This is a set of engineering drawings prepared by the Town of Killingly Engineering Department for the KHS Emergency Access Road project, spanning from Station 0+00 to Station 19+05. The project involves construction of a 20-foot-wide gravel road totaling approximately 1,900 linear feet, designed to provide emergency access to the Killingly High School campus. The drawings depict three sheets covering different segments of the road alignment, including horizontal and vertical geometry, utility conflicts, stream crossing details, and wetland impact areas. Key features include an 8-inch PVC sewer connection with specified invert elevations, a proposed 48-inch reinforced concrete pipe (RCP) stream crossing, and two distinct wetland impact zones totaling 2,000 square feet. The project incorporates vertical curves with specific K-values and lengths, slope limitations, and clearing limits, with elevation data ranging from approximately 377 feet to 404 feet along the route. The drawings indicate existing site conditions including treelines, a school driveway, gravel road, baseball field, brook, and chain-link fence locations.

The associated Tree Removal and Stumping Services contract opportunity requires the successful bidder to provide tree and brush cutting, removal, and disposal services within the marked clearing limits shown on the site plan. Removed material may be hauled off-site or chipped and dispersed outside the clearing limits, with disposal locations to be clearly specified by the bidder and verified as permitted to accept the material volumes. A mandatory site walk is scheduled for June 17, 2026, at 9:00 a.m. at 226 Putnam Pike, Killingly, Connecticut 06239, where contractors must meet at the location identified on the locus map included with the request for proposals.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8" PVC SEWER

INV = 394.23

1+00

1.

9.

2+00

9.

9.

3+00

9.

8.

4+00

8.

7.

5+00

7.

6.

6+00

6.

5.

PVI STA:1+26.25

PVI ELEV:400.56

K:10.00

LVC:50.00

BV

C

S:

+0 1.

BV

C E:

.5

EV

C

S:

+5 1.

EV

C E:

.3

PVI STA:5+64.35

PVI ELEV:396.18

K:150.00

LVC:150.00

BV

C

S:

+8 9.

BV

C E:

.9

EV

C

S:

+3 9.

EV

C E:

.6

PVI STA:0+51.42

PVI ELEV:397.56

K:33.33

LVC:50.00

BV

C

S:

+2 6.

BV

C E:

.9

EV

C

S:

+7 6.

EV

C E:

.5

ST

A

:0 +0

6.

EL

EV

:3

.4

2.50%

4.00% -1.00%

CP 14

MAG SPK

ELEV = 398.62

OUTCROP

EX

IST

IN

G

G

RA

VE

L R

O

AD

TO

R

T.

TO

K

HS

APPROX. SLOPE LIMITS

R = 42'

R = 25'

EXISTING TREELINE

EXISTING SCHOOL DRIVEWAY

AT&T 4603

SMH #8

TF = 393.44

INV = 388.54 (IN SMH 9)

INV = 388.34 (OUT)

SMH #9

TF = 404.91

INV = 398.12 (IN SMH13)

INV = 396.22 (STUB N)

INV = 395.80 (OUT)

8" PVC

8" PVC

8" P

VC

3+

4+

4+

0+00

1+00

2+00

3+00 4+00

5+00

6+00

APPROX. SLOPE LIMITS

APPROX. CLEARING LIMITS

20' WIDE GRAVEL ROAD

SCALE

1" = 20' H 1" = 20 V

M A

TC

H

LI

N

E

ST

A . 6

+5

SCALE

1" = 20'

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TOWN OF KILLINGLY ENGINEERING DEPARTMENT

AutoCAD SHX Text

DESIGN BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text A.B.E.

AutoCAD SHX Text

AutoCAD SHX Text

APRIL. 26'

AutoCAD SHX Text

- OF -

AutoCAD SHX Text

AutoCAD SHX Text

KHS EMERGENCY ACCESS ROAD STA. 0+00 TO 6+50

7+00

4.

3.

8+00

0.

1.

9+00

0.

9.

10+00

1.

5.

11+00

9.

1.

12+00

9.

9.

PVI STA:9+14.87

PVI ELEV:389.17

K:50.00

LVC:100.00

BV

C

S:

+6 4.

BV

C E:

.1

EV

C

S:

+6 4.

EV

C E:

.1

PVI STA:12+16.80

PVI ELEV:377.09

K:27.78

LVC:250.00

BV

C

S:

0+

.8

BV

C

E:

.0

-2.00% -4.00%

BROOK

38238

388 W.F.7

W.F.6

W.F.5

W.F.4

W.F.4A

W.F.5A

W.F.6A

W.F.7A

W.F.8A

9A

W.F.(VHB)

6+

7+

8+00

9+00

10+00

11+00

12+00

13+00

APPROX. CLEARING LIMITS

APPROX. SLOPE LIMITS

20' WIDE GRAVEL ROAD

PROPOSED 48" RCP STREAM

CROSSING

WETLAND IMPACT #1

MATCH LINE STA. 6+50

M

ATCH LINE STA. 13+00

SCALE

1" = 20' H 1" = 20 V

SCALE

1" = 20'

AutoCAD SHX Text

TOWN OF KILLINGLY ENGINEERING DEPARTMENT

AutoCAD SHX Text

DESIGN BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text A.B.E.

AutoCAD SHX Text

AutoCAD SHX Text

APRIL 26'

AutoCAD SHX Text

- OF -

AutoCAD SHX Text

KHS EMERGENCY ACCESS ROAD STA. 6+50 TO 13+00

14+00

5.

5.

15+00

2.

2.

16+00

5.

5.

17+00

4.

4.

18+00

7.

7.

19+00

9.

9.

PVI STA:16+27.97

PVI ELEV:397.65

K:22.27

LVC:100.00BV

C S:

5+

.9

BV

C E:

.1

EV

C

S:

6+

.9

EV

C

E:

.9

0.51%

5.00%

CP 6 P.K.

ELEV = 397.33

CP 7 MAG SPK.

ELEV = 397.49

CP 5

MAG SPK

ELEV = 399.01

" H

DPE

CONC.

OPEN DUGOUT

CONC. FLOOR

METAL

BLEACHERS

H

HYDRANT

BIT. WALK

BIT. W

ALK

BIT.

ACCES

S R

OAD

W.F.

BROOK

CHAIN LINK FENCE

CHAIN LINK FENCE

EXISTING TREELINE

EX

IST

ING TR

EE

LIN

E

BROOK

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

9W.F.

W.F.

W.F.

W.F.

W.F.

W.F.

5A

W.F.

6A W.F.

7A

W.F.

8A W.F.

9A W.F.

(VHB)

W.F.

W.F.

W.F.

W.F.

+0

14+00

15+00

16+00 17+00

18+00

19+0019+05

BASEBALL FIELD

APPROX. CLEARING LIMITS

APPROX. SLOPE LIMITS

NOTE:

TOTAL WETLAND IMPACT = 2,000 S.F. ±

WETLAND IMPACT #2

MATCH LINE STA. 13+00

SCALE

1" = 20' H 1" = 20 V

SCALE

1" = 20'

AutoCAD SHX Text

DESIGN BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text A.B.E.

AutoCAD SHX Text

AutoCAD SHX Text

MAR. 26'

AutoCAD SHX Text

- OF -

AutoCAD SHX Text

AutoCAD SHX Text

KHS EMERGENCY ACCESS ROAD STA. 13+00 TO 19+00

TOWN OF KILLINGLY ENGINEERING DEPARTMENT

Sheets and Views
20 s 1
Sheet 2.pdf
Sheets and Views
20 s 2
Sheet 3.pdf
Sheets and Views
20 s 3

File details come from the government source that posted it. Updated .