TH01_CDRLs.pdf
PDF 352 KB Posted
- Attached to
- 1356-01-294-6889 TH01 IGNITER
- Solicitation number
- N0010426QK051
About this file
This document is a Contract Data Requirements List (DD Form 1423-1) for a federal contract with the system/item number 4T-1356-01-294-6889-TH01. The form outlines five distinct data items to be submitted by the contractor: Test Procedure (A001), Test/Inspection Report (A002), Failure Analysis/Corrective Action Report (A003), Ammo Data Card (A004), and Contractor's Progress, Status and Management Report (A005). The primary requiring offices are NUWC Newport, NAVSEA PMS-404L, and NAVSUP Weapon Systems Support, with distribution to multiple naval logistics and support centers.
Each data item has specific submission requirements, including frequency (one-time, per lot, monthly), timing of first and subsequent submissions, and detailed documentation standards. For example, the Test Procedure (A001) must specify process control instructions and inspection procedures to ensure product conformance, while the Ammo Data Card (A004) must be prepared using the Worldwide Ammunition-Data Repository (WARP). The Contractor's Progress Report must be submitted via mail or email by the 5th day of each month after contract award. The documents are to be signed and dated by a government inspector and must meet various military and quality standards, including MIL-STD-1168 and ANSI/ASQC Q9000-2000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 JeƯerson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting OƯicer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ☐ TM ☐ OTHER ☐
D. SYSTEM/ITEM
4T-1356-01-294-6889-TH01
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
ALL DRAWINGS
6. REQUIREING OFFICE
NUWC NEWPORT
18. ESTIMATED TOTAL
PRICE
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE TIME
12. DATE OF FIRST
SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. ADP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Draft
Final
Reg Repro
16.REMARKS
THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION
PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,
SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR
EQUIVALENT. THE PLAN IS TO INCLUDE PRODUCTION LOT QUALITY CONFORMANCE
INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG WITH ALL APPLICABLE DATA ENTRY
SHEETS TO BE USED TO DOCUMENT PROCESS
INSPECTIONS.
BLK 14: DISTRIBUTION ADDRESS
1. NAVSUP Weapon Systems Support
2. NAVSUP Ammunition Logistics Center
3. Naval Surface Warfare Center POC Information: See Section H
SEE BLOCK 16 0 1 0
15. TOTAL 0 1 0
G. PREPARED BY
Richard Rzomp
H. DATE
11/7/2025
I. APPROVED BY
John Knecht
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 o f
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 JeƯerson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting OƯicer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A002
Test/Inspection Report
3. SUBTITLE
Pre-Production & Production Test
DI-NDTI-80809B
ALL DRAWINGS
DD
PER LOT
SEE BLOCK 16
Reg Repro
16.REMARKS
THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE
DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT
CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION
RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE
REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT
OBJECTIVE QUALITY EVIDENCE. THE REPORT MUST BE APPROVED BY NAVSUP
WSS CONTRACTING OFFICER BEFORE FINAL ACCEPTANCE OF THE LOT.
BLK 12: DATE OF PRE-PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS
AFTER FIRST ARTICLE TEST COMPLETION.
BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT
ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.
Richard Rzomp
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 o f
5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 JeƯerson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting OƯicer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A003
Failure Analysis/Corrective Action Report
DI-SESS-80255B
Section E
LT
Reg Repro
16.REMARKS
BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.
BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.
BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT
10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30
DAYS AFTER NOTIFICATION OF LOT FAILURE.
BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FAT
COMPLETION OF SECOND FAILED LOT AND BEYOND.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 o f
5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 JeƯerson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting OƯicer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A004
Ammo Data Card (ADC)
DI-MISC-80043B
SD
Reg Repro
16.REMARKS
BLK 4: DATA CARD SHALL BE PREPARED IN ACCORDANCE WITH MIL-STD-1168,
AS CHANGED BY ADL EXCEPTIONS AND THE CONTRACT DOCUMENT LIST BY
ACCESSING THE WORLDWIDE AMMUNITION-DATA REPOSITORY (WARP) WHICH IS
LOCATED: https://mhpwarp.redstone.army.mil. AN ACCESS REQUEST FORM
MUST BE COMPLETED BEFORE WARP CAN BE ACCESSED. QUESTIONS SPECIFIC TO
WARP SHOULD BE ADDRESSED TO ONE OF THE RESPECTIVE POCs AS LISTED ON
THE WEBSITE.
BLK 10,12,13: DATA CARDS PROVIDED TO NAVSEA PMS-404 AND THOSE SENT
WITH SHIPMENTS SHALL BE HARDCOPY PRINTOUTS GENEREATED WITH THE WARP
PROGRAM AND SHALL BE SIGNED AND DATED BY THE GOVERNMENT INSPECTOR.
NAVSEA PMS-404 SUBMISSIONS SHALL ALSO INCLUDE HARDCOPY PRINTOUT OF
SAMPLES CARDS (SEE MIL-STD-1168, PARA 4.3.1.4)
1. NAVSUP WEAPON Systems Support
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 o f
5 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 JeƯerson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting OƯicer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
A005
Contractor’s Progress, Status and Management Report
DI-MGMT-81928
NAVSEA PMS-404L
LT
MNTHLY
Reg Repro
16. REMARKS
BLK 11, 12,14: THE DD-375 REPORT SHALL BE SUBMITTED VIA MAIL OR EMAIL ON OR BEFORE
THE 5TH DAY OF EAC MONTH AFTER CONTRACT AWARD.
15. TOTAL
Philip Lindley
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 o f
5 Pages
File details come from the government source that posted it. Updated .