Technical_Specifications.pdf
PDF 317 KB Posted
- Attached to
- Steele Boulevard Park
- Solicitation number
- 2027-01
- Issued by
- Hartford County, Connecticut
About this file
This is a Technical Specifications document prepared by Barton and Loguidice, LLC for the Steele Center @ Farmington Avenue TOD Community Park project in Berlin, Connecticut. The project involves the redevelopment of a 0.29-acre Town-owned parcel into a public community park with a lump sum base bid and alternate bid structure. The scope of work includes installation of a paver plaza, covered pavilion (16ft x 24ft Alpine Timber Frame Pavilion Kit), sidewalks, lawn areas, decorative plantings, fences, bike rack, benches, and an Historic Marker Board. The project incorporates a pavilion foundation, cast-in-place concrete work for pads and sidewalks/ramps, exterior lighting fixtures, site furnishings, unit pavers, segmental concrete retaining walls, storm drainage systems, underground conduit, and landscaping elements including topsoil placement, turf, and plant materials. The contractor must complete work within ninety (90) consecutive calendar days from the Notice to Proceed, with a pre-construction meeting to be scheduled within five (5) days after the effective date of agreement. Biweekly progress meetings are required, and the contractor must submit initial construction schedules within five (5) days of the Owner-Contractor agreement.
The specifications establish detailed requirements for materials, workmanship, and quality control, including independent testing laboratory services selected and paid for by the Owner, with contractor responsibility for costs of additional testing beyond specified requirements. All concrete work must comply with ASTM standards and ACI specifications, with field testing including compression cylinders at 7 and 28 days. The pavilion installation requires a CT licensed professional engineer to stamp the foundation and slab design, and electrical work must be NEC code compliant. The contractor is responsible for sedimentation and erosion control, mobilization, construction layout and as-built surveys, and removal of all temporary facilities upon project completion. All major work items including concrete, pavilion structure, electrical, landscaping, and drainage are included in the general lump sum payment with no separate measurement or payment for individual components. The specifications require submittal of product data, shop drawings, samples, and proposed products lists per the submittal procedures outlined in Section 01 33 00, with all materials and equipment subject to engineer approval prior to installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Steele_Boulevard_Park_(Addendum_#2_Revision).pdf | ||
| Steele_Boulevard_Park.pdf | ||
| CHRO_Documents.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Barton and Loguidice, LLC Steele Center @ Farmington Ave, TOD Community Park Farmington Avenue, Berlin, CT
Technical Specifications Index
TECHNICAL SPECIFICATIONS
INDEX
01 11 00 Summary of Work 01 31 19 Project Meetings 01 33 00 Submittals 01 43 00 Quality Control and Assurance 01 45 23 Testing Laboratory Services 01 57 13 Sedimentation Control System 01 57 21 Anti-Tracking Apron 01 71 13 Mobilization 01 71 23 Construction Layout 03 30 00 Cast-In-Place Concrete 13 34 23 Fabricated Pavilion Structure 26 05 00 Common Work Result for Electrical 26 56 00 Exterior Lighting 31 11 00 Clearing & Grubbing 31 23 00 Excavation and Fill 31 23 13 Formation of Subgrade 31 23 23 General Fill & Borrow 31 23 33 Trenching and Backfilling 31 23 35 Bedding for Pipes and Structures 31 37 00 Riprap 32 11 23 Processed Aggregate Base 32 12 16 Bituminous Concrete 32 12 16.43 Granite Curbing 32 17 23 Pavement Markings and Signage 32 31 29 Wood Fences and Gates 32 32 23 Segmental Concrete Unit Masonary Retaining Wall 32 33 00 Site Furnishings 32 78 00 Unit Pavers 32 91 19 Topsoil Placement and Grading 32 92 00 Turf and Grasses 32 93 00 Plants 33 42 00 Storm Drainage – Piping 33 42 00 Storm Drainage – Structures 33 70 00 Underground Conduit
Section 01 11 00 – Summary of Work
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.01 DESCRIPTION
A. This project includes the installation of a paver plaza, covered pavilion, sidewalks, lawn areas, decorative plantings and fences to screen the site from adjacent land uses.
Sidewalks will connect the park to the recently constructed Steele Center additional amenities include a bike rack, benches and an Historic Marker Board that will highlight the history of the area, including information about the former Berlin Train Station that was destroyed by fire while being renovated.
1.02 CONTRACT
A. Construct work under the lump sum base bid and alternate bid prices provided by the Contractor, in accordance with the Contract Documents.
1.03 PHASING OF WORK
A. The total contract time will be ninety (90) consecutive calendar days, beginning at a date to be specified in the Notice to Proceed. Work shall be substantially complete at this time.
PART 2 - PRODUCTS
2.01 GENERAL
A. Not Applicable.
PART 3 - EXECUTION
3.01 GENERAL
A. Not Applicable.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
Section 01 11 00 – Summary of Work
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of the general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental thereto.
END OF SECTION
Section 01 31 19 Project Meetings
SECTION 01 31 19
PROJECT MEETINGS
PART 1 - GENERAL
1.01 DESCRIPTION
A. Owner shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called meetings throughout the progress of the work.
Owner, or Owner's Representative, shall:
1. Prepare agenda for meetings.
2. Preside at meetings.
3. Record the minutes; include all significant proceedings and decisions.
4. Reproduce and distribute copies of minutes within three (3) working days after each meeting to all participants in the meeting and to all parties affected by decisions made at the meeting.
B. Contractor shall make physical arrangements for meetings. Representatives of contractors, subcontractors and suppliers attending the meetings shall be qualified and authorized to act on behalf of the entity each represents. Engineer will ascertain that Work is expedited consistent with Contract Documents and the construction schedules.
C. Related requirements specified in other sections:
1. Summary of Work
2. Submittals
3. Project Record Documents
4. Operating and Maintenance Data
1.02 PRE-CONSTRUCTION MEETING
A. To be scheduled at site within five (5) days after the effective date of agreement but before the Contractor starts the work. Attendance to include:
1. Owner's Representative
2. Engineer
3. Contractor and Contractor's Superintendent
B. Suggested Agenda:
1. Distribution and discussion of a list of major subcontractors and suppliers and projected construction schedule.
Section 01 31 19 Project Meetings
2. Critical work sequencing.
3. Major equipment deliveries and priorities.
4. Project coordination - designate responsible personnel.
5. Procedures and processing of field decisions, proposal requests, submittals, Change Orders, and Applications for Payment.
6. Adequacy of distribution of Contract Documents.
7. Procedures for maintaining Record Documents.
8. Use of premises, including office and storage areas.
9. Construction facilities, controls and construction aids.
10. Temporary utilities.
11. Safety and first-aid procedures.
12. Security and housekeeping procedures.
1.03 PROGRESS MEETINGS
A. Biweekly (or as agreed upon) plus special meetings will be scheduled at site or via video conference as required by progress of the work. Attendance to include Engineer and consultants, Contractor and Subcontractors and Suppliers as appropriate to the agenda.
B. Suggested Agenda:
1. Review of work progress since previous meeting.
2. Field observations, problems, conflicts.
3. Problems which impede Construction Schedule.
4. Review of off-site fabrication, delivery schedules.
5. Corrective measures and procedures to regain projected schedule.
6. Revisions to Construction Schedule.
7. Plan progress, schedule during succeeding work period.
8. Coordination of rules.
9. Review of submittal schedules; expedite as required.
10. Maintenance of quality standards.
11. Review proposed changes for effect on Construction Schedule and on completion date, and effect on other contracts of the project.
12. Outstanding items.
13. Other business.
PART 2 - PRODUCTS
2.01 GENERAL
A. Not Applicable.
Section 01 31 19 Project Meetings
PART 3 - EXECUTION
3.01 GENERAL
A. Not Applicable.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of the general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 33 00 – Submittals
SECTION 01 33 00
SUBMITTALS
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work under this specification covers the following work:
Submittal procedures Required submittals Proposed products list Shop drawings Product data Samples Weight Tickets Record Drawings (Redlined plans) Any Other Information Required to be Submitted by the Contractor in Accordance with the Contract Documents
PART 2 - PRODUCTS
A. Not Applicable.
PART 3 - EXECUTION
3.01 SUBMITTAL PROCEDURES
A. Each submittal shall be accompanied with a transmittal letter and be submitted digitally via email distribution (hard copies shall be provided if requested by the owner of engineer) for review and distribution by the Owner or Designee.
B. Contractor shall sequentially number the transmittal forms. Resubmittals to have original number with an alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent Drawing sheet and detail number(s), and specification Section number, as appropriate.
D. Apply Contractor's stamp, signed or initialed certifying that review, verification of products required, field dimensions, adjacent construction Work, and coordination of information, is in accordance with the requirements of the Work and Contract Documents.
E. Schedule submittals to expedite the project.
F. Identify variations from Contract Documents and Product or system limitations which may
Section 01 33 00 – Submittals be detrimental to successful performance of the completed Work.
G. Provide space for Contractor and Engineer review stamps.
H. Revise and resubmit submittals as required, identify all changes made since previous submittal.
I. Distribute copies of reviewed submittals to concerned parties via email. Instruct parties to promptly report any inability to comply with provisions.
3.02 REQUIRED SUBMITTALS
A. The Contractor shall provide submittals in accordance with the requirements specified herewithin for the following items:
1. All components of the installation as required by these specifications or the Owner.
2. Drawings of proposed installation if different from Contract Drawings.
3.03 CONSTRUCTION PROGRESS SCHEDULES
A. Submit initial progress schedule within five (5) days after date of Owner-Contractor agreement for Owner's review.
B. Revise and resubmit as required.
C. Submit revised schedules bi-weekly, identifying changes since previous version.
D. Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Indicate the early and late start, early and late finish, float dates, and duration.
E. Indicate estimated percentage of completion for each item of Work at each submission.
F. Indicate submittal dates required for shop drawings, product data, samples, and product delivery dates, including those furnished by Owner.
3.04 PROPOSED PRODUCTS LIST
A. Within 10 days after date of Owner-Contractor agreement, submit complete list of major products proposed for use, with name of manufacturer, trade name, and model number for each product.
B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.
Section 01 33 00 – Submittals
3.05 SHOP DRAWINGS
A. Submit the number of copies which the owner/engineer require, in the format requested.
B. After review distribute in accordance with Article on Procedures above and for record documents.
3.06 PRODUCT DATA
A. Submit the number of copies which the owner/engineer require, in the format requested.
B. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturers' standard data to provide information unique to this project.
C. After review, distribute in accordance with Article on Procedures above and provide copies for Record Documents.
3.07 SAMPLES
A. Submit samples, when specified in individual specification sections, to illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices.
Coordinate sample submittals for interfacing work.
B. Submit the number of samples specified in individual specification sections; one of which will be retained by Owner.
3.08 MANUFACTURER'S INSTRUCTIONS
A. When specified in individual specification sections, submit manufacturers' printed instructions for delivery, storage, assembly, installation, start-up, adjusting, operation and maintenance and finishing, in quantities specified for product data.
B. Identify conflicts between manufacturers' instructions and Contract Documents.
3.09 MANUFACTURER'S CERTIFICATES
A. When specified in individual specification sections, submit manufacturers' certificate to Owner for review, in quantities specified for product data.
B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference date, affidavits, and certifications as appropriate.
C. Certificates may be recent or previous test results on material or product, but must be acceptable to Owner.
3.10 RECORD DRAWINGS (REDLINED PLANS)
Section 01 33 00 – Submittals
A. Submit record drawings (redlined plans) in accordance with the applicable requirements of the Owner as specified within the Contract Documents for all permanent installation work.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of the general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 43 00 – Quality Control and Assurance
SECTION 01 43 00
QUALITY CONTROL AND ASSURANCE
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work includes:
1. Quality assurance and control of installation
2. References
3. Field samples
4. Manufacturers' field services and reports
1.02 RELATED WORK
A. This specification is related to all work related to this project.
1.03 QUALITY ASSURANCE
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with specified standards as a minimum quality of the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
C. Perform work by persons qualified to produce workmanship of specified quality.
D. Obtain copies of standards when required by Contract Documents.
E. Should specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding.
1.04 SUBMITTALS
A. None
PART 2 - PRODUCTS
2.01 GENERAL
A. Not Applicable.
Section 01 43 00 – Quality Control and Assurance
PART 3 - EXECUTION
3.01 GENERAL
A. Not Applicable.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 45 23 – Testing Laboratory Services
SECTION 01 45 23
TESTING LABORATORY SERVICES
PART 1 - GENERAL
1.01 DESCRIPTION
A. The Owner will select and will pay for an Independent Testing Laboratory to perform inspections and in place testing as required by the Contract Documents. The Contractor shall engage the services of the designated laboratory. The cost of laboratory testing which is considered to be the Contractor’s responsibility, includes, but not limited to testing required to demonstrate material quality is in compliance with the Contract Documents.
B. The Contractor shall employ the services of a separate qualified laboratory for additional samples and tests required by the Contractor beyond the specified requirements. The Owner will not pay for any additional Contractor testing required to fulfill the intent of these contract documents. Costs associated with re-testing after results of initial testing indicates non-conformance with the plans or Specifications shall be the responsibility of the Contractor.
C. The Contractor shall arrange for any inspections required by the State or the Town officials, unless otherwise noted by the owner/engineer.
D. The Testing Laboratory shall provide comparable services to those specified in the Contract Documents.
1.02 RELATED WORK
Section 31 23 00 – Excavation and Fill Section 31 23 23 – General Fill & Borrow Section 31 23 25 – Granular Material Section 32 91 19 – Topsoil Placement and Grading Section 32 92 00 – Turf and Grasses Any other testing required by one or more of the various Technical Specification Sections of the Contract Documents and not itemized above.
1.03 QUALITY ASSURANCE
Comply with the requirements of ANSI/ASTM E329 and ANSI/ASTM D3740 – latest revisions.
All testing laboratories shall be licensed/authorized to operate in the State of Connecticut.
Section 01 45 23 – Testing Laboratory Services
Testing laboratories shall maintain a full time CT Registered Engineer on staff to review services.
Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to either the National Bureau of Standards (NBS) Standards or accepted values of natural physical constants. All testing equipment used on this project shall have been calibrated within the last thirty (30) calendar days prior to the date of performing the Contract required testing.
1.04 SUBMITTALS
Prior to the start of work, submit the name, address, and telephone number and names of full time CT Registered Professional Engineer and responsible officer of the laboratory required by and to be paid for by the Contractor. Testing laboratory to be approved by owner or designee.
Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of NBS during most recent tour of inspection, with memorandum of remedies of any deficiencies reported by the inspection. Submit evidence of calibration in conformance with Part 1.02.D above.
1.05 LABORATORY RESPONSIBILITIES
A. Test the samples submitted by the Contractor.
B. Provide qualified personnel at site after due notice; cooperate with Engineer and Owner in performance of services.
C. Perform specified inspection, sampling, and testing of products.
D. Ascertain compliance of materials and mixes with requirements of Contract Documents.
E. Promptly notify Engineer, Owner and Contractor of observed irregularities or non-conformance of work or products.
F. Perform additional inspections and tests required by Engineer.
1.06 LABORATORY DUTIES
A. Cooperate with Owner, and Contractors, provide qualified personnel promptly on notice. Perform specified inspections, sampling and testing of materials and methods of construction; ascertain compliance with requirements of Contract Documents.
Section 01 45 23 – Testing Laboratory Services
B. Promptly notify Owner, and Contractors of irregularities or deficiencies of work, which are observed during performance of services. Submit two (2) copies of reports of inspections and tests to the Engineer, addressed to the Owner, including:
C.
1. Date issued
2. Project title and number
3. Testing Laboratory name and address
4. Name and signature of Inspector
5. Date of inspection or sampling
6. Record of temperature and weather
7. Date of test
8. Identification of product and specification section
9. Location in project
10. Type of inspection or test
11. Observations regarding compliance with Contract Documents.
D. Laboratory is not authorized to release, revoke, alter or enlarge on requirements of Contract Documents; to approve or accept any portion of work, or perform any duties of the contractor.
E. Laboratory may not assume any duties of the Contractor; and the Laboratory has no authority to stop work.
1.07 CONTRACTOR RESPONSIBILITIES
A. Deliver to laboratory at designated location, adequate samples of materials proposed to be used which require testing, along with proposed mix designs.
B. Cooperate with Laboratory personnel and provide access to work.
C. Provide to Laboratory, preliminary representative samples of materials to be tested in required quantities.
D. Furnish casual labor and facilities to provide access to work to be tested, to obtain and handle samples at the site, and to facilitate inspections and test.
E. Notify Laboratory sufficiently in advance of operations to allow for his assignment of personnel and schedule of tests.
F. Arrange with Laboratory, and pay for, any additional samples and testing required for Contractor’s convenience.
Section 01 45 23 – Testing Laboratory Services
G. Arrange with Laboratory, and pay for, any additional inspections, sampling and testing required when initial tests indicate that work does not comply with Contract Documents.
H. Arrange for and conduct any inspections required by State and/or local building, fire protection, safety, health or environmental officials.
PART 2 - PRODUCTS
2.01 GENERAL
A. Not Applicable.
PART 3 - EXECUTION
3.01 GENERAL
A. Not Applicable.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 57 13 Sedimentation Control System
SECTION 01 57 13
SEDIMENTATION CONTROL SYSTEM
PART 1 - GENERAL
1.01 DESCRIPTION
A. This work shall consist of furnishing, placing, maintaining and removal of sedimentation control systems (hay bales, silt fences, straw waddles, fabric geotextile, inlet sediment control devices, etc.), as shown on the plans or as directed by the Engineer and where necessary to prevent erosion and control sedimentation.
B. The sedimentation control system shall be placed prior to beginning construction activities. For stockpiles, sediment control system shall be placed on the first day the stockpile is used.
1.02 RELATED WORK
A. Section 31 11 00 – Clearing & Grubbing B. Section 31 23 00 – Excavation and Fill C. Section 31 23 13 – Formation of Subgrade D. Section 31 23 23 – General Fill & Borrow E. Section 31 23 25 – Granular Material F. Section 32 91 19 – Topsoil Placement and Grading G. Section 32 92 00 – Turf and Grasses
1.03 QUALITY ASSURANCE
A. Where Form 819 is referred to, it means "State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction, Form 819, 2024" and including all Supplemental Specifications.
B. References to "2024 Connecticut Guidelines for Soil Erosion and-Sedimentation Control", as amended.
1.04 SUBMITTALS
A. Submit haybales, silt fence, straw waddles, inlet protection and filter fabric geotextiles to the Engineer for approval.
Section 01 57 13 Sedimentation Control System
PART 2 - PRODUCTS
2.01 MATERIALS
A. Silt fence shall be a woven geotextile conforming to the plans and specifications. Filter fabric shall be a non-woven geotextile. Geotextiles shall conform to Form 819 Article M.08.01-26.
B. Inlet protection shall be a woven geotextile conforming to the plans and specifications.
Filter fabric shall be a woven polypropylene geotextile and fits the opening of a catch basin. Geotextiles shall conform to Form 819 Article M.08.01-26.
C. Haybales shall conform to Form 819 Article 2.19.02.
PART 3 - EXECUTION
3.01 GENERAL
The work shall conform to the requirements of Form 819 Article 2.19.03.
The work shall include the implementation of the appropriate portions of the erosion and sedimentation control plan.
The Contractor shall appoint an individual, acceptable to the Engineer, to coordinate and supervise the maintenance and control of sedimentation and erosion control systems and devices. Compliance with these provisions shall also be included in all subcontract agreements.
1. Provide the Engineer with daily logs of the construction progress, updated schedules and conditions of on-site sedimentation and erosion controls/water quality, upon request.
2. All sedimentation and erosion control devices shall be inspected weekly by the Contractor to verify their operation and to determine the cleaning and repair necessary for the duration of this Contract. In addition, special attention shall be given to the adequacy of the control systems prior to severe storm weather forecasts. Suspend operations (earthwork) for major storm events and implement additional sedimentation and erosion controls as necessary. Inspect control systems during and after storms to determine necessary repairs.
Section 01 57 13 Sedimentation Control System
3. Repairs to sedimentation control systems directed by the Engineer shall be accomplished within 24 hours of the directive or as soon as possible prior to storm forecasts.
4. Contractor shall maintain on-site, at all times, replacement materials for the devices utilized, readily available for necessary repairs.
5. The Contractor shall comply with the Best Management Practices as shown in Form 819, Article 1.10.03 and "2024 Connecticut Guidelines for Soil Erosion and- Sedimentation Control", as amended.
The Engineer has the authority to control the surface area of each material exposed by construction operations and to direct the Contractor to immediately provide permanent or temporary pollution control measures to prevent contamination of adjacent wetlands, watercourses or other areas of water impoundment. Every effort shall be made by the Contractor to prevent erosion on the site and abutting property.
The Engineer shall limit the surface area of earth material exposed if the Contractor fails to sufficiently protect the slopes to prevent pollution.
The erosion control features installed by the Contractor shall be maintained by the Contractor to ensure their efficient operation, and he shall remove/replace such installations if ordered by the Engineer.
The Contractor shall operate all equipment and perform all construction operations so as to minimize pollution. The Contractor shall cease any of his operations, which will increase pollution during rainstorms.
3.02 HAY BALE INSTALLATION
Hay bales shall be placed as shown on the plans or as directed by the Engineer. They shall be held in place by two wooden stakes in each bale driven a minimum of eighteen
(18) inches into the ground. Bales shall be maintained or replaced until they are no longer necessary for the purpose intended or are ordered removed by the Engineer.
3.03 SILT FENCE INSTALLATION
Silt fence shall be mounted on wood-stakes or posts with or without fence backing as recommended by the fabric manufacturer. The bottom six (6") inches of the fabric shall be buried by trenching, laying the six (6") inch section horizontally on the ground and burying by ramping the soil up to the silt fence.
Section 01 57 13 Sedimentation Control System
Maintain silt fence throughout the contract period and remove all such temporary features when directed. Any damaged during construction shall be replaced at no additional cost to the Owner.
Sediment buildup shall be removed from behind silt fence before it exceeds six (6") inches in depth. Silt fence shall be inspected weekly and repaired/replaced as necessary.
Additional inspections may be required prior to or immediately following any manor rainstorms. Silt fence shall be removed at the completion of the project.
3.04 INLET PROTECTION INSTALLATION
A. Inlet protection shall be installed as shown on the plans or as directed by the Engineer.
Inlet protection sacks shall be installed per manufacturers’ recommendations and be maintained throughout the contract period. Any damaged during construction shall be replaced at no additional cost to the Owner.
3.05 MAINTENANCE
A. Sedimentation control measures shall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately.
B. Should the sedimentation control measure decompose or become ineffective prior to the end of the expected usable life, the sedimentation control measure shall be replaced promptly.
C. Sediment deposits shall be removed when they reach approximately one-half the height of the sedimentation control measure.
D. Any sediment deposits remaining in place after the sedimentation control measure is no longer required shall be dressed to conform to the existing grade, prepared and seeded.
3.06 REMOVAL AND CLEANUP
A. All temporary erosion control facilities when ordered by the Engineer shall be removed in a neat and workmanlike manner, and shall also include removal and disposal of accumulated silt.
B. Sediment deposits are to be removed when they reach approximately one-half the height of the device, i.e. silt fence, hay bales, etc. Accumulations of one-half of the wet storage volume in any temporary sediment trap will be used as criteria for commencement of cleaning operation. Disposal of materials removed during cleaning
Section 01 57 13 Sedimentation Control System operations shall be the responsibility of the Contractor. Dispose material off-site or as directed by the Engineer.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 57 00 Temporary Controls - Anti-Tracking Apron
SECTION 01 57 00
ANTI-TRACKING APRON
PART 1 - GENERAL
1.01 DESCRIPTION
A. Work under this specification covers furnishing and installing anti-tracking apron(s) as shown on the plans or as directed by the Engineer.
1.02 RELATED WORK
A. Section 01 57 21 – Sedimentation Control System B. Section 31 11 00 – Clearing & Grubbing C. Section 31 23 00 – Excavation and Fill D. Section 31 23 13 – Formation of Subgrade E. Section 31 37 00 – Riprap F. Section 31 11 23 – Processed Aggregate Base Course G. Section 32 91 19 – Topsoil Placement and Grading H. Section 32 92 00 – Turf and Grasses
1.03 QUALITY ASSURANCE
A. Where Form 819 is referred to, it means "State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction, Form 819, 2024" and including all Supplemental Specifications.
1.04 SUBMITTALS
A. No submittals are required.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Crushed stone shall conform to the requirements of Form 819, Article M1.01.01, No. 4.
B. Geotextile shall conform to the requirements of Form 819, Article M.08.01-19.
PART 3 - EXECUTION
3.01 CONSTRUCTION METHODS
Section 01 57 00 Temporary Controls - Anti-Tracking Apron
A. The Contractor shall install all anti-tracking pads at the locations, to the dimensions and details shown on the plans or as directed by the Engineer.
B. The Contractor shall maintain all anti-tracking pads to ensure effective, working order.
If any pad becomes full of sediment or is otherwise rendered ineffective, the Contractor shall remove the contaminated stone and replace it with new stone or take other appropriate measures to ensure proper operation and intent.
C. The Contractor shall immediately remove all sediment spilled, dropped, washed or tracked onto public right-of-way.
D. The Contractor shall remove all anti-tracking pads completely when no longer required for the purpose intended.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of general work.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 71 13 Mobilization
SECTION 01 71 13
MOBILIZATION
PART 1 - GENERAL
1.01 DESCRIPTION
A. This item shall consist of all work necessary for the movement of personnel and equipment to the project site, and for the establishment of all field offices, buildings and other facilities necessary to the performance of the work.
B. The Contractor shall provide all temporary facilities necessary for the proper completion of the work. Temporary facilities shall include but not be limited to contractor’s water supply, electrical, telephone, and sanitary services. It is anticipated that a construction field trailer will not be necessary for this project.
1.02 RELATED WORK
A. Not applicable
1.03 SUBMITTALS
A. No submittals are required.
PART 2 - PRODUCTS
2.01 GENERAL
A. Not applicable.
PART 3 - EXECUTION
3.01 GENERAL
A. Not applicable.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of general work.
Section 01 71 13 Mobilization
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 01 71 23 Construction Layout
SECTION 01 71 23
CONSTRUCTION LAYOUT
PART 1 – GENERAL
1.01 DESCRIPTION
A. The work under this item shall consist of all construction layout and reference staking necessary for the proper control and satisfactory completion of all work on the project.
Also included in this item is an as built survey of the site after completion of the project.
1.02 RELATED WORK
A. Section 01 57 21 – Anti-Tracking Apron B. Section 31 11 00 – Clearing & Grubbing C. Section 01 57 13 – Sedimentation Control System D. Section 03 30 10 – Cast-in-place Concrete E. Section 03 33 10 – Concrete Pads F. Section 31 23 13 – Formation of Subgrade G. Section 31 37 00 – Riprap H. Section 32 12 16 – Bituminous Concrete I. Section 32 91 19 – Topsoil Placement and Grading J. Etc….
1.03 QUALITY ASSURANCE
A. Where Form 819 is referred to, it means "State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction, Form 819, 2024" and including all Supplemental Specifications.
1.04 SUBMITTAL
A. No submittals are required.
PART 2 - PRODUCTS
2.01 GENERAL
A. Stakes shall be of the quality specified in Form 819, Article 9.80.02.
PART 3 - EXECUTION
3.01 GENERAL
Section 01 71 23 Construction Layout
A. The work shall conform to Form 819, Article 9.80.03 except as amended below:
1. Paragraph 1 of Article 9.80.03 is deleted.
2. The Town shall provide to the Contractor all control points and bench marks in the field necessary for the prosecution of the work.
3. A digital copy of the contract plans will be furnished in AutoCAD format to the contractor upon request.
4. Contractor shall be responsible for all construction layout and staking.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. The work which conforms to this Specification and is performed shall not be measured for separate payment, but shall be included as part of the general work.work shall not be measured but will be paid for at the contract lump sum price. Fifty percent of this item will be certified for payment when 10% of the contract is complete. Seventy-five percent of this item will be certified for payment when 30% of the contract is complete.
One-hundred percent of this item will be certified for payment when 50% of this contract is complete.
4.02 PAYMENT
A. This work will not be paid for separately, but shall be included as part of the general work, which shall include all materials, equipment, tools, labor, and work incidental
Section 03 30 00 Cast-In-Place Concrete
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes material and performance requirements for miscellaneous cast-in-place concrete for structural concrete, fill concrete, and grout for:
1. Pavilion foundation.
2. Pads.
3. Sidewalks/Ramps.
4. Grout for structural steel, equipment bases, and incidental Work.
B. Concrete for paving, curbs, gutters, and sidewalks is specified elsewhere.
C. Related Work specified elsewhere:
A. Section 13 34 23 – Fabricated Pavilion Structure B. Section 32 33 00 – Site Furnishings C. Section 32 78 00 – Unit Pavers
1.02 REFERENCES
A. The following is a list of standards that may be referenced in this Section:
1. ASTM International (ASTM):
a. A184, Standard Specification for Fabricated Deformed Steel Bar Mats for Concrete Reinforcement.
b. A185, Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement.
c. A497, Standard Specification for Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement.
d. A615, Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement.
e. A706, Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement.
f. A767, Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement.
g. A775, Standard Specification for Epoxy-Coated Steel Reinforcing Bars.
h. A884, Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement.
i. A934, Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars.
Section 03 30 00 Cast-In-Place Concrete
j. C31, Standard Practice for Making and Curing Concrete Test Specimens in the Field.
k. C33, Standard Specification for Concrete Aggregates.
l. C39, Standard Test Method for Compressive Strength of
Cylindrical Concrete Specimens.
m. C42, Standard Test Method for Obtaining and Testing Drilled
Cores and Sawed Beams of Concrete.
n. C88, Standard Test Method for Soundness of Aggregates by Use of
Sodium Sulfate or Magnesium Sulfate.
o. C94, Standard Specification for Ready-Mixed Concrete.
p. C143, Standard Test Method for Slump of Hydraulic Cement
Concrete.
q. C150, Standard Specification for Portland Cement.
r. C172, Standard Practice for Sampling Freshly Mixed Concrete.
s. C173, Standard Test Method for Air Content of Freshly Mixed
Concrete by the Volumetric Method.
t. C231, Standard Test Method for Air Content of Freshly Mixed
Concrete by the Pressure Method.
u. C260, Standard Specification for Air-Entraining Admixtures for
Concrete.
v. C309, Standard Specification for Liquid Membrane-Forming
Compounds for Curing Concrete.
w. C494, Standard Specification for Chemical Admixtures for
Concrete.
x. C595, Standard Specification for Blended Hydraulic Cements.
y. C618, Standard Specification for Coal Fly Ash and Raw or Calcined
Natural Pozzolan for Use as a Mineral Admixture in Concrete.
z. C803, Test Method for Penetration Resistance of Hardened
Concrete.
aa. C805, Test Method for Rebound Number of Hardened Concrete.
bb. C979, Standard Specification for Pigments for Integrally Colored
Concrete.
cc. C989, Standard Specification for Ground Granulated Blast-Furnace
Slag for Use in Concrete and Mortars.
dd. C1017, Standard Specification for Chemical Admixtures for Use in
Producing Flowing Concrete.
ee. C1064, Standard Test Method for Temperature of Freshly Mixed
Hydraulic-Cement Concrete.
ff. C1116, Standard Specification for Fiber-Reinforced Concrete and
Shotcrete.
gg. C1315, Standard Specification for Liquid Membrane-Forming
Compounds Having Special Properties for Curing and Sealing Concrete.
Section 03 30 00 Cast-In-Place Concrete
hh. C1330, Specification for Cylindrical Seal Backing for Use with Cold Liquid Applied Sealants.
ii. C1371, Standard Test Method for Determination of Emittance of Materials Near Room Temperature Using Portable Emissometers.
jj. C1549, Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar Reflectometer.
kk. D920, Standard Specification for Elastomeric Joint Sealants.
ll. D994, Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).
mm. D1751, Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).
nn. D1752, Standard Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction.
oo. D2628, Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete.
pp. D2828, Specification for Non-Bituminous Inserts for Contraction Joints in Portland Cement Concrete Airfield Pavement, Sawable Type.
qq. D3406, Specification for Joint Sealant, Hot-Applied, Elastomeric, Jet Fuel Resistant Type for Portland Cement Concrete Pavements.
rr. D3569, Specification for Joint Sealant, Hot-Applied, Elastomeric- Type, for Portland Cement Concrete Pavements.
ss. D3581, Specification for Joint Sealant, Hot-Applied, Jet-Fuel- Resistant-Type, for Portland Cement and Tar-Concrete Pavements.
tt. D5249, Specification for Backer Material for Use With Cold- and Hot- Applied Joint Sealants in Portland Cement Concrete and Asphalt Joints.
uu. D5893, Specification for Cold-Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete Pavements.
vv. D6690, Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements.
ww. E329, Specification for Agencies Engaged in Testing and Inspection of Materials Used in Construction.
2. American Concrete Institute (ACI):
a. 301, Specifications for Structural Concrete.
b. 305R, Hot Weather Concreting.
c. 306R, Cold Weather Concreting.
Section 03 30 00 Cast-In-Place Concrete
d. 304, Guide for Measuring, Mixing, Transporting, and Placing Concrete.
e. 308, Standard Practice for Curing Concrete.
f. 318/318R, Building Code Requirements for Structural Concrete and Commentary.
g. 325.9R, Guide for Construction of Concrete Pavements and
Concrete Bases.
3. American Welding Society (AWS):
1.03 SUBMITTALS
A. Comply with Section 01 33 00, Submittal Procedures.
B. Action submittals:
1. Submit batch plant’s certified test results of the following:
a. Cement, mill test reports.
b. Aggregates, sieve analyses.
2. Product data and samples:
a. Submit manufacturer's information for material specified in Part 2 of this Section that will be incorporated into this project.
3. Mix design: Concrete mix design and compressive strength results of field trial batches for each class of concrete incorporated into the work.
C. Informational submittals:
D. Samples:
1. Submit a 6-inch sample of approved pre-molded joint filler for
Engineer’s and Resident Project Representative’s reference.
1.04 DELIVERY, STORAGE, AND HANDLING
A. All packaged materials shall be delivered in original, unopened containers with the manufacturer’s name, labels, product identification, and batch numbers.
B. Remove damaged materials from the site immediately.
C. Store all packaged materials off the ground and protect from rain, freezing and excessive heat until ready for use. Comply with manufacturer’s recommendations for storage.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Portland cement: Comply with ASTM C150 Type I.
Section 03 30 00 Cast-In-Place Concrete
B. Fine aggregates:
1. Comply with ASTM C33.
2. Shall be clean, sharp, natural sand, free from loam, clay, organic impurities or frozen materials and shall conform to ASTM C33 in all respects.
3. Organic impurities shall not exceed limits specified in ASTM C40.
C. Coarse aggregate:
1. Comply with ASTM C33 and CTDOT Material Designation.
2. Coarse aggregate shall consist of strong, clean, crushed limestone or crushed gravel, free from deleterious material.
3. Coarse aggregate shall meet the physical requirements designation 703-
0201 and 703-0202, respectively.
D. Water used in mixing concrete shall be clean and free from all acid, alkali or organic matter and shall be obtained from a potable water supply unless specifically permitted otherwise by the Engineer.
E. Ready-mix concrete shall comply with ASTM Specification C94, this Specification, and used subject to the Engineer’s approval.
F. Admixtures:
1. Air entraining agent:
a. Daravair 1000 or Darex AEA, as manufactured by W.R. Grace Co.
b. MasterAir, by BASF Master Builders.
c. Or approved equal.
2. Water reducing agent:
a. Plastiment, by Sika Corporation.
b. Pozzolith, by BASF Master Builders.
d. WRDA, by W.R. Grace.
2. High-range water reducers or superplasticizers:
a. Sikament-FF, by Sika
b. Daracem-100 or WRDA-19, by W.R. Grace.
c. Or approved equal.
G. Bonding Agent:
1. Two-component, 100% solids, moisture-tolerant, structural epoxy adhesive.
2. Conform to ASTM C881, Types I, II, and V, Grade-2, Class C and AASHTO
M235.
3. Product:
a. Sikadur 32 Hi-Mod, by Sika Corporation.
b. Or approved equal.
Section 03 30 00 Cast-In-Place Concrete
H. Forms and accessories:
Forms shall be wood, metal, or other approved materials as follows:
Plywood shall be commercial standard Douglas Fir, moisture resistant, concrete form plywood, at least 5-ply 5/8” thick.
Metal forms shall be as approved, and must produce surfaces equal to those specified for wood forms.
Form oil:
Concrete form release compound shall be composed of an organic chemical that reacts with the alkali content of concrete to form a release film, along with providing an inert barrier to provide double separation.
Form release compound shall be VOC-compliant, non-staining mineral oil, such as Duogard, by W.R. Meadows, or equal.
Form ties:
Ties shall be adjustable length and free of devices that will leave hole or depression larger than 7/8” diameter.
b. When forms are removed no metal shall be left within 1” of finished surface.
Pre-molded joint filler:
Expansion joint filler composed of granulated cork particles, resin-bonded into board form, compressed and dehydrated under heat and pressure, that will expand up to 140% of the original thickness after installation due to the re-absorption of moisture.
Joint filler shall conform to the following standards and have the following requirements:
ASTM D1752, Type III.
AASHTO M 213, Type II.
ASTM D 545:
Density Minimum: 16.0 lb/cu. ft.
Load to Compress to 50% original thickness: 50 to 1500 psi.
Recovery: 90%, minimum.
Thickness: 1/2-inch.
Manufacturer: Self-Expanding Cork Expansion Joint Filler, by W.R. Meadows.
Joint Sealant:
Single-component, elastomeric polyurethane sealant, gray in exposed locations.
Physical properties, cured:
Tensile properties, per ASTM D412 at 21 days:
Tensile Stress: 175 psi, minimum.
Elongation at Break: 550%.
Modulus of Elasticity:
Section 03 30 00 Cast-In-Place Concrete
25%: 170 psi.
50%: 130 psi.
100%: 90 psi.
Shore A Hardness, per ASTM D2240 at 21 days: 45, +/-5.
Tear Strength, per ASTM D624 at 21 days: 55 lb./in.
Adhesion in Peel, per ASTM C794.
Concrete: 20-lb. min.: 0% adhesion loss.
Aluminum: 20-lb. min.: 0% adhesion loss.
Glass: 20-lb. min.: 0% adhesion loss.
Service Range: -40 degrees F to 170 degrees F.
The sealant shall conform to Federal Specification TT-S-00230C, Type II, Class A.
The sealant shall conform to ASTM C920, Type S, Grade NS, Class 35.
The sealant shall comply with NSF Standard 61 for use in contact with potable water.
The sealant shall be non-staining.
VOC content: 8 g/L.
Products:
MasterSeal NP1, by BASF MasterBuilders.
Sikaflex 1A, by Sika Corporation.
Or approved equal.
Grout:
Non-metallic, non-shrink cementitious grout for structural applications.
Products:
Masterflow 100, by Master Builders / BASF.
Sika Grout 212, by Sika Corporation.
Or approved equal.
Liquid Hardener:
Lapidolith, by Conren.
EmeryTop 400, by Laticrete International, Inc.
Or approved equal.
Curing compound:
Acrylic-based:
Kure-N-Seal, by Sonneborn.
CS-309, by W.R. Meadows.
Water-based:
VOCOMP-20, by W.R. Meadows.
MIX DESIGN
The various classes of concrete shall be designated as follows:
Section 03 30 00 Cast-In-Place Concrete
MAXIMUM PERMISSIBLE WATER-CEMENT RATIOS FOR
CONCRETE (WHEN STRENGTH DATA FROM TRIAL BATCHES OR FIELD
EXPERIENCE ARE NOT AVAILABLE)
CLASS
MIN. 28-DAY
COMPRESSIVE
STRENGTH IN
PSI*
NON-AIR-ENTRAINED CONCRETE AIR-ENTRAINED CONCRETE
ABSOLUTE RATIO
BY WEIGHT
US GAL. PER 94-
LB. BAG OF
CEMENT
ABSOLUTE RATIO
BY WEIGHT
US GAL. PER 94-
LB. BAG OF
CEMENT
A 5,000 ** ** ** **
B 4,000 0.44 5.0 0.35 4.0
C 3,000 0.58 6.6 0.46 5.2
D 2,500 0.67 7.6 0.54 6.1
E 2,000 0.71 8.0 - -
*28-day strength. With most materials, water/cement ratios shown will provide average strengths greater than indicated in Section 5.4 of ACI 318R as being required.
*For strength above 4,500 psi (non-air-entrained concrete) and 4,000 psi (air-entrained concrete) proportions shall be established by methods of Sections 5.3 or 5.4 of ACI 318R.
Unless otherwise specified, all concrete shall be Class B, non-air-entrained except exposed concrete which shall be air-entrained. When foundation walls or grade beams are exposed to weather above grade, the entire wall shall be considered exposed concrete.
Maximum aggregate size:
1-1/2”: general work.
3/4”: Sections less than 12 inches thick, heavy reinforcing; slabs.
3/8”: floor toppings.
Section 03 30 00 Cast-In-Place Concrete
Maximum slump:
Reinforced concrete: 4 inches.
Reinforced concrete, walls less than 12 inches thick: 5 inches.
Columns: 5 inches.
Non-reinforced concrete: 3 inches.
Air Content:
The entrained air shall be controlled between 4% and 6%.
For mixes containing coarse aggregate 3/4-inch or smaller and for exposed concrete subject to frost and salt action, increase air entrainment to 5% to 7%.
EXECUTION
BATCHING AND MIXING
The Contractor shall have available at all times sufficient approved materials such that, when once started, concreting shall be a continuous operation until the placing of the panel or section is completed. The top surface shall be generally level.
When construction joints become necessary, they shall be made as hereinafter specified.
All concrete shall be mixed not less than 60 revolutions in the drum of a modern power mixer, at the rated speed of rotation. Mix not less than an additional 30 revolutions after the addition of any further water to the mix.
Transit-mixed concrete shall be transported to the job site unmixed and only after arrival at the job site shall mixing begin. All concrete shall be unloaded from the mixer within 45 minutes after completion of mixing. All concrete still remaining in the truck shall be rejected.
The total time interval from the time the cement makes contact with the aggregate to the complete unloading from the mixer shall not exceed 90 minutes, unless such time is extended by the Engineer. The time may be reduced in hot weather or under unusual conditions, if unsatisfactory results are obtained.
FORMWORK
The Contractor shall design and construct suitable and adequate formwork in conformance with ACI 347R.
All shoring shall be properly braced to safely withstand all vertical, moving and lateral forces during the construction period.
Section 03 30 00 Cast-In-Place Concrete
Set forms true to line and grade and make mortar-tight.
Chamfer above grade exposed joints, edges, and external corners of concrete 3/4-inch, unless otherwise indicated.
Before concrete placement, coat the contact surfaces of forms with a non-staining form coating compound.
Do not use mineral oil on formed surfaces to be painted. Prevent concrete damage during form removal.
Concrete for footings may be placed in excavations without forms upon inspection and approval by the Engineer.
Excavation width shall be a minimum of 4 inches greater than finished dimensions indicated.
It shall be the Contractor’s responsibility to determine the time at which forms may be removed without endangering the structure, subject to the following limitations, unless documentation is provided to modify these requirements:
Footing forms: 24 hours minimum; continue curing as specified.
Wall forms: 2 days minimum for ten (10) feet high. Add one (1) day for each additional five (5) feet of height; continue curing as specified.
JOINTS FOR CONCRETE:
Expansion joints:
Expansion joints shall be constructed where shown and as directed.
Reinforcement,…