TECHNICAL SPECIFICATIONS - QB273.pdf
PDF 83 KB Posted
- Solicitation number
- HC101320QB273
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1 - Vendor Sample Maps_Version2.pdf | ||
| HC101320QB273.v1.pdf | ||
| 1 - Vendor Block Sample_Version3 (002).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTENTION GRISSOM ARB LOCATION THIS REQUIREMENT MUST BE ENGINEERED AND
PROVISIONED TOTALLY DIVERSE END TO END TO GOVERNMENT'S SERVICE DELIVERY
POINTS (SDP'S) FROM CJON: SF21JUL209928, MEANING THAT PHYSICAL PATHS ARE
TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS),
AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM, THERE MUST BE A 50 METER PHYSICAL
SEPARATION FROM CJON: SF21JUL209928. THE 50 METER SEPARATION IS WAIVED INSIDE
BLDG 427.
COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL O FFICES AND/OR WIRING
CENTERS. DRAWINGS MUST INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE
REQUIREMENTS, TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES
RED LINED END TO END SO THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END
DIVERSITY REQUIREMENTS ARE MET.
ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH
CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDEN TIFYING ALL POINTS OF
PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.
THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-
PROVISIONING-TEAM@MAIL.MIL ) FOR HISTORICAL PURPOSES.
SATELLITE OBJECTION: DIVERSITY: DISA MANDATE THIS TSO IS IN SUPPORT OF
EXERCISE/PROJECT: DISA MPLS
DIVERSITY/AVOIDANCE INSTRUCTIONS: DIVERSITY IS REQUIRED. THE VENDORS MUST
PROVIDE MAPS AND DRAWINGS PER STANDARD PROVISIONS. DIVERSITY IS DEFINED AS
50 METER/164 FEET SEPARATION WITH NO COMMON CONDUITS, MANHOLES, FACILITY
ENTRANCES AND POWER.
CONUS NO JUMBO FRAME ETHERNET VENDOR WILL PERFORM ACCEPTANCE TESTING IN
ACCORDANCE WITH EITHER RFC-6815 OR ITU-T Y.1564. VENDOR MUST TEST THE CIRCUIT
FOR 24 HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF 64,128,256,512,1024,1280
AND 1518 BYTES MUST BE USED. THE TEST MUST VERIFY LENGTH OF RECEIVED FRAMES,
INDICATE NUMBER OF FRAMES DROPPED, NUMBER OF FRAMES RECEIVED OUT OF
ORDER, AND DUPLICATE FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME
DATA RATE IN EACH DIRECTION. BURST TESTS MUST BE RUN TO DETERMINE MINIMUM
INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME LOSS. A
THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST
FRAMES CAN BE TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST
MUST BE RUN WITH FRAMES ADDRESSED TO THE HARDWARE BROADCAST ADDRESS
CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY DISTRIBUTED
THROUGHOUT THE TEST.
A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 120 SECONDS, AND
REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD
BE RUN AT THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE
THROUGHPUT TEST. END TO END LATENCY WILL BE CALCULATED AS THE AVERAGE
OVER THE 20 TEST RUNS. FRAME LOSS RATE TESTS SHOULD BE RUN AT THE FRAME
RATE CORRESPONDING TO THE MAXIMUM FRAME RATE, AND REDUCED BY 10%
INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS IN WHICH NO FRAMES
ARE LOST.THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE
SIZES EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01%
FOR ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE MEASURED WILL BE
ACCORDING TO THE FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP
TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND
ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN
50MS ONE WAY WITHIN THE 48 CONTINENTAL STATES. ANY APS SWITCHOVER SHALL
TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY SHALL BE NO LESS THAN
99.5%.
THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED
TO -3 TO -9 DBM.
THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY
LOCATIONS, IAW UNIQUE INSTALLATION FACTORS.
THE VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT
BOTH LOCATIONS.
THE VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND
IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE
COORDINATION AND ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627.
THE VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627.
THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE
OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE
AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN
THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST
ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE
"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR
24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)
IAW ITU-T-Y.1564.
THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE
DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C)
618-418-8627, (D) 418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR
INSTALLATION AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION
FACTORS.
INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.
VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO
REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
VENDOR MUST CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO
BEGINNING THEIR END-TO-END TESTING.
ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA
GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL.
PRIMARY: (C) 618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950. 7. DD FORM 1368 WILL
BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO 350-135-1 BY RNSOC, SCOTT AFB, IL.
GUIDANCE ON SUBMISSION IS AVAILABLE AT
<HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>. CLICK ON "DISA-DITCO
CIRCULAR, 350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION
PROCEDURES."
MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:
10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL
1. TEST AND ACCEPTANCE: THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED,
SATISFACTORY, 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-
418-8627 (D) 418-8627.
2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE
GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN
TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564
STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10
MSEC.
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL U. REMARKS
CONTINUED: BE GREATER THAN 24 HOURS.
4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN
MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR
EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION.
THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-
UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL,
DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
File details come from the government source that posted it. Updated .