About this file

SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB ETHERNET IP BACKBONE CIRCUIT BETWEEN BLDG 1901, RDP (REMOTE DEMARC POINT) ROOM, 1901 E 3RD ST., MCGUIRE AFB, NJ 08641 AND BLDG 308, ROOM 203, 5450 CARLISLE PIKE, NSA MECHANICSBURG, PA 17050-0975. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a request for quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-83. The provisions that apply to this acquisition are identified in the DITCO Basic Agreements and Section M of the attached document. The associated North American Industrial Classification System (NAICS) code for this procurement is 517311 with a small business size standard of 1500. All quoted prices shall be identified in CLIN 0001 and applicable SLINs 0001AA, 0001AB, etc. as applicable for monthly recurring charges and CLIN 0002 and applicable SLINs 0002AA, 0002AB, etc. as applicable for non-recurring charges. CLIN/SLINs shall include item descriptions, quantities and units of measure. The requested service date and acceptance criteria are outlined in the attached inquiry. The product and service code for this telecommunications requirement is DG11. The selected company must comply with the following commercial item terms and conditions, which are incorporated herein by reference and as outlined in existing basic agreements: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications if there is no existing basic agreement; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the selected clauses in paragraph (b) in the existing basic agreement. Quotes are due 2 AUG 2021, by 4:00 PM (CST) at DITCO Scott AFB, IL 62225-5406 Point of Contact(s): CASSANDRA Y. COOPER (618) 418-6862, EMAIL: CASSANDRA.Y.COOPER.CIV@MAIL MIL.

View the file

Other files

File Type Posted
MAPS FOR DIVERSE Vendor Block Diagram Sample and Maps.pdf PDF
HC101321QA321_v1.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TESTING REQUIREMENTS HC101321QA321

5. ***ATTENTION MCGUIRE AFB LOCATION*** THIS REQUIREMENT MUST BE ENGINEERED

AND PROVISIONED TOTALLY DIVERSE END TO END TO GOVERNMENT'S SERVICE

DELIVERY POINTS (SDP'S) FROM TSR: RU08APR217041, MEANING THAT PHYSICAL PATHS

ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM THERE MUST BE A 50

METER PHYSICAL SEPARATION FROM TSR: RU08APR217041. L. REMARKS CONTINUED: 6.

THE TELECOM PROVIDER MUST PROVIDE DITCO COL OR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FR OM THE COMMERCIAL DEMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/O RWIRING CENTERS. DRAWINGS MUST INCLUDE

SEPARATION DISTANCES BETWE EN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND

ROUND TRIP DELAY ( RTD), AND FIBER ROUTES RED LINED END TO END SO THE

GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE

MET. ADD ITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/P ATH

CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ I E16 (DISA.MEADE.IE.MBX.IE16-

PROVISIONING-TEAM@MAIL.MIL) FOR HISTO RICAL PURPOSES. 7. THE VENDOR MUST

PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION FROM

COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A"

AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING

LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 8. THE

VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS,

IAW UNIQUE INSTALLATION FACTORS. 9. THE VENDOR MUST CONDUCT WALK-THROUGH

SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS. 10. THE VENDOR MUST

CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON

RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.

PHONE: (C) 618-418-8627, (D) 418-8627. 11. THE VENDOR MUST CONTACT DISA GOC TIER-II

ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C)

618-418-8627, (D) 418-8627. M. REMARKS CONTINUED: 12. THE PROVIDER MUST CONDUCT

A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE

CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR

OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z"

LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC

AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE

DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE

SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE

TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-

T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES

STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.

REMARKS: 1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION:

FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE

MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.

NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX

WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS

PRIOR TO DELIVERY. (B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET

FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF

9000 OCTETS (BYTES) JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT, DEDICATED

PATH. (E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO

CIRCUIT. N. REMARKS CONTINUED: (F) TESTING CRITERIA: VENDOR MUST TEST THE

CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR

NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS

EQUAL TO 9000 BYTES. (G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO

USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%

AVAILABILITY OR BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER

UPON RECEIPT OF TROUBLE. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO

ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST HAVE A 24X7 NETWORK

OPERATIONS CENTER. (K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS,

MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT. (L) THE

COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE

DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

C618-418-8627, D418-8627 GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING

AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627. 2. VENDOR

WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE

SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS AUTHORIZED

IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST COORDINATE SITE VISIT

WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT

BOTH USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48

HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. O. REMARKS CONTINUED: 6.

ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950. 7. DD FORM 1368 WILL

BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC, SCOTT AFB, IL.

GUIDANCE ON SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS

CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST BY

DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR

PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING

PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT

HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE

LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO LOSS OF

BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. 4. ROUND TRIP

DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILLBE MEASURED IN MILLISECONDS

FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S

SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10

MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE

GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP

AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA

IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. P. REMARKS CONTINUED: **

DIVERSITY INFO: SERVICE DIVERSITY REQUESTED; DUAL HOMING CCSD: TBD2; DUAL

HOMING REMARKS: TBD2 IS A PLACE HOLDER FOR THE CCSD OF THE DIVERSE CIRCUIT.

** ADDITIONAL PROVISIONING INFORMATION: DISA (DISN IP ROUTER NETWORK

BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS) ** FUNDING TCO APL:

DEFENSE INFORMATION SYSTEMS AGENCY (DISA) ** FUNDING APPROVAL: THIS

REQUIREMENT IS A BONA FIDE NEED OF FY21 AND DISA FY21 FUNDING INFORMATION IS

AVAILABLE IN DISA'S TELECOMMUNICATIONS INVENTORY AND BILLING INFORMATION

(TIBI) APPLICATION. Q. REMARKS CONTINUED: ANY ADDRESSEE ON THE (TSO) WILL

NOTIFY ALL ADDRESSEES IMMEDIATELY BY MESSAGE IDENTIFYING ANY ISSUES,

PROBLEMS, OR SITUATIONS WHICH MAY PREVENT OR DELAY THE IMPLEMENTATION OF

THIS TELECOMMUNICATIONS SERVICE ORDER (TSO). ALL STATIONS WILL REVIEW THE

CONFIGURATION, EQUIPMENT, CONTACT NUMBERS AND ADDRESSES CONTAINED IN THIS

(TSO) AND PROVIDE UPDATES TO ORIGINATOR OF (TSO) ANY ERRORS SO THAT

SUBSEQUENT (TSOS) MAY BE UPDATED. R. SATELLITE OBJECTION: DIVERSITY: DISA

MANDATE S. COMPLETION REPORT: DISA GOC IP B/D312-770-8627,C001-618-220-86 FOR

STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO, FOR THIS ACTION COMPLETION

REPORTS WILL BE SUBMITTED IAW DISAC 310-130-1, CHAPTER 2 BY DISA GLOBAL IP, DSN

312-418-8627; COML 618-418-8627. ALL OTHER CCO/CMO RESPONSIBILITIES REMAIN WITH

THE DESIGNATED CCO/CMO IAW DISAC 310-70-1, CHAPTER 8. T. DD FORM 1368: DD FORM

1368'S (MODIFIED USE OF LEASED COMMUNICATION FACILITIES), OR EMAIL EQUIVALENT,

WILL BE SUBMITTED, AS REQUIRED, ON THIS CIRCUIT IAW DISAC-DITCO 350-135-1 BY THE

STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO. GUIDANCE ON SUBMISSION IS

AVAILABLE AT HTTP://WWW.DITCO.DISA.MIL/CORPORATELIBRARY/HOME.ASP. CLICK ON

"350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION PROCEDURES." U.

IMPLEMENTATION ASSISTANCE: IMPLEMENTATION ASSISTANCE: FOR SERVICE

ACTIVATION INQUIRIES/SCHEDULING/ASSISTANCE, NAVIGATE TO THE DISA GLOBAL

SERVICE ACTIVATIONS CUSTOMER ACCESS PORTAL:

HTTPS://DISA.DEPS.MIL/DISA/COP/GSM-O/BACKBONE/CUSTOMER%20ACCESS%2

0SITE/SITEPAGES/SAM%20CUSTOMER%20HOMEPAGE.ASPX, OR CONTACT DSN 312-418-

8627, CMCL 001-618-418-8627. FOR EMAIL SUPPORT, PLEASE CONTACT THE APPROPRIATE

TEAM BELOW: DEDICATED/NIPRNET/SIPRNET/VPN SERVICE ACTIVATIONS: EMAIL:

DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL SIPRNET ACCESS

MIGRATION (SAM) PROJECTS (D508, D710, D806, D910): EMAIL:

DISA.SCOTT.GLOBAL.MBX.IMPACT-TEAM@MAIL.MIL FOR ALL OTHER PROJECT RELATED

EFFORTS: EMAIL:DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL DISN

BACKBONE ACTIVATIONS: EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-

INTEGRATION-LEAS E-BB-T@MAIL.MIL V. IMPLEMENTATION ASSISTANCE CONTINUED: FOR

CIRCUIT INSTALLATION ASSISTANCE WITH THE COMMERCIAL LEASED PATH, CONTACT

DCP COMMERCIAL ACTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820. W.

UNSATISFACTORY SERVICE REPORTING INSTRUCTIONS: FOR UNSATISFACTORY SERVICE

OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING DISA PROVIDED

TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT

CENTER (DCCC) TOLL FREE NUMBER IS 1-844-347-2457 (1-844-DISA HLP) OPTION 2, COML

1-614-692-0032 OPTION 2, DSN 312-850-0032 OPTION 2. X. THIS TSO IS IN SUPPORT OF

EXERCISE/PROJECT: DISA MPLS IMPLEMENTATION PROJECT (D300) Y. JUSTIFICATION OF

SERVICE REQUESTED: THIS ACTION SUPPORTS DISN IP BACKBONE IMPLEMENTATION

File details come from the government source that posted it. Updated .