SECTION C: STATEMENT OF WORK

SECTION C: STATEMENT OF WORK

ARCHITECT-ENGINEER SERVICES IN SUPPORT OF

U.S. ARMY CORPS OF ENGINEERS, NORTHWESTERN DIVISION, PORTLAND DISTRICT

PORTLAND, OREGON

TOPOGRAPHY AND REAL PROPERTY BOUNDRY SURVEYING

C-1. GENERAL. The Contractor, as an independent Contractor and not as an agent of the Government, shall provide all labor, management, facilities, supplies, equipment, and materials (other than those to be furnished by the Government as set forth in this Contract or supporting Task Orders), as necessary to accomplish the required services. The Architect & Engineering firm (henceforth known as the A&E) shall plan, schedule, coordinate, and ensure the full, effective, efficient, and economical performance of all services ordered under this contract. The A&E shall provide adequate professional supervision and quality control to ensure the accuracy, quality, completeness, and timely progress of the work.

C-2. LOCATION OF SERVICES. The Contractor may be required to render services at the office(s) of the various Contractor team members, on-site at the offices of various U.S. Army Corps of Engineers (USACE) activities, or on-site at various project sites or installations. The location of work performed hereunder shall be stated in the individual Task Orders. The Government expects the bulk of the Task Orders to be issued by USACE, Northwestern Division, Portland District (CENWP). This contract will be available for use primarily by other USACE Districts within the Corps’ Northwestern Division.

C-3. CONTRACT EFFECTIVE PERIOD(S). The ordering period for this contract will be for five (5) years from the date of award.

C-4. TYPICAL SERVICES. This is primarily a land survey Single Award Task Order Contract (SATOC). Services required in this contract fall generally into the following broad categories:

C-4.1 Engineering Surveys involved in the planning and execution of surveys for the development, design, construction, operation and maintenance of civil and other engineered projects includes all surveying activities required to support the conception, planning, design, construction, maintenance, and operation of engineered projects. Typical projects include topographic mapping for design or construction, deformation monitoring (structural health) surveys, and geodetic control surveys.

C-4.2 Surveying of Real Property involved with the establishment of land boundaries, rights of way, and easements. These surveys typically resulting in a Records of Survey and Written Legal Descriptions. Real property surveys require a professional land surveyor licensed in the state which the work is located to file a Plat with the county Government in which the work is located. Typical projects include USACE boundary retracements, establishment of new boundaries or easements, the preparing legal descriptions for the surveys and documentation of boundary line encroachments. Also included in real property surveys, is the delineation of leases, permits and licenses and their accompanying legal descriptions.

Specialized surveying techniques are occasionally required to provide topographic or real property information most efficiently and economically. Some but not all of these techniques are listed below:

C-4.3 Aerial Surveys (Photogrammetry, Lidar, and/or Other Sensors mounted in a flying vehicle –either manned or unmanned).

C-4.5 Hydrography/ Hydraulic Survey/ Hydrographic Surveys (surveying and charting land under bodies of water, including seas, lakes, ponds and rivers using either a manned or unmanned vessel). Includes river, creek and valley sections for hydrological studies.

C-4.6 Terrestrial Laser Scanning (a ground-based, mapping method similar to LIDAR that rapidly acquires accurate, dense 3D point clouds of object surfaces by laser range finding), C-4.7 Mobile Mapping (the process of collecting geospatial data from a from either a manned or unmanned vehicle/vessel using photogrammetry or Laser /Scanning techniques), C-4.8 Subsurface Utility Engineering Surveys (geophysical surveys that determine the location of underground utilities to help aid in site design).

C-4.9 Miscellaneous Surveys Surveys not specifically mentioned above which use the same type of measuring equipment. Examples could include but not be limited to the following surveys: American Land Title Association (ALTA) Surveys, Resource/Geographic Information System (GIS) data surveys, Federal Emergency Management Agency (FEMA) Flood Surveys, or National Geodetic Survey (NGS) user submitted project surveys (Blue Book) or OPUS shared surveys.

C-5. PERFORMANCE OF SERVICES. The A&E shall render services under this Contract on such days, continuous or intermittent, as are required by the needs of the Government and ordered by the Procurement Contracting Officer during the Contract period.

C-6. APPLICABLE LAWS, REGULATIONS, AND STANDARDS. The Contractor shall perform all work in accordance with current Federal and State Laws, regulations and standards regarding personal safety, training, report requirements, and site investigation procedures. In particular, services under this contract shall comply with the most recent edition of the following USACE Engineering Manuals:

Pub Number
Title
Pub Date
EM 1110-1-1002
Survey Markers and Monumentations
3/1/2012
EM 1110-1-1000
Photogrammetric and LiDAR Mapping
4/30/2015
EM 1110-1-1002
Survey Markers and Monumentations
3/1/2012
EM 1110-1-1003
Navstar Global Positioning System Surveying
2/28/2011
EM 1110-1-1005
Control and Topographic Surveying
1/1/2007
EM 1110-1-1802
Geophysical Exploration for Engineering and Environmental Investigations
8/31/1995
EM 1110-2-1003
Hydrographic Surveying
11/30/2013
EM 1110-2-1009
Structural Deformation Surveying
2/28/2018
EM 1110-2-2907
Remote Sensing
10/1/2003
EM 1110-2-6056
Standards and Procedures for Referencing Project Evaluation Grades to Nationwide Vertical Datum's
12/31/2010
EM 405-1-03
Real State Geospatial Data and Mapping
9/30/2016

Guidance for Services under this contract may be supplemented by non-USACE specification. Individual task orders will specify additional documents when required.

C-7. GENERAL REQUIREMENTS.

C-7.1 Narrative The contractor shall provide a Survey Narrative. The report shall be incorporated into the drawing/graphics of the completed survey and shall include the following items:

a. Project name, location and date of the Survey

b. Horizontal Datum and Epoch

c. Vertical Datum - See EM 1110-2-6056.

d. Active/Passive Control used to connect to the National Spatial Reference System (NSRS) including coordinates and elevations of the Control.

e. Local/Boundary Marks used

f. Boundary lines used

g. References

h. Description of the work, Methodology, Instrumentation

i. Local and NSPS coordinate accuracy estimates,

j. Date of Survey

If no graphics are provided, this information shall be provided in a separate document.

C-7.2 Field Survey Report. A standardized report format should be used for all major survey projects. A project report submitted in a consistent format provides essential background information to the design engineer. The following outline found in EM 1110-1-1005 listed above may be used for guidance in preparing the report.

a. Section 1: General Project Description. Overview of the project including location, purpose, and parties involved.

b. Section 2: Background. Reason for project (more detailed description) and more specific location description including a map. Accuracy and deliverables should be discussed in this section. Attach or include a copy of the original statement of work prepared by the originator. Add funding information if applicable.

c. Section 3: Project Planning. How the project was planned including: reconnaissance results; control establishment; data, DGPS method(s) selected; topographic survey techniques; feature and attribute standards selected.

d. Section 4: Data Collection. Overview of how data was collected including: Equipment used (make and model); data collection method(s) selected; topographic survey techniques; feature and attribute standards selected.

e. Section 5: Primary control Data Processing. How the control data processing was performed including processes followed.

(1) Subsection 5-1: Total station traversing – adjustment software, results, closures, final adjustment results and coordinate listings.

f. Subsection 5-2: GPS Control surveys and baseline processing – software used; baseline processing results (summary); reprocessed baselines and reason for; parameters for baseline processing (elevation marks, type of ephemeris used); summary results for loop closures (if applicable).

g. Subsection 5-3: Combined GPS, Total Station, Differential Leveling Network adjustments – software used; results of unconstrained adjustment, minimal constrained adjustment, and fully constrained adjustment; summary of weights used, general statistics.

h. Section 6: Project Summary and Conclusion. This section shall include overall results of the processing, products produced, listing of deliverables being submitted, list of metadata files submitted, overall accuracy of the data collection (based on results from data processing section), problems encountered during data collection and data processing, recommendations for future data collection efforts for this type of in this area (lessons learned).

i. Section 7: Output and Reports from Software. This section shall include the detailed reports and output from software packages used during the data processing. This section might have multiple subsections – e.g., one for each step in the processing that has output that is critical in evaluating results.

Note: This report shall be submitted in a digital format.

C-7.3 Metadata any data, database(s) and/or geospatial data produced through this contract must be documented through the preparation of standard metadata (data about data) descriptions. fully compliant with the current Federal Geographic Data Committee (FGDC) Metadata Standards. The current Federal standard at the time of this writing is found in ISO Standard, 19115:2003 NAP Geographic Information - Metadata. A free copy of this standard is available at:

https://www.fgdc.gov/standards/projects/incits-l1-standards-projects/NAP-Metadata/napMetadataProfileV11_7-26-07.pdf/view

C-7.4 Raw Data submission: Raw data maybe requested for any of the surveys. Electronic data submissions are preferred. Electronic raw data collector data should be supplemented with Field notes, entered in a waterproof notebook or waterproof form, detailing set up information, site sketches, etc. Field notes shall be neat, complete, numbered, indexed, and accurate; every page shall be appropriately identified. Only original Field notes will be accepted. The Electronic Raw data and Field notes when combined should allow for the reconstruction of the Survey. See EM 1110-1-1005 for guidance on handwritten field notes. Adobe PDF copies of the Field Notes maybe requested in Lieu of actual field books/forms Digital Raw data shall be provided a format compatible with Trimble Business Center Version 5.30 unless the Task Order specifies otherwise.

C-7.5 Horizontal Datum: Engineering site plan drawings are normally referenced to a local state plane coordinate system (SPCS), in rare cases Engineering Surveys may be referenced to an arbitrary coordinate system relative to some point on the project – a monument, corner, road intersection, etc. While Real Estate Records of Survey are often on a local coordinates system as previously described, for this contract to the greatest extent possible use SPCS coordinates for Real Estate surveys. Most project control will consist of SPCS coordinates in an appropriate National Spatial Reference System (NSRS) as defined by the National Geodetic Survey. Individual Task Orders and will indicate when a superseded NSRS or local coordinate system should be used. If the Task Order lacks specific guidance use the current NGS datum. Where applicable provide the Datum, Datum Realization and epoch information (i.e. NAD 83 (2011) epoch 2010.00) for the coordinates used

C-7.6 Vertical Datum: A vertical reference system is a geopotential surface that define elevations and depths. EM 1110-2-6056 listed above requires that all project elevations be referenced to the current NGS nationwide NSRS vertical reference system. The elevation system used for the survey may be the current NSRS, A superseded NSRS system, a site specific project datum, a Tidal System, an Adopted Low Water System (Columbia River Datum) or an arbitrary local system. A datum equation to convert the elevation to Current NSRS system must be provided regardless of the elevation system used. All projects that required elevations shall have at least one NGS control point with a NSRS elevation. Provide the NGS’ point identification (PID) and NGS listed elevation of this primary control point.

C-7.7 Accuracy Primary control will consist of established USACE or National Geodetic Survey (NGS) monuments with published 2nd Order, Class II or better accuracies unless otherwise authorized. Verify by re-observation all USACE Primary Control points and all NGS Second Order Class II points used. Consider verifying coordinate position by re-observing all Primary Control points, minimum accuracy for any required secondary site control supporting the collection of three-dimensional data is Third Order, Class I or better accuracies unless otherwise authorized. Link all secondary control to at least one Primary Control point.

C-7.8 Monumentation Use marks that are set in the most stable and permanent material available (Bedrock, if possible). The monument shall not be set in areas subject vertical motion or to erosion by wind and waves. Consider locations that reduce susceptibility to motion. To guard against frost, heave the monument shall extend at least 1.0 feet below the frost line. The face of the benchmark shall be set horizontally for convenience in plumbing the rod. To the greatest extent possible consider using existing National Geodetic Survey or USACE marks. A witness post will be either present or set in a prudent location which will serve as a reference to the control monument. The goal is to Leave behind accurate and stable control points that will support both this survey and future activities. EM 1110-1-1002 listed above provides details for the placing of survey marks. The COR will provide monument naming information for new and reset marks. For permanent Monuments (monuments meant to last two or more years) create a USACE Survey Monument Archival & Retrieval Tool (U-SMART) data submission sheet. See the following for a link to U-SMART: http://usmart.usace.army.mil Guidance for preparing U-Smart data sheets can be found in USACE Engineering Regulation ER 1110-1-8170.

Temporary markers (duration of less than two years) shall be documented on the supporting drawings and project reports.

C-8. REAL PROPERTY SURVEYS. The goal of each Real Property Boundary Survey is to provide a visible and legally correct boundary that protects both the property rights of the Government and adjoining landowners. Real Property boundary lines shall be established and/or retraced in accordance with appropriate state boundary laws. The placement of the lines shall be governed by the set of facts and evidence found in the course of the survey. Monuments set or held as marking the corners shall be the result of a well-reasoned analysis by the PLS. The graphics/drawings developed for these surveys, usually called a Record of Survey (ROS), shall conform to the specifications of the county government where the project is located. A Professional Land Surveyor (PLS or RLS - registered in the state where the project is located shall file the Record of Survey with the appropriate County Surveyor/ Auditor.

C-8.1 Record of Survey Requirements. In addition to the requirements of State Law and the County Survey office, all Record of Survey shall have the following:

a. Show boundary lines giving length and bearing (As measured and per Record) on each straight line. Show Radius. Length of Curve, and Long Cord Bearing and Distance (As measured and per Record) for curved lines.

b. Surveys of parcels with water boundaries shall describe the feature located including, top of bank, edge of water, mean high water line, ordinary high-water line and the method used to locate the water boundary. Water boundaries may be located in their approximate position as long as this is adequately depicted and explained with notes on the face of the plat or map.

c. Furnish a legal description as specified below that conforms to the record title boundary.

d. Reconcile any discrepancies between the survey and the record legal description.

e. Give the area of the parcel.

f. Identify the Name and widths of Right-of-Way of adjoining streets, Rail Roads, canals and etc.

g. Show encroachments.

h. Describe fences and walls and locate them with respect to the property lines.

i. Show Easements both Of Record and Apparent.

j. Show Lot, Block, Section and Township Names and lines.

k. Provide National Spatial Reference System (NSRS) Control points and coordinates used and Control Scheme through which the coordinates were determined.

l. Show Found and Set Monuments and their relationship to established monuments, provide Monument attributes describing Monument Kind, Monument size and other data relating to the monument.

m. Provide a Tie to a monumented Public Land Survey System Section Corner, Quarter Section Corner, Sixteenth Corner, Donation Land Claim Corner or monumented lot corner of record.

n. Provide the Horizontal Datum used, Basis of Bearing, and Scale Factor

o. The following data products shall be provided with a real Property Boundary Surveys:

p. The PLS shall provide duplicate Records of Survey to the Government in both hard copy and electronic format.

q. U-SMART data sheets for all boundary Points found or Set, Place the following statement in the Description/Comment field for Boundary Marks, “This monument is used to mark real property.”

C-8.2 Legal Descriptions. should be accurate and concise, containing enough information to permit a surveyor to definitely locate the tract on the ground and to establish, or reestablish, its boundary lines and corners. Provide Area (Acreage) of the boundary. All Legal Descriptions shall have an accompany sketch to allow for accuracy checking. EM 405-1-03 listed above provides guidance on preparing legal descriptions. The following data products shall be provided with a legal description:

a. Text of description in Adobe Acrobat Version DC Compatible format

b. Sketch of the boundary in Adobe Acrobat Version DC Compatible format. The sketch that accompanies a property description shall show all information referenced in the description and shall state that such sketch is not a survey. The initial point in the description shall be tied to either a government corner, a recorded corner, or some other well-established survey point.

C-8.3 CAD Files, Deliverable Formats. All mapping products developed under this contract shall be delivered in one or more of the following data formats:

a. Bentley Microstation Version v8i (Select Series 4) compatible CAD files.

b. Autodesk AutoCAD Version 2017 compatible CAD files.

c. ArcGIS Version 10.X (or as specified in the task order) compatible File-based geodatabases unless otherwise specified in the individual task order performance work statement(s).

C-8.4 CAD Files. All CAD products shall conform to the requirements of the USACE CAD Standards and CENWP requirements as noted http://www.nwp.usace.army.mil/About/Standards.aspx.

C-8.5 GIS Files. Each mapped area shall be delivered as a file-based geodatabase compatible with the task order specified version of ArcGIS. The geodatabase shall contain the following two feature datasets:

a. Planimetric Features. The planimetric features feature dataset shall contain all collected features that do not contribute to the DTM. Each discrete feature type (buildings, guard rails, utilities, etc.) shall populate a separate feature class within the feature dataset. Three-dimensional feature classes and additional attributes shall be used when appropriate.

b. Topographic Features. The topographic features feature dataset shall contain individual feature classes for breaklines, mass points, spot elevations, contours, and obscure areas.

c. Breaklines. The breakline feature class shall contain only PolylineZ features that do not cross or meet. An additional breakline type attribute field shall be included to classify breaklines as regular or interpolated.

d. Mass Points. The mass points feature class shall contain only PointZ features.

e. Spot Elevations. The spot elevations feature class shall contain only PointZ features with an additional attribute field populated with their elevation value.

f. Contours. The contours feature class shall contain Polyline features with an additional attribute field populated with their elevation value. An additional contour type attribute field shall be included to classify contours as regular or interpolated. Contour interval will be specified in the task order performance work statement.

g. Obscure Areas. The obscure areas feature class shall contain polygons showing areas where there is doubt that the DMT data shall meet the accuracy class of the mapping due to dense vegetation, shadows, etc.

In addition to the planimetric and topographic features, the geodatabase shall include a terrain surface of the project area, ortho-rectified imagery (if specified), and any other derivatives specified in the task order. Feature dataset level metadata shall be imbedded in all deliverables.

C-8.6. SURVEY DATA INTEGRATION. Many task orders under this contract will require topographic and/or bathymetric data collected from multiple platforms or by multiple methods to be combined into a single topographic dataset or database. These tasks may require any combination of concurrently collected hydrologic and topographic data or integration of newly collected data and existing data. Accordingly, Contractor shall be with the geographic extent, accuracies, and limitations of all existing topographic datasets within the geographic area of this contract.

C-8.7 Concurrent Collection. To support numerical hydraulic modeling, a single terrain dataset is often required that represents above water and below water portions of the survey area. Varying resolutions and accuracies may be required for different locations within the survey area. Any combination of Light Detection and Ranging (LiDAR), photogrammetric or bathymetric data collection may be required to achieve the desired final product economically, efficiently, and accurately. When multiple survey approaches or platforms are employed, data shall be collected referenced to a common horizontal coordinate system and vertical datum as specified in the task order statement of work. Adjacent areas of different survey type shall be collected with sufficient data overlap to achieve a seamless transition.

C-8.8 Integration of Existing Datasets. It may be economical in some cases to utilize previously collected topographic data to supplement or expand on data collected under this contract. The Contractor shall be aware (to a reasonable degree) of publicly available data sets and current data collection efforts within the geographic region of this contract. Integration of new and existing data may require geographic transformation and/or vertical datum conversion. Methods for transformation and vertical datum conversion must be sufficient to meet the accuracy requirements in the task order statement of work, fully documented, and approved by the CO.

C-8.9 Deliverables. The final deliverable format for integrated datasets will be specified in the task order statement of work. Deliverable formats will include but not be limited to CAD files or Geodatabases as specified above with additional levels or feature classes to accommodate hydrographic or other data types or ESRI ArcGIS 10.X compatible TIN’s, Rasters, or Terrains.

C-8.10 COMPUTER VIRUS CHECKING. Prior to submitting an electronic file or electronic media to the Government, the Contractor shall check it for viruses utilizing an anti-virus software package. The product utilized shall be current. The Contractor shall maintain a subscription or utilize a software product vendor who provides updates at least quarterly.

C-8.11 CONTRACT DELIVERABLES. Each task order issued under this contract shall specify products to be delivered. The Contractor shall reference individual task orders for applicable submittal schedules.

C-8.12 EQUIPMENT AND SUPPLIES. The supplies to be furnished to and/or provided by the Contractor shall be detailed in the scopes of work provided for individual task orders, as applicable.

C-9. ENGINEERING SURVEYS. Must conform to the appropriate USACE Engineering Manuals, other National Specifications, and/ or Industry Standards. The Professional Land Surveyor (PLS or RLS - registered in the state that the work is being performed) shall certify that the field survey notes and computations are complete, correct and that they meet or exceed the specified project accuracy requirements Create a map of the project that is accurate and detailed enough to support design, construction, operation or maintenance of the project

C-9.1 CONTROL SURVEYS. Control survey work consist of determining National Spatial Reference (NSRS) Coordinate Values (Latitude, Longitude, Ellipsoid Height, and Orthometric Elevation) of the marks that form the backbone of all subsequent surveys. The goal of Control Surveys is to obtain NSRS values that are Accurate (Close to the True Value), Precise (repeatable) and as economically as possible. It is understood that no measurement is without error (Inaccuracy), control survey’s aim to minimize these errors by providing redundant measurements that catch mistakes and allow for a measurement adjustment. Typical instrumentation includes Global Navigation Satellite Systems (GNSS), Total stations and Digital bar-code levels. EM 1110-1-1005 and EM 1110-1-1003 listed above details the requirements of Control Surveys. This guidance maybe supplemented by National Geodetic Survey publications.

The following additional products may be required with a Control Survey project:

Control Map filed with the County Surveyor/Auditor showing the Control Scheme through which the coordinates were determined. See appropriate State Laws for details:

a. Vicinity Sketches.

b. Photographs, (Close up, Eye Level, Horizontal).

c. U-SMART submission Data sheets.

d. Coordinate Files (Pt, N, E, El, Description).

e. Adjustment Reports (Lease Squares, Traverse, and/or Level).

f. NGS Blue Book or OPUS shared data submission.

C-9.2 Topographic Surveys. Topographic surveys are intended to show the earth’s contours and/or the position of fixed objects thereon. The information collected is often used to develop highly detailed Engineering drawings. The collection of survey measurements for the production of Topographic Maps using Total Stations, GNSS, Leveling instruments and/or Terrestrial Laser Scanning are detailed in EM 1110-1-1005 listed above.

Topographic mapping the result of the surveys shall have the following item include in the drawings:

a. All Topographic maps shall include a North Arrow, Scale Bar/Scale Text, and State Plane Grid Ticks.

b. Provide Break lines at a density and accuracy appropriate to the final map scale and contour interval as specified in the task order’s statement of work Individual break line features shall be continuous features and by definition shall not cross another break line feature.

c. Provide Mass Point / Spot Elevations in sufficient number and distribution that when combined with the break lines contours can be interpolated.

d. Planimetric Features: Provide Structural features include bridges; trestles; tunnels; piers; retaining walls; dams; power plants; transformer and other substations; transportation terminals and airfields; oil, water, and other storage tanks; and similar detail as appropriate for the scale of the final mapping. Additionally, provide other land use features including curbs, sidewalks, parking stripes, driveways, hydrants, man-holes, lampposts, and similar features for mapping scales of 50 feet to the inch or larger.

e. Provide contours at the interval specified in the Task Order.

The following additional products may be required with a Topographic mapping project:

a. Digital Mapping (CADD or GIS or PDF).

b. Triangulated Irregular Network (TIN) including break lines and mass points.

c. LandXML Surface Model.

d. Coordinates Files of Surveyed points (Pt, N, E, El, Description).

e. Attributes of topographic features (Example Tree Height, Trunk diameter, and Drip line radius).

f. Cross Section Data in “EM” format See EM 1110-1-1005 above for details.

C-9.3 Deformation Monitoring Surveys. Surveys at District structures meant to detect excessive settlement and deflection of the structures. The results of these surveys are incorporated into periodic inspection reports published by the District. Each Structure has a detailed list of instructions which must be followed to the greatest extent possible in order to mimic historic survey of the structure thus insuring repeatable results. Data is collected using High Order Total Station, Dual frequency GNSS and/or Digital Bar-Code levels. Data reduction for these surveys is usually done by USACE personnel. EM 1110-2-1009 listed above details the requirements of Deformation Surveys.

The following additional products may be required from Deformation Surveys:

a. Raw Measurements from GNSS, Total Station and/or Digital Level.

b. Calibration data for instruments used.

c. Photographs of monitoring control points.

d. Project inspection report that details control and monitoring point condition, line of sight problems, and etc.

C-10 SECONDARY SURVEYING SERVICES

C-10.1 Aerial Surveys. With Aerial Surveys it is possible to carry out topographic surveys of the same quality as the surveys using ground collected methods, but in a fraction of the time. This substantially reduces the cost of a site survey and the workload of specialists in the field. EM 1110-1-1000 listed above details the requirements of Aerial Surveys.

Photo Control surveys support Aerial Mappings by placing photo targets and establishing the three-dimensional positions of the target. Unless otherwise indicated, photo control points or paneled points may use temporary marks as defined in EM 1110-1-1002 listed above.

In addition to topographic mapping, the following Aerial Survey data products maybe requested:

a. Digital Ortho-photos.

b. Aerial photo processing.

c. Generation and/or scanning of vector drawings from photos and raster files.

d. Geographic Information Services (GIS) including digital file translations to alternate formats.

e. Classified Point Clouds, Bare Earth models.

C-10.2 Hydrography/Hydraulic Survey/Hydrographic Survey. These surveys involve collection of three-dimensional data for obtaining transects and topographic data of lakes, stream and ponds. Hydraulic survey tasks may require any combination of shallow draft hydrographic survey and conventional land survey techniques. When water is shallow and can be waded, traditional topographic survey methods are used. (Consider using an attached bottom plate as necessary to prevent the rod from penetrating silt and mud.) When water is deeper or too swift for wading, various hydrographic survey methods described in EM1110-2-1003 listed above may be used. These may include unmanned vessels, small manned workboats with sounding poles or lead lines, or specialized hydrographic survey vessels with echo sounders, either single (vertical-beam) or multi-beam transducers. When multiple survey approaches or platforms are employed, the data collected shall be referenced to a common horizontal coordinate system and vertical datum as specified in the task order’s statement of work. Adjacent areas of different survey type shall be collected with sufficient data overlap to achieve a seamless transition.

In addition to topographic mapping, the following Hydro Survey data products maybe requested:

a. Coordinate point file (x, y, z).

b. Calibration data (Bar Check etc.).

c. River/Stage gages used.

d. Location of Aids to Navigation.

e. Cross Section/Transect Surveys for hydrological studies and projects EM format may be requested.

f. Four digital photographs shall be taken at each cross-section/Transect location.

g. Shoreline data.

C-10.3 Terrestrial Laser Scanning. Is often used as a dense and rapid form of Topographic Surveying. Other uses involve 3-D documentation and/or modeling of buildings and structures. These instruments are especially suited to collect hard to access sites. EM 1110-1-1005 provides USACE guidance on this type of survey, the contractor should supplement this guidance with Industry standards. In addition to topographic mapping, the following Terrestrial Laser Scanning data products maybe requested:

a. Classified Point Cloud in industry standard format.

b. Surveys of Interior spaces which are to be incorporated into either a Project As Built or a Building Information Model (BIM).

C-10.4 Mobile Mapping. Mobile Mapping systems often combine Terrestrial Laser Scanning, and/or Terrestrial Photogrammetry with GNSS and Inertial Measurement Units to produce Topographic Maps of large area very rapidly. Currently USACE does not have an EM that covers this type of survey. EM 1110-1-1000, Third Party and Industry standards most likely will provide guidance until USACE incorporates guidance for these surveys into an EM. Dam Crest and Jetty mapping are possible application for this type of survey.

In addition to topographic mapping, the following mobile mapping data products maybe requested:

a. Classified Point Cloud in industry standard format.

b. Georeferenced Photographs/Ortho photos.

C-10.5 Subsurface Utility Engineering Surveys Utility Surveys locate, measure and depict surface and subsurface utilities and their related structures, these structures include water, sanitary sewer, drainage, electrical, liquid and gas fuels, communication (copper and fiber-optics), telephone, cable television, street lights, central heating, cathodic protection and etc. The utility locating survey must use the most appropriate equipment and technology to identify all underground utilities, both known and unknown, and active and abandoned. Specifically, use geophysical techniques appropriate for the conditions present in the Project Area such as multi-frequency pipe and cable locators, single channel ground penetrating radar, SPAR utility and pipeline locator, magnetic gradiometer, and when necessary, acoustic methods

Buried Utility may not always fall in the public right-of-way, and as such may not be covered under the One Call 811 free locate service. The utility surveyed area must extend at least three feet beyond the border of the intended (or active) area of interest. Potholing of the utilities maybe required. Guidance for these surveys are provided by EM 1110-1-1005, and EM 1110-1-1802 listed above. Additional guidance is provided by American Society of Civil Engineers’ Utility Engineering & Surveying Institute. In addition to topographic mapping, the following Subsurface Utility Engineering Surveys data products maybe requested:

a. Field Staking of Test-hole locations.

b. Provide Test Hole Survey report.

c. Field Mark Utility locations.

C-10.6 Miscellaneous Surveys Guidance for these surveys will be provide by individual Task Orders.

C-11 Deliverable Formats All Topographic mapping and/or Records of Survey developed under this contract shall be delivered to the District in one or more of the following formats:

a. Bentley Microstation Version v8i (Sect Series 4) compatible CAD files.

b. ArcGIS Version 10.X (or specified in the task order) compatible File-based geodatabases.

c. AutoDesk AutoCAD Version 2017 compatible CAD files.

d. Adobe Acrobat DC compatible files.

e. Hard Copies.

f. Other file formats as specified in individual Tasks orders.

C-12. METADATA. Any data, database(s) and/or geospatial data produced through this contract must be documented through the preparation of standard metadata (data about data) descriptions. The Contractor shall ensure that the metadata delivered is compliance with the ISO Standard, 19115:2003 Geographic Information - Metadata. A conflicts of interest free copy of this standard is available at:

https://www.fgdc.gov/standards/projects/incits-l1-standards-projects/NAP-Metadata/napMetadataProfileV11_7-26-07.pdf/view

C-13. TECHNICAL CRITERIA AND STANDARDS.

C-.13.1 Applicable Laws and Regulations. The A&E shall perform all work in accordance with current Federal and State laws and regulations regarding personal safety, training, report requirements, and site investigation procedures.

C-13.2 Codes and Standards. Work under this Contract shall comply with the latest codes, standards, and regulations applicable to the work requested including USACE Engineering Regulations, Manuals, and Industry Codes and Standards.

C-13.3 Applicable Publications. The A&E shall comply with applicable Guide Specifications, Engineering Manuals, Engineering Technical Letters, Design Memoranda, and other technical reference materials as required.

C-13.4 Professional Stamps or Seals and Signatures on Drawings. All design documents shall be stamped or sealed, and signed by a professional engineer who is registered in the United States of America. The documents shall include:

a. One set of properly signed, stamped, or sealed and dated drawings.

b. A certified cover document showing, for each discipline, the name and stamp or seal of the professional who supervised the work and the date stamp or seal was affixed.

C-14. COMPLIANCE WITH APPLICABLE LAWS. The A&E shall be responsible for his/her employees, assuring that they strictly observe the laws of the United States or other governing bodies affecting all operations at all sites. The A&E shall comply with all applicable laws under which he/she is operating, including those concerning the inspection and operation of equipment, and the licensing of all applicable personnel. It is further understood and agreed that the A&E assumes all responsibility for the safety of his/her employees, plants, and materials.

C-15. EQUIPMENT AND SUPPLIES. The supplies to be furnished and/or provided by the A&E shall be identified in the Detailed Statement of Work provided for individual Task Orders, as applicable.

C-16. SUBMITTAL SCHEDULE AND REQUIREMENTS. Each Task Order issued under this Contract shall specify products to be delivered. The A&E shall reference individual Task Orders for applicable submittal schedules.

C-17. QUALITY CONTROL. For each applicable Task Order, the A&E shall prepare and submit a Quality Control Plan (QCP) within 10 calendar days following Notice to Proceed. The QCP shall be in accordance with USACE Engineering Regulation 1110-1-12, “Quality Management.” USACE Engineering Regulation 1110-1-12 can be viewed at the following website: http://publications.usace.army.mil/publications/eng-regs/. The QCP shall address the following:

C-17.1. Management Philosophy. Management approach and methodology to be followed during the performance of the work.

C-17.2. Management Structure. Description of roles and responsibilities.

C-17.3. Analysis Tools. Tools, such as computer programs, to be used in the execution of the Task Order.

C-17.4. Scheduling. The sequence of events involved in carrying out the specific tasks. Clearly show the review and correction periods scheduled prior to submittals.

C-17.5. Communication. The methods by which clear and accurate communications are to be achieved, the names of parties authorized to request modification of the work, and how much modification shall be coordinated and documented.

C-17.6. Procedures. The A&E shall define the procedures for conducting reviews, which shall include functional, technical, interdisciplinary, bidability, constructability, operability, and sustainability reviews.

C-18 CONTRACTOR QUALITY ASSURANCE. The A&E shall perform a quality assurance review of each product delivered under this Contract. The review shall focus on verification of assumptions and methods used in analysis and alternatives development, and the review of calculations, design criteria, and developed drawings. The review shall verify the product meets the customer’s needs consistent with the requirements set forth in individual Task Orders and this Contract. The same individuals who produced the work shall not complete the review.

All reviews shall be documented and shall be certified as being complete for each product submittal.

C-19 TRAVEL AND TRANSPORTATION. Travel will not be reimbursed at more than applicable rates cited in the Federal Travel Regulations (FTR), prescribed by the General Services Administration (GSA), for travel in the conterminous 48 United States (see website: http://www.gsa.gov/portal/category/104711). Mileage will be reimbursed at a rate not to exceed (NTE) the rates and amounts authorized for Federal civilian employees as cited in the Joint Travel Regulations (JTR), Volume 2 (see website: http://www.defensetravel.dod.mil/site/travelreg.cfm). The JTR, while not wholly applicable to A&Es shall provide the basis for determination of reasonable and allowable travel expenses. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and Federal Acquisition Regulation (FAR) 31.205-46 Travel Costs (subject to local policy and procedures). Exceptions to these guidelines shall be approved in advance by the KO. Costs will be allowable only if the following information is documented:

Date and place (city, town, or other similar designation) of the expenses.

Purpose of the trip.

Name of person on trip and that person’s title or relationship to the A&E.

C-20 ANTI-TERRORISM/OPERATIONS SECURITY (AT/OPSEC). For applicable Task Orders, all A&E and all associated subcontractor employees shall comply with applicable facility access and local security policies and procedures; any or all of the subparagraphs listed below (C-26.1.-C-27.7.) may be required in each Task Order. If any of the following requirements have been fulfilled within one year prior to NTP of the Task Order, verification of such shall be provided by the A&E to the COR.

C-20.1. AT Level I Training. All A&E employees, to include subcontractor employees, requiring access to Corps facilities and controlled access areas shall complete AT Level 1 awareness training with 30 calendar days after Contract/Task Order award date. The A&E shall submit a signed and dated training roster for each affected A&E and subcontractor employee to the COR within five calendar days after completion of training by all employees and subcontractor personnel. Obtain training DVD from the A/E Contract Coordinator (CENWP-EC-TC) or the Security & Law Enforcement Office (CENWP-SL). Estimated training time is 10 minutes per individual.

C-20.2. Access and General Protection/Security Policy and Procedures. If required, all A&E and all associated subcontractor employees shall comply with applicable facility access and local security policies and procedures. The A&E shall also provide to the COR and Project Security Point of Contact (POC) all information required for background checks to meet facility access requirements to be accomplished by the Security Office. The A&E workforce must comply with all personal identity verification requirements as directed by the Department of Defense (DoD), Headquarters Department of Defense (HQDA), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, shall the Force Protection Condition (FPCON) at any individual facility change; the Government may require changes in A&E security matters or processes.

a. Contractors Requiring Common Access Card (CAC). The A&E and all subcontractor employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon , to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more.

b. Identification of Employees. The A&E shall submit, by secure means (through a password protected spreadsheet or Adobe document, or encrypted email) a complete, dated, signed list of all A&E and subcontractor employees and their titles who will be working on the project to the COR within fifteen days prior to the commencement of the work. This listing shall be revised and resubmitted with personnel changes occur. The following information shall be provided:

Name of A&E
Name of Employee
Employee’s birth date
Employee’s place of birth
Employee’s valid identification with photo

c. Non-US Citizen Employees. The A&E shall submit color photocopies of the Permanent Resident Card or passport to the COR of all A&E employees who are non-US citizens. The COR will provide the Portland District Security Office the submitted photocopies at least one month (30 calendar days) in advance of the start of work by the employees. A&E personnel who are non-US citizens shall not be permitted access to the Project until the Foreign Visitor Authorization is received from HQUSACE. A&E personnel who are non-US citizens shall not be permitted to work on the contract at all until Foreign Visitor Authorization is received.

d. Authorized Unescorted Access Requirements. Perform a Personnel Risk Assessment (PRA) on all A&E personnel that require authorized unescorted access to the Powerhouse. Costs associated with the execution of the PRA shall be at the expense of the A&E. The content of the PRA is defined by the requirements as follows:

· Criminal Check - Obtain a criminal background check, completed within the last seven years, on all A&E personnel that require authorized unescorted access to the Powerhouse. A minimum of a 7-year criminal background check with the state patrol office shall be performed from all states of residence and employment, for the past seven years. The Project Security Officer through the COR will approve, disapprove, or revoke authorized unescorted access to the Powerhouse as a result of the 7-year background check.

· Identity Verification – A&E employees shall provide positive verification of individual identity prior to authorized unescorted access to the Powerhouse. Acceptable forms of identity verification are documents issued by a federal Government agency that include: the individual's photograph, name, and date of birth, such as a passport or military identification (ID) card. Additionally, a state issued driver's license or ID card in compliance with REAL ID (https://www.dhs.gov/real-id) is acceptable for identity verification.

· The Criminal Check and Identity Verification shall be updated at least every seven years for each employee requiring authorized unescorted access to the Powerhouse.

· Escort Requirements - A&E personnel not cleared for authorized access to the Powerhouse may be escorted by Government or A&E personnel that have authorized unescorted access to the Powerhouse. All costs related to the escorting of non-cleared personnel shall be at the expense of the A&E. Additional burden shall not be placed upon the Government to provide these escorts. Prior to access, coordination with the Project Security Officer is required, including but not limited to:

· Verification of identity with photo identification

· Name of escorting individual and verification of unescorted status

· Time of entry into the Powerhouse

· Time exiting the Powerhouse.

e. Security Programs.

· Quarterly Security Awareness Program. Submit and maintain a quarterly security awareness program for employees requiring authorized unescorted access to the Powerhouse. Security awareness documents will be furnished by the Project Security Officer and shall be distributed to A&E personnel by the A&E. Costs associated with the distribution of the security awareness documents shall be at the expense of the A&E. These documents shall be distributed using direct (email, memos, computer training, and etc.) and indirect (posters, brochures, and etc.) communications.

· Annual NERC Mandated Cyber Infrastructure Protection Training Program. Submit and maintain an annual North American Electric Reliability Corporation (NERC) Mandated Cyber Infrastructure Protection Training Program. When the Contract requires the A&E employee to have authorized unescorted access to the Powerhouse, the USACE NERC Mandated Cyber Infrastructure Protection Training shall be completed by the employee prior to authorized unescorted physical or authorized cyber access to the Powerhouse. The Project Security Officer or COR will furnish the training curriculum, materials, and supplies. Costs associated with the execution of this training shall be at the expense of the A&E. A minimum of seven days prior to engaging in work, submit a complete, signed and dated, listing of all personnel who have successfully completed the USACE NERC Mandated Cyber Infrastructure Protection Training. Submit a revised listing within seven calendar days of any personnel changes.

C-20.3. iWATCH and/or CorpsWatch Training. All A&E and all associated subcontractors shall complete the local iWATCH, CorpsWatch, See Something, Say Something program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of Contract award and within 30 calendar days of new employees commencing performance.