TRD-01 Brockton Trial Court - Boiler Emergency Stops - Addendum 1.pdf
PDF 1 MB Posted
- Solicitation number
- BD-26-1107-FADM-ADMIN-118978
- Issued by
- Plymouth County, Boston City, Massachusetts
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TRD-01 Brockton Trial Court - Boiler Energency Stops.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office Of Court Management Facilities Management & Capital Planning
COMM Buys Bid BD-26-1107-FADM-ADMIN-118979
TRD01 – Brockton Trial Court – Boiler Emergency Stops
ADDENDA #1
7/23/2025
The ATTENTION OF THE BIDDERS SUBMITTING PROPOSALS FOR THE ABOVE-
MENTIONED BID, IS HEREBY CALLED TO THE FOLLOWING ADDENDUM. THE ITEMS SET
FORUTH HEREIN, WHETHER OF OMISSION, ADDITION, SUBSTITUTION OR
CLARIFICATION ARE TO BE INCLUDED IN AND FORM A PART OF THE PROPOSAL
SUBMITTED.
THE NUMBER OF THIS ADDENDUM (#1) MUST BE ACKNOWLEDGED ON THE PROPOSAL
FORM.
In response to submitted question #1 – the contract for review has been revised to remove the DCAMM requirements
See the following revised documents:
Scope of Work Statement Instructions to Bidders
Attachment A – Prevailing Wage Statement Attachment B – Forms Used During Bidding
Brockton Trial Court – Boiler Emergency Stop Buttons BD-26-1107-FADM-ADMIN- 118979
Scope of Work Statement Page 1 of 3
Scope of Work Statement
MGL Chapter 149 Projects: With Labor Costs of $10,000 to $49,999
Addendum #1 – 7/23/2025
AWARDING ENTITY
Awarding Entity: Massachusetts Trial Court Agency Name and Address: 3 Pemberton Square, Boston MA 02108 Project Number: BD-26-1107-FADM-ADMIN-118978 Estimated Construction Cost: $15,000.00
• Labor = $5,000.00
• Materials & Equipment = $10,000.00
CONTACT INFORMATION
Name and Title: Tom Prentiss, Procurement Coordinator Phone: 857-895-1454 Email Address: thomas.prentiss@jud.state.ma.us
CONTRACT AND BIDDING INFORMATION
Project Name: Brockton Trial Court – Boiler Emergency Stop Buttons Project Description: Installation of new Emergency Stop Buttons in the Penthouse Mechanical Room at
(2) locations to power down the (3) gas fired boilers.
Site Visit: Contact Facilities Specialist Supervisor to schedule site visit prior to submitting bid
Richard Connaughton
508-897-2666
Richard.connaughton@jud.state.ma.us
Bid Deadline: August 4, 2025 @12:00 PM
Bids to be submitted electronically via COMMBUYS
OSD Trade Category: TRD-01 Additional Information:
SCOPE OF WORK
Detailed Scope of Work:
This project involves the installation of new emergency stop buttons at strategic locations to enhance the safety and provide immediate shutdown capabilities for the designated equipment: (3) gas fired boilers.
Scope of Work Statement Page 2 of 3
Design and Planning The electrical contractor shall perform the following tasks.
• Review existing electrical schematics and machine documentation (available for review during Site Visit) to determine the appropriate integration points for the emergency stop systems.
• Design a safe and reliable electrical circuit that meets all applicable safety standards including but not limited to NFPA and OSHA.
• Supply the stop buttons that are required, ensuring they are appropriate for the environment and application.
• Develop a detailed wiring diagram and connection schedule
Material Procurement Procure all necessary material and components, including:
• Self-latching emergency stop buttons (typically bright yellow with a red push button)
• Enclosures (boxes) to house the buttons and wiring and ensure adequate protection and safety
• EMT raceways to be dedicated to the use and continuous from button to boiler, installed in a neat and professional manner, adhering to all electrical condes to ensure the system is wired such that activating any emergency stop button overrides all other functions and initiates a safe shutdown
• All necessary hardware for the installation
• Properly ground all systems
Testing and Commissioning
• Conduct a through testing of the installed systems to verify functionality and adherence to safety requirements in the presence of Trial Court Facilities Staff
• Confirm that activating the emergency stop button properly stops the relevant equipment
• Verify that resetting the emergency stop button only allows the system to be restarted, not physically start the equipment directly.
• Provide documentation of successful testing and commissioning
Documentation
• Provide updated electrical drawings and schematic diagrams reflecting the new installation
• Provide a list of all material used, including manufacturers and model numbers
• Provide instructions for the proper operation and resetting of the emergency stop system
• Provide adequate signage to indicate the purpose of the devices at the location of the devices
• Provide signage at each boiler indicating the installation of the emergency stop devices and the location
Schedule
• Include a timeframe for the project, such as a start date and completion date
• Project can be completed during normal court business hours (7:00am – 4:00pm)
• Testing and verification of installation will be done during off hours to ensure proper stop and restart was successful
Scope of Work Statement Page 3 of 3
Notes
1. Emergency stop buttons must be self-latching meaning they remain in the actuated position until deliberately reset
2. Contractor will make a site visit prior to submitting bid at a pre-determined date and time to meet with Trial Court Representative that is familiar with the scope of this project. (Refer to Site Visit information)
3. All electrical work required an electrical permit issued by the City of Brockton
PROJECT SCHEDULE
Planned Start Date: September 2, 2025 Contract Duration Until Substantial Completion: September 19, 2025 Contract Duration Until Final Completion: September 30, 2025
ATTACHMENTS
The following sections are included in the appendices and are part of this contract:
Instruction to Bidders Attachment A – Prevailing Wage Sheets - Brookton Attachment B – Forms Used During Bidding
FORMS
It is the responsibility of the awarding entity to ensure that they obtain the required licenses/certifications from all workers who will be assisting with the work. The following forms are to be completed and submitted with the bid:
Required Licenses /Certificates Certificate of Insurance Payment Bond and Performance Bond
50% payment bond if total contract is >$25,000 OSHA Certificates for all employees
COMMONWEALTH OF MASSACHUSETTS
INSTRUCTIONS TO BIDDERS
Addendum #1 - 7/23/2025
Awarding Authority:
Office of Court Management, Facilities Management & Capital Planning (FMD) Suffolk County Courthouse Three Pemberton Square Boston, MA 02108 Telephone: (857) 895-1454 Email: thomas.prentiss@jud.state.ma.us
Project Title: Brockton Trial Court – Boiler Emergency Stop Buttons
Category of Work: TRD-01 Electrical Services
Project Description and Scope:
This project involves the installation of new emergency stop buttons at strategic locations to enhance safety and provide immediate shutdown capabilities for designated equipment for the (2) hot water boilers.
Deadline for filing General bids is at: 12:00 PM Monday August 4, 2025
The minimum wage rate requirements for this Contract are located in Attachment A to these Instructions to Bidders.
Pursuant to M.G.L. c. 30, §39S(a) (2) all employees to be employed on the project must have successfully completed a course in construction safety and health approved by OSHA and of at least 10 hours in duration.
Site visits will only be coordinated with the Facilities Systems Supervisor on site prior to submitting bid.
Richard Connaughton
(508) 897-2666 richard.connaughton@jud.state.ma.us
Bid forms for this Contract are located in Attachment B to these Instructions to Bidders.
The time for completion of the Work is based off of the proposed project schedule and will be specified in Article 2 of the Owner - Contractor Agreement for the successful bidder. Liquidated damages for failure to complete work on time is $100 per day and will be stated in Article 7 of the Owner - Contractor Agreement.
Bidding Documents must be obtained via COMMBUYS website. If you need to talk with someone at COMMBUYS, please call the COMMBUYS help desk at (617) 720- 3197. COMMBUYS Job Aids for Vendors on how to use COMMBUYS are available by clicking the link below.
https://www.mass.gov/service-details/job-aids-for-vendors
The filed subtrades for this project are as follows: (not applicable)
As used herein, capitalized terms shall have the meaning assigned to them in the General Conditions of the Contract and the Owner - Contractor Agreement unless the context clearly indicates otherwise.
SECTION I - BIDDER'S REPRESENTATION
1.1 Each general bidder or sub-bidder (hereinafter sometimes referred to as "Bidder”) by making a bid or sub-bid (hereinafter sometimes referred to as "Bid") represents and warrants that Bidder has visited and examined the Site and the Contract Documents, that Bidder is familiar with the local conditions under which the Work is to be performed, that Bidder has correlated personal observations with the requirements of the Contract Documents, and that where the Contract Documents require, in any part of the Work, a given result to be produced, the Contract Documents are adequate and that Bidder will produce the required result within the Bid price and that the Bid is made in accordance therewith.
1.2 Failure to so examine the Contract Documents and the Site will not relieve any Bidder from any obligation under the Bid as submitted. Neither the Commonwealth nor the Designer will be responsible for errors, omissions and/or charges for extra work https://www.mass.gov/service-details/job-aids-for-vendors arising from Bidder's failure to familiarize itself with the Contract Documents or existing conditions.
SECTION 2 -- GENERAL BIDDERS - CERTIFICATE OF ELIGIBILITY AND
UPDATE STATEMENT ( not applicable)
SECTION 3 – FILED SUB-BIDDERS - CERTIFICATE OF ELIGIBILITY AND
UPDATE STATEMENT (not applicable)
SECTION 4 -- REQUESTS FOR INTERPRETATION
4.1 Any questions by prospective Bidders concerning interpretation of the Contract Documents must be uploaded into COMMBUYS to the Awarding Authority and should be in its possession at least three working days before the date set for the receipt of general Bids, or, if a question pertains to Item 2 filed sub-Bid work, at least three working days before the date set for the receipt of filed sub-Bids. The Awarding Authority will post any addenda or written interpretations on COMMBUYS that it deems necessary to Bidders at least 48 hours before the General Bids Submission Deadline Date.
Bidders may NOT rely upon oral communications or interpretations from the Awarding Authority or the Designer and the Awarding Authority shall not be bound by them.
4.2 It is the sole responsibility of the Bidder to ascertain the existence of any addenda issued by the Awarding Authority on COMMBUYS, by Bidder.
4.3 Wherever in the Contract Documents reference is made to Massachusetts General Laws, it shall be construed to include all amendments thereto effective as of the date of the issuance of the invitation to bid on the proposed work.
SECTION 5 -- PREPARATION OF BIDS; ALTERNATES
5.1 General Bids shall be submitted on the Form for General Bid included in Attachment B to these Instructions to Bidders.
5.2 All entries on the Bid form shall be typewritten or in ink.
5.3 Where so indicated on the Bid form, sums shall be expressed in both words and numerals. Where there is a discrepancy between the Bid sum expressed in words and the Bid sum expressed in figures, the Bid sum expressed in words shall control unless the intention of the Bidder clearly is otherwise as determined by the Awarding Authority in its sole discretion.
5.4 Each general Bidder shall acknowledge all required alternates in Section C on the Form for General Bid by entering the dollar amount of addition or subtraction necessitated by the alternate. General Bidders shall enter on the Form for General Bid a single amount for each alternate that shall consist of the sub-Bidders' amounts and the amount for work performed by the general Bidder.
5.5 If an alternate includes work within the Bidder's scope of work and does not involve a change in the cost of the Bid, the Bidder shall so indicate by writing "No Change" or "N/C" or "0" in the space provided for that alternate.
5.6 The lowest Bidder will be determined on the basis of the sum of the base Bid and the accepted alternates.
5.7 (not applicable) If the space for indicating a requirement for payment and performance bonds for filed subcontractors is left blank by the general Bidder on the Form for General Bid, the Awarding Authority shall interpret this as a "No."
5.8 (not applicable) Costs for subcontractors' bond premiums shall be paid for by the general Contractor in accordance with M.G.L. c. 149, § 44F unless the project is a project in which contractor and subcontractor prequalification are required pursuant to M.G.L.
149, §§ 44D1/2 or 44D3/4.
5.9 (not applicable) If the general Bidders are instructed to carry an amount for a given subtrade listed under Item 2, general Bidders shall list the subtrade and the amount provided by the Awarding Authority. The line under "bonds required" on the Form for General Bid should be left blank or marked "N/A" in order for subsection 5.10 to apply.
5.10 (not applicable) Upon solicitation of a subcontractor to perform the work required with respect to a subtrade referenced in subsection 5.9, the general Bidder's Contract Price shall be adjusted by the following: a) the difference between the subcontract amount and the amount carried in the general Bid; b) the total cost of the subcontractor's bonds, if the general Bidder requires such bonds after the solicitation is completed and if the general Bidder complied with 5.9 above; c) the documented increased costs for the general Bidder's bonds, if any, attributable to the incremental difference between the amount carried for the given subtrade and the actual subcontract amount.
5.11 (not applicable) Overhead and profit for supervision of the subtrade mentioned in subsections 5.9 and 5.10 above shall be included by all general Bidders in Item 1 of the subdivision of the Contract Price. No additional overhead or profit will be paid on the incremental difference between the amount carried for the subtrade and the subcontract amount as stated in M.G.L. c. 149, § 44F(4)(a)(2).
5.12 (not applicable) Sub-Bidders should not list Paragraph E sub-subcontractors unless requested to do so by the Awarding Authority.
5.13 Each general Bid and each Bid of a filed subcontractor must be accompanied by a bid deposit in the form of a bid bond; cash; or a check certified by, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to the Commonwealth of Massachusetts. Any bid bond shall be (a) in a form satisfactory to the Awarding Authority, (b) with a surety company qualified to do business in the
Commonwealth and (c) conditioned upon the faithful performance by the principal of the agreements contained in the Bid.
5.14 The amount of such bid deposit shall be 50% fifty per cent of the value of the Bid including alternates.
SECTION 6 - SUBMISSION OF BIDS
6.1 Each general Bid, including a photocopy of the bid deposit shall be uploaded into
COMMBUYS.
General Bid for:
Project Title: BD-26-1107-FADM-ADMIN-118979 Brockton Trial Court – Boiler Emergency Stop Buttons
215 Main Street Brockton, MA 02301
General Bidders name, business address, and telephone number.
6.2 All Bids must be received by the Awarding Authority via the COMMBUYS Website no later than the Deadline for Filing General Bid date specified on page 1 of these Instructions to Bidders. Any Bid received after this deadline date and time will not be accepted.
6.3 Bidding results will not be given out over the telephone prior to 1:00 PM of the day following the Bid opening.
SECTION 7 - WITHDRAWAL OF BIDS; REJECTION OF BIDS
7.1 Any Bid may be withdrawn prior by emailing Tom Prentiss at thomas.prentiss@jud.state.ma.us prior to the Deadline for filing General Bid date on page one.
7.2 A Bidder may withdraw its Bid without penalty by emailing Tom Prentiss at thomas.prentiss@jud.state.ma.us at any time up to the time of Award as defined below in subsection 9.1 only upon demonstrating to the satisfaction of the Awarding Authority that a death or disability has occurred or a bona fide clerical or mechanical error of a substantial nature was made during the preparation of the bid. Failure to demonstrate conclusively that a bona fide clerical or mechanical error of a substantial nature was made may result in forfeiture of the Bid deposit.
7.3 The Awarding Authority reserves the right to waive any informality in or to reject any and all Bids if it is in the public interest to do so. Without limiting the foregoing, the Awarding Authority reserves the right to reject unit prices which it deems unduly high or unduly low as unbalanced.
mailto:thomas.prentiss@jud.state.ma.us mailto:thomas.prentiss@jud.state.ma.us
SECTION 8 - MBE AND WBE PARTICIPATION (not applicable)
SECTION 9 -- CONTRACT AWARD
9.1 "Award" means the determination, selection, and notification of the lowest, responsible and eligible Bidder by the Awarding Authority.
9.2 The Awarding Authority will award the Contract within thirty days, Saturdays, Sundays, and legal holidays excluded after the opening of Bids in accordance with M.G.L. c.149 §44A.
9.3 The Contract will be awarded to the lowest responsible and eligible Bidder as determined by the Awarding Authority, except in the event of substitution as provided under M.G.L. c.l49, §§44E and 44F, in which cases the procedure as required by said sections shall govern the award of the Contract.
9.4 As used herein, the term "lowest responsible and eligible Bidder" shall mean the general Bidder whose Bid is the lowest of those Bidders who, in the Awarding Authority's opinion, are ready, willing and able to comply with all requirements of the Contract Documents and demonstrably possess the skill, ability, and integrity necessary for the faithful performance of the Work, based on the determination of past performance and financial soundness under (i) M.G.L. c.l49 §44A and following sections, (ii) the rules, regulations, orders, guidelines and policies promulgated from time to time by the Commissioner of the Division of Capital Asset Management and Maintenance ("DCAMM") and (iii) any other relevant criteria that the Commissioner may prescribe. If the Awarding Authority determines that any non-filed subcontractor chosen by a Bidder is not qualified or responsible, then the Bidder shall obtain another subcontractor satisfactory to Awarding Authority and the contract price shall not be adjusted.
9.5 The general Bid price shall be the price set forth in paragraph C of the Form for General Bid. No general Bid shall be rejected (i) because the sum of the prices set forth in Item 1 and 2 does not equal the general Bid price set forth in said paragraph C or (ii) because of one or more errors in setting forth the name, the sub-Bid price of a sub-Bidder, or the total of Item 2, provided that the sub-Bidder or sub-Bidders designated are clearly identifiable, or (iii) because the plans and specifications do not accompany the Bid or are not submitted with the Bid.
9.6 Should the Contract Documents require submission of special data to accompany the Bid, the Awarding Authority reserves the right to rule the Bidder’s failure to submit such data an informality and to received said data subsequently within a reasonable time as set by the Awarding Authority, provided that no such ruling shall result in an unfair advantage to the Bidder.
9.7 The Awarding Authority also reserves the right to reject any sub-Bid if it determines that such sub-Bid does not represent the Bid of a person competent to perform the work as specified, or if fewer than three sub-Bids are received for a sub-trade, and the Bid prices are not reasonable for acceptance without further competition.
9.8 If the Awarding Authority decides to reject all general Bids or if the Awarding Authority does not receive any general Bids, the Awarding Authority may retain and use the sub-Bids received for a second opening of general Bids; provided, however, that there are no changes in the work involved for the subtrades for which the sub-Bids are so retained and used; and provided, further, that the Awarding Authority shall obtain the consent of each sub-Bidder included in any award of a general Contract made pursuant to the second opening of general Bids if such award is not made within ninety days, Saturdays, Sundays and legal holidays excluded, after the opening of such sub-Bids.
SECTION 10 - EXECUTION OF CONTRACTS
10.1 If a selected filed sub-Bidder fails, within five days, Saturdays, Sundays and legal holidays excluded, after presentation of a Subcontract by the general Bidder to which the Contract was awarded, to perform its agreement to execute a Subcontract in the form provided by the Awarding Authority with such general Bidder contingent upon the execution of the general Contract, and, if requested to do so by such general Bidder in the general Bid, to furnish a performance and a payment bond as stated in its filed sub-Bid, such general Bidder and the Awarding Authority shall select from the other filed sub- Bids duly filed with the Awarding Authority for such subtrade and not rejected the lowest responsible and eligible filed sub-Bidder at the amount named in its filed sub-Bid as so filed against whose standing and ability the general Contractor makes no objection, and the Contract price shall be adjusted by the difference between the amount of such filed sub-bid and the amount of the sub-bid of the delinquent filed sub-Bidder.
10.2 Upon receipt of the Award, the general Bidder awarded the Contract shall submit a properly executed original of each of the following documents prior to execution of the Contract by the Awarding Authority. All documents should be completed in BLUE pen.
All such documents shall be in the form prescribed by the Awarding Authority.
-Owner-Contractor Agreement (two originals needed) --50% Payment Bond with power of attorney attached -Certificates of Insurance evidencing coverages in amounts required by the Contract Documents
-Any other documents that the Awarding Authority may reasonably require in connection with the Contractor's execution of the Contract.
-Written representation by the General Contractor to the effect that it has presented subcontracts to all selected filed sub-Bidders and a statement as to whether or not each such selected filed sub-Bidder has executed its subcontract such that the Awarding Authority may release the Bid deposit with respect to the same. Misrepresentation of the foregoing shall render the general Contractor liable to the Awarding Authority for the sum of any Bid deposit released by the Awarding Authority with respect to a filed sub-Bidder that fails to execute its subcontract.
10.3 Please note that no part of the General Contractor's work may be subcontracted without the prior written approval of the Awarding Authority. If the General Contractor desires to subcontract any part of the Work, other than work covered by Item 2, filed sub-Bidders, the General Contractor must promptly forward to the Awarding Authority a list in triplicate designating the work to be performed and the name of each proposed subcontractor for approval by the Awarding Authority. Approved subcontractors are eligible for direct payments under M.GL. 30, § 39F, as amended. Material suppliers not involving site labor need not be submitted for approval.
SECTION 11 - RETURN OF BID DEPOSITS
11.1 If no award is made, upon the expiration of the time prescribed in M.G.L. c. 149, § 44A for making an award; except that, if any general Bidder fails to perform its agreement to execute the Contract and furnish a 50% Payment Bonds as stated in its Bid, then said general Bidder's Bid deposit shall become the property of the Commonwealth as liquidated damages; provided that the amount of the Bid deposit that becomes the property of the Commonwealth shall not exceed the difference between the Contractor's Bid price and the Bid price of the next lowest responsible and eligible Bidder; and provided further that, in the case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the general Bidder, such general Bidder's Bid deposit shall be returned.
11.2 If a selected sub-Bidder fails to perform its agreement to execute a sub-contract with the general Bidder selected as the general Contractor, contingent upon the execution of the General Contract, and, if requested to do so in the general Bid by such general Bidder, to furnish a Performance and Payment Bonds as stated in its sub-Bid in accordance with M.G.L. c. 149, § 44F(2), the Bid deposit of such sub-Bidder shall become the property of the Commonwealth as liquidated damages, provided that the amount of the Bid deposit that shall become the property of the Commonwealth shall not exceed the difference between its sub-Bid price and the sub-Bid price of the next lowest responsible and eligible sub-Bidder.
11.3 In addition to the provisions for the return of Bid deposits as provided above, upon receipt of a Bid Bond in an amount not less than the amount of the required Bid deposit, the Awarding Authority shall return any Bid deposit of a Bidder forthwith after the public opening of Bids.
ATTACHMENT A
Addendum #1 - 7/23/2025
PREVAILING WAGE SCHEDULE
The minimum wage rates provided in the following pages have been provided by the Division of Occupational Safety of the Massachusetts Department of Labor and Workforce Development. The Awarding Authority is not responsible for errors or omissions in such wage rates.
M.G.L. c. 149, §§ 26 and 27 provide as follows:
". . . Payments by employers to health and welfare plans, pension plans and supplementary unemployment benefit plans under collective bargaining agreements or understandings between organized labor and employers shall be included for the purpose of establishing minimum wage rates as herein provided.
. . . The aforesaid rates of wages in the schedule of wage rates shall include payments by employers to health and welfare plans, pension plans and supplementary unemployment benefit plans as provided in said section twenty-six, and such payments shall be considered as payments to persons under this section performing work as herein provided. Any employer engaged in the construction of such works who does not make payments to a health and welfare plan, a pension plan and a supplementary unemployment benefit plan, where such payments are included in said rates of wages, shall pay the amount of said payments directly to each employee engaged in said construction "
See the file name “Attachment A – Prevailing Wage Sheets - Brockton.pdf” for the Prevailing Wage Report.
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Massachusetts Trial Court City/Town: ABINGTON
Contract Number:
Description of Work: This project involves the installation of new emergency stop buttons at strategic locations to enhance safety and provide immediate shutdown capabilities for designated equipment
Job Location: 215 Main Street, Brockton MA 02301
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $40.95 $15.57 $20.17 $0.00 $0.00 $76.69
12/1/2025 $40.95 $15.57 $21.78 $0.00 $0.00 $78.30
1/1/2026 $40.95 $16.17 $21.78 $0.00 $0.00 $78.90
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2025 $41.02 $15.57 $20.17 $0.00 $0.00 $76.76
12/1/2025 $41.02 $15.57 $21.78 $0.00 $0.00 $78.37
1/1/2026 $41.02 $16.17 $21.78 $0.00 $0.00 $78.97
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2025 $41.14 $15.57 $20.17 $0.00 $0.00 $76.88
12/1/2025 $41.14 $15.57 $21.78 $0.00 $0.00 $78.49
1/1/2026 $41.14 $16.17 $21.78 $0.00 $0.00 $79.09
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
1/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $43.80 $14.50 $4.30 $6.75 $0.00 $69.35ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
Page 2 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.21 $0.00 $68.95
12/1/2025 $41.97 $9.90 $9.25 $9.21 $0.00 $70.33
6/1/2026 $43.41 $9.90 $9.25 $9.21 $0.00 $71.77
ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $9.90 $9.25 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Page 3 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
2/1/2025 $65.80 $11.49 $15.57 $8.02 $0.00 $100.88
8/1/2025 $67.95 $11.49 $15.57 $8.02 $0.00 $103.03
2/1/2026 $69.30 $11.49 $15.57 $8.02 $0.00 $104.38
8/1/2026 $71.50 $11.49 $15.57 $8.02 $0.00 $106.58
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (QUINCY)
2/1/2027 $72.90 $11.49 $15.57 $8.02 $0.00 $107.98
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $32.90 $11.49 $15.57 $8.02 $0.00 $67.98
2 60.00 $39.48 $11.49 $15.57 $8.02 $0.00 $74.56
3 70.00 $46.06 $11.49 $15.57 $8.02 $0.00 $81.14
4 80.00 $52.64 $11.49 $15.57 $8.02 $0.00 $87.72
5 90.00 $59.22 $11.49 $15.57 $8.02 $0.00 $94.30
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.98 $11.49 $15.57 $8.02 $0.00 $69.06
2 60.00 $40.77 $11.49 $15.57 $8.02 $0.00 $75.85
3 70.00 $47.57 $11.49 $15.57 $8.02 $0.00 $82.65
4 80.00 $54.36 $11.49 $15.57 $8.02 $0.00 $89.44
5 90.00 $61.16 $11.49 $15.57 $8.02 $0.00 $96.24
Page 4 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $48.85 $9.90 $9.25 $9.80 $0.00 $77.80
12/1/2025 $50.35 $9.90 $9.25 $9.80 $0.00 $79.30
6/1/2026 $51.90 $9.90 $9.25 $9.80 $0.00 $80.85
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $53.40 $9.90 $9.25 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $47.70 $9.90 $9.25 $9.80 $0.00 $76.65
12/1/2025 $49.20 $9.90 $9.25 $9.80 $0.00 $78.15
6/1/2026 $50.75 $9.90 $9.25 $9.80 $0.00 $79.70
CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.25 $9.90 $9.25 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $48.03 $9.90 $9.25 $9.80 $0.00 $76.98
12/1/2025 $49.53 $9.90 $9.25 $9.80 $0.00 $78.48
6/1/2026 $51.08 $9.90 $9.25 $9.80 $0.00 $80.03
CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.58 $9.90 $9.25 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
3/1/2025 $49.62 $9.83 $11.47 $8.50 $0.00 $79.42
9/1/2025 $50.87 $9.83 $11.47 $8.50 $0.00 $80.67
3/1/2026 $52.12 $9.83 $11.47 $8.50 $0.00 $81.92
9/1/2026 $53.37 $9.83 $11.47 $8.50 $0.00 $83.17
CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts)
3/1/2027 $54.62 $9.83 $11.47 $8.50 $0.00 $84.42
Apprentice: CARPENTER
Effective Date: 3/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.33 $9.83 $0.00 $1.73 $0.00 $33.89
2 45.00 $22.33 $9.83 $0.00 $1.73 $0.00 $33.89
3 55.00 $27.29 $9.83 $0.00 $3.40 $0.00 $40.52
4 55.00 $27.29 $9.83 $0.00 $3.40 $0.00 $40.52
5 70.00 $34.73 $9.83 $11.41 $5.10 $0.00 $61.07
6 70.00 $34.73 $9.83 $11.41 $5.10 $0.00 $61.07
7 80.00 $39.70 $9.83 $11.44 $6.80 $0.00 $67.77
8 80.00 $39.70 $9.83 $11.44 $6.80 $0.00 $67.77
Page 5 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
10/1/2024 $26.65 $7.02 $3.80 $1.00 $0.00 $38.47
10/1/2025 $27.75 $7.02 $3.80 $1.00 $0.00 $39.57
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.85 $7.02 $3.80 $1.00 $0.00 $40.67
All Aspects of New Wood Frame Work
CEMENT MASONRY/PLASTERING 7/1/2024 $49.19 $13.35 $16.43 $7.78 $1.80 $88.55
Apprentice: CARPENTER
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
2 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
3 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
4 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
5 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
6 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
7 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
8 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
2 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
3 65.00 $17.32 $7.02 $0.00 $1.00 $0.00 $25.34
4 70.00 $18.66 $7.02 $0.00 $1.00 $0.00 $26.68
5 75.00 $19.99 $7.02 $3.80 $1.00 $0.00 $31.81
6 80.00 $21.32 $7.02 $3.80 $1.00 $0.00 $33.14
7 85.00 $22.65 $7.02 $3.80 $1.00 $0.00 $34.47
8 90.00 $23.99 $7.02 $3.80 $1.00 $0.00 $35.81
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
2 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
3 65.00 $18.04 $7.02 $0.00 $1.00 $0.00 $26.06
4 70.00 $19.43 $7.02 $0.00 $1.00 $0.00 $27.45
5 75.00 $20.81 $7.02 $3.80 $1.00 $0.00 $32.63
6 80.00 $22.20 $7.02 $3.80 $1.00 $0.00 $34.02
7 85.00 $23.59 $7.02 $3.80 $1.00 $0.00 $35.41
8 90.00 $24.98 $7.02 $3.80 $1.00 $0.00 $36.80
Page 6 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (QUINCY)
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $59.51 $15.55 $13.25 $3.25 $0.00 $91.56
12/1/2025 $60.98 $15.55 $13.25 $3.25 $0.00 $93.03
6/1/2026 $62.31 $15.55 $13.25 $3.25 $0.00 $94.36
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $63.79 $15.55 $13.25 $3.25 $0.00 $95.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2025 $58.46 $9.95 $11.85 $12.10 $0.00 $92.36
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.60 $13.35 $16.43 $0.00 $0.00 $54.38
2 60.00 $29.51 $13.35 $16.43 $2.78 $1.80 $63.87
3 65.00 $31.97 $13.35 $16.43 $3.78 $1.80 $67.33
4 70.00 $34.43 $13.35 $16.43 $4.78 $1.80 $70.79
5 75.00 $36.89 $13.35 $16.43 $5.78 $1.80 $74.25
6 80.00 $39.35 $13.35 $16.43 $6.78 $1.80 $77.71
7 90.00 $44.27 $13.35 $16.43 $7.78 $1.80 $83.63
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.23 $9.95 $0.00 $0.00 $0.00 $39.18
2 55.00 $32.15 $9.95 $0.00 $6.66 $0.00 $48.76
3 60.00 $35.08 $9.95 $0.00 $7.26 $0.00 $52.29
Page 7 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
6/2/2025 $47.75 $9.90 $9.25 $9.65 $0.00 $76.55
12/1/2025 $49.25 $9.90 $9.25 $9.65 $0.00 $78.05
6/1/2026 $50.80 $9.90 $9.25 $9.65 $0.00 $79.60
12/7/2026 $52.30 $9.90 $9.25 $9.65 $0.00 $81.10
6/7/2027 $53.90 $9.90 $9.25 $9.65 $0.00 $82.70
12/6/2027 $55.50 $9.90 $9.25 $9.65 $0.00 $84.30
6/5/2028 $57.18 $9.90 $9.25 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.85 $9.90 $9.25 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.75 $9.90 $9.25 $9.65 $0.00 $77.55
12/1/2025 $50.25 $9.90 $9.25 $9.65 $0.00 $79.05
6/1/2026 $51.80 $9.90 $9.25 $9.65 $0.00 $80.60
12/7/2026 $53.30 $9.90 $9.25 $9.65 $0.00 $82.10
6/7/2027 $54.90 $9.90 $9.25 $9.65 $0.00 $83.70
12/6/2027 $56.50 $9.90 $9.25 $9.65 $0.00 $85.30
6/5/2028 $58.18 $9.90 $9.25 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.85 $9.90 $9.25 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.50 $9.90 $9.25 $9.65 $0.00 $77.30
12/1/2025 $50.00 $9.90 $9.25 $9.65 $0.00 $78.80
6/1/2026 $51.55 $9.90 $9.25 $9.65 $0.00 $80.35
12/7/2026 $53.05 $9.90 $9.25 $9.65 $0.00 $81.85
6/7/2027 $54.65 $9.90 $9.25 $9.65 $0.00 $83.45
12/6/2027 $56.25 $9.90 $9.25 $9.65 $0.00 $85.05
6/5/2028 $57.93 $9.90 $9.25 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.60 $9.90 $9.25 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.75 $9.90 $9.25 $9.65 $0.00 $77.55
12/1/2025 $50.25 $9.90 $9.25 $9.65 $0.00 $79.05
6/1/2026 $51.80 $9.90 $9.25 $9.65 $0.00 $80.60
12/7/2026 $53.30 $9.90 $9.25 $9.65 $0.00 $82.10
6/7/2027 $54.90 $9.90 $9.25 $9.65 $0.00 $83.70
12/6/2027 $56.50 $9.90 $9.25 $9.65 $0.00 $85.30
6/5/2028 $58.18 $9.90 $9.25 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.85 $9.90 $9.25 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 65.00 $38.00 $9.95 $0.00 $7.87 $0.00 $55.82
5 70.00 $40.92 $9.95 $11.85 $8.47 $0.00 $71.19
6 75.00 $43.85 $9.95 $11.85 $9.08 $0.00 $74.73
7 80.00 $46.77 $9.95 $11.85 $9.68 $0.00 $78.25
8 90.00 $52.61 $9.95 $11.85 $10.89 $0.00 $85.30
Page 8 of 32Wage Request Number: 20250714143224-S1Issue Date: 07/14/2025
Supplemental
Unemployment Total Rate
6/2/2025 $48.50 $9.90 $9.25 $9.65 $0.00 $77.30
12/1/2025 $50.00 $9.90 $9.25 $9.65 $0.00 $78.80
6/1/2026 $51.55 $9.90 $9.25 $9.65 $0.00 $80.35
12/7/2026 $53.05 $9.90 $9.25 $9.65 $0.00 $81.85
6/7/2027 $54.65 $9.90 $9.25 $9.65 $0.00 $83.45
12/6/2027 $56.25 $9.90 $9.25 $9.65 $0.00 $85.05
6/5/2028 $57.93 $9.90 $9.25 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.60 $9.90 $9.25 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $47.75 $9.90 $9.25 $9.65 $0.00 $76.55
12/1/2025 $49.25 $9.90 $9.25 $9.65 $0.00 $78.05
6/1/2026 $50.80 $9.90 $9.25 $9.65 $0.00 $79.60
12/7/2026 $52.30 $9.90 $9.25 $9.65 $0.00 $81.10
6/7/2027 $53.90 $9.90 $9.25 $9.65 $0.00 $82.70
12/6/2027 $55.50 $9.90 $9.25 $9.65 $0.00 $84.30
6/5/2028 $57.18 $9.90 $9.25 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.85 $9.90 $9.25 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $78.11 $10.08 $11.62 $10.04 $0.00 $109.85 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $55.79 $10.08 $11.62 $12.67 $0.00 $90.16 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .