TESTING REQUIREMENTS HC101321QA321.pdf
PDF 90 KB Posted
- Solicitation number
- HC101321QA321
- Issued by
-
Defense Information Systems Agency
About this file
SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN A 10GB ETHERNET IP BACKBONE CIRCUIT BETWEEN BLDG 1901, RDP (REMOTE DEMARC POINT) ROOM, 1901 E 3RD ST., MCGUIRE AFB, NJ 08641 AND BLDG 308, ROOM 203, 5450 CARLISLE PIKE, NSA MECHANICSBURG, PA 17050-0975. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a request for quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-83. The provisions that apply to this acquisition are identified in the DITCO Basic Agreements and Section M of the attached document. The associated North American Industrial Classification System (NAICS) code for this procurement is 517311 with a small business size standard of 1500. All quoted prices shall be identified in CLIN 0001 and applicable SLINs 0001AA, 0001AB, etc. as applicable for monthly recurring charges and CLIN 0002 and applicable SLINs 0002AA, 0002AB, etc. as applicable for non-recurring charges. CLIN/SLINs shall include item descriptions, quantities and units of measure. The requested service date and acceptance criteria are outlined in the attached inquiry. The product and service code for this telecommunications requirement is DG11. The selected company must comply with the following commercial item terms and conditions, which are incorporated herein by reference and as outlined in existing basic agreements: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications if there is no existing basic agreement; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the selected clauses in paragraph (b) in the existing basic agreement. Quotes are due 2 AUG 2021, by 4:00 PM (CST) at DITCO Scott AFB, IL 62225-5406 Point of Contact(s): CASSANDRA Y. COOPER (618) 418-6862, EMAIL: CASSANDRA.Y.COOPER.CIV@MAIL MIL.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAPS FOR DIVERSE Vendor Block Diagram Sample and Maps.pdf | ||
| HC101321QA321_v1.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TESTING REQUIREMENTS HC101321QA321
5. ***ATTENTION MCGUIRE AFB LOCATION*** THIS REQUIREMENT MUST BE ENGINEERED
AND PROVISIONED TOTALLY DIVERSE END TO END TO GOVERNMENT'S SERVICE
DELIVERY POINTS (SDP'S) FROM TSR: RU08APR217041, MEANING THAT PHYSICAL PATHS
ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE
LOCATIONS), AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM THERE MUST BE A 50
METER PHYSICAL SEPARATION FROM TSR: RU08APR217041. L. REMARKS CONTINUED: 6.
THE TELECOM PROVIDER MUST PROVIDE DITCO COL OR POWERPOINT DRAWINGS FOR
TECHNICAL REVIEW SHOWING THE ROUTES FR OM THE COMMERCIAL DEMARCS TO THE
SUPPORTING CENTRAL OFFICES AND/O RWIRING CENTERS. DRAWINGS MUST INCLUDE
SEPARATION DISTANCES BETWE EN DIVERSE REQUIREMENTS, TOTAL FIBER MILES AND
ROUND TRIP DELAY ( RTD), AND FIBER ROUTES RED LINED END TO END SO THE
GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
MET. ADD ITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/P ATH
CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF
PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.
THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ I E16 (DISA.MEADE.IE.MBX.IE16-
PROVISIONING-TEAM@MAIL.MIL) FOR HISTO RICAL PURPOSES. 7. THE VENDOR MUST
PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE EXTENSION FROM
COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A"
AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING
LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM. 8. THE
VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY LOCATIONS,
IAW UNIQUE INSTALLATION FACTORS. 9. THE VENDOR MUST CONDUCT WALK-THROUGH
SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS. 10. THE VENDOR MUST
CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON
RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.
PHONE: (C) 618-418-8627, (D) 418-8627. 11. THE VENDOR MUST CONTACT DISA GOC TIER-II
ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. PHONE: (C)
618-418-8627, (D) 418-8627. M. REMARKS CONTINUED: 12. THE PROVIDER MUST CONDUCT
A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE
CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR
OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z"
LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC
AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE
DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE
SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE
TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-
T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564.
REMARKS: 1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION:
FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE
MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY.
NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX
WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS
PRIOR TO DELIVERY. (B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET
FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF
9000 OCTETS (BYTES) JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT, DEDICATED
PATH. (E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO
CIRCUIT. N. REMARKS CONTINUED: (F) TESTING CRITERIA: VENDOR MUST TEST THE
CIRCUIT FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION
RATE (CIR) IAW ITU-T-Y.1564. NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS
EQUAL TO 9000 BYTES. (G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO
USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5%
AVAILABILITY OR BETTER. (H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER
UPON RECEIPT OF TROUBLE. (I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO
ASSIST IN ANY CIRCUIT OUTAGES. (J) VENDOR MUST HAVE A 24X7 NETWORK
OPERATIONS CENTER. (K) TELECOM PROVIDER MUST MAINTAIN OPERATIONS,
MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT. (L) THE
COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
C618-418-8627, D418-8627 GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING
AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D) 418-8627. 2. VENDOR
WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE
SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE WIRING IS AUTHORIZED
IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST COORDINATE SITE VISIT
WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT
BOTH USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48
HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. O. REMARKS CONTINUED: 6.
ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA
GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950. 7. DD FORM 1368 WILL
BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC, SCOTT AFB, IL.
GUIDANCE ON SUBMISSION IS AVAILABLE AT
<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO
CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS
CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST BY
DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR
PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING
PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN
99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT
HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE
LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO LOSS OF
BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS. 4. ROUND TRIP
DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILLBE MEASURED IN MILLISECONDS
FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S
SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10
MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE
GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP
AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA
IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING. P. REMARKS CONTINUED: **
DIVERSITY INFO: SERVICE DIVERSITY REQUESTED; DUAL HOMING CCSD: TBD2; DUAL
HOMING REMARKS: TBD2 IS A PLACE HOLDER FOR THE CCSD OF THE DIVERSE CIRCUIT.
** ADDITIONAL PROVISIONING INFORMATION: DISA (DISN IP ROUTER NETWORK
BACKBONE AND BACKBONE HOSTS)(CONUS AND OCONUS) ** FUNDING TCO APL:
DEFENSE INFORMATION SYSTEMS AGENCY (DISA) ** FUNDING APPROVAL: THIS
REQUIREMENT IS A BONA FIDE NEED OF FY21 AND DISA FY21 FUNDING INFORMATION IS
AVAILABLE IN DISA'S TELECOMMUNICATIONS INVENTORY AND BILLING INFORMATION
(TIBI) APPLICATION. Q. REMARKS CONTINUED: ANY ADDRESSEE ON THE (TSO) WILL
NOTIFY ALL ADDRESSEES IMMEDIATELY BY MESSAGE IDENTIFYING ANY ISSUES,
PROBLEMS, OR SITUATIONS WHICH MAY PREVENT OR DELAY THE IMPLEMENTATION OF
THIS TELECOMMUNICATIONS SERVICE ORDER (TSO). ALL STATIONS WILL REVIEW THE
CONFIGURATION, EQUIPMENT, CONTACT NUMBERS AND ADDRESSES CONTAINED IN THIS
(TSO) AND PROVIDE UPDATES TO ORIGINATOR OF (TSO) ANY ERRORS SO THAT
SUBSEQUENT (TSOS) MAY BE UPDATED. R. SATELLITE OBJECTION: DIVERSITY: DISA
MANDATE S. COMPLETION REPORT: DISA GOC IP B/D312-770-8627,C001-618-220-86 FOR
STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO, FOR THIS ACTION COMPLETION
REPORTS WILL BE SUBMITTED IAW DISAC 310-130-1, CHAPTER 2 BY DISA GLOBAL IP, DSN
312-418-8627; COML 618-418-8627. ALL OTHER CCO/CMO RESPONSIBILITIES REMAIN WITH
THE DESIGNATED CCO/CMO IAW DISAC 310-70-1, CHAPTER 8. T. DD FORM 1368: DD FORM
1368'S (MODIFIED USE OF LEASED COMMUNICATION FACILITIES), OR EMAIL EQUIVALENT,
WILL BE SUBMITTED, AS REQUIRED, ON THIS CIRCUIT IAW DISAC-DITCO 350-135-1 BY THE
STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO. GUIDANCE ON SUBMISSION IS
AVAILABLE AT HTTP://WWW.DITCO.DISA.MIL/CORPORATELIBRARY/HOME.ASP. CLICK ON
"350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION PROCEDURES." U.
IMPLEMENTATION ASSISTANCE: IMPLEMENTATION ASSISTANCE: FOR SERVICE
ACTIVATION INQUIRIES/SCHEDULING/ASSISTANCE, NAVIGATE TO THE DISA GLOBAL
SERVICE ACTIVATIONS CUSTOMER ACCESS PORTAL:
HTTPS://DISA.DEPS.MIL/DISA/COP/GSM-O/BACKBONE/CUSTOMER%20ACCESS%2
0SITE/SITEPAGES/SAM%20CUSTOMER%20HOMEPAGE.ASPX, OR CONTACT DSN 312-418-
8627, CMCL 001-618-418-8627. FOR EMAIL SUPPORT, PLEASE CONTACT THE APPROPRIATE
TEAM BELOW: DEDICATED/NIPRNET/SIPRNET/VPN SERVICE ACTIVATIONS: EMAIL:
DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL SIPRNET ACCESS
MIGRATION (SAM) PROJECTS (D508, D710, D806, D910): EMAIL:
DISA.SCOTT.GLOBAL.MBX.IMPACT-TEAM@MAIL.MIL FOR ALL OTHER PROJECT RELATED
EFFORTS: EMAIL:DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL DISN
BACKBONE ACTIVATIONS: EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-
INTEGRATION-LEAS E-BB-T@MAIL.MIL V. IMPLEMENTATION ASSISTANCE CONTINUED: FOR
CIRCUIT INSTALLATION ASSISTANCE WITH THE COMMERCIAL LEASED PATH, CONTACT
DCP COMMERCIAL ACTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820. W.
UNSATISFACTORY SERVICE REPORTING INSTRUCTIONS: FOR UNSATISFACTORY SERVICE
OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING DISA PROVIDED
TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT
CENTER (DCCC) TOLL FREE NUMBER IS 1-844-347-2457 (1-844-DISA HLP) OPTION 2, COML
1-614-692-0032 OPTION 2, DSN 312-850-0032 OPTION 2. X. THIS TSO IS IN SUPPORT OF
EXERCISE/PROJECT: DISA MPLS IMPLEMENTATION PROJECT (D300) Y. JUSTIFICATION OF
SERVICE REQUESTED: THIS ACTION SUPPORTS DISN IP BACKBONE IMPLEMENTATION
File details come from the government source that posted it. Updated .