DEPARTMENT OF THE TREASURY
LIMITED-SOURCES JUSTIFICATION
This acquisition is conducted under the authority of the Multiple Award Schedule Program (see FAR 8.401)
Treasury Standard Form – 1012 (Rev 5/18)
Prescribed by Treasury: DTAP 1008.405-6
Tracking No.
1. Identification of the agency and the contracting activity:
The requiring activity is the Office of the Comptroller of the Currency Information Technology Services (ITS), and the contracting activity is the Office of the Comptroller of the Currency.
2.a Nature and/or description of the action being approved:
The purpose of this limited-sources justification is to obtain approval to modify an existing task order to add scope.
2.b Name of the vendor: Federal Working Group 2.c Requisition No.: TBD 2.d Bridge contract: ☐ Yes ☒ No 2.e Brand name: ☐ Yes ☒ No 3.a A description of the supplies or services required to meet the agency’s needs:
Operations and maintenance of Richardson, TX data center 3.b Includes IT: ☒ Yes ☐ No - NAICS - 541519 3.c IGCE/Estimated dollar value:
The IGCE is $117,600 inclusive of an optional task. The value of the six month extension is $4,961,583.68. Based on FWG’s quote, the modification will increase the option year value by $313,850 to $5,275,433.68. The total value of the task order will increase from $54,182,341.21 to $54,496,191.21.
4.a Identification of the authority being used (Check the appropriate box that applies).
☐ FAR 8.405-6(a)(1)(i)(A) – An urgent and compelling need exists, and following the procedures would result in unacceptable delays.
☒ FAR 8.405-6(a)(1)(i)(B) – Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized.
☐ FAR 8.405-6(a)(1)(i)(C) – In the interest of economy and efficiency, the new work is a logical follow-on to an original Federal Supply Schedule order or BPA provided that the original order or BPA was placed in accordance with FSS procedures in accordance with the applicable Federal Supply Schedule ordering procedures. The original order or BPA must not have been previously issued under sole-source or limited-sources procedures.
☐ FAR 8.405-6(b) – Items peculiar to one manufacturer.
4.b Supporting Rationale:
In accordance with 8.405-6, Limiting sources, OCC justifies the use of only one source via (a)(1)(i)(B) – Only one source is capable of providing the supplies or services required at the level of quality required because the supplies or services are unique or highly specialized.
OCC has limited competition to the existing vendor because the work is related to the scope of their task order.
5. A determination by the ordering activity Contracting Officer that the order or BPA represents the best value consistent with FAR 8.404(d):
The Contracting Officer has determined that the modification represents the best value consistent with FAR 8.404(d) and lowest overall cost alternative (considering price and administrative costs) to meet the Government’s needs based on the discounts provided off FWG’s GSA Schedule.
6. A description of the market research conducted among schedule holders and the results or a statement why market research was not conducted:
This acquisition is conducted under the authority of the Multiple Award Schedule Program (see FAR 8.401)
Due to the nature of acquisition and the unique qualifications of the contractor as described in section 5 above the Government market research was not conducted. However, the Government will seek competition for these services in subsequent acquisitions.
7.a Any other facts supporting this justification:
N/A 7.b Attachments: ☐ Yes ☒ No
8. A statement of the actions, if any, the Requiring Activity and Contracting Activity may take to remove or overcome any barriers that led to restricted consideration before any subsequent acquisition for the supplies and services is made:
The current task order ends in January 2023 and the OCC is in the process of finalizing the requirements document for the recompete. The increased scope is required due to the OCC’s move from their existing disaster recovery location in Colorado. This scope is included in the recompete requirements.
9. Certifications and Approvals:
9.a Program Office Certification (Requiring Activity). I hereby certify that any supporting information and data provided (e.g., the Government’s minimum needs or requirements, or other rationale for the limited sources) and which form the basis for this justification for an exception to fair opportunity, are accurate and complete to the best of my knowledge and belief.
Name: Clyde Halsrud Date:
Signature:
9.b Contracting Officer Certification and Approval. I hereby determine the circumstances of this acquisition support the justification to acquire these supplies or services on a limited source basis. I also certify this limited-sources justification is accurate and complete to the best of my knowledge and belief. Therefore, unless additional approvals are required as prescribed below, as the authorized contracting officer for this acquisition, I hereby approve the processing of this requirement on a limited-source basis.
Name: Karen Oettinger Date:
Signature:
10. Additional Reviews and Approvals (As applicable):
10.a Bureau Chief Information Officer or Authorized Designee (for IT requirements that are over $5 million, but not exceeding $68 million) (Contracting Activity). I have reviewed this justification and find it to be accurate and complete to the best of my knowledge and belief, and representative of the Government’s need. Therefore, I hereby consent to the approval of this justification. (Note: The Bureau CIO may delegate their authority for proposed contracts over $5 million, but not exceeding $13.5 million to the Associate Bureau CIO(s).)
Name: N/A Date:
Signature:
10.b Advocate for Competition (if over $700,000, but not exceeding $13.5 million) (Contracting Activity). I have reviewed this limited-sources justification and find it to be accurate and complete to the best of my knowledge and belief. Therefore, unless additional
This acquisition is conducted under the authority of the Multiple Award Schedule Program (see FAR 8.401) approvals are required as prescribed below, as the ordering activity’s Advocate for competition, I hereby approve this limited-sources justification.
Name: N/A Date:
Signature:
10.c Head of the Procuring Activity or Authorized Designee (if over $13.5 million, but not exceeding $68 million) (Contracting Activity). I have reviewed this limited-sources justification and find it to be accurate and complete to the best of my knowledge and belief. Therefore, unless additional approvals are required as prescribed below, as the head of the procuring activity or authorized designee, I hereby approve this limited-sources justification.
Name: N/A Date:
Signature:
10.d Treasury Chief Information Officer (for IT requirements that are over $68 million).
I have reviewed this justification and find it to be accurate and complete to the best of my knowledge and belief, and representative of the Government’s need. Therefore, I hereby consent to the approval of this justification.
Name: N/A Date:
Signature:
10.e Senior Procurement Executive (if over $68 million) (Contracting Activity). I have reviewed this limited-sources justification and find it to be accurate and complete to the best of my knowledge and belief. Therefore, I hereby approve this limited-sources justification.
Name: N/A Date:
Signature:
| 2b Name of the vendor Federal Working Group: | |
| 2c Requisition No TBD: | |
| toggle_1: Off | |
| toggle_2: Off | |
| fill_3: | |
| undefined: Off | |
| FAR 84056a1iA An urgent and compelling need exists and following the: Off | |
| FAR 84056a1iC In the interest of economy and efficiency the new work is a: Off | |
| FAR 84056b Items peculiar to one manufacturer: Off | |
| 7a Any other facts supporting this justification NA: | |
| fill_3_2: | |
| undefined_2: Off | |
| 2022-07-20T12:14:15-0400 | |
| Clyde E. Halsrud |
| 2022-07-20T12:22:16-0400 | |
| Karen E. Oettinger |
File details come from the government source that posted it. Updated .