TRD1_Redacted.pdf

PDF 74 KB Posted

Attached to
CT100B Test Set
Solicitation number
FA2823-24-Q-A037
Issued by

About this file

This document is a Technical Requirements Document from the Department of the Air Force's Headquarters 96th Test Wing at Eglin Air Force Base. It outlines the requirements for the procurement of a CT100B test set with a CT100-DA-DBNC test adapter. The key requirements include a fast-risetime step-pulse TDR, the ability to capture arbitrary length waveforms, real-time frequency-domain measurements, and the capability to detect various cable faults and damage. The delivery requirement is 60 days after order.

The related federal contract opportunity is a Special Notice from the Air Force Test Center (AFTC) to conduct a sole source procurement of the CT100B TDR Cable Analyzer Test from MOHR TEST & MEASUREMENT LLC. The anticipated contract will be a Firm Fixed Price Commercial Purchase Order under the statutory authority of 41 USC 1901. The applicable NAICS code is 334511 with a size standard of 750 employees. Responses are due by August 23, 2024, and the anticipated award date is September 2, 2024.

View the file

Other files

File Type Posted
SSJ2_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 96TH TEST WING (AFMC)

EGLIN AIR FORCE BASE FLORIDA

5 June 2024

MEMORANDUM FOR: AFTC/PZIOA

FROM:

SUBJECT: Technical Requirements Document for the CT100B test set with a CT100-DA-DBNC test adapter:

1. The has a requirement to purchase a CT100B test set with a CT100-DA-DBNC test adapter. Requirements are:

a. CT100B.

b. CT100-DA-DBNC Dual BNC Differential Test Set Adapter

c. Fast-risetime step-pulse TDR (150pstyp) designed for high-resolution testing of metallic cable.

d. Arbitrary length waveforms up to 1.5 million points

e. Real-time frequency-domain measurements

f. Normalized TDR traces with adjustable rise time

g. Detects subtle partial faults, opens, shorts, kinks, taps, shield damage, thermal damage, sunlight/UV damage, water ingress, loosened or corroded interconnects, and poor-quality cables and connectors.

h. Lightweight and portable, operates for a full shift without recharging.

2. Delivery Requirement: 60 days ARO.

3. Point of Contact: .

File details come from the government source that posted it. Updated .