About this file

This document outlines the technical requirements for a federal contract to provide a 10 gigabit Ethernet circuit between two government facilities. The awarded contract calls for GTT Global Telecom Government Services, LLC to install and maintain a 10Gb circuit with less than 10 milliseconds round trip delay between Building 975 at Whidbey Island Naval Air Station in Oak Harbor, Washington and Building 2145 at Beale Air Force Base in California. The service date to be met is October 25, 2021, and liquidated damages may be assessed for any delay in meeting this date. The contract was awarded for $341,180 on July 27, 2021. The circuit must be engineered and provisioned with totally diverse physical paths, including separate man holes, conduit, central office locations, and fiber builds from an existing circuit.

1. IN ACCORDANCE WITH INQUIRY HC101321QA427, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A 10GB CIRCUIT BETWEEN BLDG 975, ROOM 101, 3565 NORTH LANGLEY BLVD, WHIDBEY ISLAND NAVAL AIR STATION, OAK HARBOR, WA 98278/CCI AND BLDG 2145, ROOM 105, 5801 C STREET, BEALE AFB, CA 95903-1517/CCI. 2. THE PROPOSED AND APROVED RTD IS: LESS THAN OR EQUAL TO 10 MILLISECONDS. ANY CHANGES TO THE RTD AFTER AWARD ARE NOT ACCEPTABLE. 3. THE SERVICE DATE TO BE MET IS: 25 OCT 2021 (SIP). THE GOVERNMENT WILL ASSESS CONSIDERATION IAW STANDARD PROVISION 42 FOR DELAY ON DELIVERY OF CIRCUIT ON CONTRACTED SERVICE DATE. 4. ESTABLISH TSP: TSP0L1WWN-01 5. SEE ATTACHMENTS AND UNIQUE INSTALLATION FACTORS FOR TECHNICAL REQUIREMENTS SPECIFIC TO THIS ORDER. 6. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION IN IDEAS. 7. THIS AWARD MUST BE WORKED IN CONJUNCTION WITH INQUIRY HC101321QA412 / TSR RU18MAY217120 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM INQUIRY HC101321QA427 / TSR RU18MAY217119; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM INQUIRY HC101321QA412 / TSR RU18MAY217120.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END

TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS FROM TSR RU18MAY217120 /

CJON: SF17MAY218858, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE

INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS.

ADDITIONALLY AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION FROM

TSR RU18MAY217120 / CJON: SF17MAY218858. ***THE 50 METER SEPARATION IS WAIVED

INSIDE BLDG 3001 FOR WHIDBEY ISLAND LOCATION.***

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE

SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND

ROUND TRIP DELAY AND FIBER ROUTES RED LINED END TO END SO THE GOVERNMENT

CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE MET.

ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH

CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX .IE16-

PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON

THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY

POINT AT THE A AND Z LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT

ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9

DBM.

THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST CONDUCT

WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: C618-418-8627, D418-8627.

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING. PHONE: C618-418-8627, D418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE

OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE

AT THE A LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR

EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN

THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST

SETS ARE PLACED AT THE DROP SIDE M. REMARKS CONTINUED: AT THE "A" LOCATION

AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO

THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT

FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR

NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564.

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB

ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. SC OR LC CONNECTORS AS

DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT

CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE

GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB.

(C) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION

UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH.

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO

CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL

ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES

STANDARD, AND AT THE COMMITTED INFORMATION RATE IAW ITU-T-Y.1564. NOTE:

ETHERNET FRAME SIZE DESIGNATOR H (MTU) IS EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE N. REMARKS

CONTINUED: GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627.

VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF

THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING.

ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

PRIMARY: C618-418-9950, D418-9950 TOLL FREE: 855-868-9950.

DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY

RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,

SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: C618-418-

8627 D418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE

GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN

TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564

STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10

MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY SHALL BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN

MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.

THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-

UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,

DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

File details come from the government source that posted it. Updated .