Questions/Answers to Solicitation
Text of this file
– 2 –
DEPARTMENT OF THE TREASURY
INTERNAL REVENUE SERVICE
WASHINGTON, D.C. 20224
file_0.png file_1.wmf
September 27, 2012
To: All Interested Offerors
QUESTIONS AND ANSWERS for (RFQ) No. TIRWR-12-Q-00042 for Moving/Relocation Services
The due date for proposals/quotes is Wednesday, October 03, 2012 at 5:00 p.m, PST
Questions:
| 1.) | Will all reconfigured workstations require to be keyed alike with the |
| purchase of new lock/cores? |
Yes
Installation Union Labor or Non-Union Labor?
There is no requirement for Union Labor/Non-Union Labor
| 3.) | For re-upholstery of existing product in Executive Area, do you have |
| quantity of items or actual typicals to refer to for proper labor |
calculations? Or can this be included after bid award for accuracy?
Use workstation typicals dated August 16, 2012.
Note: The vendor shall not use the PDF plan labeled "2nd Floor" in the Excess Furniture attachment.
| 4.) | For Power Pole locations, will electrician be responsible for cutting of |
| ceiling tiles where applicable? |
Yes
| 5.) | After bid award, can additional labor for cutting of any panels for |
| access to electrical, thermostats be covered for additional fees that are |
not visible at this time?
No, this is a Fixed-Price contract and no additional costs are anticipated.
| 6.) | Regarding wall mounted furniture components in private offices, the floor |
| plans indicate some freestanding and wall mount applications. Can | |
| additional labor after bid award be included to cover this cost after | |
| design phase? |
No, this is a Fixed-Price contract and no additional costs are anticipated.
| 7.) | Who will be responsible for any items that were captured in the |
| inventory and are missing upon teardown? How will the inventory be |
secured?
Vendor is responsible to include/document all product seen during site visits and inventory phase. IRS/GSA shall secure furniture.
8.) Can we get a floor plan of the 3rd floor swing space?
Refer to attachment dated 09-27-12
9.) Can we get the design intent drawings, workstation typical documents?
All the drawings and typicals have been provided. Please refer to attachments .
Late questions will not be acknowledged.
– 2 –
DEPARTMENT OF THE TREASURY
INTERNAL REVENUE SERVICE
WASHINGTON, D.C. 20224
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_09-27-12_1st_Flr_and_Third_Floor_Swing_Space042312__(2).pdf | ||
| TIRWR12Q00042-A0005 1 .rtf | RTF text file | |
| TIRWR12Q00042-A0004 1 .rtf | RTF text file | |
| TIRWR12Q00042-2.rtf | RTF text file | |
| Revised and Final Set of Documents Dated Aug. 17 2012.pdf | ||
| TIRWR12Q00042 1 Revised for full and open.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .