This is a Timber Sale Prescription document issued by the Michigan Department of Natural Resources (MDNR), Forest Resources Division, for a timber marking and sale preparation project in the Gwinn Management Unit. The project involves marking and prescribing treatment for timber harvesting across five stands (6, 9, 19, 36, and 43) totaling approximately 292.8 acres in Sections 3 and 9 of Township 49N, Range 26W. The timber sale, identified as Sale Number 32-010-26 (Comp 203), requires contractors to perform selective cutting using group selection or single-tree selection methods to maintain Northern Hardwoods management objectives, with specific basal area targets ranging from 65 to 80 square feet per acre depending on the stand. The contractor must complete a mandatory pre-work meeting before October 1, 2025, and finish all contract work by August 1, 2026. Work can commence immediately upon contract award. Key deliverables include GPS data collection using the Field Maps application for all boundary lines, regeneration gaps, and marked trees; a list of personnel who performed marking or cruising work; and a summary of paint materials used.
The prescription specifies detailed marking requirements including paint colors for different boundary types (blue with pink flagging for private boundaries, red for state boundaries, yellow for interior payment unit lines, orange for trees marked to cut, and green for trees to leave), minimum diameter specifications for different product types (10.6 inches for sawlogs, 4.6 inches for pulpwood), and special instructions for creating regeneration gaps of 0.25 to 0.75 acres in stands 6, 9, 36, and 43. The MDNR will supply paint from the Gwinn Office and coordinate scheduling with contractor operations. Contractors are responsible for obtaining landowner permission to cross private land and must protect corner monuments and bearing trees discovered during marking operations. The document does not specify pricing terms, but contractors must demonstrate they can manage multiple markers within assigned geographic areas and maintain identifiable records of work performed by each individual involved in marking and cruising operations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 7 R4038 (Rev. 03/16/2022)
Michigan Department of Natural Resources – Forest Resources Division
TIMBER SALE PRESCRIPTION
GENERAL
Forest Resources Division Management Unit
Gwinn
Sale Name (or prescription name)
Comp 203 Contract Marking
Timber Sale Number (if applicable)
32-010-26
LOCAL CONTACT
Name
Jacob Siler
Email Address
SilerJ3@michigan.gov
Telephone
(906) 221-5885
TIMELINE
Contract Work Can Begin:
Immediately (Pre-work meeting must occur before 10/01/25)
Contract Work Must Be Completed By This Date:
08/01/2026
LEGAL DESCRIPTION
Town
49N
Range
26W
Section(s)
3 & 9
Description
SENW,SWNE,NESW,S1/2SW,SE of Sec 3; SWNW,SW,W1/2SE of Sec 9
Year of Entry
Compartment(s)
32203
Stand Number(s)
6, 9, 19, 36, 43
Access
Access will be through State and private. See map for details. Ask local contact for available landowner info.
ACREAGE (Payment will be made based on these estimated acres) Estimated Acres
292.8 Source
Inventory GPS Other:
TREATMENT & OBJECTIVE
STAND # / VDU # / PU # COVER TYPE ACRES INITIAL BA TREATMENT MANAGEMENT OBJECTIVE
S6 / VDU 6 / PU 4 M9 17.4 111-140 Group Selection Northern Hardwoods
S9 / VDU 9 / PU’s 2 & 3 M9 70.1 111-140 Group Selection Northern Hardwoods
S19 / VDU 19 / PU’s 6-12 M9 177.3 111-140 Single Tree Selection Northern Hardwoods
S43 / VDU 43 / PU 1 M9 9.8 111-140 Single Tree Selection Northern Hardwoods
S36 / VDU 36 / PU 5 M9 18.2 111-140 Group Selection Northern Hardwoods
PRESCRIPTION
Stand 6: Cut using a group selection system. Mark stand to 70 SQ FT using complete marker as a guide. Retain all hemlock and yellow birch unless harvest is necessary for operations. Create gaps of 0.25 - 0.75 acres in areas of advanced regeneration, intolerant species, or areas that look like they will support regeneration. Leave tops in gaps (When marking gaps mark trees with large bushy tops or forks with x's rather than a slash to denote that any material under 8 inches must be left within the gap). Consider planting of oak and white pine if regeneration of gaps fails. Gaps should cover around 10-20 percent of the treatment.
Stand 9: Cut using a group selection system. Mark stand to 70 SQ FT using complete marker as a guide. Retain all hemlock and oak unless harvest is necessary for operations. Create gaps of 0.25 - 0.75 acres in areas of advanced regeneration, intolerant species, or areas that look like they will support regeneration. Leave tops in gaps (When marking gaps mark trees with large bushy tops or forks with x's rather than a slash to denote that any material under 8 inches must be left within the gap). Consider planting of oak and white pine if regeneration of gaps fails. Gaps should cover around 10-20 percent of the treatment.
Stand 19: Cut using a selection system. Mark stand to 65 SQ FT using complete marker as a guide. Retain all hemlock, white ash, and yellow birch, unless harvest is necessary for operations. Due to heavy deer yard use across portions of the stand, do not create regeneration gaps. Target reserving 2-5 suitable seed trees per acre; these trees should be released to improve crown and overall tree health and be marked so they are protected for long term seed production.
Prescription continued on page 2.
2 of 7 R4038 (Rev. 03/16/2022)
PRESCRIPTION
Stand 36: Cut using a group selection system. Mark stand to 80 SQ FT using complete marker as a guide. Retain all hemlock, white pine, and yellow birch unless harvest is necessary for operations. Create gaps of 0.25 - 0.75 acres in areas of advanced regeneration, intolerant species, or areas that look like they will support regeneration. Leave tops in gaps. When marking gaps, mark trees with large bushy tops or forks with x's rather than a slash to denote that any material under 8 inches must be left within the gap. Consider planting of oak and white pine if regeneration of gaps fails.
Stand 43: Cut using a selection system. Mark stand to 70 SQ FT using complete marker as a guide. Retain all hemlock, oak, white ash, and yellow birch, unless harvest is necessary for operations. Create gaps of 0.25 - 0.75 acres in areas of advanced regeneration, intolerant species, or areas that look like they will support regeneration. Leave tops in gaps.
When marking gaps, mark trees with large bushy tops or forks with x's rather than a slash to denote that any material under 8 inches must be left within the gap. Consider planting of oak and white pine if regeneration of gaps fails. Gaps should cover around 10-20 percent of the treatment.
Management Objective: Northern Hardwoods (Mark to Cut)
• Gaps will be installed in accordance with ‘Interim Guidance – Increased Minimum Gap Size and Regeneration
Accountability for Uneven-aged Management’.
When marking, prioritize selection of trees to be cut in the following order:
1. Remove high-risk and cull trees.
2. Remove trees of poor form.
3. Mark to encourage an all age stand structure (improve diameter distribution).
4. Leave nest trees and legacy trees (trees >26” in diameter at breast height).
5. Leave exceptional den trees (cavity trees).
6. Encourage species diversity.
7. When marking canopy gaps, mark all undesirable trees for cutting within gap down to 2” DBH.
8. Follow all guidelines set forth in “The Complete Marker”.
9. Further guidance will be discussed at prework meeting.
3 of 7 R4038 (Rev. 03/16/2022)
PAINT LINES
This is included in the bid This is not included in the bid
Paint line work to be performed: (See attached map for locations)
TYPE OF LINE WORK TO BE DONE PAINT COLOR
Exterior line against private Blue Other: w/ pink flagging
Exterior line against state Red Other:
Interior payment unit Yellow Other:
Other: Green Other:
Exclusions to mark and why:
• Changes to linework can be approved by the contract administrator as needed to assist with practical layout.
• Contact the contract administrator if any intermittent streams or vernal pools are found which are not present on the Map; these may need to be excluded.
Standards for marking exterior lines against private land:
• For exterior line against PVT, GPS a point every 5 chains along the line as it is painted.
• Line shall be run straight between department survey monuments and be marked with blue paint and pink flagging; flagging is needed at a minimum every ½ chain (33’) along lines.
• Avoid using dead or badly damaged trees – boundary trees must last for the duration of the timber sale (up to 5-6 years)
• Avoid using small (fast-growing) stems and those exposed to direct sunlight.
• Exterior line against private must be visible from inside payment unit.
Standards for marking interior payment unit lines:
• Interior payment unit lines must be visible from all sides.
BOUNDARY GPS
GPS data files will be provided
FEATURE WORK TO BE DONE NOTES
Volume Determination Unit (VDU)
Payment Unit (PU) GPS all sale lines with the Field Maps application.
Exclusions
Special Instructions:
• All painted boundaries must be GPS’d in the Field Maps application as reference lines and delivered to the DNR.
• All gaps must be GPS’d in the Field Maps application and the points delivered to the DNR.
4 of 7 R4038 (Rev. 03/16/2022)
TIMBER MARKING SPECIFICATIONS
Total Merchantable Residual BA (Basal Area) +/- 10: See Prescription section on pages 1 & 2.
TREATMENT NUMBER SIZE
Regeneration Gaps Per Acre: Stands 6, 9, 36 & 43 – See instructions below 0.25 to 0.75 acres
Girdled Trees Per Acre:
PRODUCT MARKING SYMBOL MINIMUM DBH TOP DOB
Sawlogs Diagonal slash on 2 opposite sides 10.6” 10.0”
Pulpwood Diagonal slash on 2 opposite sides 4.6” 4.0”
TYPE OF WORK WORK TO BE DONE PAINT COLOR
Trees marked to leave Green Other:
Trees marked to cut Orange Other:
Special Marking Instructions:
• Put upper marks on two opposite sides of trees 6’ above the ground, all marked trees must have stump marks.
• In Stands 6, 9, 36 and 43: Only establish regeneration gaps in areas with advanced regeneration. Target area of
10-20% of treatment in gaps may not be reached if advanced regeneration is not present.
o Gaps will be installed in accordance with ‘Interim Guidance – Increased Minimum Gap Size and
Regeneration Accountability for Uneven-aged Management’.
o Aim for lower side of target area for regeneration gaps, i.e., 10% o All regeneration gaps need a reference point collected in MobileMap and returned to DNR.
o Regeneration gaps are delineated by marking all trees to cut in orange.
o When marking gaps, mark trees with large bushy tops or forks with x's rather than a slash to denote that any material under 8 inches must be left within the gap.
o Avoid marking regeneration gaps immediately adjacent to each other or red line, i.e., merchantable trees should be present between gaps and between gaps and red line.
o No regeneration gaps are needed in Stand 19.
• If stick nests are discovered within the stand while marking, contact the Contract Administrator.
• Avoid marking in wet weather conditions, or when tree boles are damp.
• The contractor is responsible for checking all workers on the contract.
• The contractor must furnish the DNR with plot data showing residual BA/Ac for payment units to be checked (Self
Administration). This is due before the DNR checks the marking.
• Final marking details are to be discussed at the pre-sale meeting.
5 of 7 R4038 (Rev. 03/16/2022)
RESTRICTIONS
1. Forest Resources Division must be able to identify who did what on the timber sale.
2. The contractor may not have more than two markers in one cruise unit without prior approval.
3. Each marker should have an assigned area to mark (not strips).
PAINT
4. Call Matt Yeo at (906) 458-5379 to make arrangements for paint.
5. Paint will be supplied from the Gwinn Office.
6. Contractor’s work schedule must coincide with the DNR work schedule for paint supply.
7. The DNR will not be available on weekends or evenings.
DELIVERABLES
8. A list of names that marked or cruised each cruise unit.
9. A summary of paint used (in quarts).
10. All GPS data must be recorded and synced with the Field Maps application.
Additional Information:
• Contractors are responsible for obtaining landowner permission before crossing private land. Private landowner contact information can be obtained by request from the Contract Administrator.
• Pre-work Meeting: The contractor must schedule and attend a pre-work meeting with the Gwinn DNR staff. All roads must be GPS’d.
When registered corners or witness trees are discovered:
• Any wooden bearing posts encountered at corners must also be painted/protected.
• Bearing and/or witness trees discovered during the course of sale preparation must be protected. This can be accomplished by painting a ring completely around the tree at 4-6 feet above ground level with either red paint (corner surrounded by state lands) or blue paint (corner surrounded by private lands). In addition, tying ribbon on these trees helps alert loggers to their presence. Do not mark any trees for harvest if cutting them is likely to result in damage to corner monuments and/or bearing trees. See map locations for known corners.
• Please report the condition of all corners, posts, and bearing trees to the local contact.