ATTENTION GRISSOM ARB LOCATION THIS REQUIREMENT MUST BE ENGINEERED AND

PROVISIONED TOTALLY DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY

POINTS (SDP'S) FROM CJON: SF21JUL209928, MEANING THAT PHYSICAL PATHS ARE

TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS),

AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM, THERE MUST BE A 50 METER PHYSICAL

SEPARATION FROM CJON: SF21JUL209928. THE 50 METER SEPARATION IS WAIVED INSIDE

BLDG 427.

COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL O FFICES AND/OR WIRING

CENTERS. DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE

REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES

RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END

DIVERSITY REQUIREMENTS ARE MET.

ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH

CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDEN TIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.

THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-

PROVISIONING-TEAM@MAIL.MIL ) FOR HISTORICAL PURPOSES.

SATELLITE OBJECTION: DIVERSITY: DISA MANDATE THIS TSO IS IN SUPPORT OF

EXERCISE/PROJECT: DISA MPLS

DIVERSITY/AVOIDANCE INSTRUCTIONS: DIVERSITY IS REQUIRED. THE VENDORS MUST

PROVIDE MAPS AND DRAWINGS PER STANDARD PROVISIONS. DIVERSITY IS DEFINED AS

50 METER/164 FEET SEPARATION WITH NO COMMON CONDUITS, MANHOLES, FACILITY

ENTRANCES AND POWER.

CONUS NO JUMBO FRAME ETHERNET VENDOR WILL PERFORM ACCEPTANCE TESTING IN

ACCORDANCE WITH EITHER RFC-6815 OR ITU-T Y.1564. VENDOR MUST TEST THE CIRCUIT

FOR 24 HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF 64,128,256,512,1024,1280

AND 1518 BYTES MUST BE USED. THE TEST MUST VERIFY LENGTH OF RECEIVED FRAMES,

INDICATE NUMBER OF FRAMES DROPPED, NUMBER OF FRAMES RECEIVED OUT OF

ORDER, AND DUPLICATE FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME

DATA RATE IN EACH DIRECTION. BURST TESTS MUST BE RUN TO DETERMINE MINIMUM

INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME LOSS. A

THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST

FRAMES CAN BE TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST

MUST BE RUN WITH FRAMES ADDRESSED TO THE HARDWARE BROADCAST ADDRESS

CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY DISTRIBUTED

THROUGHOUT THE TEST.

A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 120 SECONDS, AND

REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD

BE RUN AT THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE

THROUGHPUT TEST. END TO END LATENCY WILL BE CALCULATED AS THE AVERAGE

OVER THE 20 TEST RUNS. FRAME LOSS RATE TESTS SHOULD BE RUN AT THE FRAME

RATE CORRESPONDING TO THE MAXIMUM FRAME RATE, AND REDUCED BY 10%

INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS IN WHICH NO FRAMES

ARE LOST.THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE

SIZES EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01%

FOR ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE MEASURED WILL BE

ACCORDING TO THE FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP

TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND

ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN

50MS ONE WAY WITHIN THE 48 CONTINENTAL STATES. ANY APS SWITCHOVER SHALL

TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY SHALL BE NO LESS THAN

99.5%.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON

THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY

POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE

GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED

TO -3 TO -9 DBM.

THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.

THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT

BOTH LOCATIONS.

THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.

THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.

THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE

OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE

AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN

THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION

BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST

ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE

"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR

24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)

IAW ITU-T-Y.1564.

THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE

DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C)

618-418-8627, (D) 418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR

INSTALLATION AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION

FACTORS.

INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO

BEGINNING THEIR END-TO-END TESTING.

ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA

GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.

PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950. 7. DD FORM 1368 WILL

BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC, SCOTT AFB, IL.

GUIDANCE ON SUBMISSION IS AVAILABLE AT

<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO

CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL

1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,

SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-

418-8627 (D) 418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE

GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN

TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564

STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10

MSEC.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL U. REMARKS

CONTINUED: BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN

MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE

CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR

EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.

THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-

UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,

DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.