Ticket 380834 ENV Facilities DCR - Fire Control Garage Bay Insulation SOW Cat7~1.pdf

PDF 2 MB Posted

Attached to
FY26 ENV Facilities DCR - Fire Control Garage Bay Insulation Ticket 380834 Cat7
Solicitation number
BD-26-1042-IT-IT001-130360
Issued by
Massachusetts

About this file

This is a Statement of Work issued by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs seeking a qualified vendor to complete insulation work at the Fire Control Garage Bay located at 841 Lowell Street, Carlisle, MA. The project scope includes furnishing, installing, and commissioning all materials, equipment, and systems necessary to insulate a 40 x 40 feet garage space with a roof height of 16 feet to the eave and 28 feet to the peak. Required work includes air sealing of all gaps, joints, penetrations, and transitions in the building envelope; wall insulation with sealed joints and weatherstripping installation; roof insulation using closed-cell spray polyurethane foam with a minimum thickness of 4 to 5 inches or sufficient to achieve R-26 to R-35; installation of framing and furring as required; and drywall installation to Level 4 finish standard. A mandatory site visit is scheduled for Wednesday, June 10th, 2026, from 1:30 PM to 3:00 PM, with vendors required to RSVP in advance. The submission deadline for proposals is June 12th, 2026, by 10:00 AM EST through COMMBUYS, with an estimated contract start date of June 15th, 2026, and a final deadline for all deliverables of June 29th, 2026. Vendor questions must be submitted through COMMBUYS by June 11th, 2026, at 11:00 AM EST, with responses posted by 2:00 PM that same day.

The contract is available under two Massachusetts Statewide Contracts: TRD01 (Tradesperson Installation, Repair and Maintenance Services) under Category 8 for HVAC/Sheet Metal Services and Category 7 for Glass/Windows/Doors, and TRD02 (Asphalt Paving, Carpentry, Excavation, Masonry and Septic Services) under Category 2 for Carpentry Services. The Small Business Purchasing Program (SBPP) award preference applies, meaning SBPP-registered participants meeting best value criteria will be awarded the contract; non-SBPP bidders will only be evaluated if no SBPP bidder meets the evaluation criteria. No services may be performed without a written Scope of Services agreement, a not-to-exceed amount, and a Notice to Proceed from EEA Facilities. All expenses to deliver services must be included in the contract price, and vendors must submit an itemized bid quotation with a not-to-exceed fixed price, expected timeline for deliverables, and associated expenses. The awarding entity reserves the right to reject any and all proposals, negotiate changes to contract performance or cost that result in lower costs or better value, and request additional information or clarification from respondents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs

100 Cambridge Street, Suite 900 Boston, MA 02114

Maura T. Healey

GOVERNOR

Kimberley Driscoll

LIEUTENANT GOVERNOR

Rebecca L. Tepper

SECRETARY

Tel: (617) 626-1000 Fax: (617) 626-1081 http://www.mass.gov/eea

STATEMENT OF WORK (SOW) FOR

Project Number: DCR-004-26

Project Name: DCR - Fire Control Garage Bay Insulation

Project Location: 841 Lowell St, Carlisle, MA 01741 Property ID: 31-6-0 Location ID: F_695461_3025969 Approximate lot Size: 2.00 Acres Source & Date: Massachusetts Interactive Property Map - June 5, 2026

Project Manager(s): Juan Guzman - Juan.Guzman@mass.gov Louis Mattei - Louis.Mattei@mass.gov

Awarding Entity: Executive Office of Energy and Environmental Affairs (100

Cambridge Street, Boston, MA)

Under OSD Statewide Contract:

TRD01: Tradesperson Installation, Repair and Maintenance Services

Categories: Category 8 (HVAC/Sheet Metal Services), Category 7 (Glass/Windows/Doors)

TRD02: Asphalt Paving, Carpentry, Excavation, Masonry and Septic Services

Categories: Category 2 (Carpentry Services)

Bid Solicitation BD-26-1042-IT-IT001-130360 - Cat7 https://massgis.maps.arcgis.com/apps/OnePane/basicviewer/index.html?appid=47689963e7bb4007961676ad9fc56ae9 mailto:Juan.Guzman@mass.gov

This is a single document associated with a complete Bid that can be found on COMMBUYS (www.commbuys.com/). All Vendors are responsible for reviewing and adhering to all information, forms and requirements incorporated into the Statement of Work. Responses received after the deadline shall be disqualified. All Vendors should plan advance lead time for uploading proposals into COMMBUYS in a timely manner prior to the deadline. All Questions and Answers and Bid Responses must be submitted electronically through COMMBUYS.

Vendors requiring assistance in the registration and use of COMMBUYS should contact the COMMBUYS Helpdesk at COMMBUYS@state.ma.us or the COMMBUYS Helpline at 1-888- MA-STATE. The Helpline is staffed from 8:00 AM to 5:00 PM Monday through Friday Eastern time, as applicable, except on federal, state and Suffolk County holidays.

Document Outline

I. Project Description II. Applicable Procurement Law

III. Scope of Work for Insulation IV. Compliance with Contract Requirements V. Compensation

VI. Best Value Selection and Negotiation VII. Small Business Purchasing Program (SBPP)

VIII. Bidder Communication IX. Estimated SOW Calendar X. Questions via the Bid (Q&A) on COMMBUYS

XI. Required Components for Response Submission XII. Attachments:

a. Attachment A – Response Cover Sheet

b. Attachment B – General Schematic

c. Attachment C – (Outside) Building View

d. Attachment D – (Inside) Building View 1

e. Attachment E – (Inside) Building View 2

f. Attachment F – (Inside) Building View 3

I. Project Description

The Commonwealth of Massachusetts, through EEA Facilities (EOEEA) is seeking to engage a qualified vendor (hereafter referred to as “Vendor”) to complete the insulation of the Fire Control Garage Bay. The detailed scope of work is provided in Section III. Additional diagrams associated with the scope are attached under the “Attachments” section of this document.

NO PROPOSALS WILL BE ACCEPTED BY EMAIL, DELIVERY OR MAIL. ONLY

PROPOSALS RECEIVED VIA COMMBUYS WILL BE ACCEPTED.

http://www.commbuys.com/

II. Applicable Procurement Law This Solicitation is issued, and any contract will be awarded, under MGL c. 7, § 22; c.

30, § 51, § 52; 801 CMR 21.00 (Goods and Services) and Construction Materials and Services: G.L. c. 149, § 44A; G.L. c. 30, § 39M.

III. Scope of Work for Insulation

The Vendor shall furnish, install, and commission all materials, equipment, and systems identified herein in accordance with all applicable federal, state, and local codes, regulations, manufacturer requirements, and industry standards.

Existing Conditions:

• The outside building dimensions are 40 x 60 feet (Attachment C)

• The garage space, where the work will be completed, is 40 x 40 feet wide

(Attachment D, Attachment E, and Attachment F)

• Height of the roof is 16 feet to roof eve and 28 feet to the peak

• Electrical service, wiring, outlets, and lighting are present within the structure.

• A simple layout schematic is included in Attachment B

Project Requirements:

• Vendor shall ensure insulation work is coordinated with any existing electrical work

• Electrical boxes shall be properly set to finished wall depth using the proper adjustments - prior to insulation installation

• Vendor shall ensure that no junction boxes or serviceable electrical components are permanently concealed by insulation in violation of applicable codes.

• Vendor shall ensure compliance with all local jurisdiction requirements and permitting.

Site Preparation:

• Clean interior metal surfaces as required for proper adhesion of insulation materials.

• Vendors may include itemized in their bid the cost for optional assistance for the removal or relocation of obstructions as necessary to complete work (can be subcontracted).

• All insulation shall be installed in a continuous, gap-free manner.

Air Sealing:

• Seal all gaps, joints, penetrations, and transitions in the building envelope, including:

o Wall and roof panel seams o Door and window perimeters o Electrical and utility penetrations

• Install weatherstripping at all exterior doors and garage doors as required.

Insulation work:

• Wall Insultation o Seal all gaps, joints, penetrations, and transitions in the building envelope, including:

Wall and roof panel seams Door and window perimeters Electrical and utility penetrations o Install weatherstripping at all exterior doors and garage doors as required.

• Roof Insultation o Install closed-cell spray polyurethane foam insulation to underside of roof.

o Minimum thickness: 4 to 5 inches, or sufficient to achieve

R-26 to R-35.

o Ensure continuous coverage to prevent thermal bridging and condensation.

Framing and Furring (if required):

• Utilize existing steel framing and wood members where suitable for attachment of interior finishes.

• Install additional furring strips or framing members as required to create a flat, plumb surface for drywall installation.

• Ensure framing depth accommodates insulation thickness and required clearances.

Drywall Installation:

• Install ½-inch gypsum board on all insulated interior walls and ceilings.

• Fasten to steel framing and/or wood supports as applicable.

• Tape, mud, and finish to a Level 4 finish standard (or better if specified).

Additional Requirements:

• Vendor must provide manufacturer data sheets and warranty documentation (if applicable).

• Vendor must complete a final walkthrough with EEA Project Manager

The Vendor shall coordinate its work with the EEA team and shall not commence work until a Notice to Proceed has been issued. All work as defined in the RFP must be completed by no later than June 29th, 2026.

Vendors must attend a mandatory site visit (details are listed in the procurement calendar), Vendors who intend to attend are required to RSVP by emailing (juan.guzman@mass.gov) in advance and advising what time they intend to arrive.

mailto:juan.guzman@mass.gov

IV. Compliance with Contract Requirements The vendor shall comply with all terms and conditions of their respective contract.

EEA Facilities reserves the right to negotiate and modify requirements with the awarded vendor.

V. Compensation No services may be performed, or fees incurred by the vendor under the contract unless a Scope of Services has been agreed to in writing and with a not-to-exceed amount and a written notice to proceed from EEA Facilities has been issued. No payments shall be made for goods or services not rendered. There will be no reimbursements for any costs incurred in the preparation of a bidder’s response to this RFP including but not limited to travel expenses, phone charges, tolls, fuel, parking or rental fees.

The services that may be provided are set forth in the SOW, and all expenses to deliver services shall be included in the contract prices. All invoices for payment under Contract shall include a detailed accounting of work authorized in a form and detail acceptable to EEA Facilities. Invoices must be submitted in a timely manner.

VI. Best Value Selection and Negotiation EEA Facilities may select the response which demonstrates the best value overall, including proposed alternatives, that will achieve the procurement and service goals of the EOEEA. Bidders may provide supplemental information. EEA Facilities and the selected bidder(s) may negotiate a change in any element of contract performance or cost identified in the original SOW or the selected Bidder’s or Contractor’s response which results in lower costs or a more cost effective or better value than was presented in the selected Bidder’s or Contractor’s original response.

During the selection process, EEA Facilities reserves the right to take any or all of the following actions if it deems them to be in the interests of the Commonwealth of Massachusetts:

• Reject any and all proposals;

• Waive any minor informalities in proposals received or request Respondents to correct them;

• Request additional information from Respondents and seek clarification from a

Respondent provided that EEA Facilities determines it is not prejudicial to the interests of the other Respondents to do so. Action by the selection team in this regard should not be construed to imply acceptance or rejection of a proposal.

VII. Small Business Purchasing Program (SBPP) Program Background. The Massachusetts Small Business Purchasing Program (SBPP) was established pursuant to Executive Order 599 to increase state contracting opportunities with small businesses having their principal place of business within the Commonwealth of Massachusetts.

Pursuant to the SBPP, it is the intention of the issuing department to award this Small Procurement to one or more SBPP participating business(es) as described below.

https://www.mass.gov/sbpp https://www.mass.gov/executive-orders/no-599-reaffirming-programs-to-ensure-diversity-equity-and-inclusion-for-diverse-and-small-massachusetts-businesses-in-state-procurement-and-contracting?_gl=1*wnz9qe*_ga*OTcxODE1Mjg3LjE2ODM2MzUyMjc.*_ga_MCLPEGW7WM*MTY5ODA3OTg1NC4yNi4wLjE2OTgwNzk4NTQuMC4wLjA.

SBPP Award Preference. While all businesses, no matter the size or principal place of business, may submit responses to this solicitation, should an SBPP participant respond and meet the best value criteria as described in this solicitation, the SBPP participant shall be awarded the contract.

The Strategic Sourcing Services Team (SST) will not evaluate submissions from non-SBPP participants unless no SBPP Bidder meets the SSST’s best value evaluation criteria.

SBPP Participation Eligibility. To be eligible to participate in this procurement as an SBPP participant, an entity must meet the following criteria, and be marked as an SBPP registered business in COMMBUYS:

1. Have its principal place of business in the Commonwealth of Massachusetts;

2. Been in business for at least one year;

3. Employ a combined total of 50 or fewer full-time equivalent employees in all locations, or employees work less than a combined total of 26,000 hours per quarter; and

4. Have gross revenues, as reported on appropriate tax forms, of $15 million or less, based on a three-year average.

Non-profit firms also must be registered as a non-profit or charitable organization with the MA Attorney General’s Office and be up to date with all filings required by that office and be tax exempt under Section 501(c) of the Internal Revenue Code.

SBPP Compliance Requirements. It is the responsibility of the Bidder to ensure that their SBPP status is current at the time of submitting a response and throughout the life of any resulting contract. Misrepresentation of SBPP status will result in disqualification from consideration, and may result in debarment, contract termination, and other actions. To learn more about the SBPP, including how to apply, visit the SBPP Webpage.

Program Resources and Assistance. Bidders and Contractors seeking assistance regarding SBPP may visit the SBPP webpage, http://www.mass.gov/sbpp, or contact the SBPP Help Desk at sbpp@mass.gov.

VIII. Bidder Communication Bidders are prohibited from communicating directly with any employee regarding this SOW except as specified in this SOW with the EEA Facilities team. No other individual Commonwealth employee or representative is authorized to provide any information or respond to any question or inquiry concerning this SOW. Bidders may contact the contact person for this SOW in the event that the SOW is incomplete, or the bidder is having trouble obtaining any required attachments electronically through

COMMBUYS.

https://www.commbuys.com/bso/ http://www.mass.gov/sbpp http://www.mass.gov/sbpp mailto:sbpp@mass.gov

IX. Estimated SOW Calendar

Milestone Date Availability of SOW on COMMBUYS June 8th, 2026 (Mandatory) Fire Control District Office Site Visit

Vendors can visit Wednesday, June 10th, 2026

Site personnel will be available only from:

1:30 PM - 3:00PM

Submission of Vendor Question(s) through COMMBUYS (DUE)

June 11th, 2026 by 11AM

EST

Responses to Vendor Questions posted in COMMBUYS (Estimated)

June 11th, 2PM, 2026

Proposal Submission Deadline June 12th, 2026 by 10AM Estimated Contract Start Date June 15th, 2026 Final Date for all Deliverables/ Specifications under the Scope of Work Deadline

June 29th, 2026

X. Questions via the Bid (Q&A) on COMMBUYS The Bid Q&A provides the opportunity for Vendors to ask written questions and receive written answers from EEA Facilities regarding this SOW. All Vendor questions must be submitted through the Bid Q&A found on COMMBUYS. Questions may be asked at any time prior to the Deadline for Submission of Questions stated in the Estimated Procurement Calendar. EEA Facilities reserves the right not to respond to questions submitted after this date. It is the Vendor’s responsibility to verify receipt of questions.

Please note that any questions submitted to EEA Facilities using any other medium (including those that are sent by mail, fax, email or voicemail, etc.) will not be answered. To reduce the number of redundant or duplicate questions Vendors are asked to review all questions previously submitted to determine whether the question has already been posted.

Vendors are responsible for entering content suitable for public viewing, since all questions are accessible to the public. Vendors must not include any information that could be considered personal, security sensitive, inflammatory, incorrect, collusory, or otherwise objectionable, including information about the Vendor’s company or other companies. EEA Facilities reserves the right to edit or delete any submitted questions that raise any of these issues or that are not in the best interest of the Commonwealth or this SOW.

All answers are final when posted. Any subsequent revisions to previously provided answers will be dated.

It is the responsibility of the prospective/ awarded Vendor to maintain an active registration in COMMBUYS and to keep current the email address of the Vendor’s contact person and prospective contract manager. If awarded a contract, the Vendor is required to monitor that email inbox for communications from EEA Facilities, including requests for clarification. EEA Facilities assumes no responsibility if a prospective/ awarded Vendor’s designated email address is not current, or if technical problems, including those with the prospective/ awarded Vendor’s computer, network or internet service provider (ISP) cause email communications sent to/ from the prospective/ awarded Vendor and EEA Facilities to be lost or rejected by any means including email or spam filtering.

XI. Required Components for Response Submission The following components specific to this SOW must be included in the order outlined below with your response. Failure to include all the requested information and completed required forms may result in rejection of your firm’s submission. Proposals received after the deadline will be rejected. The required SOW components are as follows:

1) Attachment A – Response Cover Sheet

2) Proposal based on Scope of Work (including Schedule)

3) Compensation Structure/ Pricing and Expenses

Proposal based on Scope of Work: This refers to an itemized bid quotation that outlines a not to exceed fixed-price fees, the expected timeline (schedule) for deliverables, and details any associated expenses outlined in the project scope. This quotation must account for any quote requirements mandated through the designated Massachusetts Statewide Contract.

Bidders are encouraged to provide supplemental information regarding anything pertaining to the scope. Bidders will not be penalized for not submitting supplemental information. EEA Facilities will consider all aspects of a bidder’s proposal in its determination.

XII. Attachments

ATTACHMENT A – Response Cover Sheet DCR - Fire Control Garage Bay Insulation

Issued on:

June 8th, 2026

VENDOR SUBMITTING RESPONSE

Firm Submitting Proposal

Name of Authorized Signatory Title

Email Phone Number

Address of Firm

Signature Date

ATTACHMENT B – General Schematic

ATTACHMENT C – (Outside) Building View