SOW-20200303
3 March 2020
Attachment (I)
TITLE
STATEMENT OF WORK
FOR QUALITY EVALUATION (QE)
TESTING OF TOMAHAWK STANDARD
INITIATORS (P/N 76Z2843-3) AND
TOMAHAWK CLS INITIATORS (P/N
JCM-14175-001)
REVISION
CAGE Code ******
TOTAL PAGES
REVISIONS
EFFECTIVITY
AUTHORITY
LTR
DESCRIPTION
DATE
APPROVED
Initial Release
APPROVALS
PREPARED BY
Punit Dave, NSWC/IHEODTD E24AL
DATE
APPROVED BY
Sameh Lofty, NSWC/IHEODTD E24TQ
DATE
Table of Contents
1. INTRODUCTION
2 APPLICABLE DOCUMENTS
3 REQUIREMENTS
4 DELIVERABLES
Summary of Tables Table 1: Test Matrix Table 2: Initiator Test Sample Table 3: CDRL Submittals
1. INTRODUCTION.
1.1 Scope. This statement of work (SOW) defines the efforts to conduct non-destructive, environment, and ballistic testing of thirty-five (35) Government Furnished Tomahawk Standard Initiators (P/N 76Z2843-3, PSEMC P/N 103377-32) and twenty-one (21) Electric Initiator (P/N JCM-14175-001, PSEMC P/N 103377-12).
1.2 Background. Similar initiators have been tested at Pacific Scientific in April 2004, February 2006, May 2009, July 2010, October 2013, February 2015, February 2016, and February 2019. The testing has provided non-destructive, environments, and ballistic test results of fleet returned units furnished by NSWC Indian Head Explosive Ordnance Disposal Technology Division (NSWC/IHEODTD).
2 APPLICABLE DOCUMENTS.
2.1 Drawings: Pacific Scientific Energetic Materials Company P/N 103377-32, Dual Bridgewire Electrical Initiator. Pacific Scientific Energetic Materials Company P/N 103377-12, Electrical Initiator.
2.2 Test Procedures: Pacific Scientific Energetic Materials Company Acceptance Test Procedure (ATP) Document No. ATP103377-12, -32, -122, -432
3 REQUIREMENTS.
3.1 Fleet Return Unit Testing.
3.1.1 Fleet Return unit testing shall be performed as shown in Table 1.
3.1.2 Non-destructive Inspections and Electrical Tests.
3.1.2.1 Leak rate testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.4.
Additionally, leak rate testing shall be conducted a second time on units after they have been subjected to environment testing and before they have been subjected to No-fire testing as outlined in sections 3.1.3 and 3.1.2.9 of this SOW, respectively.
3.1.2.2 Electrostatic discharge (ESD) testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.5. ESD testing shall only be conducted after environment testing, under section 3.1.3 of this SOW, and before No-fire testing, per section 3.1.2.9 of this SOW, is conducted.
3.1.2.3 Dielectric withstanding shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.8.
Additionally, dielectric withstanding will be conducted a second time on units after they have been subjected to environment testing and before No-fire testing as outlined in sections 3.1.3 and 3.1.2.9 of this SOW, respectively.
3.1.2.4 Insulation resistance shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.7.
Additionally, insulation resistance will be conducted a second time on units after they have been subjected to environment testing and before No-fire testing as outlined in sections 3.1.3 and 3.1.2.9 of this SOW, respectively.
3.1.2.5 The Thermal Transient Test (TTT) shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific local instructions: “85mV 220mV 1A 10ms Reading @ 0.1”. Additionally, TTT will be conducted a second time on units after they have been subjected to environment testing and before No-fire testing as outlined in sections 3.1.3 and 3.1.2.9 of this SOW, respectively.
3.1.2.6 Bridgewire resistance testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section
4.6. Additionally, bridgewire resistance testing shall be conducted a second time on units after they have been subjected to environment testing and before they are subjected to No-fire testing as outlined in sections 3.1.3 and 3.1.2.9 of this SOW, respectively.
3.1.2.7 The X-ray radiographic inspection shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.9. X-ray radiographic inspection shall be only conducted prior to environment testing, under section 3.1.3 of this SOW. If possible, all units shall be on one board for X-ray. Radiographic inspection report and copy of X-ray(s) shall be provided in accordance with CDRL A001 (Technical Report–Study/Services).
3.1.2.8 The N-ray radiographic inspection shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.10. N-ray radiographic inspection shall be only conducted prior to environment testing, under section 3.1.3 of this SOW. If possible, all units shall be on one board for N-ray. Radiographic inspection report and copy of N-ray(s) shall be provided in accordance CDRL A001 (Technical Report–Study/Services).
3.1.2.9 No-fire testing shall be conducted on units as specified in 35 units in Table 2 and 21 units in Table 3. The initiator shall not fire or dud within five minutes when subjected to a DC current of 1.0 Amperes minimum per bridgewire with a power of 1.0 Watt minimum applied to each bridge simultaneously at ambient conditions. A direct current of not less than one ampere supplying a minimum of one watt shall be applied to both bridgewires simultaneously for a period of at least five minutes to verify compliance with the requirements. No fire tests shall be conducted in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 Rev E, section 5.5.
3.1.2.10 Non-destructive inspections and electrical test results shall be recorded. A copy of test and inspection results, and, if necessary, associated non conformance reports, shall be delivered in accordance with CDRL A001 (Technical Report–Study/Services).
3.1.2.11 In the event of a failure, the contractor shall be limited to photographing and verifying the respective test setup and notifying the Government representative.
3.1.3 Environment Tests.
3.1.3.1 Shock testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.1.
3.1.3.2 Vibration testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.2.
3.1.3.3 Temperature – Shock/Humidity/Altitude (TSHA) testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.3.
3.1.3.4 Environment test results shall be recorded. A copy of test results, and, if necessary, associated non conformance reports, shall be delivered in accordance with CDRL A001 (Technical Report–Study/Services).
3.1.3.5 Photographs shall be taken of the test setup for each environment test and copies delivered in accordance with CDRL A001 (Technical Report–Study/Services).
3.1.3.6 In the event of a failure, the contractor shall be limited to photographing and verifying the respective test setup and notifying the Government representative.
3.1.4 Ballistic (Function) Tests.
3.1.4.1 The ballistic testing shall include 35 units in Table 2 and 21 units in Table 3.
Functional testing is conducted in a 10.0 to 10.2 cc closed bomb and in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.6, except temperature conditioning at temperatures -65 °F, 70 °F, or 160 °F is required as noted in Tables 2 and 3. Temperature conditioning time, for the hot and cold conditions, shall be a minimum of 4 hours and no greater than 24 hours.
3.1.4.2 Test data, which includes maximum pressure and function time, and current and pressure time traces shall be recorded. A copy of test results (data and current and pressure time traces), and, if necessary, associated non-conformance reports, shall be delivered in accordance with CDRL A001 (Technical Report–Study/Services). A compact disc containing a digital copy of the current and pressure time data traces, in a file format that is compatible with Excel spreadsheets (e.g., .csv files), shall be delivered in accordance with CDRL A001 (Technical Report–Study/Services).
3.1.4.3 Photographs shall be taken of test setup and the exterior of the post fired units, including photos of the output cavity and hot gas leaks around the threads and o-ring.
Photographs shall be delivered in accordance with CDRL A001 (Technical Report– Study/Services).
3.1.4.4 In the event of a failure, the contractor shall be limited to verifying the test setup and taking a post-fire x-ray of the unit(s) alongside a successfully functioned unit. The contractor must retain any failed units for at least 45 days after testing or until released for disposal by a government representative, whichever comes first. The contractor shall ship failed unit(s) back to the government only upon request.
3.1.5 Test Dates. Ballistic testing shall be completed at least by 18 weeks after receipt of hardware.
3.1.6 On-Site Visit and Coordination. Pacific Scientific shall notify the NSWC/IHEODTD at least ten (10) days prior to both environment tests listed in section 3.1.3 and ballistic testing section 3.1.4, so representatives can make travel arrangements to witness testing.
The NSWC/IHEODTD technical representative is Punit Dave at 301-744-2329.
3.1.7 Disposal of Test Sample. Any unit(s) that does not meet requirements in SOW sections
3.1.2.3 and 3.1.2.4 shall be shipped back to NSWC/IHEODTD after functional testing is complete. All other units can be disposed at the vendor after all CDRLs have been accepted by NSWC/IHEODTD.
Table 1: Test Matrix
NUMBER OF INITIATORS
(GROUPS)
TEST
SOW SECTION
REQUIREMENT A B C TOTAL
Leak Rate 3.1.2.1 16 24 16 56 Dielectric Strength* 3.1.2.3 16 24 16 56 Insulation Resistance* 3.1.2.4 16 24 16 56 Thermal Transient Test* 3.1.2.5 16 24 16 56 Bridgewire Resistance* 3.1.2.6 16 24 16 56 Radiographic Inspection (X-ray)* 3.1.2.7 16 24 16 56 Radiographic Inspection (N-ray)* 3.1.2.8 16 24 16 56 Shock* 3.1.3.1 16 24 16 56 Vibration* 3.1.3.2 16 24 16 56
TSHA* 3.1.3.3 16 24 16 56
Leak Rate* 3.1.2.1 16 24 16 56 Electrostatic Discharge* 3.1.2.2 16 24 16 56 Dielectric Strength* 3.1.2.3 16 24 16 56 Insulation Resistance* 3.1.2.4 16 24 16 56 Thermal Transient Test* 3.1.2.5 16 24 16 56 Bridgewire Resistance* 3.1.2.6 16 24 16 56 No-Fire Current* 3.1.2.9 16 24 16 56 Ballistic (Function) Test*
Cold Temperature (-65 °F) 3.1.4 16 56 Ambient Temperature (70 °F) 3.1.4 24 56 Hot Temperature (160 °F) 3.1.4 16 56
* Testing must be complete in order indicated in Table 1.
Table 2: Initiator Test Sample (P/N 103377-32)
TCN Lot S/N Group
Non-destrutive Inspections &
Electrical Testing (SOW section
3.1.2 excluding
3.1.2.2 and
3.1.2.9)
Environment Testing
(SOW section 3.1.3)
Post Environment
Electrical Testing
(SOW
sections
3.1.2.1 to 3.1.2.6)
No-Fire Testing
(SOW section 3.1.2.9)
Ballistic Testing (SOW section 3.1.4) Temperature
(°F)
1 ESD07C025-001 A X X X X 70
2 ESD07C025-001 A X X X X 70
3 ESD07C025-001 A X X X X 70
4 ESD07C025-001 B X X X X -65
5 ESD07C025-001 B X X X X -65
6 ESD07C025-001 C X X X X 160
7 ESD07C025-001 C X X X X 160
8 SEB89G003-035 A X X X X 70
9 SEB89G003-035 A X X X X 70
10 SEB89G003-035 A X X X X 70
11 SEB89G003-035 B X X X X -65
12 SEB89G003-035 B X X X X -65
13 SEB89G003-035 C X X X X 160
14 SEB89G003-035 C X X X X 160
15 ESD08A026-012 A X X X X 70
16 ESD08A026-012 A X X X X 70
17 ESD08A026-012 A X X X X 70
18 ESD08A026-012 B X X X X -65
19 ESD08A026-012 B X X X X -65
20 ESD08A026-012 C X X X X 160
21 ESD08A026-012 C X X X X 160
22 SEB93B002-001 A X X X X 70
23 SEB93B002-001 A X X X X 70
24 SEB93B002-001 A X X X X 70
25 SEB93B002-001 B X X X X -65
26 SEB93B002-001 B X X X X -65
27 SEB93B002-001 C X X X X 160
28 SEB93B002-001 C X X X X 160
29 ESD02H008-003 A X X X X 70
30 ESD02H008-003 A X X X X 70
31 ESD02H008-003 A X X X X 70
32 ESD02H008-003 B X X X X -65
33 ESD02H008-003 B X X X X -65
34 ESD02H008-003 C X X X X 160
35 ESD02H008-003 C X X X X 160
TS1 SDV01A005-014 - - - - ambient TS2 SDV01A005-014 - - - - ambient TS3 SDV01A005-014 - - - - ambient TS4 SDV01A005-014 - - - - ambient TS5 SDV01A005-014 - - - - ambient TS6 SDV01A005-014 - - - - ambient
Table 3: Initiator Test Sample (P/N 103377-12)
4 DELIVERABLES.
4.1 Technical Report–Study/Services (CDRL A001).
First Submission - Copy of ballistic test data sheets, and associated current and pressure time traces, non-destructive inspection results, electrical test results, environment test results, test equipment list and calibration information, and conditioning chamber temperature profile shall be provided to NSWC/IHEODTD within 2 days after the completion of the ballistic testing. Any non-conformance report shall be provided for any unit(s) that does not meet the non-destructive inspections, electrical, environment, or ballistic test requirements.
Subsequent Submission - Electronic copy of current and pressure time traces, in a file format compatible with Excel spreadsheets (e.g., .csv files), and photographs shall be provided to NSWC/IHEODTD within 30 days of completion of testing. Radiographic
TCN Lot S/N Group
Non-destrutive Inspections &
Electrical Testing
(SOW section
3.1.2 excluding
3.1.2.2 and 3.1.2.9)
Environment Testing
(SOW section 3.1.3)
Post Environment
Electrical Testing
(SOW sections
3.1.2.1 to 3.1.2.6)
No-Fire Testing
(SOW section 3.1.2.9)
Ballistic Testing
(SOW
section 3.1.4)
Temperature (°F)
1 ESD07M008-001 A X X X X 70
2 ESD07M008-001 A X X X X 70
3 ESD07M008-001 A X X X X 70
4 ESD07M008-001 B X X X X -65
5 ESD07M008-001 B X X X X -65
6 ESD07M008-001 C X X X X 160
7 ESD07M008-001 C X X X X 160
8 SEB97G001-012 A X X X X 70
9 SEB97G001-012 A X X X X 70
10 SEB97G001-012 A X X X X 70
11 SEB97G001-012 B X X X X -65
12 SEB97G001-012 B X X X X -65
13 SEB97G001-012 C X X X X 160
14 SEB97G001-012 C X X X X 160
15 SDV01A001-018 A X X X X 70
16 SDV01A001-018 A X X X X 70
17 SDV01A001-018 A X X X X 70
18 SDV01A001-018 B X X X X -65
19 SDV01A001-018 B X X X X -65
20 SDV01A001-018 C X X X X 160
21 SDV01A001-018 C X X X X 160
inspection reports and copy of X-rays and N-rays shall be provided to NSWC/IHEODTD within 30 days of completion of testing.
4.2 CDRL Summary.
Table 3: CDRL Submittals
CDRL
NUMBER
TITLE FIRST
SUBMISSION
SUBSEQUENT
SUBMISSION
CDRL A001 Technical Report -Study/Services (SOW paragraphs 3.1.2, 3.1.3, and 3.1.4)
Within 2 days of completion of ballistic tests
Within 30 days of completion of ballistic tests
4.3 Deliverable Address.
The address for data is:
NSWC/IHEODTD
Attn: Punit Dave, E24PD
4393 BENSON ROAD SUITE 101
INDIAN HEAD, MD 20640-5092
Punit.Dave@navy.mil
4.4 Points of Contact
NSWC/IHEODTD Technical Repsentative:
Punit Dave, CODE E4PD 301-744-2329 Punit.Dave@navy.mil
NSWC/IHEODTD Technical Representative:
Sameh Lotfy, CODE E24SL 301-744-2312 sameh.lotfy@navy.mil
WAWF email notifications shall be sent to: rosemary.hodgson@navy.mil mailto:sameh.lotfy@navy.mil
| 1. INTRODUCTION. |
| 1.1 Scope. This statement of work (SOW) defines the efforts to conduct non-destructive, environment, and ballistic testing of thirty-five (35) Government Furnished Tomahawk Standard Initiators (P/N 76Z2843-3, PSEMC P/N 103377-32) and twenty-one (21) ... |
| 1.2 Background. Similar initiators have been tested at Pacific Scientific in April 2004, February 2006, May 2009, July 2010, October 2013, February 2015, February 2016, and February 2019. The testing has provided non-destructive, environments, and b... |
| 2 APPLICABLE DOCUMENTS. |
| 2.1 Drawings: Pacific Scientific Energetic Materials Company P/N 103377-32, Dual Bridgewire Electrical Initiator. Pacific Scientific Energetic Materials Company P/N 103377-12, Electrical Initiator. |
| 2.2 Test Procedures: Pacific Scientific Energetic Materials Company Acceptance Test Procedure (ATP) Document No. ATP103377-12, -32, -122, -432 |
| 3 REQUIREMENTS. |
| 3.1 Fleet Return Unit Testing. |
| 3.1.1 Fleet Return unit testing shall be performed as shown in Table 1. |
| 3.1.2 Non-destructive Inspections and Electrical Tests. |
| 3.1.2.1 Leak rate testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.4. Additionally, leak rate testing shall be conducted a second time on units aft... |
| 3.1.2.2 Electrostatic discharge (ESD) testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.5. ESD testing shall only be conducted after environment tes... |
| 3.1.2.3 Dielectric withstanding shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.8. Additionally, dielectric withstanding will be conducted a second time o... |
| 3.1.2.4 Insulation resistance shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.7. Additionally, insulation resistance will be conducted a second time on un... |
| 3.1.2.5 The Thermal Transient Test (TTT) shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific local instructions: “85mV 220mV 1A 10ms Reading @ 0.1”. Additionally, TTT will be conducted a second time... |
| 3.1.2.6 Bridgewire resistance testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.6. Additionally, bridgewire resistance testing shall be conducted a ... |
| 3.1.2.7 The X-ray radiographic inspection shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.9. X-ray radiographic inspection shall be only conducted prior t... |
| 3.1.2.8 The N-ray radiographic inspection shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 4.10. N-ray radiographic inspection shall be only conducted prior ... |
| 3.1.2.9 No-fire testing shall be conducted on units as specified in 35 units in Table 2 and 21 units in Table 3. The initiator shall not fire or dud within five minutes when subjected to a DC current of 1.0 Amperes minimum per bridgewire with a power... |
| 3.1.2.10 Non-destructive inspections and electrical test results shall be recorded. A copy of test and inspection results, and, if necessary, associated non conformance reports, shall be delivered in accordance with CDRL A001 (Technical Report–Study/... |
| 3.1.2.11 In the event of a failure, the contractor shall be limited to photographing and verifying the respective test setup and notifying the Government representative. |
| 3.1.3 Environment Tests. |
| 3.1.3.1 Shock testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.1. |
| 3.1.3.2 Vibration testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.2. |
| 3.1.3.3 Temperature – Shock/Humidity/Altitude (TSHA) testing shall be conducted on 35 units in Table 2 and 21 units in Table 3 in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.3. |
| 3.1.3.4 Environment test results shall be recorded. A copy of test results, and, if necessary, associated non conformance reports, shall be delivered in accordance with CDRL A001 (Technical Report–Study/Services). |
| 3.1.3.5 Photographs shall be taken of the test setup for each environment test and copies delivered in accordance with CDRL A001 (Technical Report–Study/Services). |
| 3.1.3.6 In the event of a failure, the contractor shall be limited to photographing and verifying the respective test setup and notifying the Government representative. |
| 3.1.4 Ballistic (Function) Tests. |
| 3.1.4.1 The ballistic testing shall include 35 units in Table 2 and 21 units in Table 3. Functional testing is conducted in a 10.0 to 10.2 cc closed bomb and in accordance with Pacific Scientific ATP103377-12, -32, -122, -432 section 5.6, except temp... |
| 3.1.4.2 Test data, which includes maximum pressure and function time, and current and pressure time traces shall be recorded. A copy of test results (data and current and pressure time traces), and, if necessary, associated non-conformance reports, s... |
| 3.1.4.3 Photographs shall be taken of test setup and the exterior of the post fired units, including photos of the output cavity and hot gas leaks around the threads and o-ring. Photographs shall be delivered in accordance with CDRL A001 (Technical Re... |
| 3.1.4.4 In the event of a failure, the contractor shall be limited to verifying the test setup and taking a post-fire x-ray of the unit(s) alongside a successfully functioned unit. The contractor must retain any failed units for at least 45 days after... |
| 3.1.5 Test Dates. Ballistic testing shall be completed at least by 18 weeks after receipt of hardware. |
| 3.1.6 On-Site Visit and Coordination. Pacific Scientific shall notify the NSWC/IHEODTD at least ten (10) days prior to both environment tests listed in section 3.1.3 and ballistic testing section 3.1.4, so representatives can make travel arrangements... |
| 3.1.7 Disposal of Test Sample. Any unit(s) that does not meet requirements in SOW sections 3.1.2.3 and 3.1.2.4 shall be shipped back to NSWC/IHEODTD after functional testing is complete. All other units can be disposed at the vendor after all CDRLs h... |
| 4 DELIVERABLES. |
| 4.1 Technical Report–Study/Services (CDRL A001). |
| 4.2 CDRL Summary. |
| 4.3 Deliverable Address. |
| 4.4 Points of Contact |
| 2020-07-10T15:39:18-0400 | |
| DAVE.PUNIT.NITESH.1568265560 |
| 2020-07-10T15:51:10-0400 | |
| LOTFY.SAMEH.MORAD FAHMY.1548163761 |
File details come from the government source that posted it. Updated .