Two Rivers-SPEC_SOL-2024-05-06-W912EK24B0004.pdf

PDF 3 MB Posted

Attached to
Two Rivers Levee and Drainage District Flood Repairs
Solicitation number
W912EK24B0004
Issued by

About this file

This document is an Invitation for Bid (IFB) for the U.S. Army Corps of Engineers Rock Island District to procure construction services for flood repairs to the Two Rivers Levee and Drainage District in Des Moines County, Iowa. The work includes grubbing, stripping, placement of bedding stone and riprap, and site restoration.

This is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set-aside with an estimated cost range between $1,000,000 and $5,000,000. The contract completion time is 365 calendar days from the notice to proceed. All questions must be submitted through the online ProjNet system. Bids are due by July 25, 2024 at 10:00 AM local time. The contract will be awarded based on the total price of the bid items. The government will provide a pre-bid site visit on July 8, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO.: W912EK24B0004

B52RIVRM202302

US Army Corps of Engineers Rock Island District

MISSISSIPPI RIVER BASIN

TWO RIVERS LEVEE AND DRAINAGE

DISTRICT, MIDDLE UNIT

DES MOINES COUNTY, IOWA

2023 EVENT PL84-99 FLOOD REPAIRS

Construction Solicitation and Specifications

MAY 2024

Tw o Rivers levee repair.

See section 01 11 00 Summary of Work in the specif ication for a detailed description.

NAICS CODE: 237990

Size Standard: $45 Million Estimated Cost Range: IAW FAR 36.204 (f) Betw een $1,000,000 and $5,000,000.

The action is an 100% Service Disabled Veteran Ow ned Small Business (SDVOSB) Set-Aside Invitation for Bid

Contract Completion: 365 Calandar Days from NTP All Questions shall be submitted Via Projnet. See Clause MVR.02 for additional information

X

JOHN J WYSOCKI 309-794-5339

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Jun-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

W912EK

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912EK24B0004 25

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912EK24B0004

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Two Rivers Levee Repair

FFP

See Section 01 11 00 Summary of Work in the Specification for a Detailed Description.

FOB: Destination

PSC CD: Y1QA

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 365 dys. ANP 1 US ARMY ENGINEER DISTRICT, ROCK

ISLAND

CEMVR

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

FOB: Destination

W912EK

Section 00100 - Bidding Schedule/Instructions to Bidders

SCHEDULE OF PRICE

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JOB XXXXXXXX $______________

0002 Grubbing and Site Preparation 1 JOB XXXXXXXX $______________

0003 Bedding Stone

0003AA First 510 Tons 510 TN __________ $______________

0003AB Over 510 Tons 90 TN __________ $______________

0004 Riprap

0004AA First 3,400 Tons 3,400 TN __________ $______________

0004AB Over 3,400 Tons 600 TN __________ $______________

0005 Site Restoration 1 JOB XXXXXXXX $______________

TOTAL OF ESTIMATED AMOUNTS

(ITEM NOS. 0001 THROUGH 0005, INCL.)

JOB = LUMP SUM TN = TONS

PLEASE ENSURE THAT UNIT PRICE AND AMOUNT LINES FOR ALL

ITEMS HAVE BEEN COMPLETED.

Award will be made based on TOTAL PRICE (ITEM NOS. 0001

THROUGH 0005).

The contractor must place bids for ALL CLINs and SUB-CLINs listed in the Schedule of Prices.

CLAUSES INCORPORATED BY REFERENCE

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-10 Contract Award--Sealed Bidding JUL 1990 52.214-12 Preparation Of Bids APR 1984 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-29 Order Of Precedence--Sealed Bidding JAN 1986 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.216-1 Type Of Contract APR 1984 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.233-2 Service Of Protest SEP 2006 52.252-5 Authorized Deviations In Provisions NOV 2020 252.215-7008 Only One Offer DEC 2022 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

A prebid meeting will be held at the Project Staging Area as shown on the plans, with a date of 8 July 2024 at a 9:00 AM to 12:00 PM CT.

The meeting is to discuss the Two Rivers Levee and Drainage District 2023 Event PL84-99 Flood Repairs, W912EK-24-B-0004 and to provide an opportunity for offerors to visit the site. This will be the only formal onsite visit with USACE during the bidding phase. Offerors are highly encouraged to attend this prebid meeting. Offerors are required to bring the following safety equipment for this meeting: safety hat, safety glasses, steel-toed boots.

(c) Participants will meet at-- Meekers Landing Road Staging Area

Site Visit POC:

Scott A. Bullock scott.a.bullock@usace.army.mil Cell: (309) 429-1115

Office: (563) 386-0572 Ext. 6704

(End of provision)

MVR.02

QUESTION AND ANSWER VIA PROJNET

ALL SUBMITTED QUESTIONS FOR THIS PROJECT AND THE ANSWERS

PROVIDED SHALL BE VIEWED IN BIDDER INQUIRY IN PROJNET AT

(https://www.projnet.org).

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in

ProjNet at (https://www.projnet.org) No Later Than (NLT) 1600 CST Monday, 15 July 2024.

To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.

The Bidder Inquiry Key is: NEBGPK-SDM8KE

Specific Instructions for First Time ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

MVR.13 INSTRUCTIONS TO BIDDERS

INSTRUCTION TO BIDDERS

The Rock Island District has implemented the below procedures for all current bid openings.

Electronic Submission of Bids:

For this IFB Solicitation, the Rock Island District is requesting all electronic bids be submitted via email to the Contracting Officer and Contract Specialist.

Contracting Officer – Ryan Larrison at ryan.r.larrison@usace.army.mil Contract Specialist – John Wysocki at john.j.wysocki@usace.army.mil

In the subject of the e-mail – the solicitation and Project Name shall be provided.

The Contracting Officer or Contract Specialist will send an email acknowledging receipt. Please note, the Firewall can cause a delay in receipt of email, so be sure to allow time for the delay.

The Contracting Officer and Contract Specialist will begin downloading bids ONE HOUR BEFORE BID OPENING TIME, which is the bid receipt cutoff time.

Contractors shall reference, Block 13 of the SF 1442 for the Bid Submission time.

All bids received after the time specificied in Block 13 will be considered late.

The Bid opening will be exactly 1 hour after the time specified in Block 13 for the submission of timely Bids.

Audio Teleconference Bid Opening Information:

Please use the following call-in information to attend the meeting:

Toll-Free: 844-800-2712 Access Code: 2828 644 9934

Following the conclusion of the bid opening, the Bid Abstract will be uploaded to SAM website under this solicitation, within 24 hours.

Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment.

Per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be submitted at time of bid.

HOWEVER, the Rock Island District reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.

For any Questions please contact:

Contracting Officer – Ryan Larrison at ryan.r.larrison@usace.army.mil Contract Specialist – John Wysocki at john.j.wysocki@usace.army.mil

Section 00600 - Representations & Certifications

52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.204-6 Unique Entity Identifier OCT 2016 52.204-8 Annual Representations and Certifications MAR 2023 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-11 Representation by Corporations Regarding Delinquent Tax

Liability or a Felony Conviction under any Federal Law

FEB 2016

52.219-1 Alt I Small Business Program Representations (SEP 2023) Alternate I

SEP 2015

52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals -- Representation.

DEC 2016

252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

(End of provision)

Section 00700 - Contract Clauses

52.201-1 Acquisition 360: Voluntary Survey SEP 2023 52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

JUN 2020

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

NOV 2021

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities

NOV 2021

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

OCT 2020

52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.210-1 Market Research NOV 2021

52.211-18 Variation in Estimated Quantity APR 1984 52.214-26 Audit and Records--Sealed Bidding JUN 2020 52.214-27 (Dev) Price Reduction for Defective Certified Cost or Pricing Data -

Modifications - Sealed Bidding (DEVIATION 2022-O0001)

OCT 2021

52.214-28 (Dev) Subcontractor Certified Cost Or Pricing Data--Modifications- -Sealed Bidding (DEVIATION 2022-O0001)

OCT 2021

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-8 Utilization of Small Business Concerns SEP 2023 52.219-9 Alt I Small Business Subcontracting Plan (SEP 2023) Alternate I NOV 2016 52.219-14 Limitations On Subcontracting OCT 2022 52.219-28 Post-Award Small Business Program Rerepresentation SEP 2023 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive

Order 14026

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for

EPA-Designated Items

MAY 2008

52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.225-9 Buy American--Construction Materials OCT 2022 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-

O0016)

FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Alt I Quantity Surveys (Apr 1984) - Alternate I APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Products and Commercial Services

SEP 2023

52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters JAN 2023 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements JAN 2023 252.205-7000 Provision Of Information To Cooperative Agreement Holders JUN 2023 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors

JAN 2023

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.236-7004 Payment for Mobilization and Demobilization DEC 1991 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022

252.244-7000 Subcontracts for Commercial Products or Commercial Services

JAN 2023

252.247-7023 Transportation of Supplies by Sea JAN 2023

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -

ALTERNATE I (APR 1984)

TThe Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 consecutive calendar days.

See Section 00 73 05 for additional requirements.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,700.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any DFARS (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

MVR.11

CERTIFIED TO TRANSACT BUSINESS

Pursuant to FAR 52.236-7, the Contractor must comply with State law. The Contractor must be certified to transact business in the State of IOWA before the Notice to Proceed may be issued. The certification is shown as an active registration on the Secretary of State website of the state where work is to be performed.

Section 00800 - Special Contract Requirements

WAGE DETERMINATION

"General Decision Number: IA20240002 06/14/2024

Superseded General Decision Number: IA20230002

State: Iowa

Construction Type: Heavy River Work

Counties: Iowa Statewide.

HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING

TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI

RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA

WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES

CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING

WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE

WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES,

RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY

CONSTRUCTION.

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,|

| | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 05/10/2024 2 06/14/2024

CARP0004-007 05/01/2024

Rates Fringes

CARPENTER........................$ 33.50 28.42

* ENGI0150-008 06/01/2024

CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT

COUNTIES

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.75 39.45

GROUP 2.....................$ 40.75 39.45

GROUP 3.....................$ 38.10 39.45

GROUP 4.....................$ 37.05 39.45

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat

GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt Paver Screed; Asphalt Plant; Automatic Curbing Machine;

Backfiller (throw bucket); Blastholer Self-Propelled Rotary Drill or Similar Machines; Boom Tractor or Side Boom;

Boring Machine (Directional, Vertical or Horizontal);

Building Hoist (1,2 or 3 drums); Caisson Auguring Machines;

Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming

Machine; Combination Backhoe Front End Loader; Combination Concrete Finishing Machine and Float; Concrete Breaker or Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;

Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.);

Curing-Tinning Machine; Dipper Dredge Crane man; Dipper Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.);

Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);

Grader, Motor Grader, Motor Patrol, Auto Grader, Form Grader, Pull Grader, Sub Grader, Elevating Grader; Group Equipment Greaser; Guard Rail Post Driver; Hoists;

Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck Mounted or Pull Type, and Similar Equipment; Laser Screed;

Loader (Track, Rubber Tire or Articulated); Locomotive Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad Foot Compactor; Shovel; Slip Form Paver; Steel Track-Type Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy;

Trenching Machine (40 H.P. & over); Work Boat.

GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster;

Boiler (Engineer or Fireman); Conveyor Over 20 H.P.;

Distributor; Driver on Truck Crane or Similar Machines;

Elevator; Farm-Type Tractor (Without Power Attachment);

Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant;

Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine (Under 40 H.P.).

GROUP 4: Air Compressor (400 C.F.M. or over); Compact Loader (Rubber Tire, Track & Utility); Engine Driven Welding Machine; Mechanical Heater (other than steam boiler); Small Outboard Motor Boat (Safety Boat & Life Boat); Water Pump (More than one well point pump).

ENGI0234-002 12/01/2022

REMAINING COUNTIES

Rates Fringes

Power equipment operators:

MISSISSIPPI RIVER

GROUP A....................$ 41.27 16.49

GROUP B....................$ 40.58 16.49

GROUP C....................$ 38.25 16.49

MISSOURI RIVER

GROUP A....................$ 40.79 16.49

GROUP B....................$ 40.12 16.49

GROUP C....................$ 37.86 16.49

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol (finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics - welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self-propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.

GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self-propelled sheepsfoot roller, self-propelled roller, dristributor, screening and washing plant, self-propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self-propelled elevator grader, water wagon on compaction

GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver-oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3"", farm type tractor (pulling disc, harrow or roller).

IRON0111-005 07/01/2023

(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE,

HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON,

LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)

Ironworker.......................$ 36.73 29.71

LABO0309-005 01/01/2024

SCOTT COUNTY

LABORERS

GROUP 1.....................$ 33.77 23.60

GROUP 2.....................$ 34.27 23.60

GROUP 3.....................$ 34.90 23.60

LABORER CLASSIFICATIONS

GROUP 1 - Flagman; Dumpman; Spotter; Broom Man; Landscaper;

Planting & Removal of Trees; Fencing Laborers; Cleaning of Forms or Lumber (in Bone Yard); Laying of Sod; Moving and/or Maintenance of Flares & Barricades; Operation of all Hand, Electric, Air, Hydraulic or Mechanically Powered Tools under the the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator; Mortar Mixer; Power & Hand Saw (When Clearing Timber); General Laborer; Material Handler; Form Handler; Concrete Dumper; Puddler; Explosives Handler;

Center Strip Handler & Installer; Prime Mover or any Mechanical Device Taking the Place of Concrete Buggy or Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting Hammer Driver; Laying & Jointing of Telephone Conduit; Gas Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin;

Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker;

Bankman on Floating Plant; Jointman With Pipelayer; Back-up Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water Main; Batterboard Man or Laser Operator on Sewer & Water Main; Laborer in Ditch or Tunnel, on Sewer or Water Main & Telephone Conduit, Cutters; Burners; Torchman; Gravel Box Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of Steel & Rebar; & Wrecking Laborers

GROUP 2 - Asphalt Raker or Luteman; Pipe Setter on Sewer or Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb Machine Operator; Concrete Burning Machine Operator; & Coring Machine Operator; Hazardous Waste Worker; Asbestos Abatement Worker

GROUP 3 - Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)

PLAS0544-001 01/01/2019

SCOTT COUNTY

CEMENT MASON/CONCRETE FINISHER...$ 27.90 23.16

TEAM0371-001 05/01/2019

SCOTT COUNTY

Rates Fringes

Truck drivers:

GROUP 1.....................$ 38.17 13.25+a GROUP 2.....................$ 38.71 13.25+a GROUP 3.....................$ 39.01 13.25+a GROUP 4.....................$ 30.34 13.25+a GROUP 5.....................$ 40.39 13.25+a

Footnote:

a. PENSION: $52.80 per day

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons , air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick- up-trucks when hauling material, tools or men to and from and on the job site, and forklifts up to 6,000 lb capacity

GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A-frame winch trucks, or similar equipment when used for transportation purposes. Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or simiolar equipment when used for transportation purposes..

GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks

GROUP 4: Oil distributors, lowboys

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

SUIA2002-002 12/01/2014

Rates Fringes

CARPENTER

Mississippi River (Iowa Side).......................$ 28.55 16.29 Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay previalis in the adjoining states, then those rates shall apply)................$ 34.60 21.38 Missouri River..............$ 31.25 12.43

CEMENT MASON/CONCRETE FINISHER...$ 33.35 10.05

Ironworkers: (setting of all structural steel and reinforcing steel installation:)

Des Moines and Lee Counties....................$ 29.42 16.68 Dubuque, Clayton & Allamakee Counties..........$ 26.67 16.68 Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.89 16.68 Jackson, Clinton, Louisa & Muscatine Counties........$ 36.20 16.68 Woodbury & Monona Counties..$ 19.46 16.68

Laborers:

Class A Mississippi River..........$ 30.92 8.60 Missouri River.............$ 28.92 8.60 Class AA Mississippi River..........$ 31.95 8.60 Missouri River.............$ 29.95 8.60 Class B Mississippi River..........$ 29.22 8.60 Missouri River.............$ 28.22 8.60 Class C Mississippi River..........$ 26.05 8.60 Missouri River.............$ 24.05 8.60

TRUCK DRIVER

Mississippi River...........$ 24.88 10.50 Missouri River..............$ 24.88 10.50

LABORERS CLASSIFICATIONS

GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.

GROUP AA: Pipelayer, concrete specialist; tunnelman

GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper), timber and chair-sawman, mechanical stresser or strechman on post-tension or pre-stressed concrete on or off job, form tamper, air-gas and electric tool opertors-vibrators- Barcohammer-Pavec-tampers-electric drills-hammers and jackhammers, tree groundman, chair tenders-tool room men and checkers, concrete processing material and monitors, stringman on paving work, broom operator (not self propelled), fence erectors, handling and placing of metal mesh, dowel bars, reinforcing baars and chairs, dumpmen and spotters, carring reinforcing rods, corrugated culvert pipe, stake chaser, seeding or mulching and planting of trees shrubs and flowers, water pumps (under 3""), compressors (under 400 CFM), general laborer, rodman, hot asphalt labor, carpenter tender, concrete finisher tender.

GROUP C: Waterboy, flagman, flagger/traffic control, watchman.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .