TO 23-F-0461.pdf
Air Force Technical Order PDF 416 KB Posted
- Attached to
- Replace Carpet and Repaint all Interior Surface for Airfield Control Tower, P-1284, USAG Humphreys
- Solicitation number
- W91QVN-23-R-0076
About this file
This is a delivery order for general construction services at Osan Air Base and Suwon Air Base in Korea. The order is issued against contract W91QVN18D0053 by the 411th Contracting Support Brigade to Yu Il Eng. & Const. Co., Ltd. for a fixed price of KRW 135,751,000. The contractor must provide all labor, tools, equipment, and resources to perform repair work identified in task orders, including replacing carpet and repainting interior surfaces at the Airfield Control Tower at Camp Humphreys. Work may only be performed on weekends, U.S. holidays, or days specified by the user due to flight operations. The period of performance is 120 days from notice to proceed.
View the file
Who attaches T.O. 23-F-0461
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 . ISSUE D BY CODE
W91QV N18D0053
1 . CO N TRA CT/P U RCH . O RD E R/
A G RE E M E N T N O .
W 91QVN
2 . D E L IVE RY O RD E R/ CA L L N O .
W91QV N23F0461
12P AGE 1 OF
5 . P RIO RITY
CODE W 91QVN
8 . DEL IVERY FOB
DEST INAT IONX
OT HE R
(See Sch edule if o t h er)
OR D ER FOR SUPPLIES OR SER VICES
3 . D A TE O F O RD E R/CA L L
2023 Jul 03
4 . RE Q ./ P U RCH . RE Q U E ST N O .
0011885300-0003
411TH C SB, KOR EA - H U MP C ON TR AC TIN G D IV
POC : MS. KIM, KU M-OK
TEL: 0503-355-0642
KU MOK.KIM2.LN @ AR MY .MIL
APO AP 96271
U N ITED STATES
411TH C ON TR AC TIN G SU PPOR T BR IGAD E, KOR EA
H U MPH R EY S C ON TR AC TIN G D IVISION
U N IT 15289
APO AP 96271-5584
U N ITED STATES
7 . ADM INIST E RE D BY (if o th er th a n 6 )
( YYYYM M M D D )
1 0 . D E L IVE R TO FO B P O IN T BY (D ate)
( YYYYM M M D D )
Y U IL EN G. & C ON ST. C O,. LTD .
OH , H Y AN G MEE
35 N AMBU SU N H W AN -R O 347-GIL, SEOC H O-GU
SEOU L 06731
KOR EA, SOU TH
CODE 1G83F9 . CONT RACT OR FACIL IT Y
SEE SCHEDULE
1 2 . D ISCO U N T TE RM S
N et 30 D ays
M A RK IF BU SIN E SS IS1 1 .
SM A L L
SM A L L
D ISA D VA N TA G E D
W O M E N -O W N E D
1 3 . M AIL INVOICE S T O T HE ADDRESS IN BLOCK
See Item 15
2 5 . T OT AL KRW 135,751,000.00
W 3BH U SA GAR R ISON H U MPH R EY S
W 3BH U SA GAR R ISON H U MPH R EY S
0194 D SSB C O A SR A
BLD G P6953 C AMP H U MPH R EY S
PY EON GTAEK 17982
X
1 7 . ACCOUNT ING AND AP P ROP RIAT ION DAT A/ L OCAL USE
CODE
1 8 . IT E M NO. 1 9 . SCHEDUL E OF SUP P LIE S/ SERVICE S
* If q u a n t i ty a ccep ted b y th e G o ver n m en t is s a m e a s q u a n t i ty a ccep ted b elo w q u a n t i ty o r d er ed a n d en cir cle.
DE L IVE RY/1 6 .
1 4 . SHIP T O
Se e Sche dule
W T4KBR W 56GBU
MARK ALL
P AC KAG ES AND
P AP ERS W ITH
IDENTIFIC ATIO N
NUMB ERS IN
B LO C KS 1 AND 2 .
2 3 . AM OUNT
1 5 . P AYM ENT W IL L BE M ADE BY CODE
AF AS-K, 8TH AR MY G8
ATTN : AC C OU N TS PAY ABLE BR AN C H
U N IT# 15236
APO AP 96205-5236
U N ITED STATES
Th is d el iv ery o rd er/cal l i s i s s u ed o n an o th er G o v ern men t ag en cy o r in acco rd an ce w i th an d s u b ject to terms an d co n d i t io n s o f ab o v e n u mb ered co n tract .
T YP E CAL L
OF P URCHASE
ORDE R
SEE SCHEDULE
24. UNITED STATES OF AMERICA
TEL: 315-755-3373
EMAIL: hyonsuk.chong1.ln@mail.mil
CONTRACTING / ORDERING OFFICER
q u a n t i ty o r d er ed , in d ica te b y X . If d i f f er en t , en ter a ctu a l
BY: MS. CHONG, HYON-SUK
If t h is bo x is m ark ed, sup p lier m ust sign Accep t an ce an d ret urn t h e fo llo win g n um ber o f co p ies:
NAM E OF CONT RACT OR SIGNAT URE T YP E D NAM E AND T IT L E
( YYYYM M M D D )
DAT E SIGNE D
ACCE P T ANCE. T HE CONT RACT OR HE REBY ACCE P T S T HE OFFE R REP RESE NT ED BY T HE NUM BE RED P URCHASE ORDE R AS IT M AY P REVIOUSL Y HAVE BEE N OR IS NOW M ODIFIE D, SUBJE CT T O AL L OF T HE T E RM S
AND CONDIT IONS SE T FORT H, AND AGRE ES T O P ERFORM T HE SAM E.
Referen ce y o u r q u o te d ated
Fu rn is h th e fo l lo w in g o n terms s p eci fied h erein . REF :
2 0 . QUANT IT Y
ORDERE D/
ACCE P T ED*
2 1 . UNIT 2 2 . UNIT P RICE
D IFFE RE N CE S
2 6 .
INSP E CT E D RE CE IVED ACCEP T E D, AND CONFORM S T O T HE
CONT RACT EXCEP T AS NOT E D
2 7 a. QUANT IT Y IN COL UM N 2 0 HAS BE E N
( YYYYM M M D D )
c. DAT E d. P RINT E D NAM E AND T IT L E OF AUT HORIZ ED
GOVERNM E NT RE P RE SENT AT IVE
b. SIGNAT URE OF AUT HORIZ E D GOVE RNM E NT RE P RE SENT AT IVE
e. M AIL ING ADDRE SS OF AUT HORIZ ED GOVE RNM ENT REP RESE NT AT IVE
36. I ce r tify th is account is cor re ct and prope r for paym e nt.
g. E -M AIL ADDRESSf. T EL EP HONE NUM BE R
a. DAT E
( YYYYM M M D D )
b. SIGNAT URE AND T IT LE OF CE RT IFYING OFFICE R
2 8 . SHIP NO. 2 9 . DO VOUCHER NO. 3 0 .
INIT IAL S
3 2 . P AID BY 3 3 . AM OUNT VE RIFIED
CORRE CT FOR
3 5 . BIL L OF LADING NO.
3 4 . CHE CK NUM BE R
3 7 . RE CEIVED AT 3 8 . RECE IVE D BY
( YYYYM M M D D )
3 1 . P AYM E NT
COM P L ET E
P ART IAL
FINAL
P ART IAL
FINAL
DD For m 1155, DEC 2001 P RE VIOUS EDIT ION IS OBSOL ET E .
3 9 . DAT E RE CE IVED 4 0 . T OT AL
CONT AINERS
4 1 . S/R ACCOUNT NO. 4 2 . S/R VOUCHE R NO.
AD D R ESS
AN D
N AME
W91QVN18D0053
W91QVN23F0461
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4001 KRW0.00
EXERCISED
OPTION
4th Option Year
FFP
General Construction for Area III, OSAN Air Base and SUWON Air Base.
(Operation and Maintenance Fund)
Both Non-Work Plan (NWP) and Work Plan (WP) Task Order.
The Contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to upgrade USFK facilities (Including New Construction Work under $2,000,000.00) located in the Republic of Korea. Actual work to be performed will be identified by individual Task Order.
NET AMT KRW0.00
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
4001AA 1 Job KRW135,751,000.00 KRW135,751,000.00
EXERCISED
OPTION
Maximum Contract Amount - K Work
FFP
Repair Work FOB: Destination
PURCHASE REQUEST NUMBER: 0011885300-0003
PSC CD: Z2AA
NET AMT KRW135,751,000.00
ACRN AA
CIN: GFEBS001188530000001
$107,815.63
Section C - Descriptions and Specifications
STATEMENT OF WORK-10Mar2023
PROJECT NO TITLE LOCATION
V9-210018 Replace Carpet and Repaint all Interior Surface for Airfield Control Tower, P-1284
USAG Humphreys
DESCRIPTION: The work to be performed for completion of this project shall be in general as described below and executed by one or more of the groups.
a. Work by Contractor:
(1) The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
(2) The contractor shall replace carpet and repaint all interior surface for airfield control tower, P-1284 in accordance with the specifications and drawings.
b. Work by In-House Forces: Not applicable to this project.
c. Work by Troop Labor: Not applicable to this project.
PRINCIPAL FEATURES: This project includes, but will not be limited to the following principal features:
Schedule # I, Repair/maintenance (K): All work shall be in accordance with the attached drawings and specifications.
1. Replace existing acoustical wall carpet with new at room 801 and 802 as per drawing and schedule (See note #1).
2. Replace existing carpet with carpet tile on the floor at room 301, 701 and provide carpet tile on the floor at room 401, 402, 801 including four (4) Ea thresholds and one (1) Ea aluminum carpet transition as per drawing and schedule (See note #1).
3. Replace existing rubber floor tread, riser and vinyl composition tile (VCT) with new rubber floor tile (RT), tread and riser on the stairway at room 802 as per drawing and schedule (See note #1).
4. Replace existing acoustical ceiling tile (ACT) with new dark colored (Black) acoustical ceiling tile at room 801 as per drawing and schedule (See note #1).
Replace existing vinyl cove base (VCB) with new at room 102, 301, 303, 401, 402, 404, 601, 701 and all in stairway as per drawing and schedule.(See note#1)
5. Surface preparation and repaint interior surface of wall at room 102, 103 (Included ceiling and floor), 202 (Included ceiling and floor), 301, 303, 401, 402, 404, 601,702 (Included ceiling and floor) and all of wall, tread, riser, landing, handrails and guardrails in the stairway including room 802 as per drawing and schedule (See note #1).
1289531226.LN
Highlight
6. Surface preparation and repaint all metal door frames, 2 (Two) Ea of metal doors at 1st floor stairway and 2 (Two) Ea of metal radiator covers at room 102 and 201 as per drawing.
7. Replace existing all gypsum wall board with 12.7mm gypsum wall board including painting finish at room 701 as per drawing. (gypsum wall board get replaced just right below the existing ceiling line).
8. Remove and re-install furniture and other obstructions, except for unit operation equipment during the work.
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
PROJECT NO TITLE LOCATION
V9-210018 Replace Carpet and Repaint all Interior Surface for Airfield Control Tower, P-1284 USAG Humphreys
1. GENERAL: In addition to the requirements specified under "GENERAL PROVISIONS" for the Fixed Price Construction Contract for this project, the Contractor shall comply with the following "SPECIAL CONDITIONS" which form a part of the contract.
2. WORK HOURS: The work related to room 801 and 802 and stairway work shall only be carried out on weekend or U.S. holidays or user specified days due to flight operations (* marked area) see drawing A4, A5 and A6. The work will be accomplished from 0730 hours through 1730 hours, from 1 October through 30 April and from 0730 hours through 1930 hours from 1 May through 30 September, Mondays through Saturdays, except for Korean Legal Holidays: Any proposed change in working hours should be approved by the Contracting Officer (KO) and Contracting Officer's Representative (COR).
3. NOTIFICATION OF INSPECTION SECTION: Prior to starting work the contractor shall notify the COR of the actual date he intends to start work. The contractor shall also give the project inspector seven working day notice prior to each concrete placement, field test, weld application, protective coating application, or any other work deemed to require inspection.
4. INSTALLATION ACCESS AND CONTROL
4.1. Installation Access: Entry to the installation requires the following: Prior coordination with the COR or designated representative, current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and picture identification for other personnel. The Contractors/Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The Contractor(s) with whom this Agreement is made shall provide a listing of vehicles that will require installation access upon the establishment of this contract (MATOC). The Government will not be responsible for damages due to delay/ stoppages caused by failure to comply.
4.2. All contractors’ employees shall be easily recognized by wearing uniform and/or name tag during the performance of work under this contract (MATOC). All cargo vehicles also shall be identified as performers by displaying company name during working hours.
4.3. Search and Control: Installations across South Korea are controlled access posts. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized Government property. Contractor-owned vehicles, Contractor employees, and their personal property shall be subject to searches and seizure of contraband and/or unauthorized Government property upon entering or leaving the Installation. The search and seizure provisions of AR 190-16, Physical Security, shall apply to Contractor personnel entering any installation.
5. ANTITERRORISM:
5.1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
5.2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
5.3. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
5.4. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 7 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
6. OPERATIONS SECURITY: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III), Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), and all other applicable background checking processing in accordance with (IAW) the United States Forces Korea (USFK) Military Police Installation Access Control Regulation 190-7, the status of forces agreement (SOFA), and all other theater regulations.
7. SUBMITTALS: The contractor shall provide contract progress schedule and submittal register within 5 working days after Notice to Proceed (NTP) is issued.
8. COORDINATION: The Contractor shall coordinate its work with all others (subcontractor and government agencies) involved in the project and shall cooperate with all other contractors and government agencies to facilitate the general progress of the work. The contractor shall be provided a list of other government agencies and other contractors as applicable, at the pre-construction conference for coordination purposes.
9. CONSTRUCTION: Prior to start of any work for civil, mechanical and electrical, the contractor shall obtain written permission from the COR. The contractor shall submit a request for the construction permit in writing, at least ten (10) working days prior to the anticipated start of work. The request shall be submitted to the COR.
10. MATERIALS COMPLIANCE: The contractor shall make certain all materials used meet the requirements of the contract and proof thereof upon request of the COR. Materials not meeting the requirements of the contract shall not be brought to the job site. All materials shall be new and the standard products of a manufacturer regularly engaged in the manufacturing of such materials. Submittals obliged by this contract such as construction progress schedule, contractor quality control plan, safety plan, submittal registry, and ENG form 4025(including attachments) will not be accepted in paper format and must be electronic files submitted via CD/DVD to COR.
11. HOISTING AND MOVING EQUIPMENT: The prime contractor and subcontractor shall provide all cranes, lifts, and any other moving equipment necessary for the proper and efficient movement of materials. The equipment shall be provided with proper guidelines, bracing, safety devices, and any other associated safety measures, as required by USACE EM 385-1-1. Prime contractor and subcontractors are responsible for safe operations.
12. EQUIPMENT: All Contractor equipment shall be functional and must meet safety standards in accordance with USACE EM 385-1-1. It is the responsibility of the contractor to inspect all of its equipment prior to use. Equipment not completely safe or functional as determined by the Government, shall be repaired and replaced before work is initiated.
13. RECORD DRAWINGS: During performance under this contract, the contractor shall accurately record and delineate on a set of electronic CAD and PDF of contract drawings, all changes in such work which constitute departures from the original contract drawings. The set of drawings (electronic CAD and PDF), thus corrected and changed, usually referred to as “As-Built” drawings, shall be delivered to the COR at the final acceptance inspection by the Government of the completed work.
14. UTILITY CUTOVERS AND INTERRUPTIONS: Ensure utility cutovers and interruptions are conducted after normal working hours or on Saturdays, Sundays, and U. S. Government holidays as identified in Local Clause 5152.222-4007. Ensure that new utility lines are complete, except for the connection, before interrupting existing service. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, shall be considered utility cutovers. All utility cutovers and interruptions shall be coordinated with the Contracting Officer Representative (COR).
15. WORK OUTSIDE REGULAR HOURS: Unless specified in the task order, work outside regular working hours requires Contracting Officer’s approval. A written request, substantiating the reason for this consideration, should be made at least fourteen (14) calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During period of darkness, the different areas at the work site shall be lighted in a manner approved by the Contracting Officer. The Contractor shall make utility cutovers after normal working hours or on Saturdays, Sundays, and U.S. Government holidays, unless directed otherwise.
16. WINTERIZATION: The contractor may be required to perform weather sensitive work during the winter season, which may cause additional costs to be incurred for the contractor. These additional costs are the contractor’s responsibility in the event it is required to work during the winter.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
4001 N/A N/A N/A N/A 4001AA Destination Government DIRECTORATE OF PUBLIC
WORKS
DPW, USAG HUMPHREYS UNIT
# 15228
APO AP 96271-5228
Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
4001 N/A N/A N/A N/A
4001AA 120 dys. ANP 1 W3BH USA GARRISON HUMPHREYS
W3BH USA GARRISON HUMPHREYS
0194 DSSB CO A SRA
BLDG P6953 CAMP HUMPHREYS
PYEONGTAEK 17982
011-82-53-470-65 FOB: Destination
WT4KBR
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after Notice to Proceed is issued. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
ACCOUNTING AND APPROPRIATION DATA
AA: 0212023202320200000113132254 M.0124229.5.02 6100.9000021001
COST CODE: A601S
AMOUNT: $107,815.63
ACRN CLIN/SLIN CIN AMOUNT
AA 4001AA GFEBS001188530000001 $107,815.63
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
Section J - List of Documents, Exhibits and Other Attachments
TECHNICAL DETAIL SPECIFICATIONS
PROJECT NO TITLE LOCATION
V9-210018 Replace Carpet and Repaint all Interior Surface for Airfield Control Tower, P-1284 USAG Humphreys
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA- SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWING
PROJECT NO TITLE LOCATION
V9-210018 Replace Carpet and Repaint all Interior Surface for Airfield Control Tower, P-1284 USAG Humphreys
GENERAL: The work shall conform to the attached contract drawings and the standard detail drawings (dated 30 November 2015, issued by the Department of the Army, Installation Management Agency, Korea Region Office and located 411th CSB’s Web http://www.usfk.mil/Resources/ContractingwithUSFK.aspx, all of which form a part of the specifications.
Drawing No. Sheet No. Ref. No. Description Date
23-013 1 of 1 T-1 Title sheet, General Notes, Location Map and Abbreviation 23 Nov 2022
“ 1 of 6 A-1 1st Floor Plan, Elevation, Scope of Work and Notes 10 Mar 2023
“ 2 of 6 A-2 2nd Floor Plan, 3rd Floor Plan and Elevation “
“ 3 of 6 A-3 4th Floor Plan, 5th Floor Plan and Elevation “
“ 4 of 6 A-4 6th Floor Plan, 7th Floor Plan and Elevation “
“ 5 of 6 A-5 8th Floor Plan, Rm 801 Elevation, Rm 802 Elevation And Floor Transition Detail “
“ 6 of 6 A-6 Interior Finish Schedule and Acoustical Wall Carpet Description “
File details come from the government source that posted it. Updated .