MISSISSIPPI NATIONAL FOREST
Chickasawhay Ranger District Turkey Fork Lake Day Use Parking Lot
PROJECT STATEMENT OF WORK (SOW)
Mississippi National Forest Jackson, Mississippi
Table of Contents
1.0 Project Introduction
1.1 Scope
1.2 Funding Limitations
1.3 Location
1.4 Background
1.5 Definition of “days” with the Statement of Work (SOW)
1.6 Project Schedule
1.7 Contact Information
1.8 Requirements for the Project’s Electronic files, Project Management and
Communications
2.0 General Requirements
2.1 Scope of Work Summary
2.2 Applicable Codes
2.3 Progress Payments
2.3.1 Schedule of Items
2.4 Project Meetings
2.4.1 Preconstruction Meetings
2.5 Contractor’s Project Schedule
2.6 Submittals
2.6.1 Submittal Register
2.6.2 Submittal Distribution and Format
2.6.3 Submittal procedures
2.6.4 Substitution
3.0 Detail Requirements by Work Item
3.1 Asphalt Replacement
3.2 Seal Coating
3.3 Striping
4.0 Specific Construction Requirements
4.1 Safety
4.2 Superintendence by the Contractor
4.3 Closure of Site
4.4 Advertisement/Company Logo
4.5 Project Limits along Roadways
4.6 Construction specifications (FP-14)
5.0 Additional Requirements
5.1 Temporary Facilities
5.2 Work Hour Restrictions
5.3 Quality Control
5.4 Hazard Control
5.4.1 Spark Arresters
5.4.2 Smoking
5.4.3 Welding
5.5 Minimizing Construction Impacts
5.6 Patching, Cutting, and Repair to Damaged Areas
5.7 House Keeping
5.8 Record Drawings
5.9 Project Closeout
5.10 Final Inspection
6.0 Attachments
1.0 PROJECT INTRODUCTION
Project Name: Turkey Fork Lake Day Use Parking Lot
1.1 Scope
In accordance with the terms and conditions of the Contract, the Contractor shall perform the work of this Statement of Work (SOW) for the USDA-Forest Service (FS) as described below.
The Contractor shall perform inspection, design, and construction services in accordance with the requirements within the contract. The Contractor shall provide all equipment, labor, supervision, transportation, materials, tools and other incidentals and execute all work necessary to perform the milling, overlay and striping of the Turkey Fork Lake Day Use Area Parking Lot in accordance with specification and exhibits in this contract, and current industry standards. Contractor is responsible for ensuring all equipment meets State, Federal, and Local Laws. District maps showing location can be sent electronically by request.
The Contractor shall perform all services necessary to produce a complete and usable project in accordance with the project goals and design intent stated herein.
1.2 Funding Limitations
The Contractor is responsible for providing all design and construction services required for the final total lump-sum firm-fixed amount as identified on the contract.
1.3 Location
The parking lot is located in the south quarter of Section 4, T4N, R7W, Greene County, Mississippi at the end of Forest Service Road 232A3
1.4 Background
This project will involve the milling and overlaying of an approximately 34,000 square foot parking lot in the Chickasawhay National Forest. The parking lot is located in the south quarter of Section 4, T4N, R7W, Greene County, Mississippi at the end of Forest Service Road 232A3. See the parking area outlined in red picture below for the start and end of paving for the parking lot. The parking lot is approximately 34,821 square feet and was placed in the late 80s or early ’90s. The pavement is showing signs of deterioration, which includes cracking and oxidation.
1.5 Definition of “Days” within the Statement of Work (SOW)
Unless stated elsewhere number of days equals number of calendar days.
1.6 The Project shall have a single construction phase unless approved by CO. The Contractor shall submit construction project schedule to the government for consideration and approval prior to receiving a notice to proceed. The project delivery date is 30 calendar days. It is expected that the Contractor shall have all phases of work complete within this time frame. All work shall be completed by October 31th, 2020.
1.7 Contact Information
Contractual:
Contracting Officer Representative (COR): Jessica Bane, Address: 968 MS-15 Laurel MS 39443. Phone: 601-428-0594 Ext 245. E-mail:
jessica.bane@usda.gov
Contract Specialist (CO): Cynthia Granderson, Address: 200 S Lamar St. STE 500N Jackson MS 39201. Phone: 601-965-1619 Email: cynthia.granderson@usda.gov
1.8 Requirements for the Project’s Electronic files, Project Management and Communications
All process documents submitted shall be PDF format via email.
2.0 GENERAL REQUIREMENTS
2.1 Scope of Work Summary
The project will consist of improving the parking lot at the facility. The FS shall approve any design elements prior to construction.
The project will include these major tasks, but not be limited to, the construction of the following major items of work:
1. Mobilize for the project
2. Install temporary traffic control signs before starting construction. See Section 635 –
Temporary Traffic Control. This shall be maintained for the duration of the project.
3. A 300-foot silt fence has been included in this project. For the silt fence to be effective as a pollution control feature, the silt fence must be placed properly at the site. The silt fence should be placed down-slope from the area to be disturbed. It need not be at the edge of the disturbance and is better located with a strip of vegetated area between the work area and the silt fence. See Section 157- Soil Erosion and Sediment Control and 713.16 – Silt Fence.
mailto:jessica.bane@usda.gov mailto:cynthia.granderson@usda.gov
4. Mill 2” of asphalt from the entire parking lot. See Section 413 - Asphalt Pavement Milling. See the parking area outlined in red picture below for the extents of the milling.
5. After the milling is complete, clean the existing surface of loose material, dirt, and other materials. Apply tack coat to the cleaned surface and curb faces at a coverage rate of 0.03 - .15 gallons / square yard. See Section 412 - Asphalt Tack Coat.
6. Apply 2” of wearing course over the entire milled and repaired area. The wearing course shall be designed using Section 402 – Asphalt Concrete Pavement by HVEEM or Marshall Mix Design Method. The mix shall be placed according to Section 403 – Asphalt Concrete.
7. All bituminous mixtures shall be transported by a truck which shall have tight, clean, smooth metal beds. Each truck shall be covered with a canvas or other suitable material of such size that will protect the mixture from the weather. See Section 401.11- Hauling.
8. Bituminous materials shall be placed, finished, and compacted according to Section 403 Asphalt Concrete. See Section 401.07- Weather Limitations.
9. Seal joints at the interface between the new asphalt the existing drainage structures, sidewalks, and pavement. See Section 414 – Asphalt Pavement Crack Sealing and Filling.
10. Re-stripe approximately 55 parking spaces or as many that can be drawn using a 9-10 foot width per standard parking spot and re-mark 3 ABA compliant parking spaces at least 132” minimum with one center aisle approximately 60” wide using the current MUTCD specifications for markings and signs. ABA typical design will be included as an attachment.
11. On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acres and 13-13-13 fertilizer at the rate of 500 pounds per acre. If seeding is placed from September 1 to February 28, in addition to the above spread ryegrass seed at the rate of 80 pounds per acre. See Section 625- Turf Establishment.
12. Option Item: Install new precast concrete parking bumpers 6" x 10" x 6' 0" with dowels. .
2.2 Applicable Codes
All work in this contract shall be done in accordance with the following in their most current edition:
1. National Fire Protection Association (NFPA)
2. OSHA – Occupational Safety and Health Act
3. ABAAS – Architectural Barriers Act Accessibility Standard
4. ADA – Americans with Disabilities Act
5. All local safety and fire regulations
6. All manufacturer installation instructions.
7. All other codes and standards referenced in the specifications.
-No Permits are required for this contract
Verification of Dimensions
The contractor shall be responsible for the conditions and proper relation of their work to the site conditions and will familiarize themselves with all details of the work and working conditions. The contractor shall verify all dimensions in the field and generate their own quantities for work provided. Any and all incidental items not specifically listed in this contract are to be included by the contractor, to provide the government a complete and usable end product.
2.3 Progress Payments
All Contractor payment shall be based on the base contract and FAR clauses. These payments for completed work shall be based on COR observation & approval, and the Schedule of Items. The CO shall specify the required submission documents to accompany any request for payment.
2.3.1 Schedule of Items
The total cost of all items shall equal the contract sum. The Schedule of Items will form the basis for progress payments if approved by the CO. No progress payments.
2.4 Project Meetings
2.4.1 Pre-Construction Meeting
The CO shall setup a pre-construction meeting with the contractor after award. The Contractor shall be responsible for certain administrative functions having to do with all correspondence and meetings to be determined later (submittals, schedules, observations, and administrative duties) as determined by the CO. Payrolls and other construction administration documentation shall be required to be prepared by the Contractor.
2.5 Contractor’s Project Schedule
General: The Contractor shall provide a Project schedule for the design and construction phases of the entire contract period within 3 weeks after award. This schedule shall be updated at intervals required by the CO. The CO shall approve and augment the Contractor’s schedule to accommodate Government needs and processes for this contract.
2.6 Submittals
2.6.1 Submittal Register
Submittals for this contract shall be assembled into a submittal register or checklist by the contractor. This checklist shall be used to track mfr. data, samples, testing, warranties, shop drawings, etc. for all products.
Manufacturer’s recommended installation procedures and Manufacturer s Industry Standard shall be the basis of how products and materials are installed in addition to building and accessibility codes. It is strongly encouraged that the Contractor provide the manufacturer s recommended installation instruction or manual for each submittal and process. If the proper installation criteria is not provided, then the CO/COR will rely on the manufacturer’s web-based material or mfr. provided documentation as the source of installation validation. No construction product, material or system shall be installed without approved documentation by the CO. They shall hold the Contractor to these installation standards in construction if there is not procedural standard for this work.
2.6.2 Submittals Distribution and Format
B. Construction Submittals:
1. All Construction submittals shall be e-mailed to the COR. Other formats may be approved by the COR.
2. Samples. The Contractor shall submit the number of samples they desire returned, plus 1 additional to the COR.
2.6.3 Submittal Procedures
The COR shall have 10 days to review and return submittals to the Contractor. The Contractor can request a faster turnaround on specific submittals in writing if warranted.
The CO/COR oversight is for quality assurance only and compliance with contract requirements. The Contractor is fully responsible and liable for construction applications, technical considerations, and use of products for the intended application.
2.6.4 Substitution
Substitutions are acceptable if approved by designer (email or signature) and appropriate documentation is given to the CO/COR to review. This process requires contacting the COR, specifying the changes and allow the COR to request the proper information needed to evaluate the change. Submitting documentation directly to the COR without prior discussions may cause additional delays in acceptance. A minimum of 2 weeks is required for any substitution, but more time may be required depending on CO requirements.
3.0 GENERAL REQUIREMENTS BY WORK ITEM
3.1 Asphalt Replacement
Mill and overlaying o an approximately 34000 square feet of asphalt as shown on the attached plans. Contractor shall regrade the base to ensure drainage to the drainage ditch. Ensure that the final base is sufficient in compaction and quality to support delivery traffic. See Section 413 - Asphalt Pavement Milling. Slope to drain and provide a smooth transition between the parking lot and driveway.
3.2 Seal Coat
After the milling is complete, clean the existing surface of loose material, dirt, and other materials. Apply tack coat to the cleaned surface and curb faces at a coverage rate of
0.03 - .15 gallons square yard. See Section 412 - Asphalt Tack
3.3 Striping
Re-stripe approximately 55 parking spaces or as many that can be drawn using a 9-10 foot width per standard parking spot and re-mark 3 ABA compliant parking spaces at least 132 minimum with one center aisle approximately 60 wide using the current MUTCD specifications or markings and signs. ABA typical design will be included as an attachment.
4.0 SPECIFIC CONSTRUCTION REQUIREMENTS
4.1 Safety
The Contractor shall comply with all Federal and State safety requirements for the type of work to be performed. Refer to the Occupation Safety and Health Standards (OSHA) for details of these and other safety requirements.
4.2 Superintendence by the Contractor
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. Superintendent must be designated in writing to
CO/COR.
4.3 Closure of Site
The contractor shall be responsible for closing the parking lot work area with barriers 1 day prior to commencement of work. The COR will be responsible for ensuring vehicles are removed from work area by end of day closing occurs. If vehicles are located within a work area, contractor shall leave vehicle in its place and not work within 10’ of the vehicles location.
Upon commencement of work, it shall be their responsible to supply and maintain traffic control devices during the duration of work and all associated dry times. One Type 2 or Type 3 barricade is required at each entrance of work location. The contractor may then utilize type 1, 2, or 3 barricades and/or any other method to ensure no vehicles can enter the work location.
4.4 Advertisement/Company Logo
The Contractor shall not place any form of advertisement or company logo, in any form, on the pavement or anywhere on Federal Lands.
4.5 Project Limits along Roadways
The limits of work along Federal, State, County, or Local roads include all pavement “drive apron” or deceleration/ acceleration lanes associated with that road or site.
4.6 Construction specifications (FP-14)
The Forest Service, US Department of Agriculture has adopted the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units (FP-14) for construction of National Forest System Roads and other projects.
The full provisions of FP-14 shall apply as applicable on this contract, unless modified by the Special Project Specifications.
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP‐14, AS MODIFIED BY U.S. FOREST SERVICE SPECIAL PROJECT SPECIFICATIONS
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill.
Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the COR and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
151 – Mobilization
Delete section in its entirety and add the following:
151.01 General
All mobilization associated with this project is considered incidental to the performance of the contract.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety and replace with the following:
151.01 General
The contractor and COR will agree upon the project schedule 3 weeks prior to work commencing. The Forest Service is required to inform the public on all closures, and consequently work must be performed according to schedule.
418 – Asphalt Pavement Sealcoat
Delete the entire section and replace with the following:
Description
418.01 This work shall consist of the application of pavement sealing material(s) on existing pavement surfaces.
418.02 Conform to the following Subsections:
Emulsified asphalt 702.03
Water 725.01(c)
Construction Requirements
418.03 Composition of Seal Material. The primary component of seal materials shall be slow setting asphalt emulsion that conforms to either AASHTO M140 or M208. The contractor shall submit a manufacturer’s certificate of compliance with each shipment of asphalt emulsion. Asphalt emulsions shall be mixed with additives that prevent bleeding. The contractor may dilute seal materials with water to improve penetration into the pavement surface or for consistency improvement.
Coal tar sealants are not acceptable.
Additive Materials: Materials such as clays, slates, fibers, carbon black and polymers may be added to emulsified asphalt provided the manufacturer’s product literature is reviewed and approved by the Engineer prior to application. If the seal material is blended with sand, the sand shall be clean, hard, durable, un‐coated particles, free from clay lumps and organic matter, with 100 percent passing the No.
16 mesh and a maximum of 5 percent passing the No. 200 mesh. The sand must have a gradation that helps control segregation and promotes suspension during product application. No more than 3 pounds of sand shall be added to each gallon of applied material.
Top Dressing and Blotter Sand: Washed concrete sand meeting AASHTO M6 gradation requirements, unless otherwise approved.
Submit proposed emulsion mix for approval 10 days prior to production.
418.04 Equipment The distribution equipment for all materials shall be capable of placing a uniform consistency of the material, and be capable of applying a uniform application over variable widths, grades and crowns of surface. Self propelled, asphalt distributor, squeegee or slurry seal spreader box, and hand‐held spray and squeegee equipment or any combinations thereof maybe required to obtain a satisfactory seal. The required application rate may also require multiple applications to obtain a satisfactory, uniformly, sealed surface. The equipment used for storing and application of liquid and slurry products shall include accurate volume measuring devices and calibrated tank. The engineer may require transport or application equipment to be weighed when full and empty if volume measuring equipment is inadequate.
418.05 Surface Preparation Clean the existing surface to be sealed of all loose material, dirt, dust, oil or any type of objectionable surface film that might jeopardize adhesion and a quality final product. Such accumulations may require removal by pressure washing, grinding, burning or scraping or a combination thereof. The surface will be approved in writing prior to applying the seal. All cleaning materials and labor required will be considered incidental to the Asphalt Pavement Sealcoat pay item.
418.06 Weather Limitations Apply the sealcoat when the air temperature in the shade and the surface temperature are at least 45 F and rising and when the weather is not foggy, rainy, or overcast. Do not apply when there is a danger of freezing within 24 hours. The COR has the authority to stop work for the above weather limitations.
418.07 Application. Ensure that the seal mix is of the desired consistency, with no signs of segregation as it leaves the mixer and distributor equipment and conforms to the approved job‐mix. Application may be by hand‐held spray equipment, asphalt distributor, squeegee or slurry seal spreader box.
Whenever practical, seal material application shall be spread in two directions, 180 degrees from each other. The Engineer may require an additional application on small areas of pavement that have more surface voids, where voids have prevented adequate coverage or where uneven application exists.
The minimum `residue' application rate of 1.0 pound per square yard shall be obtained over the entire surface to be treated. Residue will consist of the asphalt cement portion of the emulsified asphalt and non‐evaporative additive materials (such as clays, slates, fibers, polymers and sand) that are suspended in the emulsion when applied. Application rates may be adjusted up or down by 0.15 pounds residue per square yard by the COR to compensate for pavement surface absorption and roughness.
The volume of emulsion used shall be readily determined by the contractor prior to, during and after application. Final payment will be based on meeting the specified application rate of residue. The COR will determine the weight of residue per gallon by drying field samples from the project to constant weight.
418.08 Maintenance & Opening to Traffic. Allow treated areas to completely cure before opening to traffic. Traffic control and the prevention of asphalt pickup under traffic is the contractor's responsibility for 10 days following treatment. When directed by the COR, blotter sand shall be applied to the sealed pavement to prevent asphalt pickup by vehicles. The COR may require removal of loose blotter sand by brooming after the maintenance period. After the treatment has been open to traffic for 10 days, the contractor shall repair any areas that are damaged by traffic, or areas that are peeling or cracking.
418.09 Sampling and Testing. Samples of the seal product as applied will be required for the project.
Samples from stored containers may also be required at the COR’s discretion. Samples will be taken by the contractor as directed by and delivered to the COR in approved plastic 1 gallon containers. Testing of the residual will be done by the COR. Results will be used in determining the actual residual seal rate applied. Additional quality testing of the emulsion may be done by the COR at his discretion to verify quality requirements.
418.10 Acceptance. As stated under 418.07 above, a minimum residual of 1.0 lbs / syd of product will be obtained on the sealed pavement surface. Sampling and testing and as outlined under 418.09 above will be used to determine “residual” and “quality” specification compliance.
Emulsified Asphalt/ the final seal product will be evaluated under Subsections 106.03 and 702.09.
Construction of the surfacing seal will be evaluated under Subsection 106.02 and 106.04.
418.11 Measurement Measure the Section 418 items listed in the schedule of items according to subsection 109.02 and the minimum “residual” specified above.
418.12 Payment. The accepted quantities will be paid at the contract price per unit of measurement for the Section 418 pay items listed in the schedule of items. All labor, materials, and equipment required to perform this required work are considered incidental to the Asphalt Pavement Crack Sealing work. Payments will be full compensation for the work prescribed in this Section.
634 – Permanent Pavement Markings
634.01
Delete and replace with the following:
This work consists of applying permanent pavement markings on pavement surfaces. All surfaces shall be clean and dry prior to the placement of markings. Apply when surface temperature are at least 45 F and rising and when the weather is not foggy or rainy.
All pavement marking layouts will be in accordance attached plans unless otherwise noted in the contract. All markings that require side by side lines will be applied at the same time with 2 different sprayers to ensure spacing is consistent throughout.
All pavement markings shall be:
Type C – Waterborne traffic paint with type 3 glass beads
Paint Colors shall be Blue for handicapped spaces and yellow for all others; curbs in front of handicapped spaces shall be painted blue as well.
635 - Temporary Traffic Control
Delete entire section except 635.01 and 635.02 and add the following:
635.03 General.
The contractor shall be responsible for closing the parking lot work area 1 day prior to commencement of work. The COR will be responsible for ensuring vehicles are removed from work area by end of day closing occurs. If vehicles are located within a work area, contractor shall leave vehicle in its place and not work within 10’ of the vehicles location.
Upon commencement of work, it shall be their responsible to supply and maintain traffic control devices during the duration of work and all associated dry times. One Type 2 or Type 3 barricade is required at each entrance of work location. The contractor may then utilize type 1, 2, or 3 barricades and/or any other method to ensure no vehicles can enter the work location.
Dry times will be discussed and agreed upon per site between the COR and contractor; in accordance with the specifications for the completed work.
635.03 Payment.
Delete subsection and replace with the following:
Payment will not be made for Temporary Traffic Control, and is considered incidental to the performance of the contract.
5.0 ADDITIONAL REQUIREMENTS
5.1 Temporary Facilities
FIELD OFFICES – The contractor is not required to have a field office.
5.2 Work Hour Restrictions
All work and deliveries shall be limited to the weekday hours of 8:00 am to 5:00 pm unless otherwise approved by the COR. No work shall occur on Federal holidays or weekends without prior approval.
5.3 Quality Control
The quality of all work shall be the responsibility of the Contractor. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings. Failure to provide adequate quality control will result in retention and other contract actions.
5.4 Hazard Control
Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.
5.4.1 Spark Arresters
Equip all gasoline or diesel powered equipment used in potential forest or grass fire locations with spark arresters approved by the U. S. Forest Service. Written determinations of areas and periods of potential fire hazard will be issued by COR.
Locate internal combustion equipment so that exhausts discharge well away from combustible materials. Locate service areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
5.4.2 Smoking
Smoking inside Forest Service buildings is prohibited, cigarette butts shall not be discarded on the ground.
5.4.3 Welding
Cutting by torch, welding or metal grinding shall be performed only when adequate fire protection is provided. Prior to performing any welding, cutting, grinding or other activities generating spark or fire hazards the project superintendent and work supervisor shall meet with the COR representative and discuss and agree to a fire protection plan
5.5 Minimizing Construction Impacts
The Contractor shall take all precautions necessary to minimize and restore all construction impacts. All existing work and conditions impacted or modified by the contractor shall be replaced with like kind at the contractor’s expense.
5.6 Patching, Cutting, and Repair to Damaged Areas
All cutting, patching and repairs on systems shall be coordinated with COR at the weekly construction meeting in advance of the work. The Contractor is responsible to fix and repair affected areas on un-approved work to the original condition or better.
5.7 House Keeping
Housekeeping: Keep project neat, orderly, and in a safe condition at all times. At the end of the work week a more through cleanup and policing shall be performed. All debris shall be removed and properly disposed.
5.8 Record Drawings
No record drawings are required for this contract.
5.9 Project Closeout
Before submitting a request for final inspection, submit the following:
Payment:
The quantities shall be paid for as lump sum quantities or by other methods of measure as listed in the SCHEDULE OF ITEMS. Such payment shall be considered full compensation for constructing the complete project in accordance with the plans and specifications. The availability of progress payments shall be determined by the CO.
The invoice must be inputted into the IPP System.
Additional Documents required to be prior to final invoice processing are:
Certified Payroll
Contract Release Form
Final payment will not be processed until all documents have been received by the CO.
5.10 Final Inspection
Cleaning: Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
Process Description: Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. The COR, commissioning agent, and Contractor will proceed with the inspection within 10 days of receipt of request. The COR will prepare a list of deficiencies ("Punch List") to be corrected before final acceptance.
The Contractor shall complete the work described on the list punch list within 14 calendar days. If the Contractor fails to complete the work within this time frame, the COR may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
6.0 Attachments
Overview of Accessible Parking Lots Site – Location Map Parking Area Outlined in Red Parking Lots 1, 2, 3, 4
Advisory 502.3.3 Marking. The method and color of marking are not specified by these requirements but may be addressed by State or local laws or regulations. Because these requirements permit the van access aisle to be as wide as a parking space, it is important that the aisle be clearly marked.
https://www.access‐board.gov/guidelines‐and‐standards/buildings‐and‐sites/about‐the‐ada‐ standards/guide‐to‐the‐ada‐standards/chapter‐5‐parking#spaces
Minimum Number of Accessible Parking Spaces [§208.2]
Parking Facility Total
Minimum Number of Accessible Spaces
Standard Van* Total (Standard + Van)
1 - 25 0 1 1 26 – 50 1 1 2 51 – 75 2 1 3 76 – 100 3 1 4 101 – 150 4 1 5
We will need one van accessible site 132 inches wide with aisle beside it at least 60‐inches wide on one side (driver side if angled parking lot).
Additional car accessible parking will be at least 96 inches wide and have a 60‐inch aisle on one side.
(same, driver side)
502.3.4 Location. Access aisles shall not overlap the vehicular way. Access aisles shall be permitted to be placed on either side of the parking space except for angled van parking spaces which shall have access aisles located on the passenger side of the parking spaces.
502.3.2 Length. Access aisles shall extend the full length of the parking spaces they serve.
502.3.3 Marking. Access aisles shall be marked so as to discourage parking in them.
Obviously, our walkway will go behind the parking area which is not ideal but don’t see another way around, particularly due to the slope. I included this portion is as well.
Accessible routes must connect parking spaces to accessible entrances. In parking facilities where the accessible route must cross vehicular traffic lanes, marked crossings enhance pedestrian safety, particularly for people using wheelchairs and other mobility aids.
All regular parking places will be at least 96 inches wide
Van Accessible g Spaces [§502.1 - 502.5]
At least one space for every 6 or fraction of 6 accessible spaces must be van accessible. Van spaces provide an additional 3 feet of width to accommodate vehicles equipped with ramps or lifts.
This extra space can be added to either the parking space or to the access aisle. A wider access aisle saves space since two spaces can share one aisle, but wider spaces can help prevent misuse of the access aisle as a parking space.
Van Space: Wider Parking Space
Bollards, signs, columns, or other elements cannot be located in the access aisle or reduce the minimum clear width of accessible routes.
Spaces and aisles must be designed so that parked vehicles do not obstruct the required clear width of adjacent accessible routes (§502.7).
Accessible routes must connect directly to access aisles. Curb ramps, where provided, cannot protrude into access aisles (which cannot slope more than 1:48 max.) to accommodate wheelchair transfers and vehicle ramps or lifts (§502.4). A landing at least 36" deep is required at the top of curb ramps; in alterations where space for this landing is unavailable, curb ramps must have side flares with a 1:12 max. slope (§406.4).
Where space for curb ramps is limited, including in alterations, parallel ramps can provide an altemative.
502 Parking Spaces
502.1 General. Car and van parking spaces shall comply with 502. Where parking spaces are marked with lines, width measurements of parking spaces and access aisles shall be made from the centerline of the markings.
EXCEPTION: Where parking spaces or access aisles are not adjacent to another parking space or access aisle, measurements shall be permitted to include the full width of the line defining the parking space or access aisle.
Advisory 502.3 Access Aisle. Accessible routes must connect parking spaces to accessible entrances. In parking facilities where the accessible route must cross vehicular traffic lanes, marked crossings enhance pedestrian safety, particularly for people using wheelchairs and other mobility aids. Where possible, it is preferable that the accessible route not pass behind parked vehicles.
Advisory 502.4 Floor or Ground Surfaces. Access aisles are required to be nearly level in all directions to provide a surface for wheelchair transfer to and from vehicles. The exception allows sufficient slope for drainage. Built-up curb ramps are not permitted to project into access aisles and parking spaces because they would create slopes greater than 1:48.
502.2 Vehicle Spaces. Car parking spaces shall be 96 inches (2440 mm) wide minimum and van parking spaces shall be 132 inches (3350 mm) wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with 502.3.
EXCEPTION: Van parking spaces shall be permitted to be 96 inches (2440 mm) wide minimum where the access aisle is 96 inches (2440 mm) wide minimum.
Figure 502.2 Vehicle Parking Spaces
502.3 Access Aisle. Access aisles serving parking spaces shall comply with 502.3. Access aisles shall adjoin an accessible route. Two parking spaces shall be permitted to share a common access aisle.
Advisory 502.6 Identification. The required "van accessible" designation is intended to be informative, not restrictive, in identifying those spaces that are better suited for van use. Enforcement of motor vehicle laws, including parking privileges, is a local matter.
502.6 Identification. Parking space identification signs shall include the International Symbol of Accessibility complying with 703.7.2.1. Signs identifying van parking spaces shall contain the designation "van accessible." Signs shall be 60 inches (1525 mm) minimum above the finish floor or ground surface measured to the bottom of the sign.
Identification [§216.5, §502.6]
Accessible spaces must be identified by signs with the International Symbol of Accessibility (ISA) (§703.7.2.1). Signs identifying van spaces must include the term “van accessible.” This designation is informative and does not restrict use of such spaces to van users only.
No other text or content is required by the Standards.
Signs must be at least 60” high measured to the bottom edge so that they are visible while vehicles are parked in a space. Signs can be on posts, or where feasible, on walls or suspended from ceilings (an 80” minimum headroom clearance is required at signs suspended above circulation paths (§307.4)). ISA designations on the parking surface, even if required by a state or local government, cannot substitute for above-ground signs that remain visible at all times.
State or local codes and regulations may address other sign characteristics, including size, color, and additional content, such as “reserved” or violation fines, but the ADA Standards do not.
VAN
ACCESSIBLE
The van accessible designation is informative, not restrictive, in identifying spaces suitable for vans since such spaces are not limited to vans only. It can be included on the main designation sign or provided on a separate sign.
RESERVED
PARKING
II
Location Map
PROJECT LOCATION
Parking Area Outlined in Red
Parking Lot -1
Parking Lot – 2
Parking Lot – 3
Parking Lot – 4
| Table of Contents |
| 2.0 General Requirements |
| 3.0 Detail Requirements by Work Item |
| 4.0 Specific Construction Requirements |
| 1.0 PROJECT INTRODUCTION |
| 1.1 Scope |
| 1.2 Funding Limitations |
| 1.3 Location |
| 1.4 Background |
| 1.5 Definition of “Days” within the Statement of Work (SOW) |
| 1.6 The Project shall have a single construction phase unless approved by CO. The Contractor shall submit construction project schedule to the government for consideration and approval prior to receiving a notice to proceed. The project delivery date ... |
| 1.7 Contact Information |
| 1.8 Requirements for the Project’s Electronic files, Project Management and Communications |
| 2.0 GENERAL REQUIREMENTS |
| 2.2 Applicable Codes |
| -No Permits are required for this contract Verification of Dimensions |
| 2.3 Progress Payments |
| 2.3.1 Schedule of Items |
| 2.4 Project Meetings |
| 2.5 Contractor’s Project Schedule |
| 2.6 Submittals |
| 2.6.2 Submittals Distribution and Format |
| 2.6.3 Submittal Procedures |
| 2.6.4 Substitution |
| 3.0 GENERAL REQUIREMENTS BY WORK ITEM |
| 3.2 Seal Coat |
| 3.3 Striping |
| 4.0 SPECIFIC CONSTRUCTION REQUIREMENTS |
| 4.2 Superintendence by the Contractor |
| 4.3 Closure of Site |
| 4.4 Advertisement/Company Logo |
| 4.5 Project Limits along Roadways |
| 4.6 Construction specifications (FP-14) |
| 102 - Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| 104 - Control of Work |
| 106 - Acceptance of Work |
| 107 - Legal Relations and Responsibility to the Public |
| 108 - Prosecution and Progress |
| 109 - Measurement and Payment |
| 151 – Mobilization |
| 155 - Schedules for Construction Contracts |
| 418 – Asphalt Pavement Sealcoat |
| 634 – Permanent Pavement Markings |
| 635 - Temporary Traffic Control |
| 5.0 ADDITIONAL REQUIREMENTS |
| 5.2 Work Hour Restrictions |
| 5.3 Quality Control |
| 5.4 Hazard Control |
| 5.4.1 Spark Arresters |
| 5.4.2 Smoking |
| 5.4.3 Welding |
| 5.5 Minimizing Construction Impacts |
| 5.6 Patching, Cutting, and Repair to Damaged Areas |
| 5.7 House Keeping |
| 5.8 Record Drawings |
| 5.9 Project Closeout |
| 5.10 Final Inspection |
| 6.0 Attachments |
| 502 Parking Spaces |