Tractor DDF PWS_5-12-21 Final_Redactions.pdf

PDF 12 MB Posted

Attached to
Deployable Debrief Facility and Tractor Federal contract opportunity
Solicitation number
FA500021R0037
Issued by
Department of the Air Force Pacific Air Forces

About this file

This is a combined synopsis and solicitation for a firm fixed price contract to provide a Deployable Debrief Facility and Tractor to the United States Air Force Pacific Air Forces. The solicitation seeks proposals for a Deployable Debrief Facility and tractor to be used by the 144 Fighter Wing in accordance with the enclosed Performance Work Statement. Proposals are due by the date specified in the solicitation, and the contract is anticipated to be awarded shortly thereafter. The successful offeror will be expected to provide the specified products on a firm fixed price basis. The North American Industry Classification System code for this requirement is 336120 for heavy duty truck manufacturing. This is an unrestricted procurement with a size standard of 1,500 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Deployable Debrief Facility and Tractor, newest first.
File Type Posted
Synopsis_Solicitation DDF_Tractor.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADAPTIVE BASING TRACTOR

WITH DEPLOYABLE DEBRIEF

FACILITY

144th Fighter Wing, California TSGT Matthew Steht

Performance Work Statement Table of Contents

1. Area of Interest.....................................................................................................Page 1

2. Solution Briefs......................................................................................................Page 2

3. Part 1 General Information...................................................................................Page 6

4. Part 2 Definitions and Acronyms.........................................................................Page 10

5. Part 3 Government Furnished Property, Equipment, and Services......................Page 12

6. Part 4 Contractor Furnished Items and Responsibilities......................................Page 13

7. Part 5 Specific Tasks............................................................................................Page 21

a. Tractor Specifications…………………………………………………..Page 22

b. DDF Specifications……………………………………………………..Page 35

8. Part 6 Technical Exhibit Drawings......................................................................Page 48

9. Part 7 Construction Security Plan.........................................................................Page 54

Page | 1

Area of Interest

The United States Air Force Fighter Squadron is currently challenged with its ability to maintain a high combat training operations tempo while simultaneously being postured for a rapid deployment. Conventional methods of deployment take several days and potentially may not be efficient enough to meet current real world requirements.

BACKGROUND AND RATIONALE

The current Secretary of the Air Force and Chief of Staff of the Air Force priorities are as follows:

1. Restore Readiness…To win any fight, any time

2. Cost-effectively Modernize…To increase the lethality of the force

3. Drive Innovation…To secure our future

4. Develop Exceptional Leaders…To lead the world’s most powerful teams

5. Strengthen Our Alliances…Because we are stronger together

These priorities when coupled with the advancement of potential adversaries such as Russia, China, Iran, and North Korea allude to the need for more ready, modern, innovative, and agile squadrons. In 2015, General Welsh stated that “The Air Force’s ability to continue to adapt and respond faster than our potential adversaries is the greatest challenge we face over the next 30 years.” However, despite these concerns our current conventional methods of deployment have relatively not changed. This is where we bring our challenge; how do we expeditiously overcome this hurdle with our Fighter Squadrons in order to give the U.S. a distinct advantage in any contested environment? This is where the Adaptive Basing Trailer concept comes into play.

Major events such as Vietnam, Desert Storm, 9/11, and many others have shaped our vision and methods of operation to some extent, but many of our evolutionary steps were based on the “last war” vice innovatively preparing for the next war. In 2017, the 1AF Commander, Lt Gen R. Scott Williams visited our base and proposed that we look at innovative ways to accomplish our NORAD mission and increase our lethality and survivability. In short, he asked us to prepare for what is potentially next while maintaining our ability to respond to current threats.

Delays in current methods of most fighter squadron deployments are simply due to the lack of ready postured aircraft support equipment and airlift. The same equipment that is used for deployments is the same equipment used during day to day combat aircraft training. Therefore, once a DEPORD has published we must prep, inspect and palletize our support equipment and this is what consumes 70% of our time. In several cases we short fall critical items and then depend on Wartime Reserve Material which can take an extensive amount of time to coordinate as well. Personnel can be expeditiously processed for readiness requirements, aircraft availability always comes through, but building pallets, increments and load plans can take several days. This is single handedly the most critical constraint in our ability to get to the fight in rapid time.

The proposed Adaptive Basing Trailer concept eliminates a great majority of these issues and without question reduces deployment time by over 2 days. The details of this concept have been in work for over one year and have involved several USAF subject matter experts throughout multiple functional areas. The trailer is designed to be self-sustained with all tools, support equipment and ready postured 24/7 similar to our combat coded aircraft.

Additionally, this trailer can be built for every fighter MDS in the USAF enterprise making it interoperable. This trailer is designed to safely fit into a USAF C-17 with room for additional equipment if needed. Overall it can provide up to 2-4 days of continuous fighter aircraft combat operations without resupply in any austere location. Often times Adaptive Basing models are based on landing at a host site such as Kunsan Air Base South Korea where typical Air Force resources are readily available such as forklifts, lodging and ground equipment are supplied. Landing at a true bare base poses significant challenges where there is virtually no support for aircraft or crew. Simply land a C-17, we drive the trailer into it, load passengers, land in the AOR and with very little set up we bring the fight.

Reducing the initial deployment going to the AOR by 31 personnel makes the lean system efficient, and also increases the number of bodies available at home station to generate the main body force by manning deployment lines, building additional pallets, loading equipment, increment monitor duties, and more man power for sortie generation. This prototype is more than just building a tractor, DDF and trailer. This is rethinking how we can get out the door and in the air.

Page | 2

1. Solution Briefs

Solution Briefs must demonstrate a tailored product that should have the capability to be tailored to multiple airframes; including but not limited to: F15E; F16; F22; and F35. Solutions meeting Phase 1 selection criteria may be invited to Phase 2 to provide a Pitch.

Solutions meeting Phase 2 selection criteria may receive an invitation to Phase 3 and receive a Request for Proposal

(RFP).

NOTE: The Government reserves the right to forgo Phase 2 and go directly to Phase 3.

A single company will be selected to provide the solution. The product must meet all desired capabilities.

Upon completion of the contract, the solution will be provided a final performance evaluation based on technical/performance merits. The government reserves the right to contract production of the selected solution and will be made based on the availability of government funds.

2. AoI Constraints

1. The solution shall describe the proposed approach to completing the product. a. Air Force subject matter experts will be available for consulting during development.

b. Simulated non-classified Air Force data will be available.

c. Visualization, distribution, and support of solution should be explained.

1. Pricing Strategy

a. Contractor will be issued a firm-fixed price award for the product.

3. Other

a. The target date for delivery of the contact is 03 JUNE 2021.

3.1 PHASE 1 – Solution Brief Submission Requirements COMPLETED AND PROCEEDING TO PHASE 3

• Submission Requirements

Written solution briefs must be sent via e-mail submission by 11:59 P.M. (AKST) on 12 April 2021, with subject line stating “ABT Tractor/DDF” to courtney.becerril.1@us.af.mil. Any proposals after the specified due date and time will be discarded and not be evaluated by the Government.

3.2 Written Solution Brief Requirements

3.2.1 Content of Solution Brief

The written Solution Briefs should not exceed five (5) single page written pages (Solution briefs can be double sided, but cannot exceed two double sided pages, and one single sides page) using 12-point font or, alternatively, Solution Briefs may take the form of briefing slides which should not exceed fifteen (15) slides unless otherwise stated on the subject AoI. Any pages or slides submitted beyond this limitation will be removed and not evaluated. The written solution brief shall include and/or address the following:

3.2.1.1 Title Page (does not count against page limit)

● At a minimum, please include company name, solution name, and solicitation number, date of submission, point of contact name, email address, phone number, and company address. This page will not count towards the page/slide limitation.

Page | 3

3.2.1.3. Executive Summary/Company Description

● Describe your commercial customer base and provide some examples of past contracts or sales of this service/solution from within the last two years.

3.2.1.2. Solution/Technology Concept

● Describe the unique aspects of your technology/solution and the proposed work as it relates to this published AoI. Identify whether the effort includes the pilot or demonstration of existing commercial technology (identified as commercially ready and viable technology), or the development of a new technology or process to training/learning.

3.2.1.3 Company Viability

● Provide a brief overview of the company. Provide a summary of current fundraising to date and/or a summary of the top line (gross sales/revenues) and balance sheet. Provide a summary of product commercialization and go-to-market strategy.

4. Evaluation of Phase 1 – Solution Briefs

4.1 General

The Solution Brief shall be evaluated against the published AETC CSO evaluation criteria.

The general AETC CSO https://beta.sam.gov/opp/521261d4010b49efb144f82fb08d9d65/view?keywords=AETC%20CSO%20FY20&sor t=- relevance&index=&is_active=true&page=1 Phase 1 evaluation criteria shall be used to evaluate and rate the proposed solution brief. The AETC CSO evaluation criteria are listed below in order of importance from top to bottom. If a solution brief does not meet the first or second evaluation criterion, the solution brief will not be further considered for Phase 2- Pitch Presentation. Upon conclusion of this round of Solution Brief evaluations, the Government will down-select offeror to further develop and submit a detailed pitch presentation.

5. Evaluation of Phase 2 – Pitch FORGOING TO PHASE 3

5.1 General

The Pitch presentation shall be evaluated against the published AETC CSO evaluation criteria.

The general AETC CSO Phase 2 evaluation criteria shall be used to evaluate and rate the proposed pitch presentation. The AETC CSO https://beta.sam.gov/opp/521261d4010b49efb144f82fb08d9d65/view?keywords=AETC%20CSO%20FY20&sort=

- relevance&index=&is_active=true&page=1 evaluation criteria are listed in order of importance from top to bottom. If a pitch does not meet the first or second evaluation criterion, the solution brief will not be further considered for Phase 3- Request for Prototype Proposal (RPP).

NOTE: The Government reserves the right to forgo Phase 2 and go directly to Phase 3.

Page | 4

6. Evaluation of Phase 3 - RPP

6.1 General

Upon conclusion of evaluation of the pitch presentations, the Government will select and invite those AoI participants meeting the Phase II criteria to further develop and submit a detailed technical and price proposals.

The proposal shall consist of a title page and two parts:

● Volume 1: Technical Proposal

● Volume 2: Price Volume

The submitted proposal shall be evaluated against the published AETC CSO evaluation criteria.

The general AETC CSO https://beta.sam.gov/opp/521261d4010b49efb144f82fb08d9d65/view?keywords=AETC%20CSO%20FY20&sort=

- relevance&index=&is_active=true&page=1 Phase 3 evaluation criteria shall be used to evaluate and rate the Phase 3 proposal submittal. The AETC CSO evaluation criteria are listed in order of importance from top to bottom. If a proposal does not meet any of the first 3 proposal adequacy items in AETC CSO Section 3.4 (items 1-

3) basis of evaluation, the proposal will be disqualified from a Phase 3 award. If AETC decides to pursue a prototype OT, then the proposal must meet the proposal adequacy items in AETC CSO Section 3.4 (items 4-8) basis of evaluation to be considered. If not, that proposal will be disqualified from a Phase 3 award.

6.1.1. In addition to the AETC CSO Phase 3 Basis of Evaluation, the following factor will also be used to evaluate and rate Phase 3 Basis of Evaluation (item1). a. Application digital design quality, innovative methodologies to accomplish set goal, ease of consumer use, capstone approach and management plan, and company’s past performance and credentials.

6.2 Technical Proposal Solution (Volume One)

Each selected AoI participant invited to Phase 3 must submit a technical proposal solution as part of their final proposal that identifies the work to be performed and the deliverables. Provide a detailed project schedule that outlines the various phases of required learning objectives within the stipulated period of performance. The AoI participant must provide a technical volume that includes a Statement of Proposed Work (SOPW) with the following tabbed sections:

● Section 1 - Background

● Section 2 – Planned objectives, timelines, and milestone schedule

● Section 3 - Approach to solution completion

● Section 4 - Tools and software applicable to develop and provide desired solution

● Section 5 - Period and place of performance

● Section 6 - Proposed direct and ancillary hardware/software required for execution

● Section 7 – Application, implementation, recommendation, and post. implementation support plan Please Note:

The proposals must identify any proprietary information or associated intellectual property

Page | 5

6.3 Price Volume (Volume Two)

6.3.1. In addition to the instructions found in AETC CSO Section 3.4, Price Proposal, this AoI requires the following:

a. Basic Period: The offeror shall submit Price Volume with a firm-fixed price proposal roll-up to successfully implement and complete the proposed prototype. Breakdown of labor, materials and other than direct costs (ODC) shall be submitted. Within the price volume include price per operating platform (iOS, Android, etc… if applicable), and price breakdown for each major feature for this contract. Price per operating system and features shall be inclusive of all required labor, equipment, material and software for a turnkey solution.

b. Option Period(s): The offeror shall also submit a priced, firm-fixed price Option(s), for expansion of the prototype solution to support all Air Force Fighter Squadrons, along with their various airframes.

Option price must assume scaling program to accommodate…INCLUDE REASONABLE SCALING NUMBERS!

7. AoI Open Period – This AoI shall close at 11:59 P.M.; 03 JUNE 2021 Alaska Time. Offers must be valid until October 1 2021 to accommodate extra time if needed for DDF design approval.

8. Point of contact AoI questions can be sent to:

TSgt. Matthew Steht Project Manager: Adaptive Basing Prototype F-15 Crew Chief 86-147 144FW California Air National Guard Work: 559-454-5326 Cell: 559-326-9286 Email: Matthew.Steht@us.af.mil

Courtney Becerril, GS-12 Contracting Specialist 673rd CONS/PKC

JBER, AK 99505

Email: Courtney.Becerril.1@us.af.mil

**Companies are advised that any Prototype Other Transaction Agreement (OTA) awarded in response to this Area of Interest may result in the award of a follow-on production contract or transaction without the use of competitive procedures. The follow-on production contact or transaction will be available for use by one or more organizations in the Department of Defense and, as a result, the magnitude of the follow-on production contract or agreement could be significantly larger than that of the prototype OTA. As such, any Prototype Other Transaction Agreement will include the following statement relative to the potential for follow-on production: "In accordance with 10 U.S.C. 2371b(f), and upon a determination that the prototype project for this transaction has been competitively awarded prototype OTA may result in the award of a follow-on production contract or transaction without the use of competitive procedure.

Page | 6

PERFORMANCE WORK STATEMENT

Adaptive Basing Tractor with frame mounted Debrief Facility

Note to Offeror: Offeror shall explicitly and completely identify any and all exceptions taken to the requirements of this specification. Drawings, literature, and any other information submitted with an offer do not constitute a stated or implied exception unless specifically identified in writing as an exception and accepted and implemented by an amendment to the solicitation or modification to a contract. Any exception deemed acceptable by the Government shall only apply to the specific item, requirement, etc. cited, and shall not extend to any other requirement.

Offeror offering other than new brand name items identified below, when an “or equal” may be acceptable, shall furnish with their offers all technical data information, product descriptions, etc. to ensure that a determination may be made as to the equality of the product(s) offered.

Part 1

General Information

1. GENERAL: This is a contract to provide a Tractor with a removable DDF mounted to the frame capable of towing the Adaptive Basing Trailer. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform construction of the DDF and Tractor as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: In 2019 AFWERX awarded a contract to build an Adaptive Basing prototype semi-trailer.

Throughout the construction process a number of shortfalls led to the need of building a Debrief Facility, and procuring a tractor capable of moving the Adaptive Basing Trailer (ABT) over the road, and also obtain an ATTLA certificate for air transportation. This contract is to fulfill the shortfalls incurred in contract FA500020C0032.

1.3 Objectives:

Build a modified Deployable Debrief Facility (DDF) in accordance with ICS-705-1 that can mount between the cab of the tractor and the front of the trailer, to include the generator on the front of the ABT. This must be approved through Air Combat Command (ACC) prior to any construction and changes to design should be expected.

Requires airlift ability by either C-17 or C-5. An ATTLA certificate will be required DDF and Tractor must be fully operational in -40 to 120-degree conditions Be capable of SIPR communications CONUS and OCONUS Be rapidly deployable anywhere in the world by airlift in one (1) hour Must not exceed 20,000 pounds fully loaded with all equipment and consumables Must have a 20-year life expectancy DDF must be removable from the frame of the tractor by forklift, and/or jacks if feasible.

o Mounting hardware must be installed to allow easy and fast loading and unloading of the DDF.

Page | 7

1.4 Scope: The performance requirements for the Tractor and DDF shall be met when fully equipped and provisioned with all tank(s) completely filled, completely serviced, and ready for mobile operations coupled to the ABT and towed over highways, city streets, and gravel roads. The DDF shall show no actual or impending failure or malfunction of components, structure, body, attachments, accessories or any other item specified herein when towed at speeds up to 65 miles per hour over highways and 35 miles per hour over gravel roads.

The DDF mounted to the Tractor will seamlessly integrat with the communication and power systems built into the ABT. There is a communications panel mounted to the exterior drivers side of the ABT, the DDF will also have an externally mounted driver side panel. There will be no SATCOM installed in the DDF, it will use the the ABT COMM package via fiberoptics.

1.5 Period of Performance: The period of performance shall be for a maximum build time of 60 days (excluding lead time from Tractor manufacture).

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. Within 5 business days of contract acceptance, a written plan will be provided to the main point of contact for this project, TSGT Matthew Steht. After acceptance of the quality control plan, the contractor shall receive acceptance in writing of any proposed change to his QC system.

Offeror shall have documented quality assurance processes to assure compliance with all specification requirements including requirements established by reference, i.e. SAE, FMVSS, NFPA, etc. Offeror shall submit, with their offer, a copy of their documented processes or procedures.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract. A condition of accepting this contract, the vendor shall host up to two design and engineering meetings with the customer at vendor’s location for a maximum of three (3) members within the allotted 60 day built time. This is to ensure:

Preliminary Design Review NLT 5 business days ARO

Critical Design Review NLT 10 business days ARO

The contractor is building the DDF to the satisfaction and needs of the government.

Catch any oversights from the design phase during the construction to prevent costly modifications after DDF/Tractor delivery.

1.6.3 The following shall be reasons for rejection:

1. Rough, sharp or unfinished edges, burrs, seams, corners, and joints.

2. Non-uniform panels. Edges that are not radiuses, beveled, etc.

3. Paint runs, sags, orange peel, “fish eyes”, etc.., and any other imperfection or lack of complete coverage of paints or coatings.

4. Body panels or components that are uneven, unsealed, or contain cracks, dents or have voids.

5. Misalignment of body fasteners, glass, viewing panels, light housings, other items with large or uneven gaps, spacing etc. such as door, body panels, and hinged panels.

6. Improperly fabricated and routed wiring or harnesses, and electrical connections.

7. Improperly supported or secured hoses, wiring harnesses, mechanical controls etc., including interference with other components.

8. Interference of chassis components, body parts, doors, etc.

9. Leaks of any gas, vacuum, or fluid lines (air conditioning, coolant, oil, etc.).

10. Noise, panel vibrations, etc.

11. Inappropriate or incorrect use of hardware, fasteners, components, or methods of construction.

Page | 8

12. Incomplete or improper welding, riveting, or bolting.

13. Lack of uniformity and symmetry where applicable.

14. Loose, vibrating, abrading body parts, components, subassemblies, hoses, wiring harnesses or trim.

15. Improper body design or interface with the chassis that could cause injury during normal use or maintenance, and which fail to provide access to perform routine or mandatory repairs or maintenance on vehicle electrical and mechanical systems. In addition, the improper combination of options which by their combination and installation are inherently incompatible with regard to function or safety shall not be acceptable.

16. Sagging, non-form fitting upholstery or padding, holes, tears, discoloration, etc.

17. Incomplete or incorrect application of rust proofing.

18. Visual deformities and equipment malfunctions.

19. Unsealed appurtenances or other body components, gaskets, etc.

20. In addition, any deviation from specification requirements or any other item, whether or not stipulated herein, that affects form, fit, function, finish, durability, reliability, safety, performance or appearance shall be cause for rejection.

1.6.4 Contract Modification: All conversions and modifications to the design will be approved by the key personnel in this contract only. All modifications to the contract after award will also be approved by the vendor. Any changes to cost will be sent as a proposal to base contracting, once approved the supplement will be validated and awarded.

1.6.5 Special Qualifications Objectives:

The contractor must be based in the United States

The contractor must have experience in manufacturing units for extremely low temperatures of -40 degrees F or colder

Must have completed a minimum of four ATTLA vehicle certifications with Wright-Patterson Air Force Base approved for aircraft transport. Proof of certifications must be submitted with bidder’s response

The offeror (manufacturers) who respond to this solicitation shall have a minimum of 5 years of engineering, design, and manufacturing experience in providing similar vehicles with equal or greater complexity to the requirements described herein.

The offeror must have previously completed a DDF, or a SCIF for the Air Force or a component of the Air Force. Other agencies or military branches use different approval channels and will not be compatible with ACC standards.

The offeror shall ensure that the application and installation of major subcomponents and systems is compliant with subcomponent vendors’ requirements and recommendations.

At a minimum, one engineer must have (This will ensure the DDF will be built with aircraft maintainers in mind):

o BS in Engineering o Military aircraft or aircraft component design experience o Development and manufacturing of aircraft components

The contractor must be the OEM of the entire DDF chassis, frame, and shell

The contractor must have a plan in place for warranty repairs:

o Nationwide service network.

o Must have a plan in place to provide parts availability and technician assistance in European countries for deployment support.

o Offeror shall have 24 hour/7days per week access to customer service. Offeror shall provide detailed information describing their customer service access.

Page | 9

1.6.6 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post-award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.7 Contracting Officer Representative (COR): The COR will be identified officially by separate letter in addition to being listed in 1.6.8 below. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.8 Key Personnel: The following personnel are considered key personnel by the government:

Project Manager- TSGT Matthew Steht

Assistant Manager- MSGT Cory Snyder

COR- MSGT Sara Carden

The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract

1.6.9 Other Direct Costs: This category includes travel (outlined in 1.6.2), shipping expenses associated with training activities and visits to contractor facilities. This will be included in contractors bid.

1.6.10 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., Cost or pricing information, budget information or analyses, specifications or work statements, etc.) Or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI). The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be accepted solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequently contracted requirements which may be affected by the OCI.

Page | 10

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage to Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.

Page | 11

2.2. ACRONYMS:

ABT Adaptive Basing Trailer ACC Air Combat Command ACOR Alternate Contracting Officer's Representative ATTLA Air Transpotability Test Loading Agency CCE Contracting Center of Excellence CDR Critical Design Review CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DDF Deployable Debrief Facility DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense GFE Government Furnished Equipment FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer LOX Liquid Oxygen NEC National Electric Code NIPR Non-classified Internet Protocol (IP) Router Network (NIPRNet) OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OEM Original Equipment Manufacture PIPO Phase In/Phase Out POC Point of Contact PDR Preliminary Design Review PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SIPR Secret Internet Protocol Router Network (SIPRNet ) SOW Statment of Work TE Technical Exhibit

Page | 12

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services None

3.2 Facilities None

3.3 Utilities None

3.4 Equipment : GSA Approved Class 5 Legal, 2 Drawer Filing Cabinet, Single-Lock X10 Gray illustrated in this PWS was purchased under the ABT contract and will be provided to the winning vendor of the DDF contract.

3.5 Materials None

Page | 13

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract.

4.1.1 Warranty

Warranty administration shall be the responsibility of the contractor.

The contractor shall provide the chassis manufacturer’s commercial warranty and the commercial furnished equipment warranties, including the body and all other parts and components required herein, against parts failure or malfunction due to design, construction or installation errors, defective workmanship, and missing or incorrect parts, for a minimum period of 36 months from date of acceptance. If the contractor receives from any supplier or subcontractor additional warranty on the whole or any component of the vehicle, in form of time or mileage, including any prorated arrangements, or the contractor generally extends to its commercial customers greater or extended warranty coverage, the government shall receive corresponding warranty benefits. The warranty coverage shall begin when the Government accepts the vehicle from the contractor FOB point of origin/destination.

Initial response for onsite warranty repairs from the offeror shall be within 48 hours. Labor, parts, shipping cost, per diem and travel for warranted repairs to and from the unit’s fielded location shall be the responsibility of the contractor. Warranty registration cards shall also be provided as applicable.

The contractor shall furnish the Government with warranty certificates showing evidence that the warranty requirements above have been met.

4.1.2 Training

Two days of centralized training shall be provided for a minimum of six (6) government personnel at the offeror location. Government personnel are responsible for the travel and lodging expense for training.

Training shall be conducted by technicians with in-depth knowledge of the vehicles and equipment to ensure that all student questions are thoroughly answered. Training shall be a combination of classroom demonstration and hands-on use of the equipment. Upon request, the contractor shall provide, in writing, full particulars of the proposed training program, including but not limited to a training syllabus.

The contractor shall provide all materials required for the training of government personnel. The training shall include written procedures on proper startup and shutdown of the vehicle. Training shall also include a recommended preventive maintenance schedule and procedures for the vehicle.

4.1.3 Operator’s Servicing and Parts Manuals

Two sets of manuals shall be furnished as follows:

o Start Up/Shut Down Manual o Operator’s Manual o Vendor Information Manual

4.1.4 Keys

Four sets of keys shall be furnished for every lock on the vehicle. All storage compartments shall be keyed alike.

Page | 14

4.1.5 Alternator Road Test

The contractor shall provide documentation from the alternator supplier with the offer that the alternator meets all requirements under all specified voltage, frequency and power factor ratings with the offeror. The alternator shall be tested to demonstrate its capability to deliver its full rated load at its regulated voltage.

The contractor shall provide the facility and load bank to perform a 30-minute full load test (resistive load test) on the alternator installed on the tractors diesel engine.

4.1.6 Road Test

The tractor shall be road tested a minimum of 10 miles to verify vehicle road performance (tracking, braking, DDF stability)

4.1.7 Vocational Test

All equipment shall be functionally tested and verified to operate in accordance with manufacturer’s operating instructions and to the government’s satisfaction. All electrical equipment shall be tested and verified to operate to the government’s satisfaction.

4.1.8 Water Spray Test

The contractor shall submit a water spray test plan to the government for approval within 10 days of receipt of order. The test shall assure a uniform high-pressure spray pattern over the sides, rear, front, and top of the DDF from a spray manifold of pressure nozzles.

Each side, front, rear, and top of the vehicle shall be subjected to the approved water spray test in accordance with the contractor’s water spray test plan. The following criteria shall be used to determine passage or failure of the water spray test:

o No water leakage is allowable into the interior of the Tractor/ DDF or extended sides. Minor water leakage (maximum of approximately one tablespoon) is allowable in exterior side compartments of the tractor.

The water spray test shall be performed on the completed vehicle after road testing at the contractor’s production facility.

The successful vendor shall submit a water spray test plan for Government approval. The plan shall assure that this vehicle will undergo a standard, consistent, water spray test on the sides, front, rear, and roof of the vehicles for a minimum period of 30 minutes, utilizing a water spray fixture equipped with high-pressure spray nozzles. The water spray test shall be performed on the completed vehicle, after road testing.

4.1.9 Extreme Weather Test

If the vendor cannot proficiently demonstrate by engineering analysis as determined by the Key Individuals listed in this contract in section 1.6.8) vehicle and system functionality to the specified temperature ranges, then the contactor shall conduct engineering testing in a climate controlled chamber to validate the functional capabilities and compliance to the requirements contained within this document .

If the vendor cannot demonstrate compliance by engineering analysis (Determined by the Key individuals listed in 1.6.8) the contractor is responsible for securing a source of supply for the engineering testing.

o Must show adequate proof that the unit can be built to withstand these conditions based on prior experience o Environmental tests may be conducted at Whiteman AFB, estimated cost to the contractor is $30,000 per day

Page | 15

4.1.10 Air Transportability

The completed vehicle shall be air transportable in accordance with MIL-STD 1366E. The successful offeror shall be responsible for certification of air transportability. Air transportability requirements for this vehicle shall include air transport certification in a C-17 and C-5 aircraft in accordance with the guidelines in MIL-STD 1791A. The completed vehicle shall be air transportable with the specified payload, less driver and passenger.

4.1.11 Tie Down Provisions

The vehicle shall be equipped with a minimum of four (4) tie down points to ensure interoperability between transported equipment and tie down devices commonly used in the transportation environment.

Supplemental tie down provisions may be provided for air transport in accordance to MIL-STD-209K.

Tie down provisions shall conform to MIL-STD-209K for both Type I and Type II equipment with the vehicle at its full payload capacity.

A structural analysis of the tie down provisions and the surrounding structural elements in accordance with MIL-STD-209K requirements shall be performed by a Professional Engineer certified in the United States and a report shall be provided to the Government. In cases where the structural analysis indicates the provisions will clearly fail the requirements, a redesign of the provisions shall be required.

The Successful Offeror shall perform operational tests, including pull strength, on all tie down provisions in accordance to MIL-STD-209K. The government shall review and approve the test plan and witness the testing. A test report shall be provided.

A shipping data plate shall be furnished in accordance with MIL-STD-209K. The shipping data plate shall be inscribed with a diagram showing the tie down attachments, the capacity of each attachment, and the recommended tie down pattern for securing the equipment during transport. A silhouette of the vehicle showing the center of gravity shall be provided on the transportation plate. Stenciling or other suitable marking shall identify tie down attachments. Tie down markings shall clearly indicate that the attachments are intended for the tie down of the equipment on the carrier.

4.1.12 Transportability Verification

The completed vehicle shall be inspected to determine that it conforms to the approved certification memo the successful offeror received from ATTLA/SDDCTEA. At a minimum, the following angles, dimensions, and descriptions shall be checked against approved data and drawings. This will include a fully loaded to max weight ABT attached to the Tractor with the DDF attached:

• Angle of approach.

• Ramp break over angle.

• Angle of departure.

• Height, longitudinal location, and identification of highest component on tractor.

• Dimensions and locations of any significant projections on tractor.

• Curb weight of each axle.

• Wheelbase.

• Front overhang.

• Rear overhang.

• Articulation of rear suspension, unloaded, each axle (curb weight).

• Rear axle spacing.

• Axle rating, front, and comparison to one-and-one-fourth (1 ¼) times (curb weight) load.

• Axle rating, rear, and comparison to one-and-one-fourth (1 ¼) times (curb weight) load.

• Suspension rating, front, and comparison to one-and-one-fourth (1 ¼) times (curb weight) load.

• Suspension rating, rear, and comparison to one-and-one-fourth (1 ¼) times (curb weight) load.

• If axle stops are to be removed for ramp loading on aircraft, verification that the driveline remains intact when cresting maximum ramp slope.

Page | 16

4.1.13 ATTLA Certificate

The certificate will be completed prior to delivery

All email correspondence shall also be copied to: ATTLA@us.af.mil

The Customer Agency shall send a written certification request containing a description of the physical characteristics of the vehicle to the Air Transportability Test Loading Agency (ATTLA) when Air Transportability (option ATR) is requested or to the Military Surface Deployment and Distribution Command Transportation Engineering Agency (SDDCTEA) for all other modes of transportability.

After receipt of order (ARO), the successful offeror shall contact the Customer Agency to ascertain if the Customer Agency has made application for Transportability Certification to the ATTLA/SDDCTEA.

The successful offeror shall make contact with the ATTLA/SDDCTEA and shall provide and submit all related drawings and engineering data, within 10 days ARO, directly to ATTLA/SDDCTEA.

The successful offeror shall continue to work with the ATTLA/SDDCTEA to obtain Transportability Certification for the vehicle(s) ordered. The successful offeror shall supply the ATTLA/SDDCTEA certification memo to the Customer agency within 120 days after receipt of the vehicle(s) order. A copy of the ATTLA/SDDCTEA certification memo shall be available during the final inspection.

ATTLA is located at Wright Patterson Air Force Base and can be contacted via e-mail at "ATTLA@wpafb.af.mil". SDDCTEA is located in Newport News, VA and can be contacted by e-mail at "dpemail@tea.army.mil" or by phone at (757) 599-1113. A transportability report form for SDDCTEA can be obtained at "http://www.tea.army.mil/pubs/nr/deploy/transinstruction/DI-PACK-80880B.pdf"\t"_new".

References, publications, assistance, and engineering services are available from SDDCTEA. Testing information can be obtained from the Aberdeen Test Center (ATC). ATC can be contacted through their website at "http://www.atc.army.mil".

Upon receipt of the request, drawings, and data, ATTLA/SDDCTEA shall conduct an analysis of the item's transportability at no cost to the requesting federal agency. If the item meets the requirements, ATTLA/SDDCTEA shall return a certification memo to the Customer Agency with a copy to the successful offeror stating the conditions of approval. Otherwise, ATTLA/SDDCTEA shall recommend changes that shall allow the item to meet those requirements. Very rarely an item cannot be airlifted or transported at all.

In these cases, ATTLA's /SDDCTEA's reply shall include an explanation of the rejection.

If analysis alone cannot positively determine the transportability of the item, then a test loading shall be required. Test loadings are done when the transportability is uncertain. The test loads require a formal test report and usually are conducted as Special Airlift or Transport Missions. The Customer agency shall be responsible for all costs associated with test loadings when it is determined to be required.

Removal or relocation of mechanically attached (non-welded, non-riveted, etc.) components with common tools, requiring not more than one (1) man-hour total to remove, relocate, and tie down; and not more than one (1) man-hour total to return the vehicle to its original state, as opposed to reduced configuration; shall be acceptable. The self-mobility of the vehicle shall not be affected by reducing its configuration. Tie downs for removed or relocated equipment shall be furnished. The rated capacity of the axles and suspension system shall be not less than 1.25 times the load imposed on each by the curb weight of the vehicle. Shoring may be used to meet the transportability requirements. The vehicle shall not be delivered to the Government in its reduced configuration.

Page | 17

4.2 Verification Requirements

The successful offeror shall verify compliance to all of the requirements specified herein prior to first vehicle production release, based on the following verification matrix. Verification may be in the form of successful offeror production line bill of material, drawings, instructions, test results, vendor documentation, certifications, or design analytical data. The successful offeror shall not proceed with production before receiving agreement from the Government that verification of compliance is satisfactory. Acceptance of designs by the Government does not relieve the successful offeror from the successful offeror’s responsibility to meet all the requirements and specifications herein, whether reviewed by the Government or not. It shall be the successful offeror’s responsibility to assure all production documentation results in the production of vehicles that are in compliance with these requirements and specifications.

PAC Post Award Conference Contract Award + 5 Days VDR Verification Design Review Receipt of Order + 10 Days FPVI First Production Vehicle Inspection BOM Bill of Material

The type of verification to be submitted for acceptance is listed below:

ET Engineering Test – to be performed by the successful offeror and results accepted by the

Government. Engineering tests are tests resulting in data output from engineering instruments used to take measurements of parameters such as temperatures, sound levels, etc. Verification may be in the form of an engineering report, test result sheet, or test summary with results documented.

COC Confirmation of Compliance – Validation by analysis or production builds documentation to be performed by the successful offeror and submitted for acceptance by the Government. Verification may be in the form of analysis summaries, build documentation, purchase orders, or similar written documentation.

QAPVT Quality Assurance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .