UCHC4-186398609_Jun_9_25_solicitation_doc.pdf

PDF 17 KB Posted

Attached to
Project 24-011 Building K Lab Renovation
Solicitation number
UCHC4-186398609
Issued by
Hartford County, Connecticut

About this file

The document is an Invitation to Bid (ITB) UCHC4-186398609 issued by the University of Connecticut Health Center (UConn Health) for Project 24-011, a laboratory renovation project. The solicitation seeks contractors to perform demolition and interior renovations of approximately 3,100 square feet on the basement level of Building K, transforming the space into a new wet laboratory and associated rooms. The bid is open to all vendors, with a non-mandatory pre-bid walkthrough scheduled for May 10, 2024, at 9:00 AM in the Main Building Lobby. The vendor Q&A period runs from May 8 to May 17, 2024, and the bid submission deadline is June 3, 2024, at 2:00 PM EDT. The project documents include architectural drawings, project specifications, conditions of bid, COVID-19 updates, and three addenda.

The solicitation features Free On Board Destination delivery terms and vendor-specified payment terms, with no specific line items indicated, suggesting a lump sum bid approach. No set-aside designations, disadvantaged enterprise requirements, or vendor restrictions are mentioned. The bid contact is Jonathan Wenger from UConn Health, reachable at jwenger@uchc.edu or 860-679-8174. While the estimated total project value is not disclosed, the comprehensive nature of the lab renovation implies a significant investment. The procurement process is structured to provide potential bidders with comprehensive information through the extensive documentation, enabling them to prepare detailed and competitive proposals for this laboratory renovation project in Farmington, Connecticut.

View the file

Other files

File Type Posted
UCHC4-186398609_Oct_28_24_solicitation_doc.pdf PDF
UCHC4-186398609_Nov_11_24_solicitation_doc.pdf PDF
UCHC4-186398609_Mar_10_25_solicitation_doc.pdf PDF
solicitation_summary.pdf PDF
UCHC4-186398609_Mar_24_25_solicitation_doc.pdf PDF
UCHC4-186398609_Oct_7_24_solicitation_doc.pdf PDF
UCHC4-186398609_Nov_4_24_solicitation_doc.pdf PDF
UCHC4-186398609_Dec_9_24_solicitation_doc.pdf PDF
UCHC4-186398609_Jan_6_25_solicitation_doc.pdf PDF
UCHC4-186398609_Feb_3_25_solicitation_doc.pdf PDF
UCHC4-186398609_Sep_16_24_solicitation_doc.pdf PDF
UCHC4-186398609_May_12_25_solicitation_doc.pdf PDF
UCHC4-186398609_Mar_17_25_solicitation_doc.pdf PDF
UCHC4-186398609_Aug_30_24_solicitation_doc.pdf PDF
UCHC4-186398609_Jan_27_25_solicitation_doc.pdf PDF
UCHC4-186398609_May_5_25_solicitation_doc.pdf PDF
UCHC4-186398609_Apr_7_25_solicitation_doc.pdf PDF
UCHC4-186398609_May_26_25_solicitation_doc.pdf PDF
UCHC4-186398609_Apr_14_25_solicitation_doc.pdf PDF
UCHC4-186398609_Dec_16_24_solicitation_doc.pdf PDF
UCHC4-186398609_Feb_24_25_solicitation_doc.pdf PDF
UCHC4-186398609_Dec_30_24_solicitation_doc.pdf PDF
UCHC4-186398609_Apr_28_25_solicitation_doc.pdf PDF
UCHC4-186398609_Sep_2_24_solicitation_doc.pdf PDF
UCHC4-186398609_Sep_23_24_solicitation_doc.pdf PDF
UCHC4-186398609_Jan_13_25_solicitation_doc.pdf PDF
UCHC4-186398609_Feb_17_25_solicitation_doc.pdf PDF
UCHC4-186398609_Feb_10_25_solicitation_doc.pdf PDF
UCHC4-186398609_Oct_21_24_solicitation_doc.pdf PDF
UCHC4-186398609_Aug_26_24_solicitation_doc.pdf PDF
UCHC4-186398609_Sep_9_24_solicitation_doc.pdf PDF
UCHC4-186398609_Aug_23_24_solicitation_doc.pdf PDF
UCHC4-186398609_Sep_30_24_solicitation_doc.pdf PDF
UCHC4-186398609_Nov_25_24_solicitation_doc.pdf PDF
UCHC4-186398609_Dec_23_24_solicitation_doc.pdf PDF
UCHC4-186398609_Jun_30_25_solicitation_doc.pdf PDF
UCHC4-186398609_Jan_20_25_solicitation_doc.pdf PDF
UCHC4-186398609_Dec_2_24_solicitation_doc.pdf PDF
UCHC4-186398609_Oct_14_24_solicitation_doc.pdf PDF
UCHC4-186398609_Nov_18_24_solicitation_doc.pdf PDF
UCHC4-186398609_May_19_25_solicitation_doc.pdf PDF
UCHC4-186398609_Jun_16_25_solicitation_doc.pdf PDF
UCHC4-186398609_Mar_31_25_solicitation_doc.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: UCHC4-186398609

Project 24-011 Building K Lab Renovation

Invitation to Bid (ITB)

UConn Health Center

May 08, 2024 - June 03, 2024

Page:2

General Header Information

UCHC4-186398609

No. UCHC4-186398609 Title: Project 24-011 Building K Lab Renovation Start Date: May 08, 2024 at 10:00:00 AM EDT End Date: June 03, 2024 at 2:00:00 PM EDT Vendor Q&A Start Date: May 08, 2024 at 2:00:00 PM EDT Vendor Q&A End Date: May 17, 2024 at 2:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: The Project consists of demolition and interior renovations to fit out approximately 3,100 square feet for a new wet lab and associated rooms located on the Basement level of Building K at the University of Connecticut Health Center, in Farmington, Connecticut.

Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: UConn Health Center

Jonathan Wenger 16 Munson Road Farmington CT, 06030 United States Tel: 8606798174 jwenger@uchc.edu

Contact Details: If you have any questions, please contact:

Jonathan Wenger 16 Munson Road Farmington CT, 06030 United States Tel: 8606798174 jwenger@uchc.edu

Selected Categories:

Page:3

Header Custom Fields:

UCHC4-186398609

Non-Mandatory Walk Through Opportunity

Site Visit Non-Mandatory Pre-Bid Walkthrough – Attendance is recommended but not required to submit a response to this bid.

A Prebid walkthrough will be held Friday, May 10th at 9:00 AM.

Contractors are to meet in the Main Building Lobby, next to Garage 3

– 263 Farmington Ave, Farmington CT. Please adhere to all parking requirements as directed

Page:4

Solicitation Requirements:

This bid has no questions defined.

UCHC4-186398609

Non-Mandatory Walk Through Opportunity

Site Visit Non-Mandatory Pre-Bid Walkthrough – Attendance is recommended but not required to submit a response to this bid.

A Prebid walkthrough will be held Friday, May 10th at 9:00 AM.

Contractors are to meet in the Main Building Lobby, next to Garage 3

– 263 Farmington Ave, Farmington CT. Please adhere to all parking requirements as directed

Page:5

Documents:

Arch - UCH Bldg K Lab Reno 24-011 CD Bid Dwgs.pdf

UCHC4 186398609 ITB 00 03 W9 05 09 Covid Update.pdf

Volume-1 Conditions of the Bid.pdf

Volume-2 Project Specifications.pdf

UCHC4 186398609 ITB 10 Addendum 1.pdf

UCHC4 186398609 ITB 10 Addendum 2.pdf

UCHC4 186398609 ITB 10 Addendum 3.pdf

Page:6

Item Specifications Solicitation has been designated as having no line items.

Page:7

File details come from the government source that posted it. Updated .