TRD_Redacted.pdf
PDF 71 KB Posted
- Attached to
- Rack Mount Telemetry Equipment Federal contract opportunity
- Solicitation number
- FA2823-24-Q-A043
- Issued by
- Department of the Air Force
About this file
This is a Technical Requirements Document (TRD) for a Rack Mount Telemetry Processing and Simulation System. The requirement is for five 2U rack-mounted industrial-grade systems with specific hardware and software components, including a bit synchronizer, decom card, telemetry simulation card, and LDPS and TDynaSim software. The system must operate on Windows 10 with an i7 8th generation processor, 16 GB DDR3 RAM or better, and a 1 TB removable hard drive. The systems must be TPM 2.0 compliant. The TRD also requires the provision of the Pro version of Lumistar data processing software with 3 or more licenses. The delivery requirement is 60 days after order. This will be a sole-source acquisition for Lumistar Inc. under Harmonix Systems Inc., issued by the Department of the Air Force.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NOCA.pdf | ||
| SSJ_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 96TH TEST WING (AFMC)
EGLIN AIR FORCE BASE FLORIDA
MEMORANDUM FOR AFTC/PZIOA
FROM:
SUBJECT: Technical Requirements Document for Rack Mount Telemetry Processing/Simulation System
The requirement is for five 2U Rack Mount Industrial Grade Telemetry Processing and Simulation Systems with the following technical requirements.
One LS-40-DB20 bit synchronizer daughter card.
One LS-50-E PCIe decom card.
One LS-70-S PCI Telemetry Super Simulation card.
LDPS and TDynaSim Software applications.
The system will operate with WIN 10 OS, an i7 8th gen processor, 16 GB DDR3 RAM or better, VGA display, DVD, and a 1 TB removable hard drive.
The system will be TPM 2.0 compliant.
Also, provide Pro version of Lumistar data processing software, server/client, with 3 or more licenses.
Delivery Requirement: 60 days ARO.
Point of Contact: .
Program Engineer
File details come from the government source that posted it. Updated .