This is a Performance Work Statement (PWS) for the hydrostatic testing of staging air receivers aboard the TSV-4 NARRAGANSETT naval vessel.

The contractor must accomplish inspection, cleaning, hydrostatic testing, restoration, and certification of eight staging air receivers (No. 1 through No. 8) and associated piping connections located in the machinery space. Work must comply with NAVSEA requirements, ABS/USCG requirements, OEM specifications, and an approved contractor-developed hydrostatic test procedure. The pre-test inspection phase requires the contractor to tag out and isolate each receiver, verify identification and nameplate data, conduct external visual inspection for corrosion, pitting, deformation, cracking, leakage, and unauthorized repairs, and submit a condition report to the Government Representative prior to testing. During preparation, pressure gauges, switches, relief valves, and instrumentation susceptible to damage must be removed or isolated, calibrated test gauges installed, drains and vents opened, receivers filled completely with fresh water with all trapped air vented, and test boundaries established using blinds, caps, or isolation valves. The hydrostatic testing phase requires individual testing of each receiver at certified test pressure or 1.5 times Maximum Allowable Working Pressure (MAWP), with a minimum five-minute hold period during which all accessible surfaces must be inspected for leakage, sweating, permanent deformation, bulging, and structural distress. No visible leakage, pressure loss, or permanent deformation is acceptable. Post-test actions include controlled depressurization, complete drainage of test water, internal drying, reinstallation of removed components, restoration to original operating configuration, and operational leak checks. Safety requirements mandate compliance with NAVSEA Standard Item requirements for tag-outs, confined space entry, hazardous energy control, and pressure testing, with submission of the test procedure for Government review, establishment of exclusion zones during pressurization, and use of only calibrated pressure gauges suitable for the test range. The Government Representative must receive a minimum 24-hour advance notice prior to pre-test inspection, test setup completion, pressurization and hydrostatic test, and final acceptance inspection. Acceptance criteria require each receiver to successfully maintain test pressure for the specified hold period, exhibit no leakage or permanent distortion, and be restored to full operational condition. The contractor must establish and maintain a Quality Control program with qualified personnel performing inspections, maintain current calibration certificates for all test equipment available for Government review, and provide a Hydrostatic Test Report containing vessel identification, location, serial number, working and test pressures, test medium, calibration certificates, test start/stop times, hold period duration, inspection results, discovered deficiencies, corrective actions performed, and contractor Quality Assurance and Government witness signatures.

View the file

Other files

File Type Posted
WAGE DETERMINATION.pdf PDF
Solicitation - N0018926QL257.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TSV-4 NARRAGANSETT

Performance Work Statement

Hydrosta c Tes ng of Staging Air Receivers

1.0 DESCRIPTION

Accomplish inspec on, cleaning, hydrosta c tes ng, restora on, and cer fica on of the ship's staging air receivers and associated piping connec ons in accordance with applicable NAVSEA requirements, approved test procedures, and OEM requirements.

2.0 LOCATION

Machinery Space – Staging Air Receiver Bank (Air Receivers No. 1 through No. 8).

3.0 REFERENCES

NAVSEA Standard Items (latest revision).

NAVSEA S9086-SY-STM-010, Chapter 551, Compressed Air Plants and Systems.

Applicable ABS/USCG requirements.

Manufacturer's data and vessel nameplate informa on.

Contractor approved Hydrosta c Test Procedure.

4.0 REQUIREMENTS

4.1 Pre-Test Inspec on

4.1.1 Tag out and isolate each air receiver from all connected systems.

4.1.2 Verify receiver iden fica on, serial number, working pressure, test pressure, and capacity from nameplates.

4.1.3 Conduct external visual inspec on of each receiver, including:

Shells

Heads

Weld seams

Supports

Nozzles

Drain connec ons

Instrument connec ons

4.1.4 Submit condi on report:

Corrosion

Pi ng

Deforma on

Cracking

Leakage

Unauthorized repairs to the Government Representa ve prior to tes ng.

4.2 Prepara on

4.2.1 Remove, disconnect, or isolate pressure gauges, pressure switches, relief valves, and instrumenta on that could be damaged during hydrosta c tes ng.

4.2.2 Install calibrated test gauge(s) with current calibra on cer fica on.

4.2.3 Open drains and vent connec ons.

4.2.4 Fill receiver completely with fresh water and vent all trapped air.

4.2.5 Establish test boundaries using blinds, caps, or isola on valves as required.

4.3 Hydrosta c Tes ng

4.3.1 Hydrosta cally test each air receiver individually.

4.3.2 Raise pressure gradually to the required hydrosta c test pressure.

4.3.3 Unless otherwise specified by verified nameplate or NAVSEA direc on, hydrosta cally test to the receiver's cer fied test pressure or 1.5 mes Maximum Allowable Working Pressure

(MAWP). (Hi-Sea Marine)

4.3.4 Hold test pressure for a minimum of five (5) minutes.

4.3.5 During the hold period inspect all accessible surfaces for:

Leakage

Swea ng

Permanent deforma on

Bulging

Structural distress

4.3.6 No visible leakage, pressure loss, or permanent deforma on is acceptable.

4.4 Post-Test Ac ons

4.4.1 Depressurize receiver in a controlled manner.

4.4.2 Drain test water completely.

4.4.3 Dry receiver internally using low-pressure air, heated air, or other approved means.

4.4.4 Reinstall removed gauges, safety valves, fi ngs, and instrumenta on.

4.4.5 Restore system to original opera ng configura on.

4.4.6 Conduct opera onal leak check a er restora on.

5.0 SAFETY REQUIREMENTS

5.1.1 Accomplish work in accordance with NAVSEA Standard Item requirements for:

Tag-outs

Confined space entry

Hazardous energy control

Pressure tes ng

5.1.2 Submit hydrosta c test procedure for Government review prior to commencement of tes ng.

5.1.3 Establish exclusion zones during pressuriza on.

5.1.4 Use only calibrated pressure gauges suitable for the test range.

6.0 INSPECTION AND ACCEPTANCE

The Government Representa ve shall be no fied a minimum of 24 hours prior to:

1. Pre-test inspec on.

2. Test setup comple on.

3. Pressuriza on and hydrosta c test.

4. Final acceptance inspec on.

Acceptance Criteria

Each receiver shall:

Successfully maintain test pressure for the specified hold period.

Exhibit no leakage.

Exhibit no permanent distor on.

Be restored to full opera onal condi on.

QUALITY ASSURANCE REQUIREMENTS

6.1 Contractor Quality Control

6.1.1 Contractor shall establish and maintain a Quality Control (QC) program to ensure all work is performed in accordance with this work item, referenced technical requirements, and approved procedures.

6.1.2 Contractor shall provide qualified personnel to perform inspections and verify compliance with all hydrostatic testing requirements.

6.1.3 Calibration certificates for all test gauges and test equipment used during hydrostatic testing shall be current and available for Government review.

7.0 DELIVERABLES

Contractor shall provide a Hydrosta c Test Report containing:

Vessel iden fica on number.

Loca on.

Serial number.

Working pressure.

Test pressure.

Test medium.

Calibra on cer ficates for gauges used.

Test start and stop mes.

Hold period dura on.

Inspec on results.

Deficiencies discovered.

Correc ve ac ons performed.

Contractor Quality Assurance signature.

Government witness signature block.

8.0 QUANTITY

Hydrosta cally test:

Staging Air Receiver 1-8

Complete and return all receivers to opera onal status upon comple on of tes ng.