Summary of Invitation to Bid CGB02527C
This Invitation to Bid (ITB) is issued by the City of Bridgeport, Connecticut, Department of Public Purchases for renovation services at Tina Klem Serenity House. The project encompasses comprehensive renovations including rehabilitation of first, second, and third-floor bathrooms; first and second-floor stairwells; kitchen; and building exterior soffits. Specific work includes new floor installation in bathrooms and kitchen, lighting upgrades in public halls and bathrooms, installation of new plumbing fixtures, drywall work, painting, stair repairs and flooring, and soffit replacement. The contractor must provide all materials, equipment, and labor to ensure compliance with Connecticut State and City of Bridgeport building codes. A mandatory pre-bid meeting and site visit will be held on Monday, November 16, 2026, at 10:00 a.m. at 74 Huntington Road, Bridgeport, CT 06608; bidders arriving more than 10 minutes late will be deemed ineligible. Electronic bid submissions are due by 2:00 p.m. Eastern Standard Time on Tuesday, December 8, 2026, through the OpenGov Procurement portal. The question deadline is Monday, November 23, 2026, at 4:00 p.m. A detailed bid sheet breaks down costs across multiple areas: bathrooms (three full bathrooms, one half bathroom), kitchen renovation, lighting and stair refurbishing, and building exterior work.
Davis-Bacon wage rates apply to this project. Bidders must submit a 10 percent bid bond or certified check if the bid exceeds $100,000. The successful contractor will be required to post a 100 percent payment and performance bond prior to work authorization. Prior to award, a satisfactory Certificate of Insurance is required, including commercial general liability, automobile liability, and workers' compensation, with additional insured and cancellation notice endorsements. The contractor must hold a valid Connecticut license, valid SAM, DUNS, Connecticut, and Federal Tax ID numbers prior to commencing work, and must obtain all required permits and inspections. The City is exempt from Connecticut sales taxes on services and materials for this project. No specific set-asides for minority-owned businesses or city-based businesses are indicated in this solicitation. The City reserves the right to reject any or all bids and to award to the responsible bidder whose bid is most advantageous in terms of cost and other specified factors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
CGB02527C
TINA KLEM SERENITY HOUSE RENOVATIONS
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Tuesday, December 8, 2026 by 2:00 pm
Table Of Contents
1. Introduction
2. Invitation to Bid
3. Bid Information
4. Scope of Work
5. Bid Sheet
6. Submission Instructions
7. Terms and Conditions
8. Vendor Questionnaire & Submission
Attachments:
A - Davis Bacon Wage_General Decision Number CT20260020 05182026
B - GENERAL CONDITIONS - FINAL REV. FEB 2026 - HIGHER_LIMITS
C - HCD - Draft Agreement
D - Construction Services Insurance Rider
1. Introduction
The City of Bridgeport seeks bids for Tina Klem Serenity House Renovations.
The requirements of this bid are outlined in greater detail under Bid Information & Statement of Work Section.
The selected awardee must meet all municipal, State and Federal practices and requirements.
1.1. Department of housing and Community Development
The City of Bridgeport Department of Housing & Community Development (HCD) developed as part of the City's broader effort to address affordable housing, neighborhood revitalization, poverty, homelessness, and deteriorating housing conditions. Its work is closely connected to federal housing and community-development programs administered through the U.S.
Department of Housing and Urban Development (HUD).
2. Invitation to Bid
The City of Bridgeport's Department of Housing and Community Development (HCD) is seeking bids for renovations for Tina Klem Serenity House Renovations.
The project consists of, but is not limited to, the rehabilitation of the 1st, 2nd, and 3rd-floor bathrooms; 1st and 2nd-floor stairwells; kitchen; and soffits. The selected contractor must provide all materials, equipment, and highly competent labor to ensure all work meets CT State and City of Bridgeport building codes.
Submissions must be received by the City of Bridgeport, Department of Public Purchases (2nd
Floor, 999 Broad Street, Bridgeport, CT 06604) until 2:00 pm on Tuesday, December 8, 2026, at which time they will be publicly opened.
All questions regarding this bid must be posted directly on the Question & Answer section of
ITB through the OpenGov Procurement portal at https://procurement.opengov.com/portal/bridgeportct.
The Question cut-off date is Monday, November 23, 2026, at 4:00 pm. All answers will be posted in the Question & Answer Section of ITB.
All bidders are responsible for regularly checking https://procurement.opengov.com/portal/bridgeportct for any issued addendums.
MANDATORY PRE-BID MEETING AND SITE VISIT:
FAILURE OF A BIDDER TO ATTEND THE MANDATORY PRE-BID MEETING OR TO
ARRIVE MORE THAN TEN (10) MINUTES LATE TO THE MEETING WILL RESULT IN
INELIGIBILITY TO PARTICIPATE IN THIS PROJECT
A mandatory pre-bid meeting/walk-thru will be held onMonday, November 16, 2026 @ 10:00 am at 74 Huntington Road, Bridgeport, CT 06608. All prospective bidders must attend the schedule meeting. This meeting will begin promptly at 10:00 am. Prospective bidders arriving https://procurement.opengov.com/portal/bridgeportct more than (10) minutes after the starting time will result in ineligibility to participate in this project.
3. Bid Information
3.1. Contractors Requirements and Responsibilities
Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of
Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of
State.
The contractor will be responsible for the safety of the work site.
The contractor is responsible obtaining and paying for any and all permits as required.
This contract award will require that the successful vendor have a valid SAM, DUNS, CT and
Federal Tax ID numbers prior to commencing work.
The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
3.2. 3.2 General Contractors Responsibilities
General Contractor Responsibilities
The Contractor shall:
• Field verify all existing dimensions, elevations, utilities, and site conditions before beginning work.
• Promptly notify the owner of any discrepancies, conflicts, or unforeseen conditions before proceeding with affected work.
• Obtain and pay for all required permits, inspections, approvals, and related fees.
• Do not commence work until all required permits and authorizations are obtained.
• Maintain a safe, secure, and orderly work area throughout construction.
• Repair or replace existing or new work damaged during construction at no additional cost to the Owner.
• Always maintain a clean and safe job site. All debris shall be removed regularly and deposited off in accordance with local regulations.
• Temporary protection must be installed such as signage, barriers shall be provided to protect the public, and workers.
• All materials should be new and of a commercially graded quality. Substitution must be approved in writing to the Architect or owner.
3.3. Bid Bond
Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.
3.4. Payment and Performance Bond
The successful bidder, prior to permission to proceed, will be required to post payment & performance bonds of 100% of the contract price if the contract price is $100,000 or more.
3.5. Davis-Bacon Wage Rates
Davis-Bacon wage rates apply, see attachment section copy of the wage determination.
Davis-Bacon Act. The law provides that contracts in excess of $2,000 involving the United
States or the District of Columbia for construction, alteration, or repair (including painting and decorating) of public buildings or public works within the U.S., must contain a clause (see
Federal Acquisition Regulation part 52.222-6) that no laborer or mechanic employed directly upon the site of the work shall receive less than the prevailing wage rates as determined by the
U.S. Secretary of Labor.
3.6. Certificate of Insurance (COI)
Prior to award a satisfactory COI will be required.
Please be advised that a satisfactory Certificate of Insurance is required prior to award. The required policies must include commercial general liability, automobile liability, and workers' compensation, along with endorsements for additional insured and notice of cancellation.
The coverage must meet or exceed the scope and limits specified in the attached insurance rider or required by applicable law, whichever is greater. Please note that these limits are minimum requirements and do not preclude the City from requiring higher limits or additional coverage.
For details on the minimum coverage limits, please refer to the insurance rider in the attachments section of the IFB.
3.7. Minority and Buy Local
INTENTIONALLY OMITTED
3.8. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB):
INTENTIONALLY OMITTED
4. Scope of Work https://www.acquisition.gov/far/part-52#FAR_52_222_6
Services shall include but not be limited to: renovations and/or improvements, general maintenance, cleaning, miscellaneous carpentry, plumbing, electrical work, flooring, and other related work.
The Contractor shall be solely responsible for obtaining all building permits required for any work completed for this Contract and ensuring that all building inspections are successfully completed.
4.1. Project Description
Tina Klem Project entails renovating the building to the codes and standards of Connecticut
Building Statures and laws. The work in its' entirety consists of contractor providing materials, labor, and all equipment necessary to facilitate the work to be completed as specified in contract documents.
Renovations include but not limited to:
1. NEW FLOOR INSTALLATION IN BATHROOMS AND KITCHEN
2. LIGHTING UPGRADE IN PUBLIC HALL AND BATHROOM
3. INSTALL NEW PLUMBING FIXTURES IN ALL BATHROOMS & KITCHEN
4. COMPOUND, PRIME AND PAINT ALL WALLS IN BATHROOMS
5. REPAIR SOFFIT & STAIRCASE
4.2. SCOPE OF WORK & SPECIFICATIONS
BATHROOM #1 - 1st FLOOR
1.Remove and dispose of existing drywall down to the wall studs. Provide and install new
1/4-inch-thick x 4-foot x 8-foot USG Sheetrock® Brand drywall panels, including measuring, cutting, fitting, fastening, and securing panels to the existing framing. Complete installation in accordance with the manufacturer’s specifications and applicable building codes, leaving surfaces ready for taping, joint compound, sanding, and finishing.
2. Remove and dispose of existing electrical fixtures and components. Provide and install new electrical fixtures, wiring, and associated components throughout the designated areas, in accordance with applicable electrical codes, manufacturer specifications, and local permitting and inspection requirements. All electrical work shall be performed by a properly licensed electrician.
3. Bathroom Mirror: Furnish and install one Glacier Bay 22.2-inch W x 27.7-inch H rectangular polystyrene-framed wall-mounted bathroom mirror, brushed nickel finish, or approved equal, including all required mounting hardware and accessories. Contractor shall verify actual wall dimensions and substrate conditions before installation. Secure mirror using appropriate manufacturer-approved hardware. Install level, plumb, centered, and securely anchored. Protect finished mirror from damage and clean upon completion.
4. Silestone Quartz Vanity Top: Furnish and install one Silestone Quartz White Rectangular
Single-Sink Vanity Top or approved equal. Contractor shall field-verify all dimensions before fabrication or installation, including vanity dimensions, wall conditions, sink and faucet locations, plumbing rough-ins, and required clearances. Vanity top shall be level, properly aligned, securely supported, and anchored to a structurally adequate vanity/cabinet or approved support system. Supporting construction shall be capable of safely carrying the weight of the countertop, sink, faucet, and associated fixtures. Provide all required brackets, supports, fasteners, sealants, and accessories. Seal all applicable joints and penetrations against water intrusion. Install in accordance with the manufacturer's written instructions.
5. Shower Stall: Provide and install one York or approved equal 36-inch W x 36-inch L x 79-inch H Alcove Shower Kit with Door and Walls or approved equal. Install plumb, level, securely anchored, properly supported, and waterproofed in accordance with the manufacturer's installation instructions and applicable plumbing/building code. Coordinate shower valve, drain, supply piping, door swing, clearances, and waterproofing with the approved installation.
6. Toilet: Provide and install one Hugo one-piece, 1.1 GPF, dual-touchless-flush, elongated white toilet, ADA-compliant, or approved equal. Toilet shall be a listed/certified plumbing fixture and shall be installed with an approved closet flange, closet bolts, gasket, water supply connection, and required accessories. Provide required floor clearance, seat height, grab-bar clearances, flush controls, and fixture clearances where an accessible toilet compartment is required. Verify all dimensions against the approved accessibility layout before installation.
7. Field Verification: Contractor shall field-verify all dimensions, elevations, clearances, substrate conditions, existing plumbing and electrical locations, fixture locations, and site conditions before commencing work or ordering materials. Do not rely solely on dimensions shown on drawings where field measurements can be obtained. Contractor shall coordinate all work between trades and verify compatibility of specified materials and fixtures with existing conditions.
8. Surface Preparation and Primer: Clean, prepare, repair, patch, and prime all specified surfaces before application of finish paint. Remove loose, peeling, blistered, or deteriorated coatings. Repair cracks, holes, damaged surfaces, and minor imperfections as necessary to provide a sound and smooth substrate. Apply one coat of white, all-purpose, multi-surface interior/exterior primer, or approved equal, compatible with the existing substrate and finish coat. Apply in accordance with the manufacturer's written instructions.
9. Semi-Gloss Finish Paint: Apply one finish coat of semi-gloss paint to all specified areas following proper surface preparation and primer application. Painting shall be suitable for interior bathroom use and compatible with the primer and substrate. Apply uniformly in accordance with the manufacturer's written instructions. Finished surfaces shall have consistent color and shall be free of runs, drips, lap marks, roller marks, brush marks, holidays, and other visible defects.
10. Code, Permits, and Inspections: All work shall comply with the currently adopted
Connecticut State Building Code, applicable Connecticut plumbing and electrical requirements, City of Bridgeport requirements, manufacturer's written instructions, and requirements of the Authority Having Jurisdiction (AHJ). Contractor shall obtain all permits required for the work and arrange required inspections. All completed installations shall be properly tested and left in safe, clean, and fully operational condition.
11. Supply and install one Glacier Bay rectangular bathroom wall mirror, measuring approximately 22.2 inches wide x 27.7 inches high, with a polystyrene frame in a brushed nickel finish, including all necessary mounting hardware, fasteners, and accessories for proper installation. Install securely in the designated location in accordance with the manufacturer’s specifications.
12. Plumbing: All new and modified water-supply, sanitary drainage, vent, fixture, and related plumbing work shall comply with the applicable Connecticut-adopted plumbing code, including required fixture, trap, venting, cleanout, backflow-prevention, water-conservation, and testing requirements. Contractor shall coordinate all fixtures rough-in dimensions with actual manufacturer specifications before installation.
13. Accessibility: Where the project or bathroom is required to be accessible, all fixtures, controls, doors, clear floor spaces, turning spaces, grab bars, mounting heights, knee/toe clearances, and approach clearances shall comply with the applicable provisions of the
Connecticut State Building Code and ICC/ANSI A117.1. The contractor shall verify accessibility dimensions before rough-in and installation.
14. Substrate and existing Conditions: Contractor shall inspect existing walls, floors, framing, plumbing, and electrical conditions before beginning work. Report concealed damage, inadequate structural support, deteriorated substrates, or code deficiencies to the Owner before proceeding with affected work.
15. Protection and Completion: Protect all finished surfaces, fixtures, tile, quartz, walls, doors, and plumbing fixtures during construction. Upon completion, remove construction debris, clean all fixtures and surfaces, remove protective coverings, test all plumbing fixtures and drains, and correct leaks, defects, damaged finishes, or improperly installed materials.
16. Code Compliance: All materials and equipment shall be new, approved/listed where required, suitable for their intended use, and installed in accordance with the manufacturer's written instructions and the applicable Connecticut State Building Code, City of Bridgeport requirements, and Authority Having Jurisdiction (AHJ) requirements.
17. Surface Preparation and Primer: Clean, prepare, repair, patch, and prime all specified surfaces before application of finish paint. Remove loose, peeling, blistered, or deteriorated coatings. Repair cracks, holes, damaged surfaces, and minor imperfections as necessary to provide a sound and smooth substrate. Apply one coat of white, all-purpose, multi-surface interior/exterior primer, or approved equal, compatible with the existing substrate and finish coat. Apply in accordance with the manufacturer's written instructions.
18. Semi-Gloss Finish Paint: Apply one finish coat of semi-gloss paint to all specified areas following proper surface preparation and primer application. Painting shall be suitable for interior bathroom use and compatible with the primer and substrate. Apply uniformly in accordance with the manufacturer's written instructions. Finished surfaces shall have consistent color and shall be free of runs, drips, lap marks, roller marks, brush marks, holidays, and other visible defects.
19. Cement Backer Board: Provide and install minimum 1/4-inch cementitious backer board at specified wet-area locations over properly prepared framing/substrate. Install with manufacturer-approved corrosion-resistant fasteners at required spacing and provide properly treated joints.
Cement board installation shall comply with the manufacturer's instructions and applicable code requirements. 1/2-inch backer board shall be used where required by the approved assembly or substrate conditions.
20. Waterproofing and Thin set: Provide and install a continuous, code-compliant waterproofing system at shower and other required wet areas. Apply Versa Bond 50-lb. Gray
Polymer-Modified Thin-Set Mortar, or approved equal, over the properly prepared and plumbed substrate and compatible waterproofing membrane. Waterproofing shall be installed in accordance with the membrane manufacturer's written instructions, including treatment of seams, corners, penetrations, niches, and transitions.
21. Floor Tile: Provide and install 18-inch x 18-inch Glossy Calacatta ceramic floor tile, or approved equal, over properly prepared, level, and plumb substrate. Install using manufacturer-approved polymer-modified thin-set mortar. Maintain consistent grout joints and provide grout suitable for wet-area applications. Floor installation shall provide proper drainage and shall not create conditions that interfere with required accessibility or plumbing clearances.
BATHROOM #2 – 2nd FLOOR
All work shall be performed in accordance with the currently adopted Connecticut State Building
Code, applicable Connecticut amendments, applicable City of Bridgeport ordinances, and all applicable plumbing, electrical, mechanical, fire-safety, accessibility, and manufacturer requirements. Contractor shall obtain all required permits and inspections from the City of
Bridgeport Building Department. Where requirements conflict, the more stringent requirement shall govern unless otherwise approved by the Authority Having Jurisdiction (AHJ).
1. Remove and dispose of existing drywall down to the wall studs. Provide and install new
1/4-inch-thick x 4-foot x 8-foot USG Sheetrock® Brand drywall panels, including measuring, cutting, fitting, fastening, and securing panels to the existing framing. Complete installation in accordance with the manufacturer’s specifications and applicable building codes, leaving surfaces ready for taping, joint compound, sanding, and finishing.
2. Remove and dispose of existing electrical fixtures and components. Provide and install new electrical fixtures, wiring, and associated components throughout the designated areas, in accordance with applicable electrical codes, manufacturer specifications, and local permitting and inspection requirements. All electrical work shall be performed by a properly licensed electrician.
3. Bathroom Mirror: Furnish and install one Glacier Bay 22.2-inch W x 27.7-inch H rectangular polystyrene-framed wall-mounted bathroom mirror, brushed nickel finish, or approved equal, including all required mounting hardware and accessories. Contractor shall verify actual wall dimensions and substrate conditions before installation. Secure mirror using appropriate manufacturer-approved hardware. Install level, plumb, centered, and securely anchored. Protect finished mirror from damage and clean upon completion.
4. Silestone Quartz Vanity Top: Furnish and install one Silestone Quartz White Rectangular
Single-Sink Vanity Top or approved equal. Contractor shall field-verify all dimensions before fabrication or installation, including vanity dimensions, wall conditions, sink and faucet locations, plumbing rough-ins, and required clearances. Vanity top shall be level, properly aligned, securely supported, and anchored to a structurally adequate vanity/cabinet or approved support system. Supporting construction shall be capable of safely carrying the weight of the countertop, sink, faucet, and associated fixtures. Provide all required brackets, supports, fasteners, sealants, and accessories. Seal all applicable joints and penetrations against water intrusion. Install in accordance with the manufacturer's written instructions.
5. Shower Stall: Provide and install one York or approved equal 36-inch W x 36-inch L x 79-inch H Alcove Shower Kit with Door and Walls or approved equal. Install plumb, level, securely anchored, properly supported, and waterproofed in accordance with the manufacturer's installation instructions and applicable plumbing/building code. Coordinate shower valve, drain, supply piping, door swing, clearances, and waterproofing with the approved installation.
6. Toilet: Provide and install one Hugo one-piece, 1.1 GPF, dual-touchless-flush, elongated white toilet, ADA-compliant, or approved equal. Toilet shall be a listed/certified plumbing fixture and shall be installed with an approved closet flange, closet bolts, gasket, water supply connection, and required accessories. Provide required floor clearance, seat height, grab-bar clearances, flush controls, and fixture clearances where an accessible toilet compartment is required. Verify all dimensions against the approved accessibility layout before installation.
7. Field Verification: Contractor shall field-verify all dimensions, elevations, clearances, substrate conditions, existing plumbing and electrical locations, fixture locations, and site conditions before commencing work or ordering materials. Do not rely solely on dimensions shown on drawings where field measurements can be obtained. Contractor shall coordinate all work between trades and verify compatibility of specified materials and fixtures with existing conditions.
8. Surface Preparation and Primer: Clean, prepare, repair, patch, and prime all specified surfaces before application of finish paint. Remove loose, peeling, blistered, or deteriorated coatings. Repair cracks, holes, damaged surfaces, and minor imperfections as necessary to provide a sound and smooth substrate. Apply one coat of white, all-purpose, multi-surface interior/exterior primer, or approved equal, compatible with the existing substrate and finish coat. Apply in accordance with the manufacturer's written instructions.
9. Semi-Gloss Finish Paint: Apply one finish coat of semi-gloss paint to all specified areas following proper surface preparation and primer application. Painting shall be suitable for interior bathroom use and compatible with the primer and substrate. Apply uniformly in accordance with the manufacturer's written instructions. Finished surfaces shall have consistent color and shall be free of runs, drips, lap marks, roller marks, brush marks, holidays, and other visible defects.
10. Code, Permits, and Inspections: All work shall comply with the currently adopted
Connecticut State Building Code, applicable Connecticut plumbing and electrical requirements, City of Bridgeport requirements, manufacturer's written instructions, and requirements of the Authority Having Jurisdiction (AHJ). Contractor shall obtain all permits required for the work and arrange required inspections. All completed installations shall be properly tested and left in safe, clean, and fully operational condition.
11. Plumbing: All new and modified water-supply, sanitary drainage, vent, fixture, and related plumbing work shall comply with the applicable Connecticut-adopted plumbing code, including required fixture, trap, venting, cleanout, backflow-prevention, water-conservation, and testing requirements. Contractor shall coordinate all fixtures rough-in dimensions with actual manufacturer specifications before installation.
12. Accessibility: Where the project or bathroom is required to be accessible, all fixtures, controls, doors, clear floor spaces, turning spaces, grab bars, mounting heights, knee/toe clearances, and approach clearances shall comply with the applicable provisions of the
Connecticut State Building Code and ICC/ANSI A117.1. The contractor shall verify accessibility dimensions before rough-in and installation.
13. Substrate and existing Conditions: Contractor shall inspect existing walls, floors, framing, plumbing, and electrical conditions before beginning work. Report concealed damage, inadequate structural support, deteriorated substrates, or code deficiencies to the Owner before proceeding with affected work.
14. Protection and Completion: Protect all finished surfaces, fixtures, tile, quartz, walls, doors, and plumbing fixtures during construction. Upon completion, remove construction debris, clean all fixtures and surfaces, remove protective coverings, test all plumbing fixtures and drains, and correct leaks, defects, damaged finishes, or improperly installed materials.
15. Code Compliance: All materials and equipment shall be new, approved/listed where required, suitable for their intended use, and installed in accordance with the manufacturer's written instructions and the applicable Connecticut State Building Code, City of Bridgeport requirements, and Authority Having Jurisdiction (AHJ) requirements.
16 Surface Preparation and Primer: Clean, prepare, repair, patch, and prime all specified surfaces before application of finish paint. Remove loose, peeling, blistered, or deteriorated coatings. Repair cracks, holes, damaged surfaces, and minor imperfections as necessary to provide a sound and smooth substrate. Apply one coat of white, all-purpose, multi-surface interior/exterior primer, or approved equal, compatible with the existing substrate and finish coat. Apply in accordance with the manufacturer's written instructions.
17. Semi-Gloss Finish Paint: Apply one finish coat of semi-gloss paint to all specified areas following proper surface preparation and primer application. Painting shall be suitable for interior bathroom use and compatible with the primer and substrate. Apply uniformly in accordance with the manufacturer's written instructions. Finished surfaces shall have consistent color and shall be free of runs, drips, lap marks, roller marks, brush marks, holidays, and other visible defects.
18. Cement Backer Board: Provide and install minimum 1/4-inch cementitious backer board at specified wet-area locations over properly prepared framing/substrate. Install with manufacturer-approved corrosion-resistant fasteners at required spacing and provide properly treated joints.
Cement board installation shall comply with the manufacturer's instructions and applicable code requirements. 1/2-inch backer board shall be used where required by the approved assembly or substrate conditions.
19. Waterproofing and Thinset: Provide and install a continuous, code-compliant waterproofing system at shower and other required wet areas. Apply Versa Bond 50-lb. Gray Polymer-
Modified Thin-Set Mortar, or approved equal, over the properly prepared and plumbed substrate and compatible waterproofing membrane. Waterproofing shall be installed in accordance with the membrane manufacturer's written instructions, including treatment of seams, corners, penetrations, niches, and transitions.
20. Floor Tile: Provide and install 18-inch x 18-inch Glossy Calacatta ceramic floor tile, or approved equal, over properly prepared, level, and plumb substrate. Install using manufacturer-approved polymer-modified thin-set mortar. Maintain consistent grout joints and provide grout suitable for wet-area applications. Floor installation shall provide proper drainage and shall not create conditions that interfere with required accessibility or plumbing clearances.
BATHROOM #3 – 3rd FLOOR
All work shall be performed in accordance with the currently adopted Connecticut State Building
Code, applicable Connecticut amendments, applicable City of Bridgeport ordinances, and all applicable plumbing, electrical, mechanical, fire-safety, accessibility, and manufacturer requirements. Contractor shall obtain all required permits and inspections from the City of
Bridgeport Building Department. Where requirements conflict, the more stringent requirement shall govern unless otherwise approved by the Authority Having Jurisdiction (AHJ).
1. Remove and dispose of existing drywall down to the wall studs. Provide and install new
1/4-inch-thick x 4-foot x 8-foot USG Sheetrock® Brand drywall panels, including measuring, cutting, fitting, fastening, and securing panels to the existing framing. Complete installation in accordance with the manufacturer’s specifications and applicable building codes, leaving surfaces ready for taping, joint compound, sanding, and finishing.
2. Remove and dispose of existing electrical fixtures and components. Provide and install new electrical fixtures, wiring, and associated components throughout the designated areas, in accordance with applicable electrical codes, manufacturer specifications, and local permitting electrician.
3. Shower Stall: Provide and install one York or approved equal 36-inch W x 36-inch L x 79-inch H Alcove Shower Kit with Door and Walls or approved equal. Install plumb, level, securely anchored, properly supported, and waterproofed in accordance with the manufacturer's installation instructions and applicable plumbing/building code. Coordinate shower valve, drain, supply piping, door swing, clearances, and waterproofing with the approved installation.
4. Bathroom Sink Faucet: Provide and install one automatic sensor, touchless, single-hole bathroom sink faucet, polished chrome, including deck plate, pop-up drain, supply connections, and required accessories, or approved equal. Faucet shall be certified/listed as required by applicable Connecticut plumbing requirements and installed in accordance with the manufacturer's instructions. Provide required backflow protection where applicable.
5. Toilet: Provide and install one Hugo one-piece, 1.1 GPF, dual-touchless-flush, elongated white toilet, ADA-compliant, or approved equal. Toilet shall be a listed/certified plumbing fixture and shall be installed with an approved closet flange, closet bolts, gasket, water supply connection, and required accessories. Provide required floor clearance, seat height, grab-bar clearances, flush controls, and fixture clearances where an accessible toilet compartment is required. Verify all dimensions against the approved accessibility layout before installation.
6. Silestone Vanity Top: Provide and install one Silestone Quartz White Rectangular Single-
Sink Vanity Top, or approved equal, where shown on the approved drawings. Provide adequate structural support, approved brackets/cleats, compatible silicone sealant, and all required accessories. Install level and securely supported without imposing excessive loads on the wall-mounted sink or plumbing. Coordinate sink, faucet, drain, backsplash, and wall penetrations before fabrication and installation. Seal all countertop-to-wall and countertop-to-sink joints against water penetration. Follow the quartz manufacturer's fabrication, handling, support, and installation requirements.
7. Plumbing: All new and modified water-supply, sanitary drainage, vent, fixture, and related plumbing work shall comply with the applicable Connecticut-adopted plumbing code, including required fixture, trap, venting, cleanout, backflow-prevention, water-conservation, and testing requirements. Contractor shall coordinate all fixtures rough-in dimensions with actual manufacturer specifications before installation.
8. Accessibility: Where the project or bathroom is required to be accessible, all fixtures, controls, doors, clear floor spaces, turning spaces, grab bars, mounting heights, knee/toe clearances, and approach clearances shall comply with the applicable provisions of the Connecticut State
Building Code and ICC/ANSI A117.1. The contractor shall verify accessibility dimensions before rough-in and installation.
9. Substrate and existing Conditions: Contractor shall inspect existing walls, floors, framing, plumbing, and electrical conditions before beginning work. Report concealed damage, inadequate structural support, deteriorated substrates, or code deficiencies to the Owner before proceeding with affected work.
10. Protection and Completion: Protect all finished surfaces, fixtures, tile, quartz, walls, doors, and plumbing fixtures during construction. Upon completion, remove construction debris, clean all fixtures and surfaces, remove protective coverings, test all plumbing fixtures and drains, and correct leaks, defects, damaged finishes, or improperly installed materials.
11. Code Compliance: All materials and equipment shall be new, approved/listed where required, suitable for their intended use, and installed in accordance with the manufacturer's written instructions and the applicable Connecticut State Building Code, City of Bridgeport requirements, and Authority Having Jurisdiction (AHJ) requirements.
12. Existing Tile Reglazing: Contractor shall clean, prepare, repair, and reglaze existing tile surfaces at all specified areas, including tile faces, grout joints, and trim faces. Remove all dirt, soap residue, loose material, failed coatings, and contaminants. Repair loose or deteriorated grout and minor surface defects prior to reglazing and replace broken tiles. Use a professional-grade coating system specifically designed for bathroom and wet-area applications. Apply in strict accordance with the manufacturer's written instructions. Finished surfaces shall be uniform in color and sheen and free of peeling, runs, drips, pinholes, cracks, or other visible defects.
13. Surface Preparation and Primer: Clean, prepare, repair, patch, and prime all specified surfaces before application of finish paint. Remove loose, peeling, blistered, or deteriorated coatings. Repair cracks, holes, damaged surfaces, and minor imperfections as necessary to provide a sound and smooth substrate. Apply one coat of white, all-purpose, multi-surface interior/exterior primer, or approved equal, compatible with the existing substrate and finish coat. Apply in accordance with the manufacturer's written instructions.
14. Semi-Gloss Finish Paint: Apply one finish coat of semi-gloss paint to all specified areas following proper surface preparation and primer application. Painting shall be suitable for interior bathroom use and compatible with the primer and substrate. Apply uniformly in accordance with the manufacturer's written instructions. Finished surfaces shall have consistent color and shall be free of runs, drips, lap marks, roller marks, brush marks, holidays, and other visible defects.
HALF BATHROOM
1. Remove and dispose of existing drywall down to the wall studs. Provide and install new
1/4-inch-thick x 4-foot x 8-foot USG Sheetrock® Brand drywall panels, including measuring, cutting, fitting, fastening, and securing panels to the existing framing. Complete installation in accordance with the manufacturer’s specifications and applicable building codes, leaving surfaces ready for taping, joint compound, sanding, and finishing.
2. Remove and dispose of existing electrical fixtures and components. Provide and install new electrical fixtures, wiring, and associated components throughout the designated areas, in accordance with applicable electrical codes, manufacturer specifications, and local permitting electrician.
3. Elongated Toilet: Contractor shall provide and install one Hugo one-piece, 1.1 GPF, dual-touchless-flush, elongated toilet, white, or approved equal. Toilet shall be new, residential grade, and listed/certified for its intended use. The contractor shall provide all necessary mounting hardware, closet flange connection, approved sealing gasket, supply connection, shutoff valve, toilet seat, and manufacturer-required accessories. Install toilet level, plumb, securely anchored, and watertight in accordance with the manufacturer's written installation instructions and applicable Connecticut plumbing and building code requirements. Contractor shall test the fixture for proper operation and verify that there are no leaks upon completion.
4. Wall-Mounted Bathroom Sink: Contractor shall provide and install one Claire 22.06-inch rectangular wall-mounted bathroom sink, glossy white, Swiss Madison type, or approved equal.
Contractor shall field-verify all dimensions, wall conditions, plumbing rough-in locations, mounting heights, and required clearances prior to installation. Provide all manufacturer-approved mounting brackets, supports, hardware, drain assembly, traps, water-supply connections, escutcheons, and accessories required for complete installation. Sink shall be securely supported by the wall structure, installed level and plumb, and sealed at applicable joints and penetrations. Install in accordance with the manufacturer's written instructions and applicable Connecticut plumbing and building code requirements. Where accessibility provisions apply, install fixture and provide required clear floor space, knee and toe clearance, mounting height, and protection of exposed plumbing in accordance with the applicable accessibility requirements.
5. Wall-Mounted Bathroom Mirror: Contractor shall provide and install one Glacier Bay 22.2-inch-wide x 27.7-inch-high rectangular polystyrene-framed wall bathroom mirror, brushed nickel finish, or approved equal. The contractor shall field-verify wall dimensions, substrate conditions, mounting location, height, and clearances prior to installation. Provide all required manufacturer-approved mounting hardware appropriate for the wall substrate. Install mirror securely, level, plumb, properly aligned, and free from cracks, chips, distortion, or other defects. Where accessibility provisions apply, locate and mount mirror in accordance with applicable accessibility requirements. Protect completed mirror from damage during construction and clean upon completion.
6. Cement Backer Board: Provide and install minimum 1/4-inch cementitious backer board at specified wet-area locations over properly prepared framing/substrate. Install with manufacturer-approved corrosion-resistant fasteners at required spacing and provide properly treated joints.
Cement board installation shall comply with the manufacturer's instructions and applicable code requirements. 1/2-inch backer board shall be used where required by the approved assembly or substrate conditions.
7. Waterproofing and Thinset: Provide and install a continuous, code-compliant waterproofing system at shower and other required wet areas. Apply Versa Bond 50-lb. Gray Polymer-
Modified Thin-Set Mortar, or approved equal, over the properly prepared and plumbed substrate and compatible waterproofing membrane. Waterproofing shall be installed in accordance with the membrane manufacturer's written instructions, including treatment of seams, corners, penetrations, niches, and transitions.
8. Floor Tile: Provide and install 18-inch x 18-inch Glossy Calacatta ceramic floor tile, or approved equal, over properly prepared, level, and plumb substrate. Install using manufacturer-approved polymer-modified thin-set mortar. Maintain consistent grout joints and provide grout suitable for wet-area applications. Floor installation shall provide proper drainage and shall not create conditions that interfere with required accessibility or plumbing clearances.
9. Compound, sand and apply paint to all wall surfaces, including surface preparation, priming as required, and finish coats, in accordance with the project specifications.
KITCHEN
1. Waterproofing and Thin-Set Mortar: Provide and install Versa Bond 50-lb. Gray
Professional Polymer-Modified Thin-Set Mortar, or approved equal, over the properly prepared substrate and compatible Alino Waterproof Membrane at designated wet areas.
Install waterproofing membrane continuously and in accordance with the membrane manufacturer's written instructions, including treatment of seams, corners, penetrations, transitions, and changes in plane. Thin-set mortar shall be mixed and applied in accordance with the manufacturer's requirements to achieve proper coverage and bond.
2. Ceramic Floor Tile: Provide and install 18-inch x 18-inch ceramic floor tile at applicable areas over a properly prepared, clean, dry, and level concrete substrate. Install tile with manufacturer-approved thin-set mortar, maintaining uniform and consistent grout joints. Tile installation shall be level, properly aligned, securely bonded, and free of lippage, cracks, hollow spots, or other defects. Provide grout and movement joints as required by the tile and mortar manufacturers and applicable code.
3. Provide and install new kitchen cabinet hardware, including cabinet pulls, knobs, hinges, drawer slides, and all necessary mounting fasteners. Hardware shall be durable, corrosion-resistant, and suitable for residential kitchen use. Finish, style, size, and color shall be selected by the owner or architect prior to installation. Hinges and drawer slides shall provide smooth operation, with soft-close mechanisms where specified. Install all hardware level, properly aligned, securely fastened, and in accordance with the manufacturer’s recommendations.
Remove and dispose of existing hardware and patch or repair mounting holes as required.
4. Kitchen Sink: Provide and install one single-basin, 16-gauge stainless-steel kitchen sink, or approved equal, sized to suit the existing or specified countertop/cabinet configuration.
Coordinate sink dimensions and cutout requirements with the actual manufacturer's template before cutting or fabrication. Provide all required mounting hardware, drain assembly, sealant, and plumbing connections. Install securely, level, watertight, and in accordance with the manufacturer's installation instructions and applicable plumbing requirements.
5. Kitchen Sink Sprayer: Provide and install one 7-inch H x 3.5-inch W x 2.5-inch D, three-mode kitchen sink sprayer set, stainless-steel/brass diverter construction, or approved equal.
Provide all required hoses fittings, connections, mounting hardware, and accessories. Install in accordance with the manufacturer's instructions and applicable plumbing requirements. Test for proper operation and leaks upon completion.
6. Quartz Vanity Top: Provide and install one Silestone Quartz White Rectangular Single-
Sink Vanity Top or approved equal. Verify actual sink, cabinet, wall, faucet, drain, backsplash, and plumbing dimensions before fabrication or installation. Provide all required supports, brackets, fasteners, compatible silicone sealant, and accessories. Install the quartz top level, securely supported, properly aligned, and sealed at all applicable joints and penetrations.
Installation shall comply with the quartz manufacturer's written requirements and applicable building and plumbing codes.
7. Field Verification and Dimensions: Contractor shall field-verify all existing and proposed dimensions, elevations, clearances, substrate conditions, plumbing locations, cabinet openings, sink and fixture dimensions, countertop dimensions, and other site conditions before commencing work or ordering/fabricating materials.
LIGHTING
1. Provide and install new LED light fixtures in all designated offices and hallways, including all necessary wiring, mounting hardware, switches, and electrical connections. Ensure all fixtures are properly installed, securely mounted, and fully operational in accordance with the manufacturer’s specifications and applicable electrical codes. All electrical work shall be performed by a licensed electrician, with required permits and inspections completed as applicable.
STAIRS - 1st Floor and 2nd Floor
1. Remove and dispose of all existing carpet from all stair treads, risers, and associated areas. Remove existing carpet padding, tack strips, staples, nails, and other carpet fastening materials as necessary. Collect and transport all removed materials and debris off-site for proper disposal. Clean and prepare the exposed stair surfaces for the installation of new slip-resistant stair flooring, leaving the work area clean and free of debris.
2. Provide and install slip-resistant laminate flooring on all designated stair treads and landings to improve traction and reduce the risk of slipping while walking. Include proper surface preparation, measuring, cutting, fitting, and secure fastening of all materials. Install slip-resistant stair nosing on each step and ensure all edges, joints, and transitions are properly secured and finished. All materials shall be durable, suitable for stair applications, and provide adequate slip resistance under normal walking conditions. Complete installation in accordance with the manufacturer's specifications and applicable building codes.
3. Sand, repair, and refinish all designated staircase components. Inspect all stair treads, risers, handrails, and other wood components for damage, wear, or deterioration. Repair or replace damaged components as necessary using materials of matching size and quality. Sand all surfaces to achieve a smooth, uniform finish, and apply wood stain to all designated areas, followed by a protective finish for durability and appearance. Complete all work in accordance with industry standards, ensuring consistent color and professional finish throughout the staircase.
BUILDING EXTERIOR - SOFFIT
1. Remove and properly dispose of all rotted, decayed, or damaged wood in the designated areas. Supply and install new pressure-treated lumber of the appropriate size and grade to replace all removed materials. Ensure all replacement wood is properly measured, cut, fitted, and securely fastened to maintain structural integrity and durability. Complete all work in accordance with applicable building codes and industry standards.
2. Provide and install new aluminum siding in the designated areas, including measuring, cutting, fitting, and securing all siding panels. Wrap all exposed edges, corners, trim, and openings with matching aluminum trim or flashing to ensure a neat, uniform, and weather-resistant finish. Include all necessary fasteners, accessories, and sealants, and complete installation in accordance with the manufacturer’s specifications and applicable building codes.
4.3. Key Deliverables
The City of Bridgeport must provide a list of key deliverables.
A. Pre-Construction
B. Permit Acquisition
C. Procurement of Materials
D. Demolition
E. Installation
F. Inspection
G. Substantial Walk Through
H. Hand Over
4.4. Schedule, Timeline, and Milestone Tracking
Proposers are required to complete and Schedule of Work and upload in the Vendor
Questionnaire & Submission section.
5. Bid Sheet
PROPOSED COST FOR BATHROOM #1
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 DEMOLITION/REMOVAL OF
PLUMBING FIXTURES
3 EA
Line Item Description Quantity Unit of
Measure Unit Cost Total
2 INSTALLATION OF PLUMBING
FIXTURES
3 EA
3 DEMOLITION/REMOVAL OF
ELECTRICAL FIXTURES
3 EA
4 ELECTRICAL FIXTURES
INSTALLATION
3 EA
5 FLOOR DEMOLITION 1 EA
6 FLOOR INSTALLATION 1 EA
TOTAL
PROPOSED COST FOR BATHROOM #2
Measure Unit Cost Total
7 DEMOLITION/REMOVAL OF
PLUMBING FIXTURES
3 EA
8 INSTALLATION OF PLUMBING
FIXTURES
3 EA
9 DEMOLITION/REMOVAL OF
ELECTRICAL FIXTURES
3 EA
10 ELECTRICAL FIXTURES
INSTALLATION
3 EA
11 FLOOR DEMOLITION/&
SHEETROCKS
1 EA
12 FLOOR INSTALLATION &
SHEETROCKS
1 EA
PROPOSED COST FOR BATHROOM #3
Measure Unit Cost Total
13 DEMOLITION/REMOVAL OF
PLUMBING FIXTURES
3 EA
14 INSTALLATION OF PLUMBING
FIXTURES
3 EA
15 DEMOLITION/REMOVAL OF
ELECTRICAL FIXTURES
5 EA
16 INSTALLATION OF ELECTRICAL
FIXTURES
2 EA
17 REGLAZING OF TILES 1 EA
18 DEMOLITION AND
INSTALLATION OF SHEETROCKS
HALF BATHROOM
Measure Unit Cost Total
19 DEMOLITION/REMOVAL OF
PLUMBING FIXTURES
3 EA
20 INSTALLATION OF PLUMBING
FIXTURES
3 EA
21 DEMOLITION/REMOVAL OF
ELECTRICAL FIXTURES
3 EA
22 INSTALLATION OF ELECTRICAL
FIXTURES
3 EA
23 FLOOR DEMOLITION/&
SHEETROCKS
1 EA
24 FLOOR INSTALLATION &
SHEETROCKS
PROPOSED COST FOR KITCHEN RENOVATION
Line Item Description Quantity Unit of
Measure Unit Cost Total
25 REMOVAL OF PLUMBING
FIXTURES & FLOORING
2 EA
26 INSTALLATION OF NEW
PLUMBING FIXTURES
2 EA
27 DEMOLITION OF FLOORING 1 EA
28 INSTALLATION OF NEW
FLOORING
1 EA
29 REMOVAL OF OLD CABINET
HARDWARE
10 EA
30 INSTALLATION OF NEW
HARDWARES
10 EA
PROPOSED COST FOR 1ST, 2ND & 3RD FLOOR
(PUBLIC HALL LIGHTING, STAIR REPAIR, FLOORING & CARPET REMOVAL)
Line Item Description Quantity Unit of
Measure Unit Cost Total
31 REMOVAL & DISPOSAL OF OLD
ELECTRICAL FIXTURES AND
CARPET
3 EA
32 INSTALLATION OF ELECTRICAL
FIXTURES AND STAIR
REFURBISHING
3 EA
PROPOSED COST FOR BUILDING EXTERIOR
Measure Unit Cost Total
33 SOFFIT DEMOLITION AND
REMOVAL
1 EA
34 NEW SOFFIT INSTALLATION 1 EA
6. Submission Instructions
6.1. Submission Instructions
All submissions must be submitted via the procurement portal.
Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.
6.2. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and…