This Technical Requirement Document details the government's request for 108 Kwall traffic concrete barriers to be delivered to Eglin AFB Duke Field. The specification mandates stringent requirements for the concrete barriers, including: construction from concrete, meeting Florida Department of Transportation certification FDOT index number 102-110, reinforcement with rebar, specific dimensional specifications (12 foot, six inches long), inclusion of 8-inch connector loops, one connector pin per barrier, and 6 tie-down points (3 on each side). Additional hard requirements include applying the product in a single application without other soil erosion control methods, with precise rebar placement as specified in an attached drawing. The vendor must schedule delivery during 0645 to 1630 hours, providing at least one business day's notice to the government point of contact, who will specify the exact delivery and offloading location after contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL REQUIRMENT DOCUMENT
1. The Government requests the purchase/delivery of 108 Kwall traffic concrete barriers be made to Eglin AFB Duke Field.
Government Points of Contact will be provided after the contract is awarded.
2. The vender shall call Government Point(s) of Contact to schedule delivery during the hours of (0645 to 1630) not later than one business day in advance of anticipated delivery. At which time, the Government will provide the exact location for that particular delivery to include offloading capabilities. This is a hard requirement, no exceptions.
3. The Government is requesting a 108 concrete traffic barriers or equal.
These are the minimal requirements that the Government is willing to accept in order to successfully complete these projected projects within the time and budget that has been allotted.
1. This product must be made of concrete. This is a hard requirement, no exceptions.
2. Barriers must meet or exceed Florida Department of Transportation certification FDOT index number 102-110. This is a hard requirement, no exceptions.
3. The concrete barriers will be reinforced with rebar in its construction. Each barrier will be 12 foot, six inches long. It will have 8 inch loops on each end of the barrier, so the barriers can be connected to each other. Each barrier will have one connector pin, supplied by the contractor. This is a hard requirement, no exceptions.
4. The barrier will have 6 tie down points (3 on each side). The tie down points will be inset on the side and will be reinforced with rebar (see attached drawing). This is a hard requirement, no exceptions.
5. The placement of the rebar must be at a minimum spacing and quantity as per the attached drawing. This is a hard requirement, no exceptions.
6. Product must be applied in one application not in several light applications and must be applied alone without the application of other soil erosion control methods. This is a hard requirement, no exceptions.