TEMPLATE Budget Justification and Construction Cost Worksheet.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
State Veterans Home Construction Grant Program
Opportunity number
VA-GRANTS-112508-002
Issued by

About this file

A1E. Budget justification worksheet

View the file

Other files

File Type Posted
SVHCGP 2019 Checklist.pdf PDF
SF424D-V1.1.pdf PDF
SF424C_2_0-V2.0.pdf PDF
SF424_2_1-V2.1.pdf PDF
SHC Safety Program.pdf PDF
TEMPLATE Checklist Item A13 Number of Beds-Distance.docx DOCX document
TEMPLATE Checklist Item A12 Number of Beds-Rate.docx DOCX document
TEMPLATE Checklist Item A11 Fully Occupied.docx DOCX document
Financial Plan Guidance.docx DOCX document
Capital Plan Guidance.docx DOCX document
Form 10-0388-4 Space Program Analysis-Adult day Health Care.pdf PDF
Form 10-0388-3 Space Program Analysis-Nursing Home and Domiciliary.pdf PDF
Schematics Guidance.docx DOCX document
TEMPLATE State Clearinghouse 2019.docx DOCX document
TEMPLATE Needs Assessment 2019.docx DOCX document
TEMPLATE Governors Designation Letter 2019.docx DOCX document
Form 10-0388-1 Initial Application.pdf PDF
TEMPLATE Project Scope.doc DOC document
oppVA-GRANTS-112508-002-cfda64.005-instructions.docx DOCX document
PKG00022340-instructions.docx DOCX document
oppVA-GRANTS-112508-002-cfda64.005-instructions.docx DOCX document
oppVA-GRANTS-112508-002-cfda64.005.pdf PDF
PKG00022340.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 Cost Breakdown

Supplement to SF 424C
BUDGET JUSTIFICATION WORKSHEET
Project #: FAI-Date Prepared:
State:Expected Construction Contract Award Date:
Location:Escalation Rate:
Project Name:Total Project Site Area (AC):
Project Type:New Building Construction Area (SF):
# of Beds:Building Renovations Area (SF):
# of Floors:Total Building Area (SF):0

NOTE: All costs should include taxes and the contractor's general conditions, bonds & insurance, overhead & profit.

Provide a narrative description of the construction or renovation work to be accomplished.

SF-424c - LINE 9
CONSTRUCTION
COSTS
DESCRIPTIONQUANTITYUNIT OF MEASURECOST PER UNITCOST
NEW BUILDING CONSTRUCTIONSF$0.00
NEW CENTRAL UTILITY PLANTSF$0.00
BUILDING RENOVATIONSSF$0.00
SYSTEM RENOVATIONS - HVAC$0.00
SYSTEM RENOVATIONS - BOILERS$0.00
SYSTEM RENOVATIONS - NURSE CALL$0.00
SYSTEM RENOVATIONS - ANTI-WANDERING$0.00
MEDICAL RECORD SYSTEM$0.00
SURFACE PARKINGSPACES$0.00
RENEWABLE ENERGYLS$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL CONSTRUCTION COST$0.00
ESCALATION$0.00
TOTAL CONSTRUCTION COST (Enter on Line 9 of SF-424c)$0.00
Provide a narrative description of the sitework to be accomplished.
SF-424c - LINE 7
SITEWORK
COSTS
DESCRIPTIONQUANTITYUNIT OF MEASURECOST PER UNITCOST
SITE UTILITIES (BEYOND 5 FOOT LINE)LS$0.00
ROADSLF$0.00
WALKSLF$0.00
LANDSCAPINGAC$0.00
SITE CLEARANCEAC$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL SITEWORK COST$0.00
ESCALATION$0.00
TOTAL SITEWORK COST (Enter on Line 7 of SF-424c)$0.00
Provide a narrative description of the demolition & removal work to be accomplished.
SF-424c - LINE 8
DEMOLITION
& REMOVAL
COSTSDESCRIPTIONQUANTITYUNIT OF MEASURECOST PER UNITCOST
BUILDING DEMOLITIONSF$0.00
SITE DEMOLITIONAC$0.00
SELECTIVE DEMOLITION - WALLSF$0.00
SELECTIVE DEMOLITION - DOORS$0.00
SELECTIVE DEMOLITION - WINDOWS$0.00
SELECTIVE DEMOLITION - ROOF$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL DEMOLITION & REMOVAL COST$0.00
ESCALATION$0.00
TOTAL DEMOLITION & REMOVAL COST (Enter on Line 8 of SF-424c)$0.00
New Construction
Renovation: Bed Replacement
Renovation: No Bed Replacement
Renovation: EMR, Legionella, Other
Safety

Enter your project's information into the blue cells only on this worksheet. Depending on your project, all cells may not be used. Cell color will change to white after data entry. Leave the unused cells blank / empty.

Enter a description of your project's construction work. This is the work for which the cost will be captured on line 9 of SF-424c.

Enter a description of your project's sitework. This is the work for which the cost will be captured on line 7 of SF-424c.

Enter a description of your project's demolition & removal work. This is the work for which the cost will be captured on line 8 of SF-424c.

1. Enter your project's construction cost information into columns B, C, D, & E only. Leave the unused cells blank / empty.

2. Column F (total cost for line item) will calculate automatically.

3. Existing line item descriptions and units of measure are provided as examples. Rename or delete these as needed for your project.

4. Your project may not require the use of all example line items. Only use those that apply to your project. It's OK to leave the unused lines empty or to delete them.

5. Add additional line items as needed by using the empty lines.

6. Avoid the use of Lump Sums (LS) costs whenever possible.

USER INSTRUCTIONS

Subtotal, Escalation, and Total cost will calculate automatically.

Subtotal, Escalation, and Total cost will calculate automatically.

Subtotal, Escalation, and Total cost will calculate automatically.

1. Enter your project's sitework cost information into columns B, C, D, & E only. Leave the unused cells blank / empty.

2. Column F (total cost for line item) will calculate automatically.

3. Existing line item descriptions and units of measure are provided as examples. Rename or delete these as needed for your project.

4. Your project may not require the use of all example line items. Only use those that apply to your project. It's OK to leave the unused lines empty or to delete them.

5. Add additional line items as needed by using the empty lines.

6. Avoid the use of Lump Sums (LS) costs whenever possible.

1. Enter your project's demolition cost information into columns B, C, D, & E only. Leave the unused cells blank / empty.

2. Column F (total cost for line item) will calculate automatically.

3. Existing line item descriptions and units of measure are provided as examples. Rename or delete these as needed for your project.

4. Your project may not require the use of all example line items. Only use those that apply to your project. It's OK to leave the unused lines empty or to delete them.

5. Add additional line items as needed by using the empty lines.

6. Avoid the use of Lump Sums (LS) costs whenever possible.

Tab 2 Bid Tabs or CMAR

In lieu of bid tabulations
Construction Cost Worksheet
Description of Work Performed and/or To Be PerformedContractor/Vendor NameCost
CONTRACTED

IN-HOUSE

TOTAL COST $ - 0

USER INSTRUCTIONS

Use this template to document the cost of construction contracts, procurements, and/or in-house costs for your project. The costs included in this worksheet should reflect site work, demolition and removal, and construction (line items 7,8, and 9 of the SF424C)

Enter the awarded contract information for each procurement on a separate line, if applicable, in this section.

Enter the description and cost of in-house work performed, if applicable, in this section.

Total cost will calculate automatically.The total cost of items in column D of this worksheet should match the total of lines 7, 8, and 9 of the final SF424C form (checklist item B6E).