This Technical Requirement Document (TRD) details the 96th Maintenance Group's specifications for replacing existing modular offices at Eglin Air Force Base. The document outlines two sets of modular offices with specific technical requirements: Set One consists of two 8'3"H x 12'W x 8'D offices, and Set Two includes two 8'3"H x 20'W x 12'D offices. Both sets require one-hour fire-rated construction, standard plank flooring with removable forklift channels, R11 insulation, saltwater primer, adjustable vented covers, three 36" x 36" PPF windows, and a single entry door with galvannealed steel frame.
Each modular office must include a 220V main breaker, eight-foot external power cable, dust/vapor resistant interior lights, five 20-amp waterproof receptacles, and a wall air conditioner with heat (810 Watts, 115V, 8000 BTUs). The buildings must be equipped with a Wet Pipe Sprinkler System meeting Unified Facility Criteria (UFC) 1-200-01 and UFC 3-600-01. Delivery is specified for no later than 120 days to 103 N Barrancas Ave., Eglin AFB, FL 32542, building 110, with the requirement that the buildings be "plug and play" upon delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| IMPORTANT INFO_DOC_BOX.pdf | ||
| COMBO_DOC_BOXES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Requirement Document for Modular Boxes The 96th Maintenance Group requires the replacement of the existing Modular Boxes Technical specifications are as follows:
Set One:
1. Two (2) Modular O ices should be 8’3”H * 12’W * 8’D. It will have a minimum of one (1) hour construction and fire suppression/notification.
2. Buildings will be less sump, standard plank flooring, and will have removeable forklift channels. Insulation for walls, ceiling, and DLC will be R11. Building will have a saltwater primer. Building will also have adjustable vents with insulated covers.
3. Building will have three (3) 36” * 36” PPF windows with a minimum of one (1) hour fire rating. One entry door with a minimum of one hour fire rating, door and frame will be galvannealed steel with primer coat. Door panel is insulated with view lite. All associated hardware will be included as applicable.
4. Building will include a main breaker with 220 V capability and minimum eight (8) foot external power cable, include dust/vapor resistant interior lights, minimum of five (5) 20-amp non-explosion interior waterproof receptacles with cover, and a wall air conditioner with heat, 810 Watt, 115V, and 8000 BTU’s.
5. Buildings will be Wet Pipe Sprinkler System capable to meet or exceed Unified Facility Criteria (UFC) 1-200-01 and UFC 3-600-01.
6. Delivery no later than 120 days. Delivered to, unloaded and staged in designated area.
Delivery address is 103 N Barrancas Ave. Eglin AFB, FL. 32542, building 110.
7. Buildings should be plug and play at delivery.
Set Two:
1. Two (2) Modular O ices should be 8’3”H * 20’W * 12’D. It will have a minimum of one (1) hour construction and fire suppression/notification.
2. Buildings will be less sump, standard plank flooring, and will have removeable forklift channels. Insulation for walls, ceiling, and DLC will be R11. Building will have a saltwater primer. Building will also have adjustable vents with insulated covers.
3. Building will have three (3) 36” * 36” PPF windows with a minimum of one (1) hour fire rating. One entry door with a minimum of one hour fire rating, door and frame will be galvannealed steel with primer coat. Door panel is insulated with view lite. All associated hardware will be included as applicable.
4. Building will include a main breaker with 220 V capability and minimum eight (8) foot external power cable, include dust/vapor resistant interior lights, minimum of five (5) 20-amp non-explosion interior waterproof receptacles with cover, and a wall air conditioner with heat, 810 Watt, 115V, and 8000 BTU’s.
5. Buildings will be Wet Pipe Sprinkler System capable to meet or exceed Unified Facility Criteria (UFC) 1-200-01 and UFC 3-600-01.
6. Delivery no later than 120 days. Delivered to, unloaded and staged in designated area.
Delivery address is 103 N Barrancas Ave. Eglin AFB, FL. 32542, building 110.
7. Buildings should be plug and play at delivery.