This document is a Request for Qualifications (RFQ) response submitted by Tierra, Inc., a certified Florida Minority Business Enterprise, to the City of Plant City for Category 5: Geotechnical Engineering Services under RFQ No. 21-020-EN-FC. The proposal submission was due December 10, 2020, at 2:00 p.m. Tierra has served as the City's geotechnical engineering consultant since 2010 and seeks to continue in this capacity as the prime consultant. The proposed project manager is Kevin H. Scott, P.E., with corporate support from Joe Di Stefano, P.E. Tierra's team includes quality control managers Larry Moore, P.E. (geotechnical) and Manny Valdes (construction), along with experienced task leaders Joseph Antinori, P.E., Daniel Ruel, P.E., and Graham Zoeller, P.E. The firm will perform services from its Tampa, Florida office, located approximately 30 miles from Plant City, and will provide geotechnical engineering and construction materials testing and inspection services as requested through task work orders. The contract term is not explicitly stated in the submission, though the parent solicitation indicates a three-year initial term with renewal options for two additional two-year periods.
Tierra proposes a fully qualified team with nearly 200 employees providing comprehensive geotechnical services including site investigations, foundation analysis and design, sinkhole evaluations, pavement analysis, permeability testing, and construction materials testing. The firm operates its own CMEC-certified and FDOT-qualified laboratory and maintains a fleet of 11 drill rigs for field investigations. Tierra's personnel hold relevant professional licenses and certifications through CTQP, ACI, and FDOT, with experience levels ranging from recent graduates to over 40 years in the field. The firm implements a documented five-step Quality Assurance and Quality Control program for all deliverables. Pricing terms are not specified in this RFQ response document. Tierra is a certified Minority Business Enterprise but does not maintain a physical office within Plant City city limits, thus not qualifying for local preference points. The firm's current workload analysis indicates key personnel availability ranging from 40 to 60 percent, demonstrating capacity to handle concurrent projects. Tierra has completed thousands of projects throughout Florida, averaging approximately 400 projects annually, with current continuing contracts serving over 20 municipalities, counties, and state agencies throughout the state, including FDOT districts and multiple county governments.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 21-020EN-FC
Library of Engineering Services for Continuing Contracts
Due Date / Time: 12/10/20 / 2:00 PM
Page | 1
December 10, 2020
CITY OF PLANT CITY
Procurement Department W.A. “Buddy” Storey, Jr., Procurement Manager 302 W. Reynolds Street, 3rd Floor Plant City, Florida 33563
RE: EXECUTIVE SUMMARY
Library of Engineering Services: Category 5, Geotechnical Engineering
RFQ No. 21-020-EN-FC
Mr. Storey:
As the City embarks upon the selection of firms to provide professional Geotechnical Engineering and Material Testing and Inspection Services, Tierra, Inc., (Tierra) would like to express our sincere desire to serve in this important role. Tierra, a certified State of Florida Minority Business Enterprise (MBE) engineering firm, has assembled a team of qualified professionals to provide professional services for Category 5: Geotechnical Engineering Services for the City of Plant City’s Library of Engineering Services Continuing Contracts (RFQ No. 21-020-EN-FC).
Category No. Category Descriptions Checkbox 1 General Engineering 2 Transportation Engineering 3 Environmental Engineering 4 Stormwater Engineering 5 Geotechnical Engineering X 6 Water and Wastewater Engineering 7 Sub-Surface Utility Engineering 8 Instrumentation and Controls Engineering 9 Electrical Engineering 19 Registered Surveying and Mapping
Tierra has served the City since 2010 as an Engineering Consultant on the current Geotechnical Engineering Services Contract and we look forward to the opportunity to continue to serve the City of Plant City.
We are committed to you! Under the leadership of our proposed Project Manager, Kevin H. Scott, P.E., Tierra will serve as the prime consultant for this contract. With nearly 200 employees, we are a full-service consulting geotechnical, environmental and construction materials testing engineering firm conveniently located in Tampa, Florida. Our diverse staff includes principal engineers, staff engineers, environmental scientists, geotechnical and construction inspectors and technicians. Our technicians are certified through CTQP, ACI and FDOT with 5 to more than 30 years of experience in geotechnical, construction, laboratory and field materials testing and inspection services.
Our well-balanced combination of in-house drill rigs and support equipment allows us to immediately tackle the most challenging projects and our in-house laboratories provide specialized testing services to support the geotechnical engineering and construction materials services we provide.
EXECUTIVE SUMMARY RFQ: 21-020EN-FC
EXECUTIVE SUMMARY
Page | 2
Our Submittal. We have carefully prepared and organized this response submittal per the City’s Request for Qualifications package. Following is a brief summary of the qualifications and advantages that Tierra will bring to the City of Plant City.
Proven Results. Whether working directly for the City or as a subconsultant to a prime firm, Tierra has worked on a variety of project types within the City of Plant City and surrounding area, including roadway improvement projects, commercial structures, drainage improvements, sinkhole studies, aviation and recreational facilities. Similar to the services required of this contract, we have extensive experience providing geotechnical engineering services as a prime consultant to government agencies and municipalities located throughout Florida. Through this experience, we have developed our ability to implement timely and cost-effective services that can be tailored to meet the needs of the City and the various work assignments that may arise out of this contract.
Experienced Personnel. We have assembled a team capable of providing excellent professional and technical expertise, proven by the long-standing work experiences of our proposed staff members. Our extensive staff provides us with the depth of resources to meet your needs and many of our team members have established working relationships with the City from previous projects. Additionally, Tierra has a group of professionals dedicated to ground subsidence identification and proper remediation action plans that are tailored to the specifics of the subsidence encountered.
Commitment to Time and Budget Requirements. At Tierra, we pride ourselves on providing projects on time and within budget. It is our corporate philosophy to approach every project with the level of understanding and service that will provide the best value and response to our clients. Tierra will work one-on-one with the City’s project managers to provide all requested services on time and within budget.
Strong, Local Presence. Tierra was founded in Hillsborough County in 1992 and we are intimately familiar with local conditions, regulations and applicable codes. We are staffed by individuals who work and live in the area and we are ready and available to respond immediately to the needs of the City.
On behalf of Tierra, we highly value the relationship we have developed with the City and look forward to the opportunity to continue to serve you. We hope you find our qualifications, experience and past work history to be an asset and we are optimistic that our response to this request for qualifications will provide the City of Plant City with the confidence to, once again, select the Tierra team.
Respectfully submitted, Tierra, Inc.
Kevin Scott, P.E. Larry Moore, P.E.
Project Manager Vice President / QC Manager
EXECUTIVE SUMMARY 1
TABLE OF CONTENTS
TAB A: ABILITY OF PROFESSIONAL PERSONNEL AND STAFF EXPERIENCE
Organizational Chart 3 Project Team 4 Resumes 5 QA/QC Program 12
TAB B: RELEVANT EXPERIENCE
Brief Company History and Firm Capabilities 14 FDOT Prequalifications 16 Schedule and Cost Control Techniques 17 Example Projects 18
TAB C: LOCATION AND ACCESSIBILITY 31
TAB D: VOLUME OF SIMILAR CONTRACTS 32
TAB E: CURRENT AND PROJECTED WORKLOAD 33
TAB F: CERTIFIED MINORITY BUSINESS ENTERPRISE 34
TAB G: LOCAL PREFERENCE 35
TAB H: REQUIRED FORMS
TABLE OF CONTENTS RFQ: 21-020EN-FC
TA
B
A
RFQ 21-020EN-FC
ABILITY OF PROFESSIONAL
PERSONNEL & STAFF
EXPERIENCE
ABILITY OF PROFESSIONAL
PERSONNEL & STAFF
EXPERIENCE
PROJECT MANAGER
Kevin Scott, P.E.
TIERRA’S SERVICES
Graham Zoeller, P.E., Task Leader
CONSTRUCTION SERVICES
Mikal Abdullah Saleem Abdullah
Rufus Bailey Charles Cormier Shayne Ellerbee
Joe Gac Ed Garrison
Earl Jacobson Russ Khan
Derret King
Nabeel Awad Robert Wiewiura
Terry Sanders Ken Magee
Nolan Pelfrey Nick Suarez
Edwin Tirado Larry Webb
Patrick Moyer Noor Alkahlidi
Construction Inspectors and Technicians Geotechnical Drilling
Kirt Peterson Jeff Berg
Joe Erickson Adam Welch Robert Shuey
Joe Smith Derek Stakelin
Ian Pooran Joe Shaw
Kenny Caudill Aaron Sandage
CORPORATE SUPPORT
Joe Di Stefano, P.E.
Joseph Antinori, P.E., Task Leader
Daniel Ruel, P.E., Task Leader
GEOTECHNICAL SERVICES
Kevin Lo, P.E.
Erick Frederick, P.E.
Henri Jean, P.E.
Marc Novak, Ph.D., P.E.
Tom Musgrave, P.E.
Ian Rovira, P.E.
Kaitie Waterman, E.I.
Dylan Nelson, E.I.
Juan Navarette, E.I.
Susie Fries, E.I.
Tyler Jean, E.I.
Engineering Support
GPR Technicians
Toby Duffield Louis Lupori
Laboratory Testing
Angela Koloc Paul Hartbarger
Victor Hosey
Larry Heitman Mariah Mundy Jeremy Shuey
SECTION A. ORGANIZATIONAL CHART
* All above personnel are based out of Tierra’s Tampa Office.
QC MANAGERS
Larry Moore, P.E. (Geo)
Manny Valdes (Construction)
Page | 4
Tierra proposes a highly qualified and experienced team to complete geotechnical engineering and material testing and inspection services for the City. We know that when you select an engineering consultant, you are really choosing people who offer you technical expertise, extensive “hands-on” experience with similar projects, and a demonstrated record of quality and responsiveness that will make your project a success. The following team of skilled professionals have been carefully selected based upon the depth of their qualifications, reputation for response, recognition for quality work, proximity and past performance:
Project Management: Kevin Scott, P.E. will serve as Tierra’s Project Manager and will work closely with the City on all contractual issues associated with this contract. With 19 years of diversified experience in the construction and engineering industry, Kevin has managed numerous continuing contracts for various local government agencies and will serve as Tierra’s single point of contact. Kevin has extensive experience providing professional geotechnical engineering services on projects within the City of Plant City and throughout Hillsborough County. These services have included roadway and stormwater projects, subdivision improvements, parks and recreation facilities, sinkhole studies and utility improvements. As Project Manager, Kevin will be responsible for managing staff resources, cost control, scheduling, change order negotiation, invoicing and overseeing communications with the City. Kevin will have the corporate support of Joe Di Stefano, P.E. who will serve as a backup point of contact for the City. With more than 40 years of industry experience, Joe will ensure that projects are adequately staffed with sufficient and qualified members of our team as well as assist in overseeing contract administration for this contract including project closeout.
Quality Control: Tierra has assigned Larry Moore, P.E. (Geotechnical) and Manny Valdes (Construction) to manage Tierra’s Quality Assurance and Quality Control (QA/QC) Management Program. Larry has more than 31 years of experience and has served as a Principal Engineer on a multitude of projects similar to those anticipated under this contract. Similarly, Manny has more than 43 years of experience in the Soils and Construction Materials Testing and Inspection field for a variety of infrastructure-related projects throughout Central Florida.
Experienced Task Leaders: Our experienced technical staff are strong leaders with proven capabilities, effective communication skills and a commitment to serve the City. The following task leaders have a solid understanding of the key elements necessary to successfully complete projects that may arise from this contract. They will be responsible for overseeing the execution of assigned task work orders and will make sure all deliverables are completed on time and within budget:
Joseph Antinori, P.E., Geotechnical Engineering Task Leader: Joseph has 15 years of experience providing geotechnical engineering services on a variety of municipal projects in Florida. Typical projects in which he has been involved include roadways and bridges, drainage/stormwater and water/wastewater facilities.
Daniel Ruel, P.E., Geotechnical Engineering Task Leader: Daniel has 9 years of experience in geotechnical engineering and has been involved in numerous projects for municipal clients, including roadway and bridge projects, subsidence investigations and aviation-related projects, a number of which were in the City of Plant City.
Graham Zoeller, P.E., Construction Services Task Leader: As Construction Services Manager for Tierra’s Tampa office, Graham will serve as the Task Leader for Construction Services Assignments under this contract.
With more than 9 years of experience in the field of geotechnical engineering and construction materials testing and inspection, Graham has extensive experience performing these services for both private and public clients.
Tierra’s key personnel are supported by a significant group of highly qualified and experienced staff engineers, environmental scientists, laboratory and field technicians. In the event additional support is required, Tierra is able to utilize the resources of our other branch offices. Resumes have been included on the following pages for the key team members shown above.
TAB A - Ability of Professional Personnel & Staff Experience RFQ: 21-020EN-FC
Page | 5
KEVIN H. SCOTT, P.E.
Project Manager / Senior Geotechnical Engineer Florida Professional Engineer, License #65514 B.S., Civil Engineering, University of South Florida, 2000
Kevin is a senior level engineer and project manager with significant experience working with both public and private sectors. He has managed several continuing and districtwide contracts for counties, cities and the Florida Department of Transportation. In this role, Kevin has successfully staffed task assignments, and managed schedules and budgets, including change order negotiations, when required. His 19 years of experience includes a variety of municipal types of projects including transportation, utility, parks/recreational facilities and vertical structures. Kevin’s technical expertise includes shallow and deep foundation analyses, retaining wall design, settlement analyses, pavement evaluation, Pile Integrity Testing (PIT) and Cross-Hole Sonic Logging (CSL).
Kevin has extensive experience providing professional geotechnical engineering services for the City of Plant City. During the winter of 2009/2010, several sinkholes/subsidences occurred within the limits of Plant City. Kevin was responsible for evaluating six (6) different roadways that had subsided during this period.
For each site, a Ground Penetrating Radar (GPR) survey was performed followed by a series of Standard Penetration Test (SPT) borings. The results of the field testing were used to formulate recommendations for remediation of the observed subsided roadways which consisted of compaction grouting. Kevin provided oversight during the remediation program to verify the recommendations were being followed and to limit budget overruns.
Relevant Experience
Mendonsa Road Stormwater Improvements, Plant City, Hillsborough County, Geotechnical Engineer of Record. Project included the design of an exfiltration trench along the south side of Mendonsa Road.
Tierra’s services included Standard Penetration Test (SPT) borings and field hydraulic conductivity tests to support the design.
Laura Street Improvements, Plant City, Hillsborough County, Geotechnical Engineer of Record. Project included the reconstruction of Laura Street from Knight Street to Warnell Street in Plant City. Tierra’s services included hand augers and soil classifications with associated geotechnical recommendations related to the identification and removal of plastic soils found along the alignment.
Wedgewood Court Improvements, Plant City, Hillsborough County, Geotechnical Engineer of Record.
Tierra’s geotechnical investigation consisted of hand augers, soil classification and associated recommendations to support the design of an underdrain system along Wedgewood Court in Plant City.
Plant City Airport Fuel Tank, Plant City, Hillsborough County, Geotechnical Engineer of Record. The project design included a new aviation gasoline storage and dispensing system. Kevin was responsible for providing geotechnical strength parameters and associated recommendations to the structural engineer to assist in the concrete supporting slab design.
Plant City Bus Parking Stabilization (Airport Road), Plant City, Hillsborough County, Geotechnical Engineer of Record. The project consisted of the design and permitting for two (2) stormwater ponds at 3102 N. Airport Road in Hillsborough County. Kevin provided information regarding infiltration rates of the near-surface soils, groundwater table levels and seasonal high groundwater table estimates to support the design.
Page | 6
JOE DI STEFANO, P.E.
Corporate Support / Project Principal Florida Professional Engineer, License #31939 B.S., Civil Engineering, University of South Florida, 1978
Joe has more than 40 years of progressive experience in the fields of geotechnical, civil engineering and construction materials testing and inspection. His experience includes work in both the public and private sector for a variety of infrastructure projects such as urban and rural roadways, interstates with complex interchanges, subdivisions and commercial sites, pipelines, water and wastewater treatment plants. His role on projects has included scoping of work, oversight of field and office personnel as well as overall project management and project closeout.
The following project experience was gained prior to joining Tierra:
Served as the Project Principal for the following on-call service contracts with various municipalities and/or agencies in the area:
City of Tampa Geotechnical and Materials Testing Services City of Largo Geotechnical and Materials Testing Services Hernando County Geotechnical and Materials Testing Services Pasco County Transportation Geotechnical and Materials Testing Services Pasco County Utilities Geotechnical and Materials Testing Services Hillsborough County Geotechnical and Materials Testing Services Pinellas County Schools Geotechnical and Materials Testing Services
The following are municipal projects in which Joe served as the Geotechnical Project Principal. Typical services for these projects included subsurface investigations, laboratory testing and geotechnical recommendations to support the design.
Busch Boulevard Pedestrian Improvements, City of Tampa, Hillsborough County, Geotechnical Project Principal. Performed subsurface investigations and foundation recommendations for the installation of four (4) new signal mast arms and two (2) new CCTV poles at the intersections of Busch Boulevard at North Boulevard and Busch Boulevard at Armenia Avenue.
12th Street Force Main, City of Tampa, Hillsborough County, Geotechnical Project Principal. Provided subsurface investigations and geotechnical recommendations for the design of an approximate 20,000 LF force main within the City of Tampa including Horizontal Directional Drilling under the Hillsborough River.
Overlook Drive, Polk County, Geotechnical Project Principal. Performed pavement cores and subsurface investigations along Overlook Drive and Carl Floyd Road as part of a preliminary engineering study.
Eloise Loop at Rifle Range Road, Polk County, Geotechnical Project Principal. Performed subsurface investigations, laboratory testing and geotechnical recommendations for the addition of turn lanes and signal mast arms at Eloise Loop Road and Rifle Range.
Page | 7
LARRY MOORE, P.E.
Quality Control: Geotechnical / Principal Engineer Florida Professional Engineer, License #47673 B.S., Civil Engineering, University of South Florida, 1987
Larry has more than 31 years of experience in geotechnical engineering for projects throughout Florida with a heavy emphasis on work within the West Central Florida area. His vast project experience includes providing geotechnical services to support roadway and bridge design and construction to embankment design and construction associated with mine tailings deposition. As a Vice President and Principal Engineer at Tierra, Larry provides technical oversight and guidance on a significant portion of Tierra’s geotechnical engineering projects, the majority of which are for municipalities and state agencies. Larry’s capabilities also include testing and production pile and drilled shaft installations involving timber, steel and prestressed concrete piles and drilled shafts for numerous bridge foundations and industry and building construction applications.
Turkey Creek Road and Sydney Road Improvements, Hillsborough County, Geotechnical Engineer of Record. Project included the widening of Turkey Creek Road from Sydney Road to Airport Road, a distance of approximately 1.25 miles and associated improvements along Sydney Road west of Turkey Creek Road.
Geotechnical services included over 100 auger borings and probes, Standard Penetration Test (SPT) borings, pavement cores and LBR sampling to support the design.
SR 39 Designated Right Turn Lanes, Plant City, Hillsborough County, Geotechnical Engineer of Record. This project included the design of designated right turn lanes along SR 39 at Alexander Street in Plant City. Tierra services included auger borings, laboratory testing including LBR sampling and associated geotechnical recommendations to support the design.
Laura Street Improvements, Plant City, Hillsborough County, Quality Control Review. Project included the reconstruction of Laura Street from Knight Street to Warnell Street in Plant City. Tierra’s services included hand augers and soils classifications with associated geotechnical recommendations related to identification and removal of plastic soils found along the alignment.
Wedgewood Court Improvements, Plant City, Hillsborough County, Quality Control Review. Project included the design of an underdrain system along Wedgewood Court in Plant City. Tierra’s services included geotechnical investigations (hand augers), soils classifications and associated recommendations to support the design.
Various Sinkhole Evaluations and Remediation Monitoring, Plant City, Hillsborough County, Quality Control Review. These projects typically included investigations to determine the horizontal and vertical extent of noted depressions, depth to competent limestone and recommendations for the remediation of the sinkhole. Tierra’s services included Ground Penetrating Radar (GPR), SPT borings, laboratory testing and recommendations for compaction grouting including remediation monitoring. The following are examples of sites in which these services were performed:
Azalea Blossom Drive Sinkhole Evaluation and Remediation Monitoring Silver Moon Drive Sinkhole Evaluation and Remediation Monitoring Mobley and Risk Street Sinkhole Evaluation and Remediation Monitoring Kipling Court and Concord Way Sinkhole Evaluation and Remediation Monitoring
Page | 8
MANNY VALDES
Quality Control: Construction / Laboratory Services Manager B.A., Biology, University of South Florida, 1973
Manny has more than 43 years of experience and is responsible for the daily operations and management of Tierra’s Tampa laboratory testing services. This includes the planning, coordination and management of a wide variety of construction projects throughout Florida. His project experience includes providing laboratory testing services and construction inspection / testing services for highway and bridge construction, low to high-rise building construction, industrial facilities, airports and municipal infrastructure facilities.
Manny’s technical expertise includes concrete field testing, aggregate lab testing, pre-stressed concrete inspection, post-tensioned concrete inspection and FAA materials testing.
FDOT District 7 Districtwide Materials Testing Contract, Multiple Counties, Laboratory Services Manager. Tierra has held the District 7 Materials Testing Contract as a prime consultant since 2009. The contract includes laboratory verification of compression testing of concrete and soils, such as standard and modified proctor tests, LBR tests, chemical tests to determine soil corrosiveness, organic content, liquid and plastic limits, grain size analysis and soil classification. Data entry into the FDOT MAC system is also a requirement of this contract.
Hernando County On-Call Services Contract, Hernando County, Laboratory Services Manager. The following are projects in which Tierra provided materials testing of soils, concrete and or asphalt during construction:
Spring Hill Driveway Sidewalks (LAP) Caribbean Drive at Commercial Way Culvert Reconstruction CR 491 Resurfacing Fort Dade Culvert Replacement Cornerstone and Wheystone Surface Treatment Airport Entrance Realignment Signalization at Mariner Boulevard and Landover Boulevard Spring Hill Area 3C Resurfacing Painted Bunting Road Paving (MSBU) Cobblestone Drive Resurfacing Powell Road Hampstead Culvert and Roadway Repairs Sunshine Grove / Jacqueline Street Intersection Improvements
Lake Hancock Boat Ramp and Trail, Polk County, Laboratory Services Manager. The project consists of the construction of asphalt pavements and drainage associated with access to a new boat ramp and trail at Lake Hancock in Polk County. The site work construction consisted of drainage, stabilized subgrade, limerock base, concrete placed in ADA parking spaces and FDOT B-12.5 and SP-12.5 asphalt. Manny oversaw Tierra’s construction materials testing and inspection services associated with this project, including density, asphalt and concrete testing services.
Page | 9
JOSEPH ANTINORI, P.E.
Task Leader / Senior Geotechnical Engineer Florida Professional Engineer, License #73176 B.S., Civil Engineering, University of South Florida, 2005
Joseph has more than 15 years of experience in the field of Geotechnical Engineering and presently serves as a Senior Geotechnical Engineer for Tierra’s Tampa office. His has extensive experience providing professional consulting services for county, state and municipal roadway and bridge projects as well as utility designs. Key areas of expertise include in-situ soil improvements, retaining wall and soil anchor system design, shallow and deep foundation analyses, settlement and slope stability analyses and pavement evaluation.
Newberger Road over Kell Creek, Hillsborough County, Geotechnical Engineer. This project included the evaluation of feasible bridge alternatives (box culverts, pipe culvert, and a single span bridge supported on shallow or deep foundations) to replace the existing Newberger Road pipe culvert over Kell Creek.
Tierra’s services included subsurface investigations (SPT and hand auger borings), laboratory testing and associated geotechnical recommendations to support the design.
Davis Island Emergency Repair, Hillsborough County, Geotechnical Engineer. The project consisted of repairing a damaged segment of 48-inch sanitary pipe along Columbia Drive North and south of Bering Street on Davis Island. The repair included utilizing line stops and the installation of a new segment of pipe.
Tierra’s services were retained to conduct a geotechnical field investigation and evaluate feasible foundation alternatives for support of the line stops as well as provide general considerations for the new pipe installation. Tierra completed three (3) Standard Penetration Test (SPT) borings to depths ranging from 45 to 50 feet below the ground surface. Due to the serious nature of this project, the work was done under an accelerated scheduled and Tierra’s services were completed within 3 working days of being notified.
Crystal Beach MSTU Paving and Drainage Improvements, Pinellas County, Geotechnical Engineer.
The project consisted of the design of paving and drainage improvements along Florida Boulevard and Grace Street between Seaford Avenue and Disston Street in Crystal Beach, Florida. Tierra’s services included subsurface investigations, laboratory testing and associated geotechnical recommendations to support the design.
David L. Tippin Water Treatment Facility High Service Pump Station and Miscellaneous Improvements, Hillsborough County, Geotechnical Engineer. The project included the design and construction of a new high service pump station with a new common header, baffling within the existing on-site clear wells, and provision for non-chlorinated backwash water for the filters. Tierra performed subsurface investigations (SPT borings and hand augers), and completed piezometer installations in order to identify the subsurface conditions and groundwater levels at the requested locations. Laboratory testing consisting of gradation, Atterberg limits, natural moisture content, split tensile strength, compressive strength, standard proctor maximum dry density and permeability/hydraulic conductivity was performed in Tierra’s in-house laboratory. Geotechnical recommendations were also provided to support the design.
Page | 10
DANIEL RUEL, P.E.
Task Leader / Geotechnical Engineer Florida Professional Engineer, License #82404 B.S., Civil Engineering, University of South Florida, 2011
Daniel has worked in the field of Geotechnical and Structural Engineering for 9 years, starting as an intern and gaining experience in soils testing, classification, materials testing and project management. He has extensive experience working for Cities, Counties and FDOT on roadway and bridge projects as well as various other typical infrastructure projects that can be anticipated. Daniel’s technical expertise includes slope stability, settlement, deep foundation design (drilled shafts and driven piles), shallow foundation design, laboratory testing and research and forensic geotechnical investigations.
WCF Plant City, Hillsborough County, Geotechnical Engineer. The project site is located at 2108 Thonotosassa Road in Plant City and consisted of developing a site to include a single-story medical office building (approximately 15,000SF) with paved parking and a stormwater pond. Tierra’s services included subsurface investigations (SPT and power auger borings, hand augers), laboratory testing and associated geotechnical recommendations to support the design.
Runway and Taxiway A Rehabilitations, Plant City Airport, Hillsborough County, Geotechnical Engineer. Project included the rehabilitation of Taxiway A and Taxiway A-4 intersection at the Plant City Airport. The improvements included a 1.5 inch milling and overlay. Tierra’s services included pavement cores, auger borings, soil classifications and associated geotechnical recommendations to support the design.
Fuel Farm, Plant City Airport, Hillsborough County, Geotechnical Engineer. Tierra provided geotechnical services to support the design of a new aviation gasoline storage and dispensing system.
Tierra’s services included Standard Penetration Test (SPT) boring, soils classifications and associated geotechnical recommendations to support the design.
West Apron and Access Road, Plant City Airport, Hillsborough County, Geotechnical Engineer.
Geotechnical services consisted of performing concrete and asphalt cores and test borings within the existing apron/taxiway and main airport access road in order to provide pavement thickness information and subsurface information to support the design of the proposed improvements.
Additional relevant project experience is as follows:
Lonesdale Pipe Drainage Improvements, Hillsborough County North Brandon Park and Rubin Padgett Park Drainage Improvements, Hillsborough County Hillsborough County Tax Collector’s Office, Hillsborough County SR 546 (Memorial Boulevard) from I-4 to Wabash Avenue, Polk County I-4 at SR 33 Interchange Modification Wildlife Crossing, Polk County Kadri Boulevard and Evergreen Woods Trail, Hernando County Lorraine Road Roadway Evaluation, Manatee County Lakewood Ranch Boulevard Roadway Evaluation, Manatee County Rye Road Box Culvert, Manatee County William E. Dunn Water Reclamation Facility Improvements, Phase I, Pinellas County Junction Box at Highlands Avenue and Jeffords Street, Pinellas County
Page | 11
GRAHAM ZOELLER, P.E.
Construction Services Task Leader / Project Engineer Florida Professional Engineer, License #79426 M.S., Civil Engineering, University of South Florida, 2010
Graham serves as the Construction Services Manager for Tierra’s Tampa office and is responsible for providing oversight of personnel on construction-phase projects. With more than 9 years of experience in the field of Geotechnical and Construction Engineering, Graham has worked on various roadway, bridge, structure, utility and aviation projects for various municipalities and state agencies. His experience includes review of materials testing reports as well as signing and sealing of reports. He also has experience performing subsurface soil explorations, shallow and deep foundation analyses, settlement and slope stability analysis and pavement evaluation. Additionally, Graham has performed deep foundation testing and analyses including high-strain dynamic pile testing and analyses and cross-hole sonic logging (CSL) during construction and has overseen numerous materials testing programs.
Thonotosassa Road Culvert Replacement, Plant City, Hillsborough County, Construction Services Manager. The project area is located along Thonotosassa Road and consisted of two collapsing culverts at two intersections with Campbell Creek. The project included the replacement of the existing box culverts, regrading the roadside drainage channels and repaving the roadway. Graham oversaw Tierra’s construction material testing and inspection services for this project, which included soil and aggregate, concrete and paving materials testing.
Women’s Care Facility, Plant City, Hillsborough County, Construction Services Manager. The project consisted of the construction of a single-story, 15,000SF medical office building. Site work construction included storm pipelines and structures, sanitary lift station, force main, water and fire pipelines and sanitary pipelines. Graham oversaw Tierra’s construction materials testing and inspection services for this project, which included field and laboratory testing of structural fill and concrete, structure and pipe backfill of soils, base course and asphalt. Additionally, Tierra performed inspections of structural steel erection and visual inspection of welded connections.
City of St. Petersburg CEI Services for Various Projects, Pinellas County, Construction Services Manager. As part of a continuing contract with the City, Tierra provided a team of CEI inspectors to assist the City on various construction projects. These projects included roadway improvements constructed in accordance with FDOT LAP specifications, sidewalk construction, sheetpile wall replacements and renovation projects for government-subsidized housing. Graham was responsible for the oversight of the CEI inspectors assigned to this contract.
Hernando County Continuing Services Contract, Hernando County, Construction Services Manager.
Tierra is currently providing geotechnical engineering and construction materials testing services for Hernando County. During his tenure with Tierra, Graham has been the engineer responsible for oversight of the materials testing program for a number of roadway reconstruction and resurfacing projects as well as sidewalk and other miscellaneous projects assigned.
Tab A: Ability of Professional Personnel & Staff Experience
Page | 12
Tierra’s key personnel identified in this section will provide technical services, as necessary, in the following areas as requested by the RFQ.
Service Kevin Scott Larry Moore Manny Valdes
Joseph Antinori Daniel Ruel Graham Zoeller
Change Order Negotiation Claims Management Cost Control Cost Estimating Constructability Analysis Design Life Cycle Cost Analysis Project Close Out Quality Control Value Engineering
Tierra has developed and consistently implements a documented Quality Assurance / Quality Control (QA/QC) Management Program where all deliverables, whether draft or final, undergo a formal review prior to submittal and which includes the training of our technical staff, maintaining current copies of test procedures, guidelines and specifications, the certification of our inspectors through CTQP, ACI and other training sources and a five-step quality control review for each document.
Our QA/QC program is not just a process, but a corporate commitment of clearly understanding client goals and expectations and providing deliverables and services that fully meet these goals and expectations in a cost-effective manner.
Tierra’s Quality Assurance and Quality Control Management Program includes the following activities:
Maintaining and utilizing current versions of FDOT guidelines, specifications, manuals and design bulletins as well as current versions of testing procedures outlined in AASHTO, ASTM and State of Florida Test Methods;
The indoctrination, training and qualification of technician staff members;
Implementing the use of approved and current test procedures and maintaining copies of such procedures for reference by technical staff;
Establishment of a maintenance program for test equipment, including the scheduled calibration of measuring and testing equipment;
Monitoring the performance of tests by qualified technicians;
Monitoring the documentation of raw data generated on approved data forms;
Generating final test reports on approved forms;
Review of testing results and reports by a Florida Registered Professional Engineer, prior to reports being issued;
Maintaining records and files of all work performed;
Training, testing, evaluating the qualifications of, and certifying technicians at their appropriate levels;
Keeping up-to-date qualification records on all technicians and inspectors.
Tab A: Ability of Professional Personnel & Staff Experience
Page | 13
QA/QC: DELIVERABLES
The foundation of our QA/QC program is to provide senior level review at multiple steps in the project to verify that the appropriate standard of care as well as the appropriate level of completion is being met for that particular stage of the project. Primary objectives of this process are to eliminate errors and miscommunications, ensure consistency and accuracy in deliverables and provide guidance throughout the duration of the project. To implement these objectives, all produced work undergoes a five-step review check prior to completion or release of deliverables:
Step 1: The ORIGINATOR provides work product and any supporting documentation to the REVIEWER for the first phase of the review process.
Step 2: The REVIEWER completes the review, indicating items that require correction or elaboration in red. Elements reviewed that do not require correction or elaboration is highlighted in yellow. The document is then returned to the ORIGINATOR for revision and/or verification.
Step 3: The ORIGINATOR reviews the comments and indicates concurrence by a red checkmark ( ) and disagreement by striking through the comment in red. Any items that are not in concurrence are resolved through the reviewer and originator.
Step 4: The agreed-upon revisions are made to the document, indicated by highlighting the comment in yellow. The document is returned to the REVIEWER for final review.
Step 5: The REVIEWER verifies with a green checkmark ( ) that the appropriate changes were made and authorizes the release of the work product.
Tierra’s five-step QA/QC process and documentation have been audited and found to be exemplary on numerous occasions by organizations such as the FDOT Florida’s Turnpike Enterprise and prime consultants audited by the FDOT for documentation of the quality control process. An example of Tierra’s QA/QC stamp is shown below:
B
RELEVANT EXPERIENCE
Page | 14
BRIEF COMPANY HISTORY
Established in 1992, Tierra is a full-service consulting geotechnical, environmental and construction materials testing engineering firm headquartered in Hillsborough County, Florida. In the past twenty-eight years, Tierra’s staff has grown from its original members to nearly 200 highly qualified and motivated professionals including principal and staff engineers, geologists, environmental scientists, geotechnical construction inspectors and technicians. Tierra is a minority-owned business enterprise dedicated to the timely and cost-efficient delivery of our services.
As a Florida-licensed professional engineering business, Tierra has the technical competence to provide a complete range of geotechnical engineering, environmental consulting and construction materials testing and inspection services for the City. A summary of our firm’s capabilities is listed below:
GEOTECHNICAL ENGINEERING SERVICES
Tierra’s staff of 28 professional engineers and 9 engineering interns have experience ranging from recent college graduates to more than 40 years’ experience providing site-specific and cost-effective solutions for clients across the state of Florida. We have provided geotechnical evaluations on a wide array of project types including roadways, buildings, airports, transportation systems, landfills, dams, wastewater facilities and water systems. Tierra’s geotechnical engineering capabilities include Site Investigation and Characterization; Planning, Feasibility and Due Diligence Studies; Sinkhole Investigations; Pavement Analysis and Design; Groundwater Evaluation; Permeability Testing; Seasonal High Water Table Determinations; Slope Stability Analysis; Foundation Analysis and Design; Retaining Wall Design;
Settlement Analysis and Design; Feasibility Studies and Site Selection Evaluation and Investigation of Sites for Borrow Suitability.
Geotechnical Drilling: Tierra has complete in-house drilling capabilities making it easier to coordinate schedules and control cost without the need to rely on subcontractors. Our fleet of eleven (11) drill rigs includes track, truck and barge-mounted equipment as well as limited access rigs which allows our drill crews to access almost any drill site regardless of terrain or location. Tierra’s geotechnical drilling capabilities include Standard Penetration Test (SPT) borings, casing installation, borehole grouting, rock coring and sampling, and well / piezometer installation and abandonment. Tierra routinely performs hand muck probes, hand augers, pavement and concrete cores, field permeability testing, Double Ring Infiltration Testing and Pile Driving Analyzer (PDA) services.
Geophysical Evaluation: Tierra has the capability to offer an array of geophysical testing for identifying and evaluating subsurface anomalous conditions. Depending on the anticipated subsurface conditions, Tierra can provide Ground Penetrating Radar (GPR) to evaluate subsurface conditions. The geophysical surveying is typically performed prior to soil borings so that the anomalous areas, if any, are identified and can be further characterized by drilling.
CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES
To meet the needs of our clients, Tierra operates its own CMEC-certified and FDOT qualified laboratory facilities. Tierra’s state of the art laboratories provide specialized testing services associated with geotechnical engineering and construction materials. Inspected annually by the FDOT State Materials Office, our laboratory staff is trained and certified to perform testing to characterize the physical properties of soil, rock, concrete, asphalt and composite building materials. In addition to certification, testing procedures are performed under the guidelines of ASTM E 329, where applicable, and in all cases a state-licensed engineer is in charge of inspection and materials testing procedures. Tierra’s construction materials testing and inspection services include the following:
TAB B - Relevant Experience RFQ: 21-020EN-FC
Tab B: Relevant Experience
Page | 15
Soils and Foundation Testing: Tierra’s certified soil technicians are trained to evaluate the suitability of subgrade soils and monitor fill placement and compaction procedures. They routinely perform in-place density and moisture content testing of fill materials to monitor for project compliance.
Our CTQP-certified Drilled Shaft and Pile Driving Inspectors are experienced in monitoring deep foundation installation. Tierra’s laboratory testing abilities for soils include, but are not limited to, moisture content, Atterberg limits, particle size analysis, limerock bearing ratio (LBR), organic content and corrosivity testing.
Asphalt Inspection and Testing: Tierra’s asphalt technicians monitor the placement of asphalt paving systems for project compliance. Our technical field and laboratory staff has extensive experience in asphalt construction methods, field verification testing, temperature, spread rate and compaction monitoring, asphalt plant inspection and density testing. We have extensive experience providing roadway pavement analysis including pavement coring and asphalt and base thickness reporting.
Concrete Testing and Inspection: Tierra provides concrete testing services at the construction site and in our in-house laboratory. All testing is performed by ACI-certified inspectors and includes the following: fresh concrete field testing and monitoring, compliance testing of fine and coarse aggregates, flexural strength testing of concrete beams, compressive strength testing of concrete cylinders, reinforcing steel placement documentation, pre-cast concrete testing and observation and concrete mix design review. The photo shown left: concrete samples from a single concrete pour prior to placement in curing facility; required 8 technicians and more than 20 hours!
ENVIRONMENTAL CONSULTING SERVICES
Projects often require some level of contamination assessment services including site assessments and remediation as well as screening, field sampling, corrective action and regulatory reporting prior to initiating design and/or construction. Tierra’s environmental professionals have years of diverse experience providing environmental services including Level I and II Contamination Screening, Phase I and II Environmental Site Assessments and asbestos and metal-based paint surveys. We are experienced with a variety of technologies, including source removal, chemical oxidation, multi-phase extraction and biological remediation as well as other conventional corrective action strategies, such as pump and treat and SVE/AS. Our environmental professionals are well-versed in federal, state and local regulations, OSHA HAZWOPER trained and medically monitored, as necessary.
Page | 16
Tierra is prequalified with the Florida Department of Transportation to perform:
Group 9: Soil Exploration, Materials Testing and Foundations
9.1 – Soil Exploration
9.2 – Geotechnical Classification Laboratory Testing
9.3 – Highway Materials Testing
9.4.1 – Standard Foundation Studies
9.4.2 – Non-redundant Drilled Shaft Bridge Foundation Studies
9.5 – Geotechnical Specialty Laboratory Testing
Group 10: Construction Engineering Inspection
10.1 – Roadway Construction Engineering Inspection
10.3 – Construction Materials Inspection
10.4 – Minor Bridge and Miscellaneous Structures CEI
Page | 17
Schedule Control Techniques: Tierra understands the critical nature of City schedules during design and construction and we are prepared to meet or exceed any response time requirements as set forth by the City.
As professionals serving many repeat clients, the ability to complete quality work within a timely manner has long been a hallmark of Tierra’s corporate philosophy. Tierra’s engineering and laboratory staff have access to all of Tierra’s offices, 24-hours a day and Tierra’s personnel are accustomed to doing what it takes to meet the needs of our clients. Our field staff routinely canvas large areas allowing us to provide service to requests with very limited lead-time and our in-house drilling and laboratory capabilities allow us to quickly schedule and report results without relying on subcontractor firms. Tierra’s staff members are able to collaborate in an integrated fashion using Go-To Internet meetings, videoconferencing and telecommunications to assist with project coordination regardless of physical location. Furthermore, all team members are linked electronically via company-provided cell phones, facilitating overall project production and coordination.
Cost Control Techniques: Tierra’s budget control measures include the use of electronic timesheets and regular tracking of project man-hours and fees to ensure that established contractual budgets are adhered to.
In cases where the scope of work for an assignment has changed, Tierra’s Project Manager will promptly contact the City’s representative to convey the scope change and discuss means for addressing this condition.
In no instance will Tierra work on out of scope items or without an agreed upon supplement for services when conditions are warranted.
Page | 18
Tierra’s experience providing the services listed in the RFQ is best shown through our experience on projects similar to those which may be requested by the City. For each example contract / project shown, Tierra performed laboratory testing in our in-house laboratory and prepared formal engineering reports summarizing our scope of services, field data, subsurface conditions encountered and engineering recommendations. Additionally, all services were provided with in-house Tierra staff, on time and within budget.
EXAMPLE PROJECT 1
CITY OF PLANT CITY GEOTECHNICAL ENGINEERING SERVICES
CONTINUING CONTRACT, 2010 – ONGOING
Tierra is currently providing professional consulting services to the City of Plant City on a continuing contract basis. We have provided these services to the City since 2010.
Mendonsa Road and Pinedale Drive Drainage Improvements (April 2010 – May 2010): The project site is located along Mendonsa Road in Plant City. An exfiltration trench was proposed to be located within a 10-foot wide easement along the south side of Mendonsa Road. Tierra performed two (2) SPT borings along the proposed exfiltration trench alignment to a depth of 15 feet below existing grade and one (1) field hydraulic conductivity test to identify the permeability characteristics of the near surface soils located along the proposed exfiltration trench alignment. Geotechnical services were completed on time and within budget.
Plant City Contact: G.D. “Willie” Nabong, P.E., 813-659-4200 Project Cost: $1,200.00 Key Personnel: Kevin Scott, P.E., Manny Valdes
Laura Street Improvements (April 2010 - May 2010): Laura Street was being reconstructed to a 2-lane urban typical section and the existing pavement on Laura Street had been removed along the majority of the roadway due to ongoing construction activities. Plastic soils had been encountered within 2 feet of the bottom of the proposed roadway base elevation along other sections of this project. FDOT Standards and Specifications require a minimum separation of 2 feet between the bottom of the roadway base and plastic materials. Tierra’s objective was to identify areas where plastic soils were anticipated to be within 2 feet of the proposed bottom elevation of the roadway base. To achieve this objective, ten (10) hand auger borings were performed to depths of approximately 8 inches to 3 feet below existing grades along the Laura Street alignment. Geotechnical services were completed on time and within budget. Plant City Contact: G.D.
“Willie” Nabong, P.E., 813-659-4200 Project Cost: $1,095.00 Key Personnel: Kevin Scott, P.E., Larry Moore, P.E., Manny Valdes
City of Plant City C/o G.D. “Willie” Nabong, P.E.
302 W Reynolds Street Plant City, Florida 33565…