THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY
POINT AT THE A AND Z LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT
ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9
DBM.
THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY
LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.
THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT
BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE:(C) 618-418-8627, D418-8627.
THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, D418-8627.
THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE
OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE
AT THE A LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR
EQUIPMENT SUITE AT THE Z LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN
THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST M. REMARKS
CONTINUED: ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION
AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO
THE GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT
FOR 24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR
NETWORK INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION
RATE (CIR) IAW ITU-T-Y.1564.
CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB
ETHERNET-LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS
DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT
CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE
GOVERNMENT 30 DAYS PRIOR TO DELIVERY.
COMMITTED INFORMATION RATE (CIR): 10GB.
ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.
NO NETWORK INTERFACE UNIT, DEDICATED PATH.
GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL ITU-
T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES
STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:
FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES.
LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,
SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.
1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.
VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.
TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION
MONITORING OF ETHERNET CIRCUIT.
THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY
THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB,
IL. (C) 618-418-8627, (D) 418-8627.
VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF
THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.
INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING.
ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA
GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.
DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY
RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS AVAILABLE AT
<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS .ASP>. CLICK ON "DISA-DITCO
CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM LINE CODE:
OPTICAL
TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-
418-8627 (D) 418-8627.
ERROR PERFORMANCE:
ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR
BETTER.
FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT
HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS.
JITTER SHALL BE LESS THAN 3 MSEC.
DELAY SHALL BE BETTER THAN 10 MSEC.
MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24
HOURS.
ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN
MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR
EQUAL TO 10 (10MS (<450)/15MS (450-1000)/ 20MS (1000-1500)/ 29MS (>1500))
MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE
GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP
AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA
IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
VENDOR MUST PROVIDE FIBER STRANDS FROM CISCO ROUTER SUITE FIBER PATCH
PANEL TO COMMERCIAL POINT OF PRESENCE (FIBER DISTRIBUTION PANEL) WITHOUT
SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE FIBER STRANDS
MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE CONTINUOUS.
VENDOR MUST BE TAG CIRCUIT WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AT
LINE SIDE OF DISA PROVIDED FIBER TERMINATING PATCH PANEL BLDG 232, ROOM 1 AND
AT DROP SIDE OF VENDOR'S FIBER DISTRIBUTION PANEL INSTALLED IN THEIR
COMMERCIAL SUITE. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED ON
THIS ORDER THE EXACT TERMINATION POINT WHEN INSTALLATION IS COMPLETE.
DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF CISCO
ASR-9006 ROUTER AND OPTICAL INTERFACE CARD BLDG 232, ROOM 1.
DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR MAINTENANCE OF SINGLE
MODE FIBER FROM OPTICAL INTERFACE CARD INSTALLED IN CISCO ASR-9006 ROUTER TO
DROP SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN
CISCO ASR-9006 ROUTER. COORDINATE TYPE OF CONNECTORS.