Date: RFI No.
RFP Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE
4/2/2018 1 What is the desired flow range (Gallons Per Minute)?
GPM Flow Rate - 15 ft. Head @ 207+ gpm GPM of Water @ 15 Ft. of Head 207 GPM of Water @ 20 Ft. of Head 188 GPM of Water @ 25 Ft. of Head 169 GPM of Water @ 30 Ft. of Head 150 GPM of Water @ 40 Ft. of Head 110 GPM of Water @ 50 Ft. of Head 69 GPM of Water @ 60 Ft. of Head 28
4/2/2018 2 What is the desired RPM? RPM's - 3450