This Statement of Work (SOW) details support services for the AN/ALR-56C Test Program Set (TPS) used with the AN/ALM-246 Tactical Electronic Warfare System (TEWS) Intermediate Support Station (TISS) for F-15C/D/E aircraft. The primary objective is to maintain and improve TPS software by investigating and resolving Deficiency Reports (DRs), with the goal of reducing shop flow time and increasing serviceable assets availability for warfighters. The contract will be performed at the Contractor's facility in St. Louis, MO, with a one-year base period and four one-year option periods.
Key requirements include organizing a program kick-off meeting, analyzing deficiency reports, incorporating DR resolutions, performing TPS selloff testing, and delivering updated software and documentation to AFLCMC/HBY. The contractor must provide monthly status reports, develop test plans, obtain new Computer Program Identification Numbers (CPINs) for updated software, and submit a Data Accession List (DAL) of all developed data and software, which will become government property. The effort is associated with contract F33657-01-D0026-RJ84 and involves coordination with 408 SCMS/GUEA and AFLCMC/HBY.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TPS-TISS Support - RFI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
AN/ALR-56C Test Program Set Support
For
AN/ALM-246 TISS
May 21, 2025
Prepared by:
408 SCMS/GUEA
235 Byron Street
Robins Air Force Base, GA 31098
DISTRIBUTION STATEMENT C: Distribution authorized to the U.S Government Agencies and their Contractors only, due to critical technology, date of determination: 1 March 2025. Other requests shall be referred to AFSC/PZABB, 236 Byron St STE 19A; Robins AFB GA 31098-1670. Questions concerning technical content should be directed at 408 SCMS/GULB, 460 Richard Ray Blvd, STE 200, Robins AFB GA 31098-1813.
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act 1979, as amended (Title 50, U.S.C., App. 2401 et seq.). Violators of these export laws are subject to severe criminal penalties.
HANDLING and DESTRUCTION NOTICE – Comply with distribution statement and destroy by any method that will prevent disclosure of the contents or reconstruction of the document.
1. Scope
1.1. Scope: This document defines the tasks associated with the maintenance of Test Program Sets (TPS) running on the AN/ALM-246 Tactical Electronic Warfare System (TEWS) Intermediate Support Station (TISS) which support diagnosis and repair of the AN/ALR-56C Radar Warning Receiver (RWR). Deficiency Reports (DRs) written against the TPS’ will be investigated, solutions found will be tested and verified and the corrected software will be fielded to improve testing and testing verticality of the AN/ALR-56C system.
1.2. Background: The AN/ALM-246 Tactical Electronic Warfare System (TEWS) Intermediate Support Station (TISS) is used to maintain the AN/ALR-56C Radar Warning Receiver (RWR) for the F-15C/D/E aircraft. Over the past several years, numerous Deficiency Reports (DRs) have been issued for the AN/ALR-56C system which were eventually determined to be Test Program Set (TPS) issues. Verticality testing issues have been identified as a significant cause.
With the current operations tempo, every effort must be made to reduce shop flow time by correcting DRs that restrict serviceable assets from being available to the war fighter.
1.3. Affected Software: AN/ALR-56C TPS software and TISS station software will be maintained to correct DRs.
1.4. Period of Performance: The period of performance for the contract/order shall be one (1) year basic with four (4) one (1) year options.
1.5. Place of Performance: These services shall be performed at the Contractor’s facility in St.
Louis, MO.
1.6. Government Property to be Provided: Government property to be provided includes items provided under contract F33657-01-D0026-RJ84 which is already at the Contractor’s facility to support this effort. Government Property will be used with the new contract on a non-interference basis.
2. Applicable Documents:
a) 32 CFR Part 117 NISPOM Rule
b) TO 33D7-38-251-1, OPERATION INSTRUCTIONS, AUTOMATIC AIRBORNE WEAPONS
SYSTEM TEST CENTRAL AN/ALM-246A, 68D040913-1001
c) TO 33D7-38-251-2, MAINTENANCE INSTRUCTIONS, AUTOMATIC AIRBORNE WEAPONS
SYSTEM TEST CENTRAL AN/ALM-246A, 68D040913-1001
d) TO 33D7-38-251-8-6, OPERATOR TEST PROCEDURES, AUTOMATIC AIRBORNE WEAPONS
SYSTEM TEST CENTRAL AN/ALM-246A, 68D040913-1001, 68D040913-1005
e) TO 00-5-16, TO 00-5-16, SOFTWARE MANAGERS AND USERS MANUAL FOR THE USAF
AUTOMATED COMPUTER PROGRAM IDENTIFICATION NUMBER SYSTEM (ACPINS)
3. Requirements:
3.1. Program Overview/ Kick-off Meeting: The Contractor shall organize a combined Program Overview and Kick-off meeting within forty-five (45) days After Receipt of Order (ARO). The Contractor shall coordinate with the Government to schedule this event and provide agenda and minutes as appropriate. The purpose of this meeting is to review all contract administrative, financial, technical, engineering, and logistical requirements. The Contractor shall have personnel in attendance with decision authority to address these areas as appropriate. (DI- ADMN-81249B, Agenda; DI-ADMN-81250B, Minutes)
3.2. Deficiency Reports: The Contractor shall analyze deficiency reports submitted by 408 SCMS/GUEA or its appointed representative and provide a Report of Findings (ROF) to AFLCMC/HBY and 408 SCMS/GUEA within ten business days of receipt of submission or receipt of exhibit if required (DI-MISC-80508B, Technical Report Study/Services).
Status/update of investigation shall be provided to AFLCMC/HBY, 408 SCMS/GULB and 408 SCMS/GUEA via the Monthly Status Report (DI-MGMT-80368A, MSR).
3.3. Incorporation of DR Resolutions: After receiving approval by 408 SCMS/GUEA or the appointed representative, the Contractor shall perform/incorporate the preferred solution identified in the ROF or specified by 408 SCMS/GUEA or the appointed. The Contractor shall also develop a test plan defining how the resultant product will be tested. The test plan shall be delivered to AFLCMC/HBY and 408 SCMS/GUEA (DI-NDTI-80566A, Test Plan).
3.4. TPS Selloff: Once the solution has been incorporated and the test plan has been approved, the Contractor shall perform a selloff using the approved test plan. The selloff shall be performed at the Contractor’s facility. The Contractor shall notify the 408 SCMS/GUEA and AFLCMC/HBY at least 30 calendar days prior to the test date, to allow for Government observation/participation. Upon completion of a selloff, the Contractor shall prepare and submit a test report to AFLCMC/HBY and 408 SCMS/GUEA (DI-NDTI-80809B, Test Report).
Acceptance of the Test Report by 408 SCMS/GUEA or its appointed representative shall imply concurrence with the product thus far and indicate the Contractor shall continue with TPS delivery.
3.5. TPS Delivery: Upon successful completion of Selloff, the updated software and documentation related to the TPS and/or TISS shall be delivered to AFLCMC/HBY (DI-MCCR- 80700/T, Computer Software Product End Item). The Contractor shall request and receive new Computer Program Identification Numbers (CPINs) for the updated software. Any recommended changes to the TOs and/or any recommended hardware change(s) to the Interface Test Adapter (ITA) or TISS shall also be delivered (DI-MISC-80508B, Technical Report- Study/Services).
3.6. Data Accession List (DAL): All data and software developed under this SOW shall become property of the Government. The Contractor shall provide a DAL listing all data and software developed by the Contractor in accomplishment of this SOW (DI-MGMT-81453A, Data Accession List). The Contractor shall provide the Government access to any of this data or software at the request of the Government. The Government's access to the Contractor's data is not limited to that contained in the DAL.