Torrance_Refinery_Water_Recycling_Plant_Microfiltration_Feasibility_Study.pdf
PDF 273 KB Posted
- Solicitation number
- RFP-TH-0117
- Issued by
- Los Angeles County, California
About this file
This Request for Proposal solicits professional engineering services from West Basin Municipal Water District, a public water agency serving 17 cities and approximately one million residents in coastal Los Angeles County, California. West Basin seeks a qualified consultant to conduct a comprehensive feasibility study for the replacement of the Microfiltration System at the Torrance Refinery Water Recycling Plant (TRWRP). The existing system, installed in 1999 with six units designed for a capacity of 3.73 million gallons per day (MGD), has experienced significant deterioration that has reduced its operational capacity. The consultant must evaluate a minimum of five alternatives to address system replacement, increased water production capacity, and potential relocation and installation of West Basin's Portable Ultrafiltration system. The pre-proposal meeting is scheduled for February 17, 2026, with the deadline for respondent questions and clarifications on February 19, 2026. Proposals must be submitted electronically through the OpenGov procurement portal by 2:00 PM on February 26, 2026, with contract award notification expected by March 9, 2026. The contract will be structured on a time-and-material basis with rates and specific not-to-exceed amounts to be determined upon execution.
The deliverables include a comprehensive feasibility study submitted in draft, draft final, and final stages, incorporating preliminary design criteria, system hydraulics analysis, environmental impact assessments, regulatory compliance review, Class 4 cost estimates, life cycle cost comparisons, and return on investment analysis for each alternative. Evaluation criteria include proposal completeness and quality, consultant qualifications and experience, key personnel qualifications, technical approach and methodology, client references, cost proposals, and insurance compliance. West Basin offers a Small and Local Business Enterprise (SLBE) incentive program providing three additional evaluation points for SBE or LBE prime consultants (six points if both designations apply) or one point if SBE/LBE subcontractors receive at least 30 percent of total contract compensation. The successful consultant must maintain comprehensive insurance coverage including Commercial General Liability of $2,000,000, Business Automobile Liability of $2,000,000, Workers' Compensation with $1,000,000 Employer's Liability coverage, and Professional Liability of $2,000,000, with West Basin named as an additional insured. Proposals must remain valid for a minimum of 90 days from the submission date, and California prevailing wage requirements apply to any subconsultants providing labor on tasks with established state classifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Torrance_Refinery_Water_Recycling_Plant_Microfiltration_Feasibility_Study.pdf | ||
| Vendor_Information_Request_Form.pdf | ||
| Mobil_CMF_O&M_Manual_Overview_(1).pdf | ||
| TRWRP_MF_SOP.pdf | ||
| Scope_of_Work.pdf | ||
| Sample_Agreement_-_Form_4_-_Non-Pro_Consultant.docx | DOCX document | |
| Sample_Agreement_-_Form_7_-_General_Services.docx | DOCX document | |
| Form_3_-_Pro-Svc_Non-Tech_-_102618.docx | DOCX document | |
| Sample_Agreement_-_Form_9_-_Supply.docx | DOCX document | |
| Sample_Agreement_-_Form_8_-_Transportation_Services.docx | DOCX document | |
| Sample_Agreement_-_Form_5_-_On-Call_Engineering_Service.docx | DOCX document | |
| Form_1_-_Engineering_Service_-_102618.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
To Provide
TORRANCE REFINERY WATER RECYCLING PLANT
MICROFILTRATION FEASIBILITY STUDY
Due
February 26, 2026, 2:00 pm
Issued by
WEST BASIN MUNICIPAL WATER DISTRICT
17140 South Avalon Boulevard, Suite 210
Carson, California 90746
Issue Date
February 2, 2026
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/westbasin https://procurement.opengov.com/portal/%7bproject.government.code%7d
West Basin Municipal Water
REQUEST FOR PROPOSAL
Torrance Refinery Water Recycling Plant Microfiltration Feasibility Study
1. Introduction
2. Scope of Work
3. General Proposal Information
4. Respondents Questions, Requests for Clarification and Exceptions
5. Small and Local Business Enterprise Program
6. Selection Process
7. Evaluation Criteria
8. Sample Agreement and Insurance Requirements
9. Proposal Response Instructions
10. Proposal Response
Attachments:
A - Scope of Work
B - TRWRP MF SOP
C - Mobil CMF O&M Manual Overview (1)
D - Vendor Information Request Form
ZZZ - Sample Agreement - Form 1 - Engineering Service
1. Introduction
West Basin is a public agency that provides imported drinking water and recycled water to 17 cities and nearly one million people in the coastal Los Angeles area. West Basin is a member agency of the Metropolitan Water District of Southern California. West
Basin's mission is to provide a safe and reliable supply of high-quality water to its customers and communities with a commitment to water reliability, water quality, sound financial and resource management, customer service and environmental stewardship. West Basin is an internationally recognized expert in water recycling, conservation, water education and water resource management. To learn more about
West Basin please visit www.westbasin.org.
1.1. Summary
The Microfiltration system at the Torrance Refinery Water Recycling Plant was built in
1999 and consists of six units designed for a capacity of 3.73 MGD (518 gpm/unit).
Deterioration over the years has reduced capacity to produce water. Replacement of the equipment and supportive ancillary is necessary. This project is to perform a feasibility study to identify the needs to replace the system, increase water production capacity, and potentially move and install West Basin's potable ultrafiltration system
(PUF).
1.2. Background
West Basin Municipal Water District (West Basin) is soliciting proposals (RFP) to provide professional engineering services for the preparation of a Feasibility Study for the Microfiltration System Replacement at the Torrance Refinery Water Recycling
Treatment Plant (TRWRP).
The TRWRP began operating in 1998 and is located in the City of Torrance on land leased from the Torrance Refinery, which was purchased from the ExxonMobil Oil
Corporation by the Torrance Refinery Company LLC (TORC) in July 2016 and is now owned by PBF Energy. The TRWRP pulls ECLWRF Title 22 water off the recycled water distribution system to produce nitrified water for cooling towers and up to 3.2 mgd of low-pressure boiler feed (LPBF) water for Torrance Refinery. For the LPBF, West
Basin treats Title 22 water through Microfiltration (MF) and Reverse Osmosis (RO) to produce LPBF water for a minimum reliable delivery of 2,200 gpm of RO water. The
MF/RO treatment process starts with 500-micron strainers. The MF membranes at
TRWRP are Memcor 90M10 CMF microfiltration units installed in 1999, a technology that is now owned and supported by DuPont Water Solutions. The Memcor 90M10 CMF units are pressurized microfiltration systems built around polypropylene (PP) modules and consist of six-rack units with an original design capacity each of 604 gpm to produce a total of 3.73 MGD of MF product water. MF effluent is pumped to the RO process followed by decarbonation for distribution as LPBF water. Each RO train originally had a design flow range of 440 – 660 gpm (approximately 8 – 11 gallons per square foot per day. The RO trains are configured in a 20:10:5 array with 6M vessels http://www.westbasin.org/ and operate at 85% permeate recovery. Currently, only three of the four RO trains are operated simultaneously to meet refinery demand, allowing for redundancy.
Originally installed in 1999, the MF equipment has experienced mechanical and equipment material degradation and failures resulting in an inability to meet refinery product water demand. Additionally, the PP membrane with the gas-backwash configuration of the 90M10C CMF system has demonstrated an inability to achieve original flux and production requirements, necessitating the use of potable water to supplement the RO feed supply. In general, the various components of the MF system
(membranes, housing, piping, and supports) are in poor condition due to age and may not be salvageable or could require a significant rehabilitation to restore reliable production of LPBF water. Additionally, the existing MF system is an obsolete, proprietary technology and cannot readily accept PVDF membrane conversion without significant modifications to the system (e.g. PP membrane is not tolerant to exposure to oxidants, so the cleaning system does not currently allow for conventional clean-in place methods such as free-chlorine solutions. The system may not accommodate modern replacement membranes from many of the qualified manufacturers available in the market today. Backwash waste is discharged into the feed of the onsite Biofor treatment system, and waste from this system is discharged to the Torrance Refinery in-plant sewer system. RO concentrate (brine) is discharged to the Torrance Refinery in-plant sewer system, which has limited hydraulic capacity and discharge quality limits.
With this feasibility study, West Basin intends to evaluate various scenarios to be considered as potential solutions for the replacement of the existing MF System.
Furthermore, West Basin is in active discussions with Metropolitan Water District of
Southern California (MWDSC) about potentially conveying advanced treated water to
West Basin's recycled water distribution system for its customers. The consultant shall make considerations of this possible outcome when developing alternatives for the MF system.
1.3. Contact Information
Tikneshea Hicks, Contracts Administrator II
Email: tiknesheah@westbasinca.gov
Phone: (310) 660-6207
17140 Avalon Blvd, Carson, CA 90746
1.4. Timeline
Solicit proposals February 2, 2026
Pre-Proposal Meeting February 17, 2026
Last day for Consultant comments or questions February 19, 2026
Proposals due February 26, 2026
Contract award notification March 9, 2026
2. Scope of Work
2.1. Scope of Work
For a complete description of all required services and deliverables, please see the attached detailed Scope of Services in the Attachments Section, Attachment A.
3. General Proposal Information
A. Respondents are encouraged to carefully review this RFP in its entirety prior to preparation of their Proposals.
B. All Proposals submitted will become the property of West Basin.
C. Respondent may modify or amend its Proposal only if West Basin receives the amendment prior to the deadline stated herein for receiving Proposals.
D. A Proposal may be considered non-responsive if conditional, incomplete, or if it contains alterations of form, additions not called for, or other irregularities that may constitute a material change to the Proposal.
E. Proposal Validity – Proposals must be valid for a period of at least 90 days from the closing date and time of this solicitation. Proposals may not be withdrawn after the submission date.
F. Pre-Contractual Expenses – West Basin shall not, under any circumstance, be liable for any pre-contractual expenses incurred by Respondents in the preparation of their Proposals. Respondents shall not include any such expenses as part of their Proposals. Pre-contractual expenses are defined as expenses incurred by the Respondent in preparing its Proposal in response to this solicitation; submitting that Proposal to West Basin; negotiating with West
Basin any matter related to the Proposal; and, any other expenses incurred by the Respondent prior to the date of award and execution of an Agreement.
G. Right to Audit – Following execution of an agreement and for a period of three years following the completion of the services, West Basin will have the right to audit the successful Respondent’s (Awardee’s) invoices and all supporting documentation generated in performance of services under the agreement
H. Confidentiality – Confidentiality of Proposals is subject to the following:
o West Basin is subject to the Public Records Act, California Government Code
Section 6250 et. seq. As such, all required submittal information is subject to disclosure to the general public.
https://procurement.opengov.com/portal/westbasin/projects/231604/document?section=2198256 o Respondent may provide supplemental information exempt from public disclosure under Gov. Code § 6254, including “trade secrets” under Evidence
Code § 1060. Such supplemental information shall not be material to the required submittal information and West Basin shall be under no obligation to consider such supplemental information in its evaluation.
o If submitting confidential, supplemental information, such information shall be clearly marked "Confidential." Upon completion of its evaluation, West Basin will delete any confidential, supplemental information submitted.
I. West Basin reserves the right to:
o Reject any or all Proposals;
o Select the Proposal most advantageous to West Basin;
o Verify all information submitted in the Proposal;
o Withdraw this solicitation at any time without prior notice and furthermore, makes no representations that any contract will be awarded to any
Respondent responding to this solicitation;
o Award its total requirements to one Respondent or to apportion those requirements among two or more Respondents as West Basin may deem to be in its best interests;
o Negotiate the final contract with any Respondent(s) as necessary to serve the best interests of West Basin;
o Amend this solicitation;
o Amend the final contract to incorporate necessary attachments and exhibits or to reflect negotiations between West Basin and the successful
Respondent.
4. Respondents Questions, Requests for Clarification and Exceptions
In the event that the Respondent has any questions or requests for clarification, the
Respondent should notify West Basin with their concerns no later than the date and time noted in the timeline. Questions and Requests for Clarification must be submitted by this date through the OpenGov Question and Answer Module.
West Basin will respond to questions and requests for clarifications and exceptions via the OpenGov Question and Answer Module.
5. Small and Local Business Enterprise Program
5.1. Small and Local Business Enterprise
The District encourages the utilization of small and local businesses. To promote the participation of Small and Local Business Enterprises in the competitive Solicitation process, the District has established a program that provides incentives to encourage small and local Vendors to participate in District Solicitations
5.2. Definition of Terms - The following definitions shall apply:
A. Local Business Enterprise (LBE) - To be considered as a local business enterprise, a firm must provide evidence, in the form of a business license, that the firm is located at a fixed commercial or residential address where administrative, clerical, professional or other productive work is performed relative to its commercial purpose. The firm must be located either within the
District’s service area or within 25 miles of the District’s Carson headquarters for a minimum of one year. Click HERE to verify your firm's Local status.
B. Small Business Enterprise (SBE) - To be considered as a Small Business
Enterprise and to encourage maximum participation, the District will accept a
Vendor that meets and is certified to the federal U.S. Small Business
Administration (SBA) size standards or the SBE standards set by the California
Department of General Services (DGS). In addition, the District will accept a
Vendor’s self-certification of any local agency within the State of California. All certifications are subject to verification.
5.3. Verification
To qualify as a Small and/or Local Business Enterprise, the Respondent must provide verification of their Business Enterprise status in the Proposal Response Section of this
RFP.
5.4. Evaluation Scoring
All Formal and Informal Proposals for Professional Services will be evaluated on a 100-point scale. A value of three (3) additional points will be added to the evaluation scores of SBE or LBE participants who propose as Prime Consultants on Professional Services
Agreements. If the participant is both a SBE and LBE, the Vendor will be awarded six
(6) points.
If a Prime Consultant includes a SBE or LBE as a Sub(s)in its Proposal, the District will award one (1) point for participation from SBE and/or LBE Sub(s) only if at least 30% of the total compensation paid by the District under the terms of the contract are allocated to and received by the SBE an/or LBE Sub(s).
In the event the proposed Services will be evaluated on a price basis only, the price
Proposals of SBE or LBE will be reduced by 3% (6% if both SBE & LBE) based on the percentage of SBE or LBE participation consistent with the policy described in the https://westbasinmwd.maps.arcgis.com/apps/webappviewer/index.html?id=46934fa1ec32475cbf153df394c16315 paragraph above. If, after this adjustment, the SBE or LBE is determined to be the most competitive price Proposal, the actual Contract amount will be the amount originally proposed.
6. Selection Process
The selection process is based on the proposals submitted. West Basin may, at its discretion, conduct interviews with Respondents.
A selection panel comprised of West Basin staff (and an outside panelist, depending on the engagement) will review the proposals and consider the following factors to select the most qualified Respondent:
• Completeness & Quality of Proposal
• Respondent Qualifications, Capabilities, and Experience
• Professional Qualifications of Key Personnel
• Technical Approach and Methodology
• References
• Compliance with Insurance Requirements
• Willingness to Provide Financial Information
• Cost Proposal
• Acceptance
Based on review of the proposals, a short list of Respondents may be selected to participate in an interview / presentation. Short-listed Respondents must be prepared to give their presentation as soon as five (5) business days following the request by West
Basin. The interview / presentation will afford the Respondent an opportunity to present the key personnel assigned to the engagement and discuss their qualifications. The selection panel may ask questions about the Respondent’s written Proposal and other issues regarding their proposed Scope of Services. Presentations will be evaluated and a successful Respondent will be selected for recommendation of contract award. The selection panel will recommend the firm that provides the best overall value to West
Basin. Contract award is subject to the approval of West Basin’s Board of Directors.
By submitting responses to this solicitation, respondents understand and agree that
West Basin may award a contract to a firm whose approach exceeds or varies from the requirements listed. West Basin will be the sole judge of which proposal best satisfies the needs of West Basin.
Negotiations regarding agreement terms, conditions, scope of services, and pricing may or may not be conducted with the selected Respondent. Therefore, Proposals submitted should represent the Respondent’s most favorable terms and offering, since the selection and award may be made without discussion with any Respondent. If West
Basin engages the Respondent in negotiations and satisfactory agreement provisions cannot be reached, then negotiations may be terminated. West Basin may elect to contact another firm submitting a Proposal. This sequence may continue until an agreement is reached.
7. Evaluation Criteria
7.1. Technical Criteria
No. Evaluation Criteria Scoring Method Weight (Points)
1. Completeness & Quality of Proposal N/A N/A
2. Respondent Qualifications, Capabilities, and Experience N/A N/A
3. Professional Qualifications of Key
Personnel N/A N/A
4. Technical Approach and Methodology N/A N/A
5. References N/A N/A
6. Cost Proposal N/A N/A
7. Small Business Enterprise Incentive
Points N/A N/A
8. Local business Enterprise Incentive
Points N/A N/A
9. Small and Local Subs Incentive Points N/A N/A
7.2. Interview Criteria
No. Evaluation Criteria Scoring Method Weight (Points)
8. Sample Agreement and Insurance Requirements
A Sample Agreement has been attached for your review. This agreement is representative of the agreement that will be executed upon award to the successful Respondent. Submission of your proposal in response to this solicitation constitutes your acceptance of all terms and conditions set forth in this sample agreement, provided that a proposer may state exceptions to terms and conditions with its proposal, and provided further that exceptions to terms and conditions not included with a proposal shall, at the District’s option, be deemed waived.
The successful Respondent shall procure and maintain, for the duration of the agreement insurance against claims for injuries to persons or damages to property arising from or in connection with the performance of the work performed. The successful Respondent shall provide the following coverage:
Commercial General Liability $2,000,000
Business Automobile Liability $2,000,000
Workers’ Compensation $1,000,000
Professional Liability $2,000,000
Prior to the start of work, the successful Respondent shall provide evidence of insurance from an insurer(s) certifying to the coverage, including an endorsement naming West Basin as an additional insured. For a complete description of the insurance requirements, please see Section 14 of the
Sample Agreement.
9. Proposal Response Instructions
Proposal Instructions
A. Submittal
1. Respondent shall submit their proposal ONLINE through the e-procurement system.
2. Proposals are BEFORE by 2:00 pm, Thursday, February 26, 2026. The E-
Procurement System will block submittal attempts after the deadline. To be clear – 2:00 PM IS LATE. THERE ARE NO EXCEPTIONS.
B. Response Requirements
1. The information requested below will be used to evaluate the Respondent’s
Proposal. Respondents may be deemed non-responsive if they do not respond to all Sections, A through J (below).
2. Proposals must be prepared simply and economically, providing a straightforward, concise description of methodology and approach to satisfy the requirements of this solicitation. Emphasis should be on completeness and clarity of content with sufficient detail to allow for accurate evaluation and comparative analysis.
3. Respondent’s Proposal shall be clear, concise, accurate, and comprehensive. Excessive or irrelevant materials will not be favorably received.
4. The Proposals shall be organized an uploaded to the OpenGov Proposal
Response Section in the order presented below:
a. Executive Summary Letter
b. Qualifications, Capabilities, and Experience
c. Key Personnel
d. Technical Approach and Methodology
e. References
f. Price Proposal
g. Compliance with Insurance Requirements Confirmation
h. Minimum Requirements Compliance Confirmation
i. Willingness to Provide Financial Information Confirmation
j. Acceptance Confirmation
10. Proposal Response
10.1. Proposal Response*
A. Executive Summary Letter
This letter shall be a brief formal letter from Respondent that provides information regarding the firm and its ability to perform the requirements of this solicitation. This letter must include the following information: complete legal company name (as it should appear in a contract), address, contact person, telephone number, and e-mail address. This letter shall identify all materials and enclosures being forwarded in response to this solicitation. The letter must be signed by an individual authorized to bind the proposing entity or by the two corporate officers authorized to bind the proposing entity as set forth in the
California Corporations Code. A proposal submission with an unsigned
Executive Summary Letter may result in the proposal being considered non-responsive.
B. Qualifications, Capabilities, and Experience
Respondent shall provide a brief discussion of its qualifications and capabilities to perform work similar in nature to the services requested herein. Respondent shall provide a brief discussion of its previous experience with engagements that are the same or similar in nature to the services requested herein.
C. Key Personnel
Respondent shall provide the names, resumes, and a statement of qualifications of key personnel who are expected to be assigned to this project and shall identify their specific responsibilities.
In addition, Respondent shall submit a complete list of all subconsultants they intend to utilize in the provision of services requested in this solicitation. Prevailing wages shall be paid to any subconsultant who provides labor on the project for which a prevailing wage classification has been established by the State of California Department of Industrial Relations. The
District reserves the right to request copies of certified payrolls and any other documentation necessary to verify the payment of prevailing wages and fringe benefits from subconsultants of any tier in accordance with the California Labor
Code.
D. Technical Approach and Methodology
Respondent shall provide a discussion of ways to maximize benefits or services to West Basin as well as discuss objectives, recommendations and solutions. Respondent shall provide a project schedule and timeline by task illustrating key deliverables. Respondent is encouraged to identify and recommend any improvements/enhancements for the proposed service, as well as highlight any other issues Respondent deems appropriate.
E. References
Respondent’ shall provide a minimum of three (3) references from different clients for engagements performed in the last five (5) years where the services provided were the same or similar nature to the services requested herein. Respondent’s Reference Information should include:
a. Client’s name, contact person, contact person’s responsibility and relationship to the project, address, and telephone number.
b. A description of the type and extent of the services provided by
Respondent to the client.
c. Names of key personnel on Respondent’s team that participated in named projects and their specific responsibilities.
*Response required
10.2. Price Proposal*
Respondent shall submit a Price Proposal for the services requested in this solicitation.
The Price Proposal shall be delineated by Task as identified in the Scope of Work. West
Basin may accept and incorporate the submitted Price Proposal as part of the award/agreement process without further negotiation or, alternatively, may use it as the basis for negotiations. Consequently, Respondents are encouraged to provide their best pricing terms.
*Response required
10.3. Proposal Validity*
By clicking YES below, the Respondent agrees to the minimum proposal validity.
Responses to this RFP shall be valid for a minimum of 90 days. Submissions not valid for at least 90 daysdays will be considered non-responsive.
☐ Yes
☐ No
*Response required
10.4. Compliance with Insurance Requirements*
Insurance requirements are listed in the in the Sample Agreement. The District will request the actual Accord insurance form and associated documentation when recommendation for award is made.
By clicking YES below, the Respondent confirms their ability to provide the required insurance coverage and Accord insurance form.
☐ Yes
☐ No
*Response required
10.5. Minimum Requirement(s) Compliance*
In addition to demonstrating that it meets the minimum requirements, Respondent shall affirm that it meets the minimum requirement by confirming below to agree to the following statement:
“I certify that I meet the minimum requirements of this solicitation.”
Respondent’s Proposal may be deemed non-responsive if these minimum requirement(s) are not met. The minimum requirements are defined in the Scope of
Services.
☐ Yes
☐ No
*Response required
10.6. Willingness to Provide Financial Statement *
If selected, Respondent may be requested to submit a complete financial statement for the two most recent years, prepared in accordance with generally accepted accounting principles. The financial statement must include a balance sheet and income statement.
By clicking Yes below, Respondent indicates that they are prepared to substantiate all information provided. Respondent must indicate herein Respondent’s willingness to provide this information.
☐ Yes
☐ No
*Response required
10.7. Small Business Enterprise Verification
Small Business Enterprise (SBE): To be considered as a Small Business Enterprise and to encourage maximum participation, the District will accept a Vendor that meets and is certified to the Federal U.S. Small Business Administration (SBA) size standards, or the SBE standards set by the California Department of General
Services (DGS). In addition, the District will accept a Vendor’s self-certification of any local agency within the State of California. All certifications are subject to verification.
To qualify as a Small Business Enterprise the Respondent must attach current copy of the firm's Small certification.
10.8. Local Business Enterprise Verification
Local Business Enterprise (LBE): To be considered as a Local Business Enterprise, a Vendor must provide evidence, in the form of a business license, that the Vendor is located at a fixed commercial or residential address where administrative, clerical, professional or other productive work is performed relative to its commercial purpose. The Vendor must be located either within the District’s service area or, within
25 miles of the District’s Carson headquarters for a minimum of one year.
Please click HERE to determine if your firm is considered Local.
https://certify.sba.gov/ https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise https://westbasinmwd.maps.arcgis.com/apps/webappviewer/index.html?id=46934fa1ec32475cbf153df394c16315
To qualify as a Local Business Enterprise the Respondent must attach current copy of the firm's business license.
10.9. Sub(s) Small and Local Business Enterprise Verification If a Prime Consultant includes a SBE and/or LBE as a Sub(s) in its Proposal, the District will award one (1) point for participation from SBE and/or LBE Sub(s) only if at least
30% of the total compensation paid by the District under the terms of the contract are allocated to and received by the SBE and/or LBE Sub(s).
The Prime must include the Sub(s) services and compensation in its Price
Proposal.
Please attach the Sub(s) Small and/or Local Verification
10.10. Acceptance*
By clicking Yes below, I, on behalf of the Respondent submitting this Proposal, quotation, or bid acknowledge that I have read and understand the subject solicitation and all its attachments. I further acknowledge that, by submission of a proposal, quotation, or bid in response to the subject solicitation, the Respondent accepts all the terms and conditions set forth in the subject solicitation and its attachments, including, but not limited to, the Sample Agreement or the Purchase Order Standard Terms and
Conditions, except as specifically identified in an exception submitted concurrently therewith.
☐ Yes
☐ No
*Response required
10.11. How did you first hear about this project?*
☐ Direct email / notification from OpenGov
☐ West Basin's Website
☐ West Basin Procurement Newsletter
☐ Industry Outreach Event
☐ West Basin's Virtual Outreach Webinar
☐ Construction Bid Platform (Ebidboard, Dodge Data, ConstructConnect, etc.)
☐ Social Media
☐ Other
*Response required
10.12. Attach your company W-9
10.13. For New Vendor Only: Attach New Vendor Form
The New Vendor Form is located in the Attachments section, Attachment D.
File details come from the government source that posted it. Updated .