Amendment_00001.pdf

PDF 197 KB Posted

Attached to
Blast Film Installation on Interior Windows Federal contract opportunity
Solicitation number
TFSATTB14Q0007
Issued by
Department of the Treasury Bureau of the Fiscal Service

About this file

Amendment 000001 to answer vendor questions

View the file

Other files for this federal contract opportunity

Other files attached to Blast Film Installation on Interior Windows, newest first.
File Type Posted
IPP_Waiver_attachment.pdf PDF
BFS_Non-Disclosure_Agreement.pdf PDF
SOLICITATION_PACKAGE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

TFSATTB14Q0007

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Parkersburg WV 26101 200 Third Street

FSA-PARKERSBURG

Avery 5F Administration Branch Division of Procurement Bureau of the Fiscal Service

Parkersburg WV 26101 Attn: D. Dayton

FSA-DDAYTON

200 Third Street Avery 5F Division of Procurement Bureau of the Fiscal Service

09/15/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/09/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer the following vendor questions:

1) What is the distance of space between the ground and the bottom of the windows? (This is to determine if a ladder will be needed)

Answer: A ladder will be needed, the top of the windows are eight feet from the floor.

2) Is a capping system required to seal the film to the frames or will the wet sealant suffice?

Answer: Wet sealant should suffice

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SHANON R. HAYES

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

TFSATTB14Q0007/000001

3) How thick is the glass that the film will be applied to?

Answer: One inch

4) Has the GSA specified a blast rating for this project? (level 2 or 3b)

Answer: The film will be a blast film that meets the level C GSA requirements of 4psi and 28psi*ms. The product will be a minimum of 7 mil clear film and certified for fragment retention.

(as per the PWS)

5) Is the glass tempered? (tempered glass will not meet specification with film only. It must be attached to the frame or it is worthless)

Answer: The glass is thermally tempered, with anchorage being made with one inch bolts.

6) Please let us know where the project is and when we can do a site visit. Or please send us the Plans

Answer: Location of requirement and information describing the requirement can be found in the Soliciation and the Performance Work Statement.

No site visit offered.

7) Do you have an estimated value or budget for the Blast Film Installation on Interior Windows Project?

Answer: This information is not available.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)