Tree Clearing - Addendum 01 - 6-23-26.pdf
PDF 604 KB Posted
- Attached to
- Tree Removal and Stumping Services
- Solicitation number
- 37407
- Issued by
- Tolland County, Connecticut
About this file
This is Addendum No. 1 to a request for proposals issued by the Town of Killingly, Connecticut for tree removal and stumping services at 226 Putnam Pike. The addendum clarifies four critical questions regarding erosion and sedimentation (E&S) controls and stump handling that were raised by prospective bidders. E&S controls are required only for stump removal in areas where runoff could reach flagged wetlands, specifically between stations 12+50 and 19+00, and must be installed on the downstream side of the existing brook and wherever runoff from stumped areas could reach the wetlands. The Town accepts all standard erosion control options including straw wales, haybales, silt fence, erosion control sock/wale, and wood chips from the clearing. Regarding stump management, the addendum confirms that stumps may be pulled and hauled off-site or pulled and left outside the 50-foot-wide clearing limits, with the clearing limits permitted to expand beyond 50 feet to accommodate access and stump placement; however, stumps may not be stockpiled within wetlands.
The addendum does not address pricing, set-asides, funding sources, or other financial terms, as it serves solely to provide technical clarifications to bidders prior to the July 14, 2026 proposal deadline. Prospective contractors should reference the original solicitation documents for complete project specifications, bid bond and insurance requirements, performance timelines, liquidated damages provisions, and other contractual terms established for the emergency access road clearing project covering approximately 1.70 acres.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enginnering1/Projects/High School/Emergency Access/Addendum/Addendum 01
June 23, 2026 Tree Removal and Stumping Services
226 Putnam Pike
TOWN OF KILLINGLY
ADDENDUM NO. 1
Questions:
1. How much (in linear feet) erosion controls is the Town requiring to be installed?
2. Are the erosion controls only required on the downstream side of the exisƟng brook?
3. What is the spec for the erosion controls, straw waƩle? haybales? Silt fence? silt fence and haybales? erosion control sock/waƩle?
4. Please confirm stumps can be pulled and leŌ on the edge of the limit of clearing provided they are not within the 50-foot clearing (so we can cut 60 feet wide and leave the stumps in the 10 feet outside the clearing to rot).
Answers:
1. E & S controls are only required for stump removal in areas where runoff could reach the flagged wetlands. For bidding purposes plan on starƟng at staƟon 12+50 and conƟnuing to staƟon 19+00.
2. Erosion controls are required on the downstream side of the exisƟng brook and wherever runoff from the stumped area could reach the wetlands between staƟons 12+50 and 19+00.
3. All the opƟons listed in quesƟon 2 are acceptable. However as stated during the walk-through wood chips from the clearing may also be used.
4. As stated during the walk-through stumps can be pulled and hauled offsite or pulled and leŌ outside of the 50-foot-wide clearing limits. The clearing limits can be wider than 50 feet to accommodate access and the placement of the stumps. Stumps may not be stockpiled within the wetlands.