About this file

This document outlines requirements for a 10 gigabit Ethernet circuit between two locations. The solicitation calls for quotes to provide, install, and maintain a non-switched 10Gb circuit with Ethernet 1.0 line coding at 1310nm between 7100 Saber Rd, FE Warren AFB, WY 82005 and 84 North Aspen St, Buckley SFB, CO 80011. The circuit must meet round trip delay of less than 10 milliseconds or 10 milliseconds per 350 miles of fiber route, 99.5% availability, zero frame loss at 10Gbps, jitter of less than 3 milliseconds, and MTTLBCI greater than 24 hours. The telecom provider must coordinate with DISA for testing, turn up, and maintenance and report any issues to DISA. The Defense Information Systems Agency is the contracting agency.

1. SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB, NON-SWITCHED, ETHERNET CIRCUIT REAWARD BETWEEN (BLDG) 1284; (RM) 188; (FL) 1ST; 7100 SABER ROAD, FE WARREN AFB, WY 82005 (FEWRNAFB/CCI) AND (BLDG) 730; (RM) 132; (FL) 1ST; 84 NORTH ASPEN STREET, BUCKLEY SFB, CO 80011-9518 (BCKLYSFB/CCI). A. THE COMMITTED INFORMATION RATE (CIR) (10GBE) REQUIRES THE VENDOR TO DELIVER A 10GB ETHERNET LAN-PHY INTERFACE AT THE DROP SIDE OF THE COMMERCIAL DEMARCS AT THE "A" AND "Z" LOCATIONS. B. REVALIDATE TSP: TSP0KJJ0K-01 C. PRIOR TO ANY TESTING VENDOR CONTACT CASA AT: EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-LEASE-BB-T@MAIL.MIL D. PRIOR TO BEGINNING THEIR END-TO-END TESTING VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS. 2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD. 3. THE SERVICE DATE TO BE MET IS: 28 NOV 23 (SIP). THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS. 4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. QUOTES MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST CLARIFICATIONS OF THE REQUIREMENT(S) BEFORE SUBMITTING QUOTES. QUESTIONS SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE POSTED TO BETA.SAM. 5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY HC101323QA248 / TSR RU28JUN238643 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM TSR INQUIRY HC101323QA248 / TSR RU28JUN238643; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR INQUIRY INQUIRY HC101323QA248 / TSR RU28JUN238643. 6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END-TO-END DIVERSITY REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES AND ROUND-TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE INCLUDED IN THE ATTACHMENTS. 7. PRE-AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT, AT A MINIMUM, CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY. QUOTES MUST BE UPLOADED TO IDEAS. 8. THIS IS A REAWARD OF A CURRENT SERVICE, (CSA LEVC000256EBM). IF THE INCUMBENT QUOTE IS EVALUATED AS THE LOWEST PRICE TECHNICALLY ACCEPTABLE, THE CURRENT CSA WILL BE ADMINSTRATIVELY DISCONTINUED WITHIN 30 DAYS OF INCUMBENT CONTRACTOR RECEIVING AWARD. THE DISCONTINUE DATE OF OLD CSA WILL BE THE DAY PRIOR TO THE START DATE OF NEW CSA. FAILURE TO READ AND ADHERE TO ANY PORTION OF THE SOLICITATION SHALL RENDER THE QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND AWARD.

View the file

Other files

File Type Posted
HC101323QA249-0001.v0.pdf PDF
1 - Vendor Sample Maps_Version2 (2).pdf PDF
HC101323QA249_v1.zip ZIP file
1 - Vendor Block Sample_Version3 (002) (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

***ATTENTION FE WARREN AFB LOCATION***

1. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END

TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR

RU28JUN238643

2. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH TSR RU28JUN238643

3. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END

TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR

RU28JUN238643, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING

MANHOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY,

AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION FROM TSR

RU28JUN238643.

4. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE

SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES, AND

ROUND-TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO THE

GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE

MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH

CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE. MBX.IE16-

PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.

TEST & ACCEPTANCE INSTRUCTIONS:

1. 10G TESTING CRITERIA: VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48

HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING.

2. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP

SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT

SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED

IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION

BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST

ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE

"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR

24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)

IAW ITU-T-Y.1564.

3. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON

THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY

POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE

GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED

TO +0.5 TO -7 DBM.

4. THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK

TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627.

5. THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY

THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB,

IL. (C) 618-418-8627, (D) 418-8627

CIRCUIT SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125

GIGABITS/S, +- 100 PPM LINE CODE: ETHERNET

1. FIBER TERMINATION FRAME FORMAT OF ETHERNET, 802.3AE, 1310NM

2. THROUGHPUT SHALL BE REPORTED AS LAYER 2 (L2) CIR. CIR: 10G LEASED CIRCUITS,

THE VENDOR/TP IS REQUIRED TO DELIVER THE LAYER 2 CIR THROUGHPUT OF 9884.9

MBPS USING THE SPECIFIED EMIX FRAME PATTERN ABCDEFGH OF CORROSPONDING

FRAME SIZES OF 64, 128, 256, 512, 1024, 1280, 1518 AND 9000 BYTES

3. RTD: ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED

IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO

THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN

OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S

MISSION. NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600

MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT

REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS

PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A AND Z LOCATIONS.THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP

AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA

IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

4. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:

(A) AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.

(B) FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST

FRAME RATE AND SHALL MEET ITU-T-Y.1564 STANDARDS.

(C) JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.

5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24

HOURS.

6. THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION

AT BOTH LOCATIONS.

7. VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER

8. VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

9. TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.

10. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

11. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING.

12. THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.

13. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.

File details come from the government source that posted it. Updated .