RFQ Trumbull Bicycle and Pedestrian Blueprint
This Request for Qualifications (RFQ) is issued by the Connecticut Metropolitan Council of Governments (MetroCOG) in partnership with the Town of Trumbull for the development of a comprehensive Bicycle and Pedestrian Blueprint. The project seeks a qualified consultant to develop a plan for a safe walking and cycling network suitable for all ages and abilities in Trumbull, Connecticut, a suburban town of 36,000 residents. The scope encompasses baseline conditions evaluation, needs assessment, level of traffic stress analyses, zoning code review, maintenance action planning, community engagement, and development of a master plan with concept designs and cost estimates for at least five priority corridors. Proposals must be submitted by December 4, 2026, at 2:00 PM to Nicolas Dostal at MetroCOG. Consultant interviews are tentatively scheduled for December 2026/January 2027, with contract negotiations to follow. The project timeline requires completion within 12 months from the effective date of award. The RFQ does not commit MetroCOG to award a contract or pay any response preparation costs.
Pricing and payment terms are to be negotiated between MetroCOG and the selected consultant, with monthly invoicing required and payment due within 30 days of receipt. Reimbursable expenses, limited to $200 aggregate unless prior written authorization is obtained, include copies, reproductions, photographs, printing, and overnight delivery services. The project is funded through FHWA's Metropolitan Planning Program and requires compliance with Federal funding requirements, including Title VI of the Civil Rights Act of 1964, non-discrimination provisions, and Federal cost principles under 2 CFR Part 200. The consultant must maintain commercial general liability insurance with limits of $1,000,000 per occurrence, commercial automobile liability insurance of $1,000,000, workers' compensation insurance in accordance with Connecticut law, and professional liability/errors and omissions insurance of $1,000,000. All work products become the sole property of MetroCOG upon completion and payment, and the consultant must comply with all applicable Federal, state, and local laws, including equal employment opportunity requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 39745_Nov_5_26_solicitation_doc.pdf | ||
| 39745_Nov_9_26_solicitation_doc.pdf | ||
| 39745_Nov_6_26_solicitation_doc.pdf | ||
| 39745_Nov_4_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications Trumbull Bicycle and Pedestrian Blueprint
4914-2684-2885, v. 1
REQUEST FOR QUALIFICATIONS
ISSUE DATE: November 2nd, 2026 PROPOSAL DEADLINE: December 4th , 2026 - 2:00 PM
SUBMIT PROPOSALS TO:
Connecticut Metropolitan Council of Governments Attn: Nicolas Dostal 1000 Lafayette Boulevard, Suite 925 Bridgeport, Connecticut 06604 ndostal@metrocogct.gov mailto:ndostal@metrocogct.gov
TABLE OF CONTENTS
1. INTRODUCTION
2. PURPOSE & BACKGROUND
3. SCOPE OF WORK/SERVICES
4. INQUIRIES
5. SUBMISSION REQUIREMENTS
6. SELECTION PROCESS
7. EVALUATION CRITERIA
8. FEDERAL FUNDING REQUIREMENTS
9. EQUAL EMPLOYMENT OPPORTUNITY PROVISIONS
10. INSURANCE REQUIREMENTS
11. ADDITIONAL SERVICES
12. PERSONNEL
13. LENGTH OF SERVICE
14. CONTRACT FORM/AGREEMENT
15. FREEDOM OF INFORMATION ACT
16. INCURRED COSTS
17. SEVERABILITY
18. ACCEPTANCE OR REJECTION BY METROCOG
19. AMENDING OR CANCELING REQUEST
20. WAIVER OF INFORMALITIES
21. WORK PRODUCTS
22. SUBCONTRACTING
23. ASSIGNING/TRANSFERRING OF AGREEMENT
24. TERMINATION
25. ACCEPTANCE OF RFQ
26. NO WARRANTY
27. RESERVATION OF RIGHTS
1. INTRODUCTION
The Connecticut Metropolitan Council of Governments (MetroCOG) and the Town of Trumbull are partnering on the Trumbull Bicycle and Pedestrian Blueprint. The Blueprint is a plan for a comprehensive safe walking and cycling network for all ages and abilities, with infrastructure that is feasible and sustainable for the town to install and maintain.
A baseline conditions evaluation and needs assessment will develop inventories of the Town's existing non-vehicular facilities, conduct level of traffic stress assessments, and assess current and desired trip activity to identify priority bicycle and pedestrian corridors and shorter-term
"low-hanging fruit" projects. Reviews of Trumbull's zoning code, capital plan, design policies, and maintenance practices will serve to identify funding mechanisms, suggest zoning code revisions, and inform the development of a Maintenance Action Plan to promote and support the development of new bicycle and pedestrian infrastructure. Throughout the project, targeted in-person and digital outreach will be conducted, including attendance at community events, meetings with focus groups, and corridor walk audits. The blueprint will culminate in the development of a Bicycle and Pedestrian master plan that will create maps of future bicycle and pedestrian routes in Trumbull, concept designs and cost estimates for a minimum of 5 priority corridors, and guidance for municipal operations regarding the funding, design, and maintenance of bicycle and pedestrian facilities.
The Trumbull Bicycle and Pedestrian Blueprint will be administered by MetroCOG, the host agency for the Greater Bridgeport and Valley Metropolitan Planning Organization (GBVMPO), which is the federally designated transportation planning agency for Connecticut's Greater
Bridgeport & Valley Planning Region. MetroCOG is also the regional Council of Governments that includes the City of Bridgeport and the Towns of Easton, Fairfield, Monroe, Stratford and
Trumbull. The Town of Trumbull is the local partner on the project and is providing match funding that enables the study.
MetroCOG, The Town of Trumbull, and the selected firm will coordinate with the Town of
Trumbull’s Department of Planning and Zoning, Public Works, Engineering, Police and Fire, Parks and Recreation, Town Council, Greater Bridgeport Transit (GBT), the Connecticut Department of
Transportation (CTDOT), and other key stakeholders throughout the duration of the study.
2. PURPOSE & BACKGROUND
Trumbull is a town of 36,000 residents located in south-western Connecticut, with a suburban character and multiple commercial centers. The Town’s land use is generally automobile oriented, having experienced much of its residential expansion in the 1950s and 1970s. Most
4914-2684-2885, v. 1 residents rely on a car for their primary mode of transportation, with less than 1% of Trumbull residents currently walking or biking to work.
Currently, the bicycle and pedestrian infrastructure in the town is modest and intermittent.
There is roughly 26 miles of sidewalk in the town, however the network experiences major gaps and suffers from a lack of interconnection. Several schools and commercial areas lack safe, well-connected sidewalks, ultimately prohibiting reliable pedestrian access. On-road cycling infrastructure is very limited, with only a few short sections of bike lane markings. The
Pequonnock River Trail that runs through the length of Trumbull is a major regional and community asset connecting the Town to Monroe in the North and Bridgeport to the South. The greenway boasts a paved multi-use pathway that is extremely popular amongst residents and visitors alike and is seen as an important active transportation and recreational amenity for people walking, cycling, rolling, and running in Town.
In recent years, the town and the community at large have demonstrated a growing interest in improving non-vehicular safety and infrastructure. Recent pedestrian and cyclist fatalities and serious injuries have signaled the imminent need for safety interventions aimed at protecting non-vehicular users in Town. Current conditions are seen as prohibitively dangerous in certain areas, with several schools discouraging biking due to safety concerns. Recent outreach efforts have found significant resident demand for more sidewalks, increased greenway linkages, and safe bicycle routes to community destinations. In response, the Town has embarked on a series of safety and non-vehicular focused projects, aiming to connect the Pequonnock River Trail to commercial and community assets with dedicated facilities, create safer roadways that accommodate all road users, and create a more vibrant streetscape. The obstacles for this expansion are not just financial but regulatory. Added maintenance responsibility and approach to new infrastructure, mechanisms for funding smaller projects, and enshrining Complete
Streets approaches to Town processes are ongoing concerns for Town Staff and Council.
Therefore, regulatory changes and administrative support will help unlock the potential for the further development of walking and cycling networks in Trumbull.
The Trumbull Bicycle and Pedestrian Blueprint will build upon previous planning work including the Town of Trumbull’s POCD, Trumbull Mall Area Study, Trumbull Center Corridor Study, Long Hill Green Plan, and the IL2 District Planning Study, as well as MetroCOG’s RPOCD, Regional Safety Action Plan, and Regional Complete Streets Policy to envision a holistic future for cyclist and pedestrian mobility in Trumbull.
3. SCOPE OF SERVICES
See Attachment A for Scope of Services.
4914-2684-2885, v. 1
4. INQUIRIES
General questions regarding this RFQ should be submitted in writing to Mr. Nicolas Dostal at ndostal@metrocogct.gov by November 13th, 2026.
Inquires and responses will be posted at https://metrocogct.gov/ no later than November 20th, 2026. Please note that MetroCOG will respond to technical questions only. No interpretive guidance, written or oral, regarding this RFQ will be given and no phone calls will be accepted.
Written approval by MetroCOG is required prior to public disclosure of submissions intended for MetroCOG. Interested consultants are expected to monitor https://metrocogct.gov/ for amendments and responses to inquiries.
5. SUBMISSION REQUIREMENTS
Prospective consultant(s) should submit a response consisting of the following sections:
A. Letter of Interest
The Letter of Interest shall include the following:
i. Name and address of firm
ii. Name and address of any proposed subconsultants.
iii. Contact Information (name, title, e-mail, phone) for the Principal-in-Charge/Project Lead
iv. Contact Information (name, title, e-mail, phone) for the Project Manager
B. Statement of Qualifications/Technical Response
i. Firm experience, including demonstrated knowledge of transportation planning and engineering, experience working with Connecticut municipalities and the Connecticut Department of Transportation, and familiarity with studying, designing, and implementing non-vehicular transportation safety and infrastructure projects.
ii. Project understanding and innovative approaches to the scope of services.
iii. Any recommendations to improve/support the scope of services.
iv. Examples and descriptions of comparable project experience, including a list of recently completed, comparable projects.
v. References from the comparable types of projects outlined above. Include project names and locations, name of primary client contacts and their contact information including e-mail addresses and telephone numbers. Indicate the role of your firm in each project, each project’s cost and date of completion, and the team members which delivered each project.
vi. Organizational framework/organization chart, including identification and resumes of the project team (Lead Consultant, Project Manager, Subconsultants (if any), etc.)
mailto:ndostal@metrocogct.gov https://metrocogct.gov/ https://metrocogct.gov/
4914-2684-2885, v. 1
vii. Identification of a day-to-day point of contact(s) for the project as well as their respective contact information.
viii. Current Federal Form SF-330 Part II.
ix. Debarment Certification Form – all respondents much provide a properly executed form ensuring the firm is not debarred from receiving federal funds (Attachment B).
Each consultant must submit two (2) paper copies and one (1) digital copy (USB flash drive) of their qualifications in a sealed envelope. Please include the name of each firm, full address, and the name of the project (Trumbull Bicycle and Pedestrian Blueprint) on the envelope. Address proposals to:
Nicolas Dostal, Transportation Planner II
Connecticut Metropolitan Council of Governments
1000 Lafayette Boulevard, Suite 925
Bridgeport, Connecticut 06604
6. SUBMISSION PROCESS
1. Proposal Submission Date: December 4th, 2026 - 2:00 PM.
2. Key Dates & Times
MetroCOG’s preliminary schedule is as follows. Please note the schedule may be altered at the
MetroCOG’s discretion.
Activity Anticipated Completion Date
RFQ Issued November 2nd, 2026
Questions/Inquiries to MetroCOG November 13th, 2026
MetroCOG’s Response to Questions/Inquires November 20th, by 4:30PM
Proposals Due December 4th, 2026 - 2:00 PM
Consultant Interviews (Tentative) December/January 2026
Contract Negotiations/Agreement Process December/January 2026
7. EVALUATION CRITERIA
MetroCOG will follow a Qualifications Based Selection (QBS) process for selecting the preferred consultant. All responses will be reviewed by an RFQ Selection Committee established by MetroCOG. Responses will be reviewed and scored on the evaluation criteria listed below.
4914-2684-2885, v. 1
- Qualifications & Experience with Non-Vehicular Transportation Safety and Infrastructure
Planning and Engineering 25%
- Project Understanding/Approach to Scope of Services 25%
- Project Organization, Schedule, and Staff Commitment 25%
- Completeness, Feasibility, and Quality of Response 25%
Upon review of responses, the RFQ Selection Committee may elect to interview a select number of firms for the purpose of presentation and clarification of materials. Upon completion of interviews, the RFQ Selection Committee will recommend the preferred consultant (or consultant team) and will authorize MetroCOG to notify the consultant of their selection and begin contract negotiations.
The preferred consultant will be notified of the decision of the RFQ Selection Committee and contract negotiations will commence immediately upon notification. MetroCOG and the preferred consultant will work to finalize the Scope of Services, Project Budget, and legal
Professional Services Agreement. At the end of the negotiations, the contract shall be awarded.
If a negotiated agreement and fee cannot be mutually agreed to by both parties, MetroCOG will terminate negotiations and begin negotiations with the next highest rated firm.
The selected consultant will be required to prepare project documents in a timely manner and submit monthly status reports indicating work completed to date and any problems that have affected the project schedule. To this end, the consultant will be expected to assign sufficient staff to complete the Scope of Services within the established and agreed upon schedule.
8. FEDERAL FUNDING REQUIREMENTS
This project is funded through FHWA’s Metropolitan Planning Program funds. Firms must demonstrate their ability to comply with all applicable Federal laws and regulations, including but not limited to:
- Title VI of the Civil Rights Act of 1964: The Recipient, in accordance with the provisions of
Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the
Regulations, hereby notifies all bidders that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.”
- Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, Federal Highway Administration
(FHWA), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.
4914-2684-2885, v. 1
- Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 C.F.R. Part 21.
- Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under this contract and the Acts and the Regulations relative to
Non-discrimination on the grounds of race, color, or national origin.
- Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the FHWA to be pertinent to ascertain compliance with such
Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information.
- Sanctions for Noncompliance: In the event of a contractor’s noncompliance with the
Nondiscrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
a. withholding payments to the contractor until the contractor complies; and/or b.
cancelling, terminating, or suspending a contract, in whole or in part.
- Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.
- Cost Principles and Procurement: All subsequent contracts resulting from this solicitation will be subject to the Uniform Administrative Requirements, Cost Principles, and Audit
Requirements for Federal Awards (2 CFR Part 200). The Contractor must ensure that all costs incurred under this resulting contract comply with the Federal Cost Principles in 2 CFR
200, Subpart E, and are reasonable, allocable, and necessary; and any subcontracting or
4914-2684-2885, v. 1 procurement of work by the Contractor adheres to the Federal procurement standards in 2
CFR §§200.317 through 200.327.
9. EQUAL EMPLOYMENT OPPORTUNITY PROVISIONS
Consultants and their subcontractors will not discriminate on the basis of race, color, national origin, or sex in the award and performance of services. Respondents must demonstrate a commitment to the effective implementation of an affirmative action plan or policy on equal employment opportunity.
Consultants must ensure equal employment opportunity to all persons and not discriminate against any employee or applicant for employment because of race, color, religion, gender, national origin, physical disability, mental disorder, ancestry, marital status, sexual orientation, criminal record or political beliefs. Consultants must uphold and operate in compliance with Executive Order 11246 and as amended in Executive Order 11375, Title VI and VII of Civil Rights Act of 1964, the Equal Employment Opportunity Act of 1972, the Fair Employment Practices Act, and the American with Disabilities Act of 1990.
Each Respondent should furnish a detailed statement describing its Equal Employment Opportunity practices and any statistical employment information that it deems appropriate, relative to the composition of its workforce or its subcontractors.
10. INSURANCE REQUIREMENTS
A. The Consultant shall carry and maintain in full force and effect for the duration of any contract resulting from this RFQ, appropriate insurance. The Consultant agrees to protect and defend, indemnify, and hold MetroCOG, the Town of Fairfield, and their respective employees (collectively, the “Indemnitees”) free and harmless from and against any and all losses, claims, liens, demands and causes of action of every kind and character including the amount of judgments, penalties, interest, court costs, and legal fees incurred by in the Indemnitees in defense of same, arising in favor of taxes, claims, liens, debts, personal injuries, including employees of MetroCOG, death or damages to property (including property of MetroCOG) and without limitations by enumeration, all other claims, or demands of every character occurring and caused in whole or in part by any negligent act or omission of the Consultant, any one directly or indirectly employed by the Consultant or anyone for whose acts the Consultant may be liable regardless of whether or not it is caused in part by MetroCOG. The Consultant will designate and provide MetroCOG with the identity of a person or persons in the Consultant’s employ who shall be responsible for handling claims from the public efficiently and expeditiously. Policies shall be issued by an insurance company authorized to do business in the State of Connecticut.
B. Insurance similar to that required by the Consultant shall be provided by or on behalf of all subcontractors to cover their operations performed and included in all subcontracts.
4914-2684-2885, v. 1
C. Insurance certificates are required with responses to this RFQ. Insurance certificates must be provided at the time of bid for site-specific work documenting coverage for the following:
i. Workers’ Compensation and Employer’s Liability in accordance with State of
Connecticut requirements.
ii. Public Liability Insurance: Comprehensive General Liability, (bodily injury, personal injury, and property damage liability) including company’s contingent Completed operations and contractual liability with a minimum:
a. $1,000,000 each occurrence
b. $1,000,000 personal and advertising injury
c. $1,000,000 general aggregate; and
d. $1,000,000 products/completed operations aggregate
iii. Comprehensive Automobile Liability Insurance. Covering all owned, hired, and rented vehicles and equipment, with limits of liability of not less than $1,000,000 for injuries to, or death of one or more persons resulting from any one occurrence and property damage limit of liability of not less than $500,000 per occurrence.
iv. Professional liability and errors & omissions insurance in the amount of $1,000,000.
v. In lieu of the insurance coverage listed under (ii) and (iii) above, the Consultant may fulfill the insurance requirements by having and maintaining excess or umbrella liability insurance with a minimum:
a. $1,000,000 per occurrence;
b. $1,000,000 aggregate of other than products/completed operations and auto liability; and
c. $1,000,000 products/completed operations aggregate.
d. All insurance certificates must name MetroCOG as additional insureds on the policies. The insurance certificates must state that coverage cannot be cancelled or materially altered without thirty (30) days’ written notice to the MetroCOG.
11. ADDITIONAL SERVICES
If you believe that additional services in addition to those requested in the Scope of Services are necessary, please identify those services and your reasons for recommending such services.
12. PERSONNEL
The Consultant shall provide the professional services identified in the Scope of Services and requested by MetroCOG. The proposal must identify the person or persons who will be responsible for conducting the work listed in the Scope of Services, and include a copy of each person's resume, including persons of the sub-contractor, if any. MetroCOG is requesting that a senior experienced person be the primary representative of the consultant in performing the services.
13. LENGTH OF SERVICE
It is expected and required that the work covered by this Scope of Services shall be completed in an expeditious manner. The project is expected to be delivered within (12) months from the
4914-2684-2885, v. 1 effective date of award. The proposal should include a detailed project timeline that indicates an approximate date for completion of the project.
14. CONTRACT/AGREEMENT
The successful Consultant will be required to sign a Professional Services Agreement (“PSA”) prepared by MetroCOG’s attorney. A copy of the PSA can be found as Attachment C. Depending upon the content of the Consultant’s qualifications, MetroCOG may modify the customary form of PSA. MetroCOG reserves the right to cancel the award to a successful Consultant if the successful Consultant proposes modifications to the PSA or attempts to modify the terms of the PSA after being notified of the award. Under the PSA, MetroCOG will have the right to terminate the Consultant’s services for cause.
15. FREEDOM OF INFORMATION ACT
Respondents are advised that any and all materials submitted in response to this RFQ shall become the sole property of MetroCOG and shall be subject to the provisions of Section 1-210 of the Connecticut General Statutes (re: Freedom of Information).
16. INCURRED COSTS
This Request for Qualifications does not commit MetroCOG to award a contract or to pay any costs incurred in the preparation of a response to this request. MetroCOG will not be liable in any way for any costs incurred by respondents in replying to this RFQ.
17. SEVERABILITY
If any terms or provisions of this Request for Qualifications shall be found to be illegal or unenforceable, then such term or provision shall be deemed stricken and the remaining portions of this document shall remain in full force and effect.
18. ACCEPTANCE OR REJECTION BY THE CONNECTICUT METROPOLITAN COUNCIL OF
GOVERNMENTS
MetroCOG reserves the right to accept and or reject any or all responses submitted for consideration or to negotiate separately in any manner necessary to serve the best interests of MetroCOG.
19. AMENDING OR CANCELING REQUEST
MetroCOG reserves the right to amend or cancel this RFQ, prior to the due date and time, if it is deemed to be in its best interest to do so.
20. WAIVER OF INFORMALITIES
MetroCOG reserves the right to accept or reject any and all responses to this RFQ, or any part thereof, and waive any informalities and/or technicalities that are deemed to be in its best interest.
21. WORK PRODUCTS
4914-2684-2885, v. 1
All reports, data, and other documents prepared by the consultant shall be submitted to MetroCOG for review and approval. Resulting work products of the Consultant pursuant to this solicitation shall be provided in both easily accessible printed and digital format and shall become the property of MetroCOG in which the consultant is contracted with. The use of consultant generated media, photos, surveys, and videos may be used by MetroCOG for future planning purposes and documents. Member municipalities may utilize work products as well.
No such approval shall in any way be construed to relieve the consultant of responsibility for technical adequacy or operate as a waiver of any of MetroCOG’s rights. The consultant shall remain liable according to applicable laws and practices for all damages to MetroCOG caused by the consultants’ negligent performance of any of services furnished relative to any agreements resulting from this solicitation.
22. SUBCONTRACTING
Consultants may team as they deem necessary to respond to this RFQ. In their response, the prime consultant and all subconsultants should be clearly identified along with the responsibilities of each. The successful respondents may utilize the services of specialty, currently unidentified subconsultants on those unforeseen portions of the work that under normal practices are performed by specialty firms. In this event, the consultant shall obtain and make available fee proposals from qualified sub-consultants for those services. The successful respondent shall not award any portion of the work to a firm that is not on the selected project team without prior written approval of MetroCOG. The acceptance of any and all subconsultants shall reside with MetroCOG and their decision shall be final. The successful respondent shall be fully responsible for the performance, finished products, acts, and omissions of his subcontractors and persons directly or indirectly employed thereby. The primary consultant will be required to include all mandatory Federal clauses, including Title VI/EEO (23 CFR 200), Debarment (2 CFR 180), and required Contract Provisions (2 CFR 200.327), in all lower-tier subcontracts or subawards.
23. ASSIGNING/TRANSFERRING OF AGREEMENT
Any successful firm is prohibited from assigning, transferring, conveying, subletting or otherwise disposing of the resulting agreement or its rights, title, or interest therein or its power to execute such an agreement to any other person, company or corporation without prior consent and approval in writing from MetroCOG.
24. TERMINATION
MetroCOG may terminate a consultant’s contract due to cause, default or negligence on the part of the consultant; or if the consultant fails, in the opinion of MetroCOG or its member municipalities, to meet the general terms and conditions of any resulting contract or to provide a level of service that is deemed to be in the best interest of MetroCOG or its member municipalities.
25.ACCEPTANCE OF RFQ
Respondents shall describe in detail any and all exceptions to any of the conditions outlined in this RFQ. MetroCOG assumes that each Respondent will accept each and every one of the
4914-2684-2885, v. 1 conditions of this RFQ unless an exception or exceptions are specified in the Respondent’s statement of qualifications.
26. NO WARRANTY
Respondents are required to examine the RFQ, specifications, and instructions pertaining to the services to be provided. Failure to do so will be at the Respondent’s own risk. MetroCOG assumes that the Respondent has made full investigation and is fully informed of the extent and character of the services to be provided under this RFQ and of the requirements of the specifications. No warranty is made or implied as to the information contained in this RFQ, specifications, or instructions.
27.RESERVATION OF RIGHTS
MetroCOG reserves the right to reject any, or any part of or all statement of qualifications for any reason; to waive informalities and technicalities; and to accept the proposal which MetroCOG deems to be in its best interest. MetroCOG reserves the right to review the qualifications and reject all proposals or take no action or elect not to select any response.
MetroCOG also reserves the right to cancel this RFQ at any time and to reissue this or a substitute RFQ at a later date. In its sole discretion and without prejudice, MetroCOG will award a contract to the Respondent that it feels is best suited to complete the scope of services. This RFQ does not constitute a contract or offer of employment.
Proposal Submission Deadline:
December 4th, 2026 - 2:00 PM
Address all Proposals to:
Mr. Nicolas Dostal Connecticut Metropolitan Council of Governments
1000 Lafayette Boulevard, Suite 925 Bridgeport, CT 06604 ndostal@metrocogct.gov
ATTACHMENTS
A. SCOPE OF SERVICES
B. DEBARMENT CERTIFICATION FORM
C. PROFESSIONAL SERVICES AGREEMENT
mailto:ndostal@ctmetro.org
ATTACHMENT A:
SCOPE OF SERVICES
Redlined Trumbull Bicycle/Pedestrian Plan
SCOPE OF WORK
Prospective consultants are encouraged to review the Scope of Work outlined below and to propose additional scoping items and alternative approaches to developing the Plan, if needed. The consultant is expected to work closely with MetroCOG and the Town of Trumbull’s Public Works, Engineering, Police and Fire, Planning and Zoning, Economic Development, Parks and Recreation Departments, Town Council, and other key stakeholders throughout the 12-month study process. The aim is to create a Comprehensive Pedestrian and Biking network that aims to facilitate safe non-vehicular travel for all ages and abilities in a manner that is feasible and sustainable for the Town to implement and maintain. The result should be visioning document that guides a tangible plan to improve and expand Trumbull’s Bicycle, Pedestrian, and Accessible networks over time.
Task 1: Baseline Conditions Evaluation and Needs Assessment
- Review existing infrastructure, safety, and project data and information provided by the Town of Trumbull and MetroCOG. Identify missing data required to fill any gaps.
- Create a GIS inventory and map of existing sidewalks, trails, bicycle facilities, accessible curb ramps, and crossings. The inventory should consider the current state of repair for existing facilities.
- Develop a user-friendly printable Map of current non-vehicular facilities and amenities intended for public use through the Town website and social media.
- Evaluate existing bicycle and pedestrian infrastructure networks to identify system gaps. Identify priority gaps based on surrounding amenities and land use.
- Conduct two level of traffic stress assessments for all roads, trails and paths, one focused on the cycling experience and the other evaluating the pedestrian experience. Create a map displaying the levels of traffic stress across the current mobility network.
- Assess existing lighting, street trees, and additional elements to evaluate the holistic pedestrian experience.
- Document current wayfinding amenities and identify locations where directional and places of interest signage should be placed around Town and along the Pequonnock River Trail.
- Analyze bus stop location and amenity data provided by Greater Bridgeport Transit (GBT). Audit stops with a lack of- or informal amenities to propose target locations for stop and shelter improvements.
- Evaluate and map current bicycle and pedestrian movement patterns and walking distances.
- Evaluate and determine locations where topography, current roadway design, and land use present challenges to safety, circulation, and accessibility.
- Evaluate current accessibility of the Pequonnock River Trail and identify areas for improvement and opportunities to enhance connections with surrounding neighborhoods.
- Document the location, type, and utilization of existing bicycle parking, including current, under- or unserved areas.
- Identify local (schools and grocery stores) and regional (parks and commercial/ employment centers) destinations that serve as current or potential bicycle and pedestrian trip generators. Identify types of uses that should be the focus of future connections (Recreational to Commercial, School to Commercial and Residential).
- Utilizing the existing conditions data and findings, identify at least 5 priority Bicycle and Pedestrian Corridors to receive concept designs as part of Task #4 below.
- Identify and map a list of near-term “low-hanging fruit” projects that can be acted upon quickly and have outsized impacts (e.g. a small segment of missing sidewalk that would link two established areas).
Task 1 Deliverables: Existing Conditions and Needs Assessment document that details current bicycle and pedestrian conditions in The Town of Trumbull to identify strengths, challenges, and opportunities for improvement. Presentation of priority Bicycle and Pedestrian Corridors as well as a list and map of near-term projects. Provide infrastructure, level of traffic stress, bicycle and pedestrian movement patterns, and trip generator data, maps, and narrative as part of the document.
Task 2: Operations, Zoning Code, and Regulations Review
- Conduct a comprehensive review of the Town of Trumbull’s Zoning Code, Regulations, Ordinances, and Policies related to the form, provision, and development requirements for walking and biking. Identify regulatory barriers to the development of bicycle and pedestrian infrastructure and walkable/bikeable environments.
- Propose revisions to bicycle and pedestrian infrastructure, complete streets, and maintenance requirements. Identify opportunities to improve regulations related to facilitating walkable and bikeable land use.
- Provide recommendations to the Town of Trumbull’s Zoning Code, Regulations, Ordinances, and Policies. Develop and provide model language and in-line code improvements to apply the recommendations related to pedestrian and bicycle infrastructure. Examples include recommendations for winter maintenance responsibility, PILOS, and Complete Streets striping when repaving.
- Recommend potential funding mechanisms within the Town Capital Plan and budget process for bicycle, pedestrian, and accessible improvements and maintenance.
- Assess current Town of Trumbull Public Works maintenance operations, practices, and requirements related to bicycle and pedestrian infrastructure to identify opportunities for improvement, potential investments, and innovative practices to streamline operations, reduce costs, and improve the quality and response time of maintenance.
- Create a Maintenance Action Plan to recommend improvements, investments, and innovative new practices, as applicable.
Task 2 Deliverables: Analysis of the Town of Trumbull’s Bicycle and Pedestrian related Zoning Code, Regulations, and Ordinances to propose revisions aimed at improving upon current conditions. Provide a summary document outlining current regulatory obstacles and model language for improvements. Provide line-item Zoning Code revisions. Create a Maintenance Action Plan for the Public Works Department to streamline and innovate upon maintenance operations.
Task 3: Community Engagement
- Conduct in-person and digital public outreach; including attendance/presence at community events and significant community locations such as the Senior Center to gather input from visitors and residents on their experience with walking, biking, and accessibility conditions within the study area. Minimum of 5 in-person events/locations.
- Conduct targeted outreach a series of focus group meetings with key interest groups including, but not limited to; Fire Department, Police Department, Seniors, School and Board of Education Staff, Parent-Teacher Associations, High School Students, and other community groups. Leverage existing in-person and online communities (such as the Pequonnock Trail Facebook group). Minimum of 8 focus group meetings.
- Conduct walk audits of the priority Bicycle and Pedestrian Corridors with key Town staff and stakeholders.
- Develop, distribute and online survey, and analyze the results of the online survey.
Task 3 Deliverables: Public Outreach Report that provides documentation of all public outreach conducted and input received; online survey process and data, and all relevant focus group comments, details, notes, and materials.
Task 4: Develop Bicycle and Pedestrian Master Plan
- Utilize and include the previous three deliverables to formulate a comprehensive Bicycle and Pedestrian Plan for the Town of Trumbull that details immediate, short- and long-term strategies.
o Consideration should be given to ensuring a non-vehicular network for All Ages and Abilities while maximizing co-benefits for placemaking, livability, economic development, and sustainability.
The following components should be included within the Master Plan:
- Network Recommendations o Create a future map of bike routes for All Ages and Abilities across
Trumbull, identifying potential trail extensions/connections, bike boulevards/neighborhood greenways, shared use paths, and protected/ separated bike lanes. The future bike network map should consider neighborhood, Town, and regional connections.
o Create a map of future pedestrian routes and sidewalks across Trumbull.
Identify opportunities for pedestrian pathways, cut throughs, and trail access points to reduce walking distances across Town.
o Provide detailed bicycle and pedestrian infrastructure concepts, visualizations, recommendations, and cost estimates for at least 5 Priority Bicycle and Pedestrian Corridors identified in Task #1. Corridors should be ordered in terms of priority.
o For priority locations where non-vehicular amenities are currently not feasible due to ROW constraints, identify potential areas where land or easements should be acquired. Provide best practices and examples of legal pathways of the process of acquisition.
o Provide recommendations for the pedestrian realm including crossing improvements, lighting, and opportunities for holistic enhancements such as greenery, green infrastructure, public art, and amenities.
o Provide a template for annual progress evaluation.
- Operational Recommendations o Incorporate recommendations for maintenance methods and investments that recognize available staffing and budgets. Consider infrastructure proposed in the Network Recommendations.
o Provide training and materials for Town Staff on the implementation and maintenance of new and innovative bicycle and pedestrian infrastructure.
o Provide design guidance that recommends minimum and ideal facility types and measurements.
o Incorporate recommendations for the Town of Trumbull’s Zoning Code, Regulations, Ordinances, and Policies related to walking and biking identified in Task #2.
o Design digital materials for communicating new infrastructure and network maps to members of the public.
o Develop a placement plan, visual identity, and detailed concepts for wayfinding and signage for the Pequonnock River Trail and around Trumbull.
Once a draft plan and network recommendations are developed, present the strategies to stakeholders. Incorporate feedback into the final Bicycle and Pedestrian Plan. If needed, brief elected officials on the plan and recommendations.
Task 4 Deliverables: Final Town of Trumbull Bicycle and Pedestrian Master Plan. The implementation plan should be inclusive of concepts, visualizations, maps, cost estimates, model ordinance and zoning language, and anticipated maintenance requirements.
ATTACHMENT B:
Debarment Certification Form
ATTACHMENT B
DEBARMENT CERTIFICATION FORM
This statement must be reproduced on company letterhead and signed by an authorized representative of the firm.
I, ________________an authorized representative of _________________ (company) certify that _________________ (company) is not debarred from receiving Federal funds.
_________________________ (Signature)
_________________________ (Print name)
_________________________ (Title)
_________________________ (Date)
ATTACHMENT C:
PROFESSIONAL SERVICES AGREEMENT
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement is dated as of (Date of Agreement) by and between CONNECTICUT METROPOLITAN COUNCIL OF GOVERNMENTS (“MetroCOG”), and (Selected Consultant), a multinational corporation with a principal place of business located at (Location).
RECITALS
A. MetroCOG has the need for certain services described in the RFQ.
B. Consultant submitted the Proposal in response to the RFQ.
C. MetroCOG awarded the contract for the performance of the Services to Consultant subject to execution of a professional services agreement.
NOW THEREFORE, for good and valuable consideration, receipt of which is hereby acknowledged, the Parties agree as follows.
1. Definitions. For purposes of this Professional Services Agreement, the following capitalized words and phrases shall have the meanings ascribed to them below.
a. “Agreement” means this Professional Services Agreement.
b. “Contract Documents” means and includes the Agreement, the RFQ and the Proposal.
c. “Member Municipalities” means and includes the City of Bridgeport, the Town of Fairfield, the Town of Easton, the Town of Monroe, the Town of Stratford and the Town of Trumbull.
d. “Party” means each of MetroCOG and Consultant and “Parties” means and includes MetroCOG and Consultant.
e. “Project” means the project described in the RFQ.
f. “Proposal” means the Consultant’s proposal submitted in response to the RFQ. A copy of the Proposal is attached as Exhibit 2.
g. “RFQ” means the Regional Safety Action Plan Phase II: Crash Hot Spot Countermeasure Suitability Analysis and Demonstration Activities Request for Qualifications, a copy of which is attached as Exhibit 1.
h. “Scope of Work” means the Scope of Work attached to the RFQ as Attachment A, as modified only by such changes as are agreed upon by the Parties in writing.
i. “Services” means and includes the services described in Scope of Work.
{01422899.DOCX Ver. 1} 1
2. Performance of Services and Standard of Care. Consultant shall perform, and require the performance by its subcontractors, the Services in accordance with the standard of care consisting of the level of skill and care ordinarily exercised by members of the Consultant’s profession currently practicing in the State of Connecticut under similar conditions and will diligently pursue the completion of the Services in accordance with the terms of the Contract Documents. Consultant shall further employ its professional judgment in accordance with said standard of care in the performance of the Services. Consultant shall re-perform Services not meeting the standard of care at no additional cost to MetroCOG.
3. Resolving Inconsistencies. In the event of an inconsistency between or among the Contract Documents: this Agreement shall control over any inconsistent term or condition of the RFP or the Proposal; and the RFQ shall control over any inconsistent term or condition of the Proposal.
4. Fees and Payments.
a. Amount of Payment: The total compensation for all Services required to be performed by Consultant pursuant to the Contract Documents shall be negotiated between MetroCOG and the Consultant.
b. Invoices and Payment: Consultant shall submit monthly invoices detailing the percentage of work completed for each task, as described in the Scope of Work. All invoices shall include a detailed description of the Services performed during the invoice period. MetroCOG will promptly advise Consultant of any revisions or additional documentation necessary for any given Consultant invoice to be paid. MetroCOG shall pay all undisputed invoiced amounts within thirty
(30) days after receipt thereof.
c. Responsibility for Certain Payments: Consultant shall remain responsible, and shall indemnify and hold harmless MetroCOG, from and against all liability for the withholding and payment of all applicable Federal, State and Local personal income, wage, earnings occupation, social security, worker’s compensation, unemployment, sickness and disability insurance taxes, payroll levies or employee benefit requirements (under ERISA, state law or otherwise) now existing or hereafter enacted and attributable to Consultant and Consultant shall require its subcontractors to indemnify MetroCOG in the same manner.
d. Reimbursable Expenses. Except for the Reimbursable Expenses, the compensation to be paid under Section 4(a) is inclusive of all expenses. Except for the Reimbursable Expenses, Consultant will be solely responsible for the payment of all expenses appropriate or necessary for Consultant to properly perform the Services. “Reimbursable Expenses” means and includes expenses actually incurred by Consultant for copies, reproductions, photographs, printing and overnight delivery services. MetroCOG will not be responsible for payment for Reimbursable Expenses in excess of $200.00 in the aggregate unless Consultant has obtained the prior written authorization of MetroCOG’s Executive Director.
5. Acceptance Procedures. Upon completion of each task or element described in the Scope of Work, Consultant shall submit to MetroCOG all associated deliverables for review. Within two (2) weeks of MetroCOG’s receipt, MetroCOG shall either accept or reject the deliverables. Deliverables will be accepted by MetroCOG only if they contain no errors and meet all specifications. Deliverables that contain errors or fail to meet all specifications will be returned to Consultant for correction and resubmission.
{01422899.DOCX Ver. 1} 2
6. Representations. Consultant hereby represents the following to MetroCOG.
a. Use of Qualified Personnel: Each of the professionals performing the Services on behalf of Consultant or an approved subcontractor has the requisite experience and training to undertake and complete the Services pursuant to the requirements of this Agreement.
b. Financial Status and Personnel: Consultant is financially stable and has adequate resources and personnel to complete the Services in a timely fashion. Consultant is not in receivership or contemplating same, has not filed for bankruptcy, and is not currently delinquent with respect to payment of property taxes in any state.
c. No Conflicts: Consultant has disclosed in writing prior to the execution of this Agreement, all conflicts or potential conflicts of interest that may or are likely to have an adverse effect on its ability to independently protect MetroCOG’s interests in connection with the Project and the performance of the Services, including, but not limited to, the nature and specifics of Consultant’s relationship with any of the Member Municipalities or other participants in the Project, for example other consultants. Consultant represents that its performance of the Services and its representation of MetroCOG, will not result in a conflict of interest, will not violate any laws or contractual obligations with third parties, and is an enforceable obligation of Consultant.
d. Prior Approval of All Subcontractors: Except for subcontractors specifically identified in the Contract Documents, Consultant will not engage any subcontractor to perform any of the Services without prior written approval by MetroCOG.
e. No Violation of Law: Neither Consultant, nor any of its officers, directors, members, managers, owners, employees, or, to the best of its knowledge any of its approved subcontractors and consultants, have committed a criminal violation of federal or state laws arising directly or indirectly from its business operations that resulted in the imposition of a monetary fine, injunction, criminal conviction or other sanction. Consultant will take all reasonable steps to ensure that its officers, directors, members, managers, owners, employees, agents, subcontractors and consultants shall comply with the requirements of all laws, rules and regulations applicable to this Agreement and to the conduct of their businesses in the performance of the Services.
f. Licenses and Permits: Consultant possesses, and will require that its subcontractors possess, all applicable professional licenses and other licenses and permits in the State of Connecticut that may be required to perform the Services.
g. Observance of Proprietary Rights: Consultant will take reasonable steps to ensure that the performance of the Services will not infringe upon or misappropriate any United States copyright, trademark, patent, or the trade secret or other proprietary material of any third persons. Upon being notified of such a claim, Consultant shall, at the request of MetroCOG and in MetroCOG’s sole discretion and to the extent caused by Consultant’s rendering of services, (i) defend through litigation or obtain through negotiation the right of MetroCOG to continue using the Services of Consultant while such claim of infringement is contested; (ii) modify the Services to be rendered at no cost, expense or damage to MetroCOG so as to make the Services non-infringing while preserving the original functionality, and/or (iii) replace the Services of the
{01422899.DOCX Ver. 1} 3 infringing or potentially infringing portion thereof with the functional equivalent.