This document outlines technical testing requirements for a 1 gigabit Ethernet circuit between two Navy locations. The circuit must be physically diverse end-to-end with separate conduit, manholes, and fiber builds maintaining at least 50 meters of separation. The provider must submit detailed drawings and connectivity diagrams showing fiber routes and separation distances. Testing criteria include 24-hour vendor testing at the circuit commit rate followed by a 72-hour government soak test. The circuit specifications require 10.3125 gigabits per second line rate and Ethernet encapsulation. Throughput must deliver 988.49 megabits per second at the layer 2 commit information rate. Round trip delay must be less than 10 milliseconds or 10 milliseconds per 350 miles. The circuit must meet high availability, low frame loss, jitter, and delay standards.

View the file

Other files

File Type Posted
HC101323QA227-0003.v0.pdf PDF
HC101323QA227-0002.v0.pdf PDF
HC101323QA227-0001.v0.pdf PDF
1 - Vendor Block Sample_Version3 (002) (1).pdf PDF
HC101323QA227.v1.pdf PDF
1 - Vendor Sample Maps_Version2 (2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY

DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S)

FROM TSR RU24MAY238593, MEANING THAT PHYSICAL PATHS ARE TOTALLY

SEPARATE INCLUDING MANHOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS),

AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM THERE MUST BE A 50 METER

PHYSICAL SEPARATION FROM TSR RU24MAY238593.

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT

DRAWINGS FOR TECHNICAL REVIEW SHOWING THE ROUTES FROM THE

COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL OFFICES AND/OR

WIRING CENTERS. DRAWINGS MUST INCLUDE SEPARATION DISTANCES

BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES, AND ROUND-TRIP

DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO THE GOVERNMENT

CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE MET.

ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED

CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT,

IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR EVALUATION AND AS A FINAL

RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE PROVIDED TO

DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL.MIL) FOR

HISTORICAL PURPOSES.

***THE 50 METER SEPARATION IS WAIVED INSIDE BLDG 740 FOR LEMOORE

LOCATION.***

TEST & ACCEPTANCE INSTRUCTIONS:

1. 1G TESTING CRITERIA: VENDOR MUST CONTACT DISA GOC TIER-II

ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING.

2. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE

DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR

EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE

CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION

AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC

AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED

AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING

MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR

ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS

IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564.

3. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN

DBM) ON THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT

SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO

CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN

SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3.0 TO -9.0 DBM.

4. THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR

SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-

8627.

5. THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE

GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627

CIRCUIT SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM

LINE CODE: ETHERNET

1. FIBER TERMINATION FRAME FORMAT OF ETHERNET, 802.3AE, 1310NM

2. THROUGHPUT SHALL BE REPORTED AS LAYER 2 (L2) CIR. CIR: 1G LEASED

CIRCUITS, THE VENDOR/TP IS REQUIRED TO DELIVER THE LAYER 2 CIR

THROUGHPUT OF 988.49 MBPS USING THE SPECIFIED EMIX FRAME PATTERN

ABCDEFGH OF CORROSPONDING FRAME SIZES OF 64, 128, 256, 512, 1024, 1280, 1518

AND 9000 BYTES

3. RTD: ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE

MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE

RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY

SUPPORT THE GOVERNMENT'S MISSION.

NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600

MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT

REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10

MILLISECONDS PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A

AND Z LOCATIONS.THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM

THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN

WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO

IMMEDIATELY IN WRITING.

4. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:

(A) AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.

(B) FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT

HIGHEST FRAME RATE AND SHALL MEET ITU-T-Y.1564 STANDARDS.

(C) JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10

MSEC.

5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER

THAN 24 HOURS.