14 16

Q

S

38.1

3735.1

3432302726252421 4443424039121198754321

24222018 27 29 31 33

V

U

T

P

O

N

L

K

J

V

T

U

R

Q

P

J

L

N

E

F

G

D

C

MC

MK

ML

M5.2M4.3M1.7M1.1 M7.1 M7.7 M8.3

MO

40393734

754321

V

T

U

V

U

T

R R

Q Q

P

4 5 7

K-4329KING

STO

N

C_TO

ILETS

VITREO

US CHINA

K-4329KING

STO

N

C_TO

ILETS

VITREO

US CHINA

K-4329KINGSTON C_TOILETS VITREOUS CHINA

K-4329KING STO NC_TO ILETSVITREO US CHINA

K-2007KING STO NC_LAVATO RYVITREO US CHINA

WH

U P D O W N

UP

U P

D O W N

DN

DN

UP

2W151 2W152

2W116A

2W116 2W115

2W115B

2W115A

2W114A

2W114 2W113

2W158 2W157

2W167

2W155

2W159

2W166

2W112

2W111

2W110

2W109

2W1082W109A

2C110

W

W

2W105 2W104

C2W1 C2C3A-1

C2W58

C2C1

C W

2E126

2W200

2W152A

2NW110

2NW107B

C C

C2C25

C C

C C

C2C28

C2C29

C C

2N E105

2NE126

2NE125

2NE111

2NE1202NE112

2NE113

2NE113A

N E E

2A 135G

2A 135 2A 135A

2A 103D

2A 104

2A 106

2A 1072A 108

2A 109

2A 110

2A 111

2A 112

2A 112E

2A 112A

2A 113

2A 114

2A 115

2A 116

2A 117

2A 117A

2A 118

2A 119 2A 120

2A 121A

2A 122

C2-8

2A 123

2A 124

2A 1252A 1262A 127

2A 128

2A 129

2A 130

2A 130A

2A 130B

2A 130C

2A 130D

2A 131

2A 131A

2A 131B

2A 132

2W133A 2W117

2W118

2W119

2W121

2W133 2W143

2W147

2W146

2W144

C2W32W143A

2W148

2W148A 2W149A

2W149

2W150

2A 121

2A 119A

2A 112B

2A 112C

2A 112D

2A 224

2A 2252A 2262A 227

2A 215

2A 214

2A 2302A 231

2A 228

STAIR

#2

TREAT. M.T.

STO.BATH

STO.

DAILY LIVING

EVAL./TRAINING

OFFICE

STO.

OCCUPATIONAL

THERAPY-CLINIC

OCCUPATIONAL

THERAPY-CLINIC

ADMIN.

SECT./WAITING M.T. ELECTROMYO-

GRAPHY ROOM

F.T.

CHECK-IN DESK

HAC

TREAT. RM.

PASSAGE

STAFF

PHYSICIAN SECT.

ADMIN.

ASSIST.

RECEPT.

AREA

CLERK

CHIEF'S

OFFICE

RESEARCH

A/C ROOM

2C108

WHEELCHAIR

TELEPHONE

F.

T. M .T

TOILET BIO WASTE

CORRIDOR CORRIDOR

CORRIDOR

CO

RR

ID

O R

STAIR

#3

OFFICE2E104

MECH. ROOM

DN 12+12R

W/C SPEC.

48. 0

2NE101A

MECHANICAL

ROOM

MECHANICAL

ROOM

ROOF

ROOF

ROOF

2C106

DATA CLO

STAIRS

#6

#1 #2 #3 #4 #5 #6

#7#8#9#10#11

(SHAFT)

CARPENTER

PM SHOP

PM SHOP

ELECTRIC

TELE. CLO.

2A 134

TELE. CLO.

BREAK RM.

341. 3

2NE101

CO

RR

ID

O R

C N

2N E129

CLERICAL

CHEM. SUPV.

2NW1212NW122

CHEM. TECH.

2NW100

STO.

2NE131

LOCKERS

2NE131A

M. TOILET

2NE130A

F. TOILET

2NE130

LOCKERS

2NW120

CHEMISTRY

SPECIAL

SCOPE

2NW119

VISITOR'S

2NW118

BIO-WASTE

H.A.C.

2NW1172NW116

GLASSWARE

ICE /

SUPERVISOR

2NW115

HEMATOLOGY

CH. MEDICAL

TECHNOLOGIST

2NW114

P & LM

2NW113

SECRETARY

PROGRAM LEADER

2NW112

P & LM

VIDAS

MICROSCOPY

2NW109

SUPERVISOR

MICROBIOLOGY

2NW108

MICROBIOLOGY

ANTE ROOM

2NW107

BSL 3

2NW107A

TB

BSL 3

MYCOLOGY

STERI. RM.

38. 3

2NW106A

STORAGE

CONFERENCE

2NW105

MOLECULAR BIO.

2NW104

REAGENT PREP.

2NW103

BIOLOGY

MOLECULAR

CORE LAB

2NW101

COOLER

WALK-IN

2NW102A

STORAGE

2NW102

C2N1A

CORRIDOR

C N W

CO

RR

ID

O R

CO

RR

ID

O R

C C

CO

RR

ID

O R

CORRIDOR

C2C4

CORRIDOR

CORRIDOR

CO

RR

ID

O R

CO

RR

ID

O R

CORRIDOR

CORRIDOR

CO

RR

ID

O R

2NE102

STORAGE

PHLEBOTOMY

12. 8

2NE102A

TELE. CLO. ENTRY

233. 3

2NE200

48. 4

2NE100A

DATA CLO.

2NE100B

M. TOILET

279. 3

2NE100

STORAGE

BULK

202. 7

2NE104

THERAPEUTIC

PHLEBOTOMY

BLOOD BANK

32. 6

2NE105A

STORAGE

SUPERVISOR

2NE106

BLOOD BANK

2NE107

FUTURE OFFICE

RELAX /

2NE128

OFFICER

ADMIN

2NE127

TECH.

ACCOUNTING

SIGN - OUT

RESIDENTS

TESTING

2NE124

ANCILLARY

STORAGE

2NE108

FILES /

2NE109

BLOCK STORAGE

SLIDE / PARAFFIN

2NE123

ADPAC

SUPERVISOR

ANATOMIC

2NE110

NEUROPATH

2NE122

CHIEF

MICROSCOPY

ELECTRON

HEMATOLOGY

2NE121

CHIEF

ANATOMIC PATH

CHIEF

CYTOLOGY

SECTIONING

GROSS

2NE119

STAINS

SPECIAL

2NE114

STORAGE

2NE118

HISTOLOGY

2NE115

STORAGE

2NE116

LABORATORY

DENTAL

2NE117

LABORATORY

HISTOLOGY

EL. CLO.

2NE100C

CO

RR

ID

O R

STAFF

2A 135C

TOILET

WOMEN

2A 135B

SECT / WAIT

OFFICE

PSYCHOLOGY

PSYCHOLOGY

OFFICEOFFICE

PSYCHOLOGY

PSYCHOLOGY

OFFICE

CLOSET

ELECTRICAL

PURPOSE

MULTI-

OPEN OFFICE

CONTROL RM.

BIO-FEEDBACK

TRAINEE

TRAINEE

TRAINEE

STO.

COORD.

V.I.S. TEAM

TREAT

EXAM /

OFFICE

CORRIDOR

MECHANICAL

EQUIPMENT

ELECT.

EQUIP.

TELE.

EQUIP.

MECHANICAL

EQUIPMENT

TELE. EQ.

ROOM

CHILLER

CLOSET

ELECTRICAL ELECTRICAL

CLOSET

2A 133

PASSAGE TOILET

STO.

OFFICE

COLD ROOM

RESEARCH LAB RESEARCH LAB

OFFICE

CORRIDOR

OFFICE

CORRIDORPASSAGE

VOLUNTEER

OFFICE

IRM

ENTRY

STORAGE

PHYSICIAN

PHYSICIAN

STAFF

PHYSICIAN

STAFF

PHYSICIAN

STAFF

CLERICAL

ROOF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

OFFICE

STO

OFFICE

STAIR

#1

2A 219

ROOM

CONTROL

2A 218

ROOM

DIRTY

2A 220

ROOM

CYSTOLOGY

2A 221

ROOM

PROCEDURE

SUPPLY

MEDICAL

EXAM #3EXAM #2EXAM #1

2A 217

CORRIDOR

2A 222

CORRIDOR

2A 216

STORAGE

UTIL.

STERILIZER

EXAM #4EXAM #5

CORRIDOR

SER VI CE

ELEV. 4

SER VI CE

ELEV. 3

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

UP 10+9R

STAIRS

#9

STAIRS

#10

DN

UP

RD

RD

RD

DN

DN

EXISTING ROOF TOP PENTHOUSEUP UP

MECH LOUVER

174 5 7 8 10 12 13 14 16

Q

S

38.1

3735.1

3432302726252421 4443424039121198754321

24222018 27 29 31 33

V

U

T

P

O

N

L

K

J

V

T

U

R

Q

M1.7

P

J

L

N

E

F

G

D

C

MC

MK

ML

M5.2M4.3M1.7M1.1 M7.1 M7.7 M8.3

MO

40393734

754321

V

T

U

V

U

T

R R

Q Q

P

4 5 7

K-4329KINGSTON C_TOILETS VITREOUS CHINA

K-4329KING STO NC_TO ILETSVITREO US CHINA

K-2007KING STO NC_LAVATO RYVITREO US CHINA

WH

UP

U P

D O W N

DN

DN

UP

2W151 2W152

2W116A

2W116 2W115

2W115B

2W115A

2W114A

2W114 2W113

2W158 2W157

2W167

2W155

2W159

2W166

2W112

2W111

2W110

2W109

2W1082W109A

2C110

W

W

2W105 2W104

C2W1 C2C3A-1

C2W58

C2C1

C W

2E126

2W200

2W152A

2NW110

2NW107B

C C

C2C25

C C

C C

C2C28

C2C29

C C

2N E105

2NE126

2NE125

2NE111

2NE1202NE112

2NE113

2NE113A

N E E

2A 135G

2A 135 2A 135A

2A 103D

2A 104

2A 106

2A 1072A 108

2A 109

2A 110

2A 111

2A 112

2A 112E

2A 112A

2A 113

2A 114

2A 115

2A 116

2A 117

2A 117A

2A 118

2A 119 2A 120

2A 121A

2A 122

C2-8

2A 123

2A 124

2A 1252A 1262A 127

2A 128

2A 129

2A 130

2A 130A

2A 130B

2A 130C

2A 130D

2A 131

2A 131A

2A 131B

2A 132

2W133A 2W117

2W118

2W119

2W121

2W133 2W143

2W147

2W146

2W144

C2W32W143A

2W148

2W148A 2W149A

2W149

2W150

2A 121

2A 119A

2A 112B

2A 112C

2A 112D

2A 224

2A 2252A 2262A 227

2A 215

2A 214

2A 2302A 231

2A 228

STAIR

#2

TREAT. M.T.

STO.BATH

STO.

DAILY LIVING

EVAL./TRAINING

OFFICE

STO.

OCCUPATIONAL

THERAPY-CLINIC

OCCUPATIONAL

THERAPY-CLINIC

ADMIN.

SECT./WAITING M.T. ELECTROMYO-

GRAPHY ROOM

F.T.

CHECK-IN DESK

HAC

TREAT. RM.

PASSAGE

STAFF

PHYSICIAN SECT.

ADMIN.

ASSIST.

RECEPT.

AREA

CLERK

CHIEF'S

OFFICE

RESEARCH

A/C ROOM

2C108

WHEELCHAIR

TELEPHONE

F.

T. M .T

TOILET BIO WASTE

CORRIDOR CORRIDOR

CORRIDOR

CO

RR

ID

O R

STAIR

#3

2E104

MECH. ROOM

DN 12+12R

W/C SPEC.

48. 0

2NE101A

MECHANICAL

ROOM

MECHANICAL

ROOM

ROOF

ROOF

ROOF

2C106

DATA CLO

STAIRS

#6

#1 #2 #3 #4 #5 #6

#7#8#9#10#11

(SHAFT)

CARPENTER

PM SHOP

PM SHOP

ELECTRIC

TELE. CLO.

2A 134

TELE. CLO.

BREAK RM.

341. 3

2NE101

CO

RR

ID

O R

C N

2N E129

CLERICAL

CHEM. SUPV.

2NW1212NW122

CHEM. TECH.

2NW100

STO.

2NE131

LOCKERS

2NE131A

M. TOILET

2NE130A

F. TOILET

2NE130

LOCKERS

2NW120

CHEMISTRY

SPECIAL

SCOPE

2NW119

VISITOR'S

2NW118

BIO-WASTE

H.A.C.

2NW1172NW116

GLASSWARE

ICE /

SUPERVISOR

2NW115

HEMATOLOGY

CH. MEDICAL

TECHNOLOGIST

2NW114

P & LM

2NW113

SECRETARY

PROGRAM LEADER

2NW112

P & LM

VIDAS

MICROSCOPY

2NW109

SUPERVISOR

MICROBIOLOGY

2NW108

MICROBIOLOGY

ANTE ROOM

2NW107

BSL 3

2NW107A

TB

BSL 3

MYCOLOGY

STERI. RM.

38. 3

2NW106A

STORAGE

CONFERENCE

2NW105

MOLECULAR BIO.

2NW104

REAGENT PREP.

2NW103

BIOLOGY

MOLECULAR

CORE LAB

2NW101

COOLER

WALK-IN

2NW102A

STORAGE

2NW102

C2N1A

CORRIDOR

C N W

CO

RR

ID

O R

CO

RR

ID

O R

C C

CO

RR

ID

O R

CORRIDOR

C2C4

CORRIDOR

CORRIDOR

CO

RR

ID

O R

CO

RR

ID

O R

CORRIDOR

CORRIDOR

CO

RR

ID

O R

2NE102

STORAGE

PHLEBOTOMY

12. 8

2NE102A

TELE. CLO. ENTRY

233. 3

2NE200

48. 4

2NE100A

DATA CLO.

2NE100B

M. TOILET

279. 3

2NE100

STORAGE

BULK

202. 7

2NE104

THERAPEUTIC

PHLEBOTOMY

BLOOD BANK

32. 6

2NE105A

STORAGE

SUPERVISOR

2NE106

BLOOD BANK

2NE107

FUTURE OFFICE

RELAX /

2NE128

OFFICER

ADMIN

2NE127

TECH.

ACCOUNTING

SIGN - OUT

RESIDENTS

TESTING

2NE124

ANCILLARY

STORAGE

2NE108

FILES /

2NE109

BLOCK STORAGE

SLIDE / PARAFFIN

2NE123

ADPAC

SUPERVISOR

ANATOMIC

2NE110

NEUROPATH

2NE122

CHIEF

MICROSCOPY

ELECTRON

HEMATOLOGY

2NE121

CHIEF

ANATOMIC PATH

CHIEF

CYTOLOGY

SECTIONING

GROSS

2NE119

STAINS

SPECIAL

2NE114

STORAGE

2NE118

HISTOLOGY

2NE115

STORAGE

2NE116

LABORATORY

DENTAL

2NE117

LABORATORY

HISTOLOGY

EL. CLO.

2NE100C

CO

RR

ID

O R

STAFF

2A 135C

TOILET

WOMEN

2A 135B

SECT / WAIT

OFFICE

PSYCHOLOGY

PSYCHOLOGY

OFFICEOFFICE

PSYCHOLOGY

PSYCHOLOGY

OFFICE

CLOSET

ELECTRICAL

PURPOSE

MULTI-

OPEN OFFICE

CONTROL RM.

BIO-FEEDBACK

TRAINEE

TRAINEE

TRAINEE

STO.

COORD.

V.I.S. TEAM

TREAT

EXAM /

OFFICE

CORRIDOR

MECHANICAL

EQUIPMENT

ELECT.

EQUIP.

TELE.

EQUIP.

MECHANICAL

EQUIPMENT

TELE. EQ.

ROOM

CHILLER

CLOSET

ELECTRICAL ELECTRICAL

CLOSET

2A 133

PASSAGE TOILET

STO.

OFFICE

COLD ROOM

RESEARCH LAB RESEARCH LAB

OFFICE

CORRIDOR

OFFICE

CORRIDORPASSAGE

VOLUNTEER

OFFICE

IRM

ENTRY

STORAGE

PHYSICIAN

PHYSICIAN

STAFF

PHYSICIAN

STAFF

PHYSICIAN

STAFF

CLERICAL

ROOF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

OFFICE

STO

OFFICE

STAIR

#1

2A 219

ROOM

CONTROL

2A 218

ROOM

DIRTY

2A 220

ROOM

CYSTOLOGY

2A 221

ROOM

PROCEDURE

SUPPLY

MEDICAL

EXAM #3EXAM #2EXAM #1

2A 217

CORRIDOR

2A 222

CORRIDOR

2A 216

STORAGE

UTIL.

STERILIZER

EXAM #4EXAM #5

CORRIDOR

SER VI CE

ELEV. 4

SER VI CE

ELEV. 3

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

STAIRS

#9

STAIRS

#10

DN

UP

RD

RD

RD

DN

4039 42 43 44388 9 11 12 13 14 16 17 19 21 24 25 26 30 32 34 35 35.1 37

D

F

G

H

J.

J

3316.1 3615

C

TOILET

2E123

HAND CLINIC

2E121

EXAM 1

2E107

EXAM 2

2E108

EXAM 3

2E109

EXAM 4

2E110

EXAM 5

2E111

EXAM 6

2E112

EXAM 7

2E113

CLEAN STOR

2E114

OTBC:

TREATMENT AREA

(EDEMA)

2E115

EXAM 12

2E131

EXAM 11

2E130

EXAM 10

2E129

EXAM 8

2E127

EXAM 9

2E128

HAC

2E117A

PRIVATE

TREATMENT

2E119

TOILET

2E105

MECH/ELEC

2E104

ANTI-COAG

2E132

WAIT

2E133

MEN

2E135

WOMEN

2E136

SOILED

2E139

CLEAN

2E138

WORK

2E140

WORK

2E141

BREAK RM.

2E142

EEG

2W177

TOILET

2W174

EEG

2W173

STOR

2W172

CLEAN

2W176

TECH.

2W175

TECH.

2W171

CORR.

2W170

EXAM V4

2A102E

EXAM V1

2A102A

EXAM V2

2A102B

WORK

2A102C

EXAM V3

2A102D

CLEAN STOR

2E122

PRIVATE

TREATMENT

2E126

PRIVATE

TREATMENT

2E125

PT EXERCISE/

CLINCIAL SPACE

2E120

STAIR

#2

STAIR

#6

STAIR #9

STAIR #

STAIR #3

MECH.

2E116A

STAIR

#1

MAXIMUM TRAVEL DISTANCE = 142 FT

MAXIMUM TRAVEL DISTANCE = 179 FT MAXIMUM TRAVEL DISTANCE = 128 FTMAX. TRAVEL

DISTANCE = 98 FT

MAXIMUM TRAVEL DISTANCE = 132 FT

EXISTING ELEVATOR SHAFTS

EXISTING

EXISTING

AREA

(N.I.C)

EXISTING

AREA

(N.I.C)

EXISTING

AREA

(N.I.C)

MAX. TRAVEL

DISTANCE = 118 FT

EXIST'G

34"

EXISTING

68"

EXIST'G.

F.E.C.

EXIST'G.

F.E.C.

EXISTING AREA

(N.I.C)

EXAM V5

2A102F

EXIST'G

34"

EXIST'G

34"

L

N

P

MAX. TRAVEL

DISTANCE = 192 FT

WEP: EQUIP.

STOR.

2E118

CARDIAC/

PULMONARY

2E124

SMOKE ZONE

(EAST)

SMOKE ZONE

(WEST)

F.2

F.1

2W138

EXAM 4

2W139

EXAM 5

2W140

EXAM 6

2W142

EXAM 8

2W141

EXAM 7

2W143

PROVIDER

2W148

EXAM 13

2W149

EXAM 12

2W151

STORAGE

2W150

EXAM 11

C2W3

CORRIDOR

2W110A

WAITING

2W112

TELE.

COM.

2W123

STAFF W.

TLT

C2W2

CORRIDOR

2W124/5

TELEHEALTH

EDUCATION

TRAINING

2W200

MECHANICAL

RM

2W111C

LOCKER

AREA

2W111A

STAFF

BREAK

2W111B

ALCOVE

2W110B

WAITING

C2W1A

CORRIDOR

2W109

CHECK

IN/OUT

C2W1

CORRIDOR

2W108

W. TLT

2W107

M. TLT

2W106

ELEC RM

2W105

TLT

2W104

BIO

WASTE

I

RESEARCH

A/C RM

C2C1

CORRIDOR

2C108

WHEELCHAIR

TELEPHONE

#1

SHAFT

#2

SHAFT

#3

SHAFT

#4

SHAFT

#5

SHAFT

#6

SHAFT

#9

SHAFT

#8

SHAFT

#7

SHAFT

#11

SHAFT

#10

SHAFT

C C

C O

R R

ID

O

R

2C106

DATA CLO.

2NE100A

DATA CLO.

2NE200

ENTRY

2NE100B

M. TLT

2NE100

BULK

STORAGE

2NE104

THERAPEUTIC

PHLEBOTOMY

2NE105A

STORAGE

2NE103

PHLEBOTOMY

STORAGE

2NE101A

W/C SPEC.

2NE101

BREAK RM

C2C4

CORRIDOR

C C

C O

R R

ID

O

R

2NE102A

TELE CLO.

2NW102

STORAGE

2NW102A

WALK-IN

COOLER 2NW101

CORE LAB

C2N1

CORRIDOR

2NE105

BLOOD

BANK

2NE128

ADMIN

OFFICER

2NE127

ACCOUNTING

TECH

2NE126

SIGN-OUT

2NE107

OFFICE

2NE106

BLOOD

BANK

SUPERVISOR

2NE129

CLERICAL

2NE125

RESIDENTS

2N3124

ANCILLARY

TESTING

2NE123

ADPAC

2NE130

LOCKERS

2NE108

FILES/

STORAGE

2NE109

SLIDE/PARAFFIN

BLOCK

STORAGE

2NE110

ANATOMIC

SUPERVISOR

2NE122

CHIEF

NEUROPATH

2NE130A

F. TLT

2NE131A

M. TLT

2NW120

SPECIAL

CHEMISTRY

2NE131

LOCKERS

I

2NW100

STO.

2NW121

CHEM.

SUP.

2NW122

CHEM.

TECH

2NE100C

ELEC.

CLO.

2NE121

CHIEF

HEMATOLOGY

2NE120

CHIEF

ANATOMIC

PATH

2NE111

ELECTRON

MICROSCOPY

2NE112

CYTOLOGY

2NE113

GROSS

SECTIONING

2MS104

STAIRS

#M4

2M225

SHARED

OFFICE

N

E E

C O

R R

ID

O

R

2A104

SECT/WAIT

2A110

ELEC CLO.

C C

C O

R R

ID

O

R

2A111

MULTI-

PURPOSE

2A114

BIO-FEEDBACK

2A113

CONTROL

RM

2A115

TRAINEE

C2C28

CORRIDOR

2A117

TRAINEE

2A117A

STO.

2A118

V.I.S.

TEAM

COORD

2A119A

OFFICE 2A112

OPEN

OFFICE

2A119

EXAM/

TREAT

2A120

OFFICE

2A121

OFFICE

2A112B

OFFICE

2A112A

OFFICE

C C

C O

R R

ID

O

R

2A112E

OFFICE

2A124

OFFICE

2A112C

OFFICE

2A123

OFFICE

2A122

OFFICE

C2-8

CORRIDOR

2A121A

OFFICE

2A128

OFFICE

2A129

OFFICE

2A127

OFFICE

2A126

OFFICE

2A125

OFFICE

C S

C

C O

R R

ID

O

R

C N

W

C O

R R

ID

O

R

CH. MEDICAL

TECHNOLOGIST

2NW114

PROGRAM

LEADER P&LM

2NW112

VISITOR'S

SCOPE

2NW119

MOLECULAR

BIOLOGY

MOLECULAR BIO.

REAGENT PREP.

2NW104

CONTROL

2A219

CYSTOLOGY

2A220

PROCEDURE

2A221

MEDICAL

SUPPLY

2A224

EXAM 3

2A225

EXAM 2

2A226

CLEAN AREA/

HOLDING

2A223

EXAM 1

2A227

CORRIDOR

2A228

TLT

2A229

EXAM 4

2A230

EXAM 5

2A231

OFFICE

2A234

DOCTOR

OFFICE

2A235

CORRIDOR

2A237

TLT

2A233

RESIDENT OFFICE

2A205

EXAM 6

2A207

CLEAN

LINEN

2A206

CORRIDOR

2A209

CONSULT.

2A210

STERILIZER

2A214

STOR.

2A216

UTIL.

2A215

W. TLT

2A135C

STAFF PHYSICIAN

2A135B

ELEC RM

2A133

TELE. CLO.

2A134

STAFF

PHYSICIAN

2A135A

CLERICAL STAFF

2A135

STAFF

PHYSICIAN

2A135D

PHYSICIAN

2A135E

STAFF BREAK RM

2A204

LOBBY

2A201

RECEPTION

2A238

WAITING

2A202

TLT

2A203

HAC

2NW117

BIO-WASTE

2NW118

HEMATOLOGY

SUPERVISOR

2NW115

ICE/

GLASSWARE

2NW116

ROOF

DIRTY RM

2A218

STERL. RM

2NW105

P&LM

SECRETARY

2NW113

2A131B

CHILLER

ROOM

LIFE SAFETY LEGEND

TRAVEL DISTANCE

25'-0"

EXIT WIDTH

FIRE EXTINGUISHER

CABINET

FEC

EXIT SIGN

0 1

0"

EGRESS WIDTH

ACTUAL OCCUPANT LOAD

MAX. OCCUPANT LOAD

AREA OF WORK

NORTH

SMOKE COMPARTMENT

LEGEND

ZONE 1PT02-04

ZONE 1PT02-05

ZONE 1PT02-06

BUILDING INFORMATION

I-2 OCCUPANCY

CONSTRUCTION TYPE: II (222) ~ NFPA

SPRINKLED BUILDING

ZONE 1PT02-06

11,810 SQ FT

ZONE 1PT02-05

7,097 SQ FT

ZONE 1PT02-04

14,570 SQ FT

ZONE 1PT02-06

12,295 SQ FT

ZONE 1PT02-04

14,570 SQ FT

EXISTING SMOKE ZONES

ZONE 1PT02-05

7,582 SQ FT

WALL RATING LEGEND

1 HOUR FIRE RATED BARRIER

2 HOUR FIRE RATED BARRIER

3 HOUR FIRE RATED WALL

SMOKE BARRIER

SMOKE RESISTANT

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

Drawing Title

Location

Project Title

Date

Approved: Project Director

Checked

Building Number

VA Project Number

Drawing Number

Drawn

Dwg.

CONSULTANTS: PROJECT MANAGER:

Office of Facilities

Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

E

D

C

B

A of

FULLY SPRINKLERED

3 4 5 6 7

2 3 4 5 6 7

E

D

C

B

A

NOT FOR

CONSTRUCTIO

N 1

Project Number Scale 15-001

NOT FOR

CONSTRUCTIO

N

Revisions: Date

AS INDICATED

/2

/2

:0

:5

P

M

RENOVATE BLDG. 1, SECOND

FLOOR, 2E AT UD

KMN, KC KC, GTS, DGC

2ND FLOOR PARTIAL LIFE SAFETY PLAN

GI101

May 1, 2019

100% CORRECTED FINAL

UNIVERSITY DRIVE, PITTSBURGH, PA 15240

646-14-102

7 7

1/16" = 1'-0"1

2ND FLOOR COMPOSITE PLAN

1" = 60'-0"2

2ND FLOOR 'EXISTING' SMOKE ZONES AT 2 EAST WING

1" = 60'-0"3

2ND FLOOR 'NEW' SMOKE ZONES AT 2 EAST WING

SYMBOL LEGEND

SECTIONS

SPRAY-ON FIREPROOFING

FIRE SAFING

ACOUSTICAL TILE

CERAMIC OR QUARRY TILE

STONE: GRANITE OR MARBLE

MEDIUM DENSITY FIBERBOARD

SHIM

FACE BRICK

CONCRETE

CRUSHED STONE OR GRAVEL

CONCRETE MASONRY UNIT

EARTH

STEEL (3/4 SCALE OR LARGER)

PLYWOOD VENEER

BATT OR BLANKET INSULATION

RIGID INSULATION

FINISHED WOOD (FOR LARGE SCALE DETAILS)

ROUGH WOOD (ALL BLOCKING AND FRAMING LUMBER)

PLASTER, CEMENT, MORTAR OR G.W.B.

BRASS OR BRONZE (3/4 SCALE OR LARGER)

ALUMINUM (3/4 SCALE OR LARGER)

MATERIAL LEGEND

ELEVATION INDICATION

FIRE EXTINGUISHER CABINET

SITE PLAN NORTH ARROW

REVISION INDICATION

BUILDING WALL SECTION INDICATION

DETAIL INDICATION

GENERAL DIMENSIONING

ROOM NAME

ROOM NUMBER

AREA DETAILED

STARTING POINT

NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.

(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF

IT IS GREATER THAN 1")

NOTE: DIMENSIONS ARE TAKEN FROM/TO

FINISH SURFACE, UNLESS OTHERWISE

NOTES.

STARTING POINT

ON ELEVATION

NORTH ARROW

DOOR SYMBOL

WINDOW SYMBOL

ELEVATION TAG

F.E.C

NORTH

ALIGN WITH EXISTING CONSTRUCTION

CENTER LINE / ELEVATION LINE

PROPERTY LINE

COLUMN GRID

LIMIT OF WORK

EXISTING COLUMN GRID

DENOTED WITH AN E/

PREFIX

FINISH SYMBOLS

CEILING HEIGHT

MATCHLINE

LINETYPE SYMBOLS

IN PLAN

NEW DOOR DESIGNATION

PARTITION TYPE SYMBOL

EQUIPMENT DESIGNATION

WORK ABOVE, BEYOND

OR TO BE REMOVED

BREAK LINE

SECTION NUMBER

SHEET WHERE SHOWN

SHEET WHERE SHOWN

REVISION NUMBER

DETAIL NUMBER

DENOTES CORNER GUARD

LOCATION

PARTITION TYPE

EQUIPMENT TYPE

(SEE EQUIPMENT MANUAL)

COLUMN GRID CENTERLINE INDICATOR

KEYNOTE INDICATOR

WINDOW TYPE

OR VISION PANEL

CG

INTERIOR

AND/OR

EXTERIOR

MULTIPLE INTERIOR

NEW DOOR

EMERGENCY DOOR DESIGNATION

EMERGENCY SWING

DOUBLE EGRESS DOOR DESIGNATION

ROOM NAME

1t 1t

A.F.F.10' 6"

D2

A101

SIM

RM #

CEILING:

WALL:

FLOOR:

BASE:

NAME

CEILING FINISH

WALL FINISH

FLOOR FINISH

BASE FINISH

ROOM FINISH TAG

N

NEW DOOR

BUMPER GUARD, CHAIR RAIL, HAND RAIL

FOR LOCATION SEE PLANS

NOTE: EXISTING DIMENSIONS INDICATED AS [0'-0"] OR WITH (VIF)

ARE SUPPLIED TO THE ARCHITECT BY OTHERS AND SHALL BE

FIELD VERIFIED BY THE CONTRACTOR. (SEE "GENERAL

CONTRACTOR RESPONSIBILITIES WITH RESPECT TO EXISTING

CONDITION NOTES")

ROOM INDICATION

KEYNOTE SYMBOL

O'-O"

FACE OF SURFACE INDICATORO'-O"

O'-O" ±

VIF

O'-O"

NEW DOOR

A101

F2

A201

A1

A3

A4 A2A201

EXISTING DOOR DESIGNATION

EXISTING DOOR

A

1 1

A

A102

AREA A

INDICATOR OF AREA SHOWN ON DRAWING

SHEET NUMBER OF ADJACENT DRAWING

A

DBL DOUBLE

DEFS DIRECT APPLIED EXTERIOR FINISH

SYSTEM

DEMO DEMOLITION, DEMOLISH

DET DETAIL

DFG DOOR FRAME GUARD

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVIDE, DIVISION

DP DOOR PROTECTION

DR DRAIN

DT DRAIN TILE

DW DISHWASHER

DWG DRAWING (S)

DWTR DUMBWAITER

E EAST

EA EACH

EF EACH FACE

EG END GUARD

EIFS EXTERIOR INSULATION FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EPDM ETHYLENE PROPYLENE DIENE

MONOMER

EPS EXPANDED POLYSTYRENE BOARD

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATE

EW EACH WAY

EXIST EXISTING

EXP EXPANSION / EXPOSED

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FA FIRE ALARM

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISH FLOOR ELEVATION

FIN FINISH (ED)

FLR FLOOR (ING)

FO FACE OF

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOS FACE OF STUD

FOW FACE OF WALL

FR FIRE RESISTANT / FRAME

FT FOOT, FEET / FIRE TREATED / FILM

TINT

FTG FOOTING

FUT FUTURE

FV FIELD VERIFY

FW FIRE WALL

FWC FABRIC WALL COVERING

GA GAGE, GAUGE

GB GRAB BAR

GC GENERAL CONTRACTOR

GALV GALVANIZED

GC GENERAL CONTRACTOR

GLU LAM GLUE LAMINATED (BEAM)

GR GROUT

GRTG GRATING

GYP GYPSUM

HC HANDICAP / HOLLOW CORE

HD HEAVY DUTY

HDBD HARDBOARD

HDR HEADER

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

ID INSIDE DIAMETER/DIMENISON

INCL INCLUDE (D), INCLUDING

INSUL INSULATE (D), INSULATION

INT INTERIOR

SYMBOLS USED AS ABBREVIATIONS:

& AND

L ANGLE

LL DOUBLE ANGLE

@ AT

d PENNEY

# POUND OR NUMBER

CENTER LINE

ABBREVIATIONS:

A&E ARCHITECTURAL AND ENGINEERING

AB ANCHOR BOLT/ROD

ABV ABOVE

ADDM ADDENDUM

ADH ADHESIVE

ADJ ADJUSTABLE, ADJACENT, ADJOINING

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AGGR AGGREGATE

AHR ANCHOR, ANCHORAGE

ALT ALTERNATE

ALUM ALUMINUM

ACT ACOUSTICAL CEILING TILE

APPROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASI ARCHITECTURAL SUPPLEMENTAL

INFORMATION

AWP ACOUSTICAL WALL PANEL

BD BOARD

BEV BEVELED

BFF BELOW FINISH FLOOR

BG BUMPER GUARD

BL BRICK LEDGE / BLINDS

BLK BLOCK (ING)

BM BEAM

BOT BOTTOM

BO BOTTOM OF

BOC BOTTOM OF CONCRETE

BOF BOTTOM OF FOOTING

BOH BOTTOM OF HEADER

BRG BEARING

BRK BRICK

BSMT BASEMENT

BTWN BETWEEN

C CHANNEL

CAB CABINET

CB CERAMIC BASE

CC CUBICLE CURTAIN

CD CONSTRUCTION DOCUMENTS

CF CUBIC FEET OR FOOT

CG CORNER GUARD

CHFR CHAMFER

CIPC CAST-IN-PLACE CONCRETE

CJ CONTROL/CONSTRUCTION JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR, CLEARANCE

CMP CAST MARBLE PANEL

CMU CONCRETE MASONRY UNIT

CO CHANGE ORDER

COL COLUMN

CONC CONCRETE

CONN CONNECT (ION)

CONSTR CONSTRUCTION

CONT CONTINUOUS, CONTINUE

CONTR CONTRACT (OR)

COORD COORDINATE

CORR CORRUGATED

CR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .