F-35 Joint Program Office N0001923R0134 Statement of Work (SOW) For F-35 Lightning II Combat Data Systems (CDS) TR-2 and TSS Hardware Disposition

Dated: 27 April 2023

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense, U.S. DoD contractors, NOR MOD, ITA MOD, AUS DOD, CAN DND and, GBR MOD, DNK MOD, and NLD MOD only, 4 July 2013. Other requests shall be referred to the F-35 Lightning II Joint Program Office, 200 12th Street S, Suite 600, Arlington, VA 22202.

THIRD PARTY AGREEMENT: This information is furnished upon the condition that it or knowledge of its possession will not be released to another nation without specific authority of the DoN of the United States; that it will not be used for other than the purpose for which it was released; that individuals or corporate rights originating in the information whether patented or not, will be respected and that the information be provided the same degree of security afforded it by the DoD of the United States.

CONTROLLED UNCLASSIFIED INFORMATION: This document contains information exempt from mandatory disclosure under the FOIA.

DESTRUCTION NOTICE: Destroy Unclassified//FOUO and Classified Documents in accordance to DoD Manual 5200.01, (Feb 24, 2012) Volume 3, Enclosure 3, Paragraph 17-19.

F-35 TR-2 Hardware Disposition

1. SCOPE

1.1. The purpose of this Statement of Work (SOW) is to prescribe the required tasks to be carried out by the Contractor, for the TR-2 and TSS hardware disposition effort outlined in sections 2 through 4.

1.2. All TR-2 and TSS Equipment covered by this SOW is cataloged on the Master Inventory List (Reference 1). This list contains all equipment the Contractor is responsible for dispositioning.

2. REQUIREMENTS

2.1. The Contractor shall comply with the Government’s Security Plan (Reference 2) provided as GFI that will apply to security procedures for the equipment.

2.2. Equipment will not be powered on, and operating status will not be assessed before packing.

3. TASKS (CLIN 0001, 0002, 0003, 0004)

3.1. The Contractor shall deliver a Certificate of Destruction upon the conclusion of the destruction event to confirm disposition of all equipment in the Master Inventory List (Reference 1) (CDRL A001)

3.2. In accordance with F-35 Lightning II Joint Program Office Special Access Program Standard Operating Procedures, Document 47492, V62; Section 5.10, Attachment 4, Effective 11 May 2020:

3.2.1. (CLIN 0001, 0002, 0003) The Contractor shall disposition 20 pallets of TR-2 hardware outlined in the Master Inventory List

3.2.2. (CLIN 0004) The Contractor shall disposition 25 pallets of TSS hardware outlined in the Master Inventory List

4. PROGRAM MANAGEMENT (CLIN 0001, 0002, 0003, 0004)

4.1. The Contractor shall hold a contract kick-off meeting within 20 days of contract award to present plan for TR-2 and TSS hardware disposition.

5. GOVERNMENT FURNISHED INFORMATION

Ref.
Title
Number
Date
Version
1
Master inventory List
N/A
--
--
2
Security Plan
N/A
--
--

CONTROLLED UNCLASSIDIED INFORMATION / / DL ONLY / / F-35 Partners. Go to www.jsf.mil/aboutus for list of Partners image1.png