Technical_Specifications.pdf
PDF 1 MB Posted
- Attached to
- BAYSHORE DRIVE SEAWALL REPLACEMENT
- Solicitation number
- 252744AMS
- Issued by
- Sarasota County, Florida
About this file
This technical specifications document, prepared by Aptim Environmental & Infrastructure, LLC for Sarasota County Public Works and the Natural Resources Conservation Service (NRCS), details the comprehensive technical construction and material specifications for the Bayshore Drive Seawall Replacement Project. The 82-page document provides extensive technical guidelines covering multiple construction specifications including structure removal, pollution control, construction surveys, mobilization and demobilization, traffic control, water for construction, piling, earthfill, structure concrete, steel reinforcement, rock riprap, geotextile, and vegetative measures. The project involves removing the existing seawall, installing new cellular sheet pile seawalls with concrete fill, constructing concrete caps and deadmen, and implementing environmental protection and site restoration measures.
The technical specifications outline precise material requirements, including specifications for Portland cement, supplementary cementitious materials, steel reinforcement, and geotextiles. The project includes specific performance standards for concrete strength (5000 psi), reinforcement materials (Chromx4100 fy = 100 ksi rebar), and environmental protections such as erosion control and water quality maintenance. The documents indicate careful attention to material quality, construction methods, and environmental considerations, with detailed testing and measurement protocols for each construction phase. The project appears to be funded through Sarasota County Public Works and the Natural Resources Conservation Service, with a focus on coastal infrastructure resilience and environmental preservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Documents_252744AMS.pdf | ||
| GENERAL_CONDITIONS_CONSTRUCTION.pdf | ||
| Permits.pdf | ||
| Project_Map.pdf | ||
| Plans.pdf | ||
| Other_Contract_Forms.pdf | ||
| NRCS_Hurricane_Ian_Repair_Grant_Provisions_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Construction and Material Specifications and Guidelines for the
Bayshore Dr Seawall Replacement Project
100% Design Submittal Prepared for:
Sarasota County Public Works 1001 Sarasota Center Blvd.
Sarasota, Florida 34240 and
Natural Resources Conservation Service (NRCS) 4500 NW 27th Avenue, Bldg. A
Gainesville, Florida 32606
Prepared by:
Aptim Environmental & Infrastructure, LLC
6401 Congress Ave Ste 140 Boca Raton, FL, 33499
COA 9317
Aptim Project No.: 631034360 December 2024 Douglas
W Mann
Digitally signed by Douglas W Mann Date: 2024.12.13 16:49:13 -05'00'
Bayshore Dr Seawall Replacement Project Sarasota County, FL 2 December 2024
TABLE OF CONTENTS
Construction Specification 3 – Structure Removal
Construction Specification 5 – Pollution Control
Construction Specification 7 – Construction Surveys
Construction Specification 8 – Mobilization and Demobilization
Construction Specification 9 – Traffic Control
Construction Specification 10 – Water for Construction
Construction Specification 13 – Piling
Construction Specification 23 – Earthfill
Construction Specification 32 – Structure Concrete
Construction Specification 34 – Steel Reinforcement
Construction Specification 61 – Rock Riprap
Construction Specification 95 – Geotextile
Construction Specification 400 – Vegetative Measures
Material Specification 531—Portland Cement
Material Specification 532—Supplementary Cementitious Materials
Material Specification 539—Steel Reinforcement (for concrete)
Material Specification 581—Metal
Material Specification 583—Coal Tar-Epoxy Paint
Material Specification 592—Geotextile
Appendix A – FDEP Approved Permits
Sarasota County, FL 3 December 2024
Construction Specifications
Construction Specification 3 – Structure Removal
1. Scope
The work consists of the removal, salvage, and disposal of structures (including fences) from the designated areas.
2. Marking
Method 1 – Each structure or structure part to be removed will be marked with stakes, flags, paint, or other suitable methods.
Method 2 – The area boundaries from which structures must be removed will be marked using stakes, flags, paint, or other suitable methods. Structures to remain undisturbed or to be salvaged will be designated by special markings.
3. Removal
Method 1 – All structures designated for removal in the contract shall be removed to the specified extent and depth.
Method 2 – Within the areas so marked, all visible and buried structures identified shall be removed to the specified extent and depth.
4. Salvage
Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections.
Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers.
5. Disposal of refuse materials
Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations.
6. Measurement and payment
Method 1 – For items of work for which specific unit prices are established by the contract, payment for the removal of each structure unit, except fences is made at the contract unit price. Fences removed or removed and salvaged are measured to the nearest
Sarasota County, FL 4 December 2024 linear foot. Payment for fence removal of removal and salvage is made at the contract unit prices for each type and size of fence.
Such payment will constitute full compensations for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
Method 2 – For items of work for which specific lump sum prices are established by the contract, payment for structure removal is made at the contract lump sum price.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
All Methods – The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed as a contract line item number in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
7. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item No. 2, Demolition Bayshore Dr cap, panels, and tiebacks
(1) This item consists of the removal of sections of existing seawall as shown on the construction drawings from Bayshore Dr project site.
(2) All items identified for structure removal shall be removed and stockpiled in the staging area. The structures shall become the contractor’s responsibility to dispose of properly offsite. Unsuitable soil (refer to Construction Specification 23 Earthfill, Section 3) encountered during excavation shall be disposed of properly to reduce environmental impacts.
(3) Any voids created by removing the existing structures that are not within the proposed work footprint will be backfilled and compacted. Backfill compaction shall adhere to the specifications listed in Construction Specification 23 Earthfill, 10, d. Subsidiary Item Earthfill, Class C Compaction, Structure Removal.
(4) In section 2 of this specification, Marking, Method 1 will apply.
(5) In section 3 of this specification, Removal, Method 1 will apply.
(6) In section 6 of this specification, Measurement and Payment, Method 2 will apply.
Sarasota County, FL 5 December 2024
(7) Items of work subsidiary to this bid item are:
Excavation, Common, Structural Earthfill, Class C Compaction, Structure Removal
b. Bid Item No. 3, Salvaging of riprap at Bayshore Dr
(1) This item consists of the salvaging of riprap as shown on the construction drawings from Bayshore Dr project site.
(2) All items identified for structure removal shall be removed and stockpiled in the staging area. The displaced, existing riprap onsite will be stockpiled and reused.
(3) Any voids created by removing the existing structures that are not within the proposed work footprint will be backfilled and compacted. Backfill compaction shall adhere to the specifications listed in Construction Specification 23 Earthfill, 10, d. Subsidiary Item Earthfill, Class C Compaction, Structure Removal.
(4) In section 2 of this specification, Marking, Method 1 will apply.
(5) In section 3 of this specification, Removal, Method 1 will apply.
(6) In section 6 of this specification, Measurement and Payment, Method 2 will
END OF SECTION
Sarasota County, FL 6 December 2024
Construction Specification 5 – Pollution Control
1. Scope
The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
The following BioPreferred® product categories are applicable to this specification:
• Mulch and compost materials
• Erosion control materials
• Fertilizers
• Dust suppressants
• Agricultural spray adjuvants
2. Material
Silt fence shall conform to the requirement of Materials Specification 592, Geotextile. All other material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works
The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sarasota County, FL 7 December 2024
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification, items of work and construction detail or required by Federal, State, or local government.
4. Chemical pollution
The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by- product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5. Air pollution
The burning of brush or trash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings or as approved the NRCS Representative.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are
Sarasota County, FL 8 December 2024 applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration
All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment
Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, items of work and construction details, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
8. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item No. 7, Environmental Protection for Bayshore Dr
Sarasota County, FL 9 December 2024
(1) This item shall consist of precautions taken by the Contractor to minimize degradation of water quality passing through the job site during construction operations. All necessary precautions shall be taken to ensure compliance with water quality standards of the State of Florida. Attention is called to Chapter 62-350, Florida Administrative Code and in particular the requirements that turbidity shall not exceed 29 Nephelometric Turbidity Units (NTU's) above natural background. Adequate silt containment procedures and equipment as displayed on the plans shall be used to control turbidity at all times.
(2) The Contractor shall be responsible for containment of pollution sources including, but not limited to, the required excavations, earthfill, and other disturbed areas. Additionally, all tanks, barrels, sumps, concrete waste pits, and sanitary facilities used during construction shall be removed and the areas will be restored to original condition.
(3) Sediment filters (silt fence) and turbidity barriers shall be installed in compliance with the plans prior to any excavation or structural removal and shall be maintained in effective condition at all locations until construction and vegetative measures are completed.
(4) Temporary erosion control measures shall be removed after project completion only after the areas have been stabilized with vegetation or other erosion control methods.
(5) In Section 7 of this specification, Measurement and payment, Method 2 will
Sarasota County, FL 10 December 2024
Construction Specification 7 – Construction Surveys
1. Scope
The work consists of performing all surveys, measurements, and computations required by this specification.
2. Equipment and material
Equipment for construction surveys shall be of a quality and condition to provide the required accuracy. The equipment shall be maintained in good working order and in proper adjustment at all times. Records of repairs, calibration tests, accuracy checks, and adjustments shall be maintained and be available for inspection by the Engineer.
Equipment shall be checked, tested, and adjusted as necessary in conformance with manufacturer's recommendations.
Material is field notebooks, stakes, templates, platforms, equipment, spikes, steel pins, tools, and all other items necessary to perform the work specified.
3. Quality of work
All work shall follow recognized professional practice and the standards of the industry unless otherwise specified in section 9 of this specification. The work shall be performed to the accuracy and detail appropriate for the type of job. Notes, sketches, and other data shall be complete, recorded neatly, legible, reproducible and organized to facilitate ease in review and allow reproduction of copies for job documentation. Survey equipment that requires little or no manual recording of field data shall have survey information documented as outlined in section 9 of this specification.
All computations shall be mathematically correct and shall include information to identify the bid item, date, and who performed, checked, and approved the computations.
Computations shall be legible, complete, and clearly document the source of all information used including assumptions and measurements collected.
If a computer program is used to perform the computations, the contractor shall provide the engineer with the software identification, vendor's name, version number, and other pertinent data before beginning survey activities. Computer generated computations shall show all input data including values assigned and assumptions made.
The elevations of permanent and temporary benchmarks shall be determined and recorded to the nearest 0.01 foot. Differential leveling and transit traverses shall be of such precision that the error of vertical closure in feet shall not exceed plus or minus 0.1 times the square root of the traverse distance in miles. Linear measurements shall be accurate to within 1 foot in 5,000 feet, unless otherwise specified in section 9 of this specification. The angular error of closure for transit traverses shall not exceed 1 minute times the square root of the number of angles turned.
The minimum requirements for placing slope stakes shall be at 100-foot stations for
Sarasota County, FL 11 December 2024 tangents, as little as 25 feet for sharp curves, breaks in the original ground surface and at any other intermediate stations necessary to ensure accurate location for construction layout and measurement. Slope stakes and cross sections shall be perpendicular to the centerline. Significant breaks in grade shall be determined for cross sections. Distances shall be measured horizontally and recorded to the nearest 0.1 foot. Side shots for interim construction stakes shall be taken with a hand level.
Unless otherwise specified in section 9 of this specification, measurements for stationing and establishing the location of structures shall be made to the nearest 0.1 foot.
Elevations for concrete work, pipes, and mechanical equipment shall be determined and recorded to the nearest 0.01 foot. Elevations for earth work shall be determined and recorded to the nearest 0.1 foot.
4. Primary control
The baselines and benchmarks for primary control, necessary to establish lines and grades needed for construction are shown on the drawings and have been located on the job site.
These baselines and benchmarks shall be used as the origin of all surveys, layouts, and measurements to establish construction lines and grades. The contractor shall take all necessary precautions to prevent the loss or damage of primary control points. Any stakes or control points lost or damaged by construction activity will be reestablished by the contractor or at contractor expense.
5. Construction surveys
Before work starts that requires contractor performed surveys, the contractor shall submit in writing for the engineer's review: the name, qualifications, and experience of the individuals to be assigned to the survey tasks.
Method 1—Contractor performed surveys shall include:
• checking and any supplemental or interim staking
• performing quantity surveys, measurements, and computations for progress payment
• other surveys as described in section 9 of this specification
Method 2—Contractor performed surveys shall consist of all work necessary for:
• establishing line and grade for all work
• setting slope stakes for all work
• checking and any supplemental or interim staking
• establishing final grade stakes
• performing quantity surveys, measurements, and computations for progress payment
Sarasota County, FL 12 December 2024
• other surveys as described in section 9 of this specification
Method 3—Contractor performed surveys shall consist of all work necessary for:
• establishing line and grade for all work
• setting slope stakes for all work
• checking and any supplemental or interim staking
• establishing final grade stakes
• performing quantity surveys, measurements, and computations for progress payments
• performing original (initial) and final surveys for determinations of final quantities
• other surveys as described in section 9 of this specification
6. Staking
The construction staking required for the item shall be completed before work on any item starts. Construction staking shall be completed as follows or as otherwise specified in section 9 of this specification:
Clearing and grubbing—The boundary of the area(s) to be cleared and grubbed shall be staked or flagged at a maximum interval of 200 feet, closer if needed, to clearly mark the limits of work. When contractor staking is the basis for determining the area for final payment, all boundary stakes will be reviewed by the engineer before start of this work item.
Excavation and fill—Slope stakes shall be placed at the intersection of the specified slopes and ground line. Slope stakes and the reference stakes for slopes shall be marked with the stationing, required cut or fill, slope ratio, and horizontal distance from the centerline or other control line. The minimum requirements for placing slope stakes are outlined in section 3, Quality of work.
Structures—Centerline and offset reference line stakes for location, alignment, and elevation shall be placed for all structures.
7. Records
All survey data shall be recorded in fully identified standard hard-bound engineering survey field notebooks with consecutively numbered pages. All field notes and printed data shall include the purpose or description of the work, the date the work was performed, weather data, sketches, and the personnel who performed and checked the work.
Electronically generated survey data and computations shall be bound, page numbered, and cross referenced in a bound field notebook containing the index for all survey activities. All work shall follow recognized professional practice.
The construction survey records shall be available at all times during the progress of the work for examination and use by the engineer and when requested, copies shall be made
Sarasota County, FL 13 December 2024 available. The original field notebooks and other records shall be provided to and become the property of the owner before final payment and acceptance of all work.
Complete documentation of computations and supporting data for progress payments shall be submitted to the Engineer with each invoice for payment as specified in section 9 of the specification. When the contractor is required to conduct initial and final surveys as outlined in section 5, Construction Surveys, notes shall be provided as soon as possible after completion to the engineer for the purpose of determining final payment quantities.
8. Payment
Method 1—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds, after presentation of correct and accurate invoices by the contractor showing related costs and evidence of the charges of suppliers, subcontractors, and others for supplies furnished and work performed. Invoices for the total amount of the contract price will not be accepted until all surveys are complete and required documentation has been determined complete. If the total of such payments is less than the lump sum contract price for this item, the unpaid balance will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of all work under the bid item.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds with progress payment amounts determined as a percentage of the total work planned as projected from the contractor's approved construction schedule. Payment of the lump sum contract price will constitute full compensation for completion of all work under this bid item.
All Methods—Payment will not be provided under this item for the purchase price of materials or equipment having a residual value.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the item to which they are made subsidiary are identified in section 9 of this specification.
9. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item No. 12, As-built construction survey
(1) This item consists of all surveys necessary in accordance with Federal Acquisition Regulation (FAR) 52.236-17 and this specification.
(2) Construction surveys shall include those described in Method 2 of section 5 of this specification, Construction surveys. Survey data shall be provided to Sarasota County within 14 calendar days after survey is completed.
Sarasota County, FL 14 December 2024
(3) Proposed structures, structures to be removed, and riprap limits shall be located and staked in the field by the Contractor.
(4) Contractor’s personnel who perform surveys shall be any person qualified by training and experience to do the work. Quantity surveys and as-builts are required prior to payment of Bid Items requiring quantities and survey verification that the item was constructed according to the drawings and specifications.
(5) The Contractor shall provide Sarasota County one unsealed copy (could be an electronic pdf file) of Construction as-builts with cross sections of the completed work verifying that the proposed structures and ditch regrading have been constructed to the neat lines and grades as shown on the drawings. As-built surveys shall be performed prior to re-routing water through the constructed structures. Upon approval of work, three Professional Land Surveyor sealed hard-copies of as-built survey drawings shall be provided to Sarasota County, and one digitally signed pdf.
Sarasota County, FL 15 December 2024
Construction Specification 8 – Mobilization and Demobilization
1. Scope
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material
Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment
Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
Sarasota County, FL 16 December 2024
b. Bid Item No. 1, Mobilization and Demobilization
(1) This item shall consist of all work as described in section 1 of this specification, Scope, and additional permitting (as needed).
(2) All equipment shall be brought to the site in clean condition.
(3) Any maintenance needed for access and haul roads shall be included in this bid item.
Sarasota County, FL 17 December 2024
Construction Specification 9 – Traffic Control
1. Scope
The work shall consist of establishing traffic control and maintaining safe, convenient use of public roads and rights-of-way.
2. Traffic and access
The contractor's operations shall cause no unnecessary inconvenience to the public. The public rights-of-way shall be maintained at all times unless interruption is authorized by proper local authority. Contractor's authorized closing or detour plans shall be provided to the engineer for approval.
Safe and adequate access shall be provided and maintained to all public protection devices and to all critical utility control locations. Facility access shall be continuous and unobstructed unless otherwise approved.
3. Storage of equipment and material in public streets
Construction materials and equipment shall not be stored or parked on public streets, roads, or highways. During any material or equipment loading or unloading activities that may temporarily interfere with traffic, an acceptable detour shall be provided for the duration of the activity. Any associated expense for this activity is the responsibility of the contractor.
Excavated material, including suitable material that is intended for adjacent trench backfill or other earth backfill as specified in section 5 of this specification, shall not be stored on public streets, roads, or highways that remain in service for the public. Any waiver of this requirement must be obtained from the proper local authority and approved by the Engineer. All excess and unsuitable material (refer to Construction Specification 23 Earthfill, Section 3) shall be removed from the site as soon as possible. Any spillage shall be removed from roadways before they are used by the public.
4. Street closures, detours, and barricades
The contractor shall comply with the requirements of all applicable responsible units of government for closure of any street, road, or highway. The contractor shall provide the required barriers, guards, lights, signs, temporary bridges, and flaggers together with informing the public of any detours and construction hazards by the most suitable means available, such as local newspapers or radio stations. The contractor is also responsible for compliance with additional public safety requirements that may arise during construction.
The contractor shall furnish, install, and, upon completion of the work, promptly remove all signs, warning devices, and other materials used in the performance of this work.
Unless otherwise specified, the contractor shall notify, in writing, the fire chief, police chief, county sheriff, state patrol, schools that operate school buses, or any other government official as may be appropriate no less than 7 days before closing, partly
Sarasota County, FL 18 December 2024 closing, or reopening any street, road, or highway.
Unless otherwise specified, the contractor shall furnish to the engineer a written plan showing the proposed method of signing, barricading for traffic control, and safety for street detours and closures.
All temporary detours will be maintained to ensure use of public rights-of-way is provided in a safe manner. This may include dust control, grading, and graveling as required in section 7 of this specification.
5. General and specific references
All signs, signals, barricades, use of flaggers, and other traffic control and public safety devices shall conform to the general requirements set forth in the Manual of Uniform Traffic Control Devices (MUTCD) and the latest edition of Standard Highway Signs and Standard Alphabets for Highway Signs and/or OSHA Construction Industry Standards (29 CFR Part 1926), Subpart G, Signs, Signals, and Barricades unless otherwise specified in section 7 of this specification.
6. Measurement and payment
For items of work for which specific lump sum prices are established in the contract, payment for the work is made at the contract lump sum price. Progress payments will be made based upon the percentage of estimated total time that traffic control will be required unless otherwise specified in section 7 of this specification. Payment will constitute full compensation for all flaggers, labor, materials, equipment, and all other items necessary and incidental to completion of the work.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
7. Item of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item No. 1, Mobilization and Demobilization
(1) This item shall consist of all work as described in Section 1.
(2) The Contractor shall provide a traffic control plan to the Engineer at least five (5) business days prior to the pre-construction conference. The Plan shall outline the signage and methods the Contractor will use to minimize disturbance to normal traffic flows in the project area as part of the Plan.
The Contractor shall utilize safety persons when unloading materials and mobilizing or demobilizing equipment from the construction site. The
Sarasota County, FL 19 December 2024
Engineer or Owner may request modifications to the traffic control plan.
The Contractor shall be responsible for coordinating with any agencies including but not limited to the Florida Department of Transportation (FDOT) and obtaining any required permits.
(3) At least five (5) business days prior to the pre-construction conference, the Contractor shall provide to the Engineer a description of the routes and areas they intend to use to transport and store material and equipment during construction in a Transport, Storage and Access Plan. The description shall also describe how the Contractor intends to access the work area. All transport routes, storage areas, access areas, and mooring locations and facilities are subject to review by the Engineer for compliance with the Plans and Specifications.
Sarasota County, FL 20 December 2024
Construction Specification 10 – Water for Construction
1. Scope
The work consists of furnishing, transporting, measuring, and applying water as specified.
2. Facilities and equipment
The contractor shall install and maintain access and haul roads and furnish, operate, and maintain all pumps, meters, piping, tanks, storage, and other facilities required to load, transport, store, distribute, and use construction water as specified.
These facilities shall be equipped with accurate, work dedicated meters; tanks of known volume; or other devices that provide a correct measurement of water supplied. Meters shall be installed at the point of delivery into water hauling equipment or application system, such as sprinkler systems or flooding systems, as specified.
3. Dust abatement and haul road maintenance
Water for dust abatement and haul road maintenance shall be applied to haul roads and other dust producing areas as needed to prevent air pollution or excessive dust (which causes impaired vision on trafficked roads and in work areas) and to maintain the roads in good condition for safe and efficient operation during periods of use. Roads that may be jointly used with the public and by the contractor's equipment shall have dust abatement provisions acceptable to the public entity that has road maintenance responsibility.
Compensation for water used for dust abatement and haul road maintenance shall be as specified in section 8 of this specification.
4. Earthfill, drainfill, and rockfill
Water required for proper installation of earthfill, drainfill, and/or rockfill shall be used in the fill materials as specified in the applicable construction specification(s). Compensation for construction water used for earthfill, drainfill, and/or rockfill shall be as specified in section 8 of this specification.
5. Concrete, mortar, and grout
Water required in the mixing or curing of concrete, shotcrete, roller compacted concrete, or other portland cement mortar or grout shall meet the requirements of the applicable construction specifications and shall be used in conformance with those specifications.
Payment for construction water used in these items is covered by the applicable concrete, mortar, or grout specification, or a combination of these.
6. Other construction requiring water
Water required and used for other construction activities under this contract, but not specifically covered by this specification shall be considered subsidiary to the item(s) of work that requires its use.
Sarasota County, FL 21 December 2024
7. Measurement and payment
Method 1—For water items for which specific unit prices are established in the contract, the volume of water furnished and used in accordance with the specifications will be measured to the nearest 1,000 gallons.
Payment for water is made at the contract unit price. Such payment will constitute full compensation for the direct costs of water. All other costs necessary for transportation, distribution, and application are subsidiary to the items of work with which they are associated.
Method 2—For water items for which specific unit prices are established in the contract, the volume of water furnished and used in accordance with the specifications will be measured to the nearest 1,000 gallons.
Payment for water and the cost associated with transportation, distribution, and application is made at the contract unit price. Such payment will constitute full compensation for completion of the work.
Method 3—For water items for which specific unit prices are established in the contract, the volume of water used in accordance with the specifications will be measured to the nearest 1,000 gallons.
Payment for water is made at the contract unit price. Such payment, excluding water cost, will constitute full compensation for completion of the work.
All methods—The following provisions apply to all methods of measurement and payment:
• The measurement for payment will include all water used except as noted in sections 5, 6, and 8 of this specification. Measurement for payment will not include water that is used inappropriately or in excess of that needed to accomplish the specified task.
• Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary.
Such items and the items to which they are made subsidiary are identified in section 8 of this specification.
8. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Subsidiary Item, Water for Construction
(1) This item shall consist of all work as described in Section 1 in the construction of the new seawalls.
Sarasota County, FL 22 December 2024
(2) All water to be used in the project site will be furnished by the Contractor and transported into the project site.
(3) In section 7 of this specification, Measurement and Payment, Method 2 will apply. Payment included on mob/demo pay item
Sarasota County, FL 23 December 2024
Construction Specification 13 – Piling
8. Scope
The work consists of furnishing and installing the specified kinds and types of piles at the locations shown on the drawings.
9. Material
Piles shall conform to the requirements of following material specifications as appropriate to the kinds of piles specified. For piles of materials other than those listed, the material requirements outlined in section 14 of this specification shall apply.
511—Steel Piles 512—Wood Piles 513—Precast Concrete Piles 514—Cast-in-Place Concrete Piles
10. Site preparation
All excavation within the area to be occupied by bearing piles shall be completed before the piles are driven.
11. Protection of pile heads
The heads of all piles shall be protected during driving by suitable caps, rings, heads, blocks, mandrels, and other devices.
The heads of timber piles shall be fitted into a steel head block or fitted with heavy steel or wrought iron rings or wire wrapping.
The heads of steel piles shall be cut square and fitted with a steel driving cap.
The heads of precast concrete piles and casings shall be fitted into cushion type drive caps having a rope or other suitable cushion next to the pile head and fitting into a casting that in turn supports a timber shock block.
Driving heads, mandrels, and other devices shall be provided by the contractor as needed for special types of piles and shall conform to the recommendations of the pile manufacturer.
12. Piles, general
The contractor shall notify the engineer before pile driving operation commences. Such notice shall be far enough in advance, a minimum of 24 hours, to provide the engineer adequate time to be present for the driving operations. Piles shall be driven only in the presence of the engineer or authorized representative.
The determination of piling order lengths shall be the contractor's responsibility unless
Sarasota County, FL 24 December 2024 otherwise specified.
Unless otherwise approved, piles shall be driven with steam, air, diesel powered hammers or a combination of hammers, or by vibration or water jets. Water jets may be used only when specifically authorized by the engineer. Where jetting is authorized, the jets shall be withdrawn before the specified depth or bearing capacity is obtained and the piles shall be driven with the hammer to the final penetration.
When drop hammers are permitted, the height of drop shall not be more than 8 feet for concrete piles or 12 feet for steel and timber piles, unless otherwise specified.
The driving of piling with followers shall be allowed only when expressly approved by the engineer.
Piles shall not be driven within 20 feet of concrete less than 7 days after placement, including concrete placed in cast-in-place piles with or without predriven shells or casings.
The contractor shall not attempt to drive piles beyond the point of refusal, as indicated by excessive bouncing of the hammer or kicking of the pile.
13. Bearing piles
Bearing piles shall be driven to the position, line, and batter specified on the drawings.
Each pile shall be driven continuously and without interruption to the specified depth or until the specified bearing capacity is obtained. Deviation from this procedure is permitted only when interruption of driving is caused by conditions that could not reasonably be anticipated.
When a diesel hammer is used, it shall be operated at full throttle when blows are counted for determination of bearing capacity except that throttle adjustments shall be made as necessary to prevent the nonstriking parts of the hammer from rising from the pile on the ram upstroke.
14. Sheet piles
The piling shall be driven in a manner that ensures perfect interlocking throughout the entire length of each pile. The piles shall be held in proper alignment during driving by assembling frames or other suitable temporary guide structures. Temporary guide structures shall be removed when they have served their purpose.
Anytime the forward edge of the sheet pile wall is found to be out of correct alignment,
a. The piling already assembled and partly driven shall be driven to the required depth.
b. Taper piles shall then be driven to bring the forward edge into correct alignment before additional regular piling is assembled and driven. The maximum permissible taper in a single pile shall be 0.25 inch per foot of length.
Sarasota County, FL 25 December 2024
15. Estimating bearing capacity
When load tests are not required, the bearing capacity of each pile shall be estimated using one of the following formulas, as appropriate:
Gravity hammers:
𝑅𝑅 =
2𝑊𝑊𝑊𝑊
𝑆𝑆 + 1
Single-acting steam or air hammers and diesel hammers having unrestricted rebound of the ram:
𝑅𝑅 =
2𝑊𝑊𝑊𝑊
𝑆𝑆 + 0.1
Double-acting steam or air hammers and diesel hammers having enclosed rams:
𝑅𝑅 = 2𝐻𝐻(𝑊𝑊+𝐴𝐴𝐴𝐴)
𝑆𝑆+0.1
or 𝑅𝑅 = 2𝐸𝐸
𝑆𝑆+0.1
where:
R = safe bearing capacity, in pounds
W = weight of striking parts of hammer, in pounds
H = height of fall, in feet
A = area of piston, in square inches
P = pressure of steam, air, or other gas exerted on the hammer piston or ram, in pounds per square inch
E = the manufacturer's rating for foot-pounds of energy developed by double-acting steam or air hammers, or 90 percent of the average equivalent energy developed by diesel hammers having enclosed rams as evaluated by gauge and chart readings, in foot-pounds
S = average penetration for the last 5 to 10 blows of a gravity hammer or the last 10 to 20 blows for steam, air, or diesel powered hammers, in inches per blow
These formulas are applicable when:
• The hammer has a free fall.
• The head of the pile is not crushed.
• The penetration is reasonably quick and uniform.
• There is no sensible bounce after the blow.
• A follower is not used.
Sarasota County, FL 26 December 2024
Twice the height of the bounce shall be deducted from H to determine its value in the formula.
If case water jets are used in conjunction with the driving, these formulas are used to determine the bearing power from the results of driving after the jets have been removed.
16. Load tests
When load tests are specified, the test loads shall be applied gradually, without impact, and in a manner that no lateral forces are applied to the pile. Load testing shall not be started until 24 hours after driving of the test pile is completed unless otherwise specified in section 14 of this specification. Except as otherwise specified, load tests shall be performed according to the following procedures.
The total test load shall be twice the specified working load and shall be applied to the pile in increments equal to 25 percent of the working load. Settlement of the top of the pile shall be measured to an accuracy of 0.01 inch before and after the application of each load increment and at 2, 4, 8, 15, 30, and 60 minutes after, and then every 2 hours until the next load increment is applied. Additional load shall not be applied until the rate of settlement is less than 0.01 inch in 1 hour.
The total test load shall remain on the pile for a minimum of 24 hours. Settlement shall be measured at 6-hour intervals during this period and at the end of the period, at least twice during removal of the load, and immediately after all of the test load is removed. The net settlement shall be measured about 24 hours after the total load has been removed.
If settlement continues in excess of 0.01 inch per hour under less than the total test load, no additional load shall be applied. However, the load that has been applied shall remain on the pile a minimum of 24 hours, and settlement measurements while the load is on the pile and during and after removal of the load shall be made as if it were the total test load.
17. Cutting off piles
The contractor shall cut the piles at the specified elevations. The length of pile cut off shall be sufficient to permit the removal of all damaged material. Steel shells or concrete casings for cast-in-place concrete piles shall be cut off at the specified elevation before being filled with concrete.
Steel bearing piles shall be cut off in clean, straight lines as shown on the drawings. Any irregularities shall be leveled off with deposits of weld metal or by grinding before placement of bearing caps.
Precast concrete piles and concrete casings shall be cut off in a manner that prevents damage to the rest of the pile or casing or to…