Trail Construction Scenario.pdf

PDF 7 MB Posted

Attached to
California Trail Maintenance and Construction BPA
Solicitation number
12363N23Q4131
Issued by

View the file

Other files

File Type Posted
Amendment 1 - Solicitation 12363N23Q4131.pdf PDF
CA Trail Maintenance and Construction BPA_Final.pdf PDF
DOL Wage Determination CA20230002 April 7 2023 Imperial County.pdf PDF
Trail Maintenance Scenario.pdf PDF
DOL Wage Determination CA20230007 April 28 2023 Multiple Counties 2.pdf PDF
DOL Wage Determination CA20230012 April 7 2023 San Luis Obispo County.pdf PDF
FSORAG_2013 Update.1.pdf PDF
DOL Wage Determination CA20230025 April 7 2023 Riverside County.pdf PDF
DOL Wage Determination CA20230001 Jan 13 2023 San Diego County.pdf PDF
DOL Wage Determination CA20230022 March 17 2023 Los Angeles County.pdf PDF
DOL Wage Determination CA20230026 March 17 2023 San Bernardino County.pdf PDF
DOL Wage Determination CA20230020 April 7 2023 Inyo_Kern_Mono County.pdf PDF
DOL Wage Determination 1977-0727 Rev. No. 69 Dated Dec 27 2022 - Services California.pdf PDF
DOL Wage Determination CA20230021 April 21 2023 Tulare County.pdf PDF
FSTAG-2013-Update.pdf PDF
DOL Wage Determination CA20230018 April 21 2023 Multiple Counties 1.pdf PDF
DOL Wage Determination CA20230004 March 30 2023 Del Norte_Lake_Mendocino County.pdf PDF
Trail_Specifications.pdf PDF
Fire Plan 2022.pdf PDF
DOL Wage Determination CA20230024 March 17 2023 Orange County.pdf PDF
DOL Wage Determination CA20230014 April 7 2023 Santa Barbara County.pdf PDF
CA Trail Maintenance and Construction Quote Package.pdf PDF
DOL Wage Determination CA20230015 March 17 2023 Ventura County.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Work

Trail history and condition:

Trail 102 new construction is a full bench contouring trail open to mountain bikes. The new construction segment is tight flagged every 10’ along the entire alignment. Most of the trail is side hill construction through moderate to heavy brush. This area was burned in 2017 and there are many downed trees that will need to be bucked or moved during construction. The contouring alignment shall be constructed with grade reversals every 200-300’ and must achieve a reverse grade which will be verified by clinometer. Special qualifications for construction of mountain bike trails apply.

Trail Design Parameters (from TMO):

Trail 102 New Construction Mountain Bike Trail

18” wide trail tread 6’ clearing limit height 72” clearing limit width Typical Grade 7% Maximum Short Pitch 15% Non-wilderness Construction Methods:

Mechanized construction allowed

Trail prism may be benched up to 36” and narrowed when back sloping.

The project consists of one trails.

1. Trail 102 is new construction of 18” wide mountain bike trail for approximately ¾ of a mile.

New construction will include side hill construction, drainage dips, rock foundation through wet areas and a 24” culvert. Upon completion, backslopes will be laid back, grubbing of roots, and clearing to limits specified in plans.

REVIEWED BY:

XXX XX/XX/XX

XXX DATE

XXX XX/XX/XX

XXX �

RECOMMENDED BY:

XXX XX/XX/XX

DISTRICT RANGER/PROGRAM MANAGER DATE

XXX XX/XX/XX

FOREST/STATION ENGINEER DATE

APPROVED BY:

XXX XX/XX/XX

FOREST SUPERVISOR/STATION DIRECTOR �

XXX XX/XX/XX

REGIOtw./RESEARCH ENGINEER �

REVISIONS:

YOUR REGION

YOUR FOREST NAME

YOUR DISTRICT NAME

TRAIL CONSTRUCTION PLANS FOR

YOUR PROJECT NAME

PROJECT SITE

PROJECT NAME

T.

s.

T.

s.

INDEX

SHEET SHEET NO.

TITLE ------------------------------------ 1

VICINITY MAP ------------------------------- 2

GENERAL NOTES ----------------------------- 3

WORK LIST --------------------------------- 4

LINE DIAGRAM ------------------------------- 5

SUMMARY OF QUANTITIES ----------------------- 6

STANDARD TRAIL TERMS ------------------------ 7

TYPICAL CROSS SECTION & SLOPE FINISH ------------ B

TYPICAL RETAINERS --------------------------- 9

CLEARING LIMITS-TREES & LOGS ------------------ 10

CLEARING LIMITS-BRUSHING ---------------------- 11

STANDARD CULVERTS -------------------------- 12

DRAIN DIP ---------------------------------13 & 14

REASSURANCE MARKERS ------------------------ 1 5

SEEDING. FERTILIZING & MULCHING ----------------- 16

No. & -""""------------ XX/Gfi(XX � DESIGN: -""""------------ XX/sf.(XX

DRAWN: -""""------------ XX/8f.(XX

YOUR PROJECT NAME

ft REVISION [)tiTE � I/ DRAWING NO.

XX/XX/XX STD_900-01

No. fr,_ XX(!lt\(XX .,\\!/I&

No. � NAME XX/afi(XX � CHECKED· NAME XX/&A;(XX

SECTION TYPICAL ID

900-GENERAL TTL

SHEET I

� NO SCALE ,i � 0

• 19

WORK LIST

BEGIN END DRAWING lYPICAL SPECIFICATION SUPPLEMENTAL

UNIT

TRAIL NO.

STATION STATION

TASK

NO. ID NO. SPECIFICATION

PAY ITEM OF QUANTITY

MEASURE

102(C) 0+00 49+63 CONSTRUCTION OF NEW TRAIL STD_91Hl1 TSF-1 911.10 NA 91101 LF 4963

" " CLEARING-TREES AND LOGS STD_912-01 CLT-1 912.10 NA 91203 LS 1

" " CLEARING-BRUSHING STD 912-02 CLB-1 912.20 NA 91212 LS 1

" " SEEDING STD 981-01 SMF-1 981 NA 98102 LS 1

" " TRAIL BLAZER INSTALLATION STD_953--01 RSM-1 953 NA 95301 EA 50

" " CONSTRUCT DRAIN DIP STD 927-10-01 DD1-1 927.10 NA 92701 EA 3

41+71 INSTALL 24 IN X 12 FT CULVERT STD 921-10-01 SCV-1 911.10 NA 92101 LF 12

' U.S. DEPARTMENT OF AGRICULTURE � r PROJECT MME 6: LOCATION � tr DRAWING NAME RE't'ISION D\TE � , DRAWING NO.

s

FOREST SERVICE YOUR PROJECT NAME WORK LIST XX/XX/XX STD_900-04

STANDARD TRAIL PLAN

YOUR FOREST NAME SECTION T'l'PICAL ID SHEET I

YOUR DISTRICT NAME

900 • GENERAL WKL NO SCALE 4 OF 19

,j I.. I.. ,j I.. I

BEGIN TRAIL

CONSTRUCTION

o+oo

(�·-� IL NO.

I 102(C)

15+00

30+00

45+00

60+00

CONSTRUCT DRAIN DIP

I I I

STA. 49+63

END NEW CONSTRUCTION

STA. 46+35

CONSTRUCT DRAIN DIP

5+00

20+00

35+00

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PROJECT NAME 6: LOCATION

e STANDARD TRAIL PLAN

YOUR PROJECT NAME

YOUR FOREST NAME

YOUR DISTRICT NAME

STA. 39+10

CONSTRUCT DRAIN DIP

DRAWING NAME

SECTION

10+00

25+00

40+00

LINE DIAGRAM

900 -GENERAL

T'l'PICAL ID

LD1

STA. 41+71

INSTALL 24 IN X 12 FT LONG

CULVERT

RE'JISION DATE

XX/XX/XX

NO SCALE

DRAWING NO.

STD_900-05

SHEET

SUMMARY OF QUANTITIES

PAY

ITEM NO. DESCRIPTION

90701 MOBILIZATION

91101 EXCAVATION

91203 CLEARING AND GRUBBING

91212 BRUSH CUTTING

92101 24 IN CORRUGATED, TYPE HDPE PIPE

92701 DRAIN DIP

95301A REASSURANCE MARKER, TYPE TB-1

98102 SEEDING

TRAIL NO.

TRAIL LENGTH

METH. UNIT

OF OF

MEAS. MEAS.

LSQ LS

SQ LF

LSQ LS

LSQ LS

AQ LF

AQ EA

AQ EA

LSQ LS

102(C)

0.94 (Ml)

STA. o+oo

TO

STA. 49+63

AS REQ'D

r U.S. DEPARTMENT OF AGRICULTURE ., fr PR0.£CT rw.E & LOCATION

JD

FOREST SERVICE YOUR PROJECT NAME

STANDARD TRAIL PLAN

YOUR FOREST NAME

YOUR DISTRICT NAME ,J 'I..

STA.

STA.

DRAWING NAME

(Ml)

STA.

TO TO

STA.

(Ml) (Ml)

STA. PROJECT TO TOTAL STA.

SUMMARY OF QUANTITIES

SECTION TYPICAL ID

906 • MEASUREMENT & PAYMENT SOQ ,J

COMMENTS

, REVISION !?ATE ., r DRAWING NO.

XX/XX/XX STD_906-01

SHEET I

NOTTO SCALE 6 �· 19 .J

� ,J �

Sample Construction Description of Work
Sample_Construction_Trail_Package
dir STD_900-01_Title_Sheet-Model-BW.EPS
dir STD_900-02_Vicinity_Map-Model-BW.EPS
dir STD_900-03_General_Notes-Model.EPS
dir STD_900-04_Work_List-Model.EPS
dir STD_900-05_Line_Diagram-Model.EPS
dir STD_906-01_Summary_Quantity-Model.EPS
dir STD_910-01_Standard_Trail_Terms-Model.EPS
dir STD_911-01_Typical_X_Section_Finish-Model.EPS
dir STD_912-01_Clearing_Limits_Trees_Logs-Model.EPS
dir STD_912-02_Clearing_Limits_Brushing-Model.EPS
dir STD_921-10-01_Standard_Culverts-Model.EPS
dir STD_927-01_Drain_Dip-Model.EPS
dir STD_927-02_Drain_Dip_Details-Model.EPS
dir STD_953-01_Reassurance_Markers-Model.EPS
dir STD_981-01_Seeding_and Mulching_-Model.EPS

File details come from the government source that posted it. Updated .