THS Packet.pdf
PDF 5 MB Posted
- Solicitation number
- RFP SRS 210000000374 1
- Issued by
- Wayne County, Reading City, Michigan
About this file
This is a project scope document for Thurston High School located at 26255 Schoolcraft, detailing water fountain and bottle filler installation requirements across multiple locations within the facility. The project encompasses 26 specific locations throughout the school, including academic hallways, athletic facilities, locker rooms, gymnasiums, administrative offices, and support areas. The work involves a combination of adding bottle fillers to existing fountains, installing new fountain and bottle filler combo units, and replacing existing equipment such as spittoons with bottle fillers. Locations requiring particular attention include the pool deck, weight room, and girls' locker rooms, where power installation may be necessary. Two locations—the wrestling room and one fountain in the competition gym—require no modifications.
The document does not specify pricing terms, contract duration, response deadlines, award dates, or funding sources. No information is provided regarding set-asides, incumbent contractors, site visit requirements, or bidders' meetings. The scope appears to be preliminary in nature, establishing the baseline work requirements and quantities needed for the fountain and bottle filler upgrade project at this school facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fisher Packet.pdf | ||
| Admin packet.pdf | ||
| RFP attachment F floor plans wc.pdf | ||
| Pierce Packet.pdf | ||
| Jeffersonpacket.pdf | ||
| Drinking Fountains RFP- revised 11-30-2020 2.pdf | ||
| Vandenberg packet.pdf | ||
| Addams Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THURSTON HIGH SCHOOL 26255 SCHOOLCRAFT 48239
#1 EXISTING FOUNTAIN/BOTTLE FILLER BY CAFÉ. This is the example do nothing
#2 Band Hall needs bottle filler on existing fountain
#3 Pool Deck needs fountain and bottle filler needs power
#4 Boy’s locker room needs fountain / bottle filler may need power
#5a Girl’s locker room south 1 of 2 within 12 feet new fountain and bottle filler
#5b Girls locker room north 2 of 2 only replacing 1 of the 2 in here
#6 Practice Gym need 1 new bottle filler on one existing fountain
#7 Aerobics outer room need 1 bottle filler on existing fountain
#8a Competition Gym 1 of 2 south set replace spittoon with bottle filler
#8b Competition Gym 2 of 2 norh fountain needs nothing
#9 500 Hall need 1 new bottle filler on one existing fountain
#10 Weight Room need new bottle filler and new fountain may need power (mechanical room is behind the wall)
#11 700 Hall add 1 new bottle filler on existing fountain
#12 Hall by 311 needs new bottle filler on existing fountain
#13 Hall by 300 needs new bottle filler on existing fountain
#14 Hall by 616 needs new bottle filler on existing fountain
#15 Hall outside media center needs 1 new bottle filler/fountain combo
#16 Hall by 610 needs 1 new bottle filler on existing fountain
#17 Hall by Eagles Nest needs new fountain and bottle filler combo.
#18 Outer Auditorium needs 1 new bottle filler on one existing fountain
#19 Hall by 110 needs 1 new bottle filler on existing fountain
#20 Hall by 210 needs 1 new bottle filler on existing fountain
#21 Senior Hall needs 1 new bottle filler on existing fountain
#22 Hall by 801 needs 1 new bottle filler on existing fountain
#23 In Transportation office room 802 needs 1 new fountain/bottle filler combo
#24 Hall by 805 need new fountain/bottle filler combo
#25 Short 600 hall need 1 new bottle filler on existing fountain
#26 Wrestling room has no fountain or filler. Do nothing
File details come from the government source that posted it. Updated .