TIA_13 Hickory Grove _ Skipper Bridge Rd_ Bid.pdf
PDF 2 MB Posted
- Solicitation number
- PE-69200-NONST-2026-000000048
- Issued by
- Georgia
About this file
Summary
This is a bid document for the Georgia Department of Transportation (GDOT) project TIA-13, which involves the widening of Hickory Grove Road and Skipper Bridge Road. The project encompasses roadway expansion and improvement work designed to enhance traffic flow and safety on these corridors. The bid document outlines the scope of work, project specifications, and requirements for qualified contractors to submit proposals for the construction and completion of the widening improvements. Specific details regarding exact quantities of materials, timelines, site visit requirements, and bid submission deadlines should be referenced within the document pages for contractor planning and proposal preparation.
The pricing structure and financial terms for this project, including bid amounts, payment schedules, and any prevailing wage requirements applicable to Georgia public works projects, are detailed in the bid specifications. The project is funded through state transportation improvement allocations, with GDOT serving as the administering agency. Additional information regarding contractor qualifications, bonding requirements, insurance specifications, and any applicable set-asides or disadvantaged business provisions would be contained within the formal bid documents to ensure compliance with state procurement regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INVITATION TO BID.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .