Technical_Specifications_-_2026_Water_Main_Improvements.pdf
PDF 456 KB Posted
- Attached to
- 2026 Water Main Improvements
- Solicitation number
- 2026-002-IFB-W2026-018-021
- Issued by
- Napa County, California
About this file
This is a Technical Specifications document prepared by the City of Napa, California for the 2026 Water Main Improvements Project, a multi-phase water infrastructure replacement initiative across four separate drawing sets and locations within the city. The project encompasses installation of approximately 3,122 linear feet of polyvinyl chloride (PVC) C900 DR14 water mains in various diameters (6", 8", and 12") on Pueblo Avenue (two separate sections), Old Sonoma Road, and Soscol Avenue, along with associated appurtenances including fire hydrants, gate valves, butterfly valves, service reconnections and installations, air release/vacuum valves, blow-off assemblies, and pressure regulating valves. The project also includes utility tie-ins, valve box adjustments, pavement restoration, erosion and sediment control, disinfection and flushing, and surface restoration work. Sealed bids are due by December 2, 2026, at 2:00 p.m. via electronic submission through the city's procurement portal. The contract term is not explicitly stated in this specifications document, though project completion schedules, phasing requirements, and working hour restrictions are outlined. A preconstruction conference is required before work commences, and the contractor must submit detailed schedules, traffic control plans, erosion and sediment control plans, and various material submittals for engineer approval before proceeding with work.
Pricing for this project is based on individual bid items covering mobilization, traffic control, potholing, shoring, erosion and sediment control, pipe installation (by diameter and type), service connections, fire hydrant assemblies, tie-ins, valve box adjustments, asphalt paving (measured by square footage), and related incidental work. Construction water costs are itemized separately with hydrant meter deposits of $1,750.00 and set fees of $140.00, plus monthly service charges and per-thousand-gallon rates. The specifications note that work not listed in the bid schedule but necessary to complete the project should be included in related bid items, establishing a total project cost responsibility. No specific set-asides, incumbent contractor information, or funding sources are identified in this technical specifications document. The work is subject to California prevailing wage requirements, compliance with Cal/OSHA regulations, water pollution control standards, traffic control requirements per the California Manual on Uniform Traffic Control Devices, and adherence to Caltrans 2025 Standard Specifications and City of Napa Standard Specifications. Work hour restrictions generally limit lane closures to 9:00 a.m. to 3:00 p.m. unless approved by the engineer, with additional restrictions in school zones requiring traffic maintenance restrictions during school pickup and drop-off times.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026_Water_Main_Improvements.pdf | ||
| Drawings_-_2026_Water_Main_Improvements.pdf | ||
| Bid_Bond.docx | DOCX document | |
| Bidder's_Questionnaire.docx | DOCX document | |
| Payment_Bond.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| Warranty_Bond.docx | DOCX document | |
| Contract_(2024-2-13)_2026_Water_Main_Improvements_(Pueblo,_Old_Sonoma,_Soscol).docx | DOCX document | |
| PRVCutSheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Napa Utilities Contract Documents 2026 Water Main Improvements TECHNICAL SPECIFICATIONS WTR2026-0002 Page 1
Technical Specifications
10-1 GENERAL
10-1.01 ORDER OF WORK
As required by these Technical Specifications, Contractor must follow the sequence of operations as set forth herein.
As the first order of Work, in accordance with the requirements in the section titled “Construction Area Signs” of these Technical Specifications, Contractor must notify residents and/or property owners of the upcoming Work, then implement the traffic control plan pursuant to the section titled “Maintaining Traffic” of these Technical Specifications.
Contractor shall identify and pothole buried utilities per sections titled, “Existing Facilities” and “Potholing,” prior to beginning trenching or excavations.
10-1.02 WATER POLLUTION CONTROL
Water pollution control Work must conform to the requirements of these Technical Specifications and the provisions in Section 13-4 through 13-9, of the Caltrans 2025 Standard Specifications.
GENERAL
The goal of these requirements is to prevent the pollution of storm water runoff from construction projects by keeping pollution out of storm drains, reducing the exposure and discharge of materials and wastes to storm water, and by reducing erosion and sedimentation. Storm drains discharge runoff directly to creeks and the river without treatment. Contractor must abide by all Laws regarding water quality as it is affected by construction activities. Specifically, Contractor must prepare and submit an Erosion and Sediment Control Plan for the Engineer’s approval that describes and pictorially shows how the requirements included in the Erosion and Soil Control Plan template are being met. The Erosion and Soil Control Plan template is available on the City’s Public Works Department website:
www.cityofnapa.org/DocumentCenter/View/6553/ESCP-Report-Template
10-1.03 SCHEDULE
Schedules will be required for this contract and must conform to requirements of Section 8-1.02, “Schedule,” of the Standard Specifications and Section 5.2 “Schedule Requirements” of these Contract Documents.
Contractor must submit three (3) copies (or digital version, i.e. PDF) of initial schedules before or at the Preconstruction Conference. The Engineer will review schedules and if not acceptable return review copy within three (3) working days after the receipt. If required, Contractor must resubmit revised schedules within three (3) working days after return of review copy. A Notice to Proceed may be issued, but work will not be allowed to commence until the City has reviewed and approved the schedule.
A two-week rolling schedule must also be updated and provided to the Engineer at the beginning of each work week. The two-week rolling schedule must include Contractor’s proposed daily activities and location(s) of work during the coming two-week period. During the contract period, Contractor must also coordinate the activities daily with the Engineer.
WTR2026-0002 Page 2
No progress payments will be made for any work if schedules are not provided to the Engineer pursuant to this section.
10-1.04 NOT USED
10-1.05 NOT USED
10-1.06 MOBILIZATION
Contractor shall setup construction facilities in neat and orderly manner within Work areas as approved by Engineer. Mobilization will be deemed complete when items necessary to conduct operations are onsite and operable.
Contractor shall setup temporary facilities per Article 7 of the General Conditions.
Contractor shall remove temporary structures and controls before inspection for Final Completion.
10-1.07 TEMPORARY TRAFFIC CONTROL
Contractor must submit, prior to or at the preconstruction conference, a traffic control plan which conforms to all requirements of these Technical Specifications. Contractor’s traffic control plan must be consistent with the City of Napa Traffic Control Plan Preparation Guidelines located at:
www.cityofnapa.org/DocumentCenter/View/536/Traffic-Control-Guidelines-PDF?bidId=
Contractor must also submit the traffic control plan as part of the City of Napa Encroachment Permit process.
This plan must include all lane closures, construction area signs, flag protection, changeable message signs, detours, and parking prohibitions. Traffic control plans must conform to the most current edition of the “California Manual on Uniform Traffic Control Devices for Streets and Highways”. No Work may commence prior to the submission and approval of a satisfactory traffic control plan. A traffic control plan will not be approved unless it conforms to the requirements of the aforementioned manual. More than one traffic control plan may be required for different phases of the Work, and each traffic control plan must conform to the requirements of these Technical Specifications and the California Manual on Uniform Traffic Control Devices for Streets and Highways.
Flagging, signs, and all other traffic control devices furnished, installed, maintained, and removed, when no longer required, must conform to the requirements of these Technical Specifications and the provisions in Section 12, "Temporary Traffic Control," of the Caltrans 2025 Standard Specifications.
Category 1 traffic control devices are defined as those devices that are small and lightweight (less than 45 kg) and have been in common use for many years. The devices must be known to be crashworthy by crash testing, crash testing of similar devices, or years of demonstrable safe performance. Category 1 traffic control devices include traffic cones, plastic drums, portable delineators, and channelizes.
If requested by the Engineer, Contractor must provide written self-certification for crashworthiness of Category 1 traffic control devices. Self-certification must be provided by the manufacturer or Contractor and must include the following: date, Federal Aid number (if applicable), expenditure authorization, district, county, route and kilometer post of Project limits; company name of certifying vendor, street address, city, state and zip code; printed name, signature and title of certifying
WTR2026-0002 Page 3 person; and an indication of which Category 1 traffic control devices will be used on the Project.
Contractor may obtain a standard form for self-certification from the Engineer.
Category 2 traffic control devices are defined as those items that are small and lightweight (less than 45 kg), that are not expected to produce significant vehicular velocity change, but may otherwise be potentially hazardous. Category 2 traffic control devices include: barricades and portable sign supports.
If requested by the Engineer, Contractor must provide a written list of Category 2 devices to be used on the Project at least five (5) days prior to beginning any Work using the devices. For each type of device, the list must indicate the FHWA acceptance letter number and the name of the manufacturer.
10-1.08 CONSTRUCTION AREA SIGNS
Construction area signs must be furnished, installed, maintained, and removed, when no longer required, in conformance with the provisions in the section titled, "Temporary Traffic Control," of these Technical Specifications.
Contractor shall use materials on the most current California Department of Transportation, Authorized Materials List for “Signing and Delineation Materials.” Type II retroreflective sheeting must not be used on construction area sign panels.
Contractor must comply with General Conditions Section 7.13 prior to disturbing soil for sign installation, if applicable. Excavations required to install construction area signs must be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes.
Sign substrates for stationary mounted construction area signs may be fabricated from fiberglass reinforced plastic as specified under California Department of Transportation, Authorized Materials List for “Signing and Delineation Materials.”
Contractor may be required to cover and maintain the cover of certain signs during the progress of the Work. Signs that are no longer required or that convey inaccurate information to the public must be immediately covered, removed, or the information must be corrected. Covers for construction area signs must be of sufficient size and density to completely block out the complete face of the signs. The retroreflective face of the covered signs must not be visible either during the day or at night. Covers must be fastened securely so that the signs remain covered during inclement weather. Covers must be replaced when they no longer cover the signs properly.
Contractor must notify residents and property owners in writing forty-eight (48) hours (excluding weekends and holidays) prior to performing any Work at the Project site.
The notification form to be provided to residents and property owners must be submitted to the City for review and approval. Attention is directed to the section titled “Submittals,” of these Technical Specifications. Street parking may be restricted as necessary to facilitate construction activity. “No Parking” signs, as required, must be placed by Contractor forty-eight (48) hours in advance of the parking restriction. “No Parking” signs must have the following information:
Tow Away, No Parking
Date of Restriction
Time of Restriction
Construction Zone
Vehicles in Violation Subject to Tow at Owner’s Expense
WTR2026-0002 Page 4
Napa Police Department: 707-257-9223
CVC 22658 (1); CVC 22651 (L)
“No Parking” signs must have red letters on a white background. “No Parking” signs must be spaced no more than thirty (30) feet apart. The City can provide “No Parking” signs at Contractor’s request. The placement of “No Parking” signs must be conducted in a manner that reasonably reflects the location of the Work at any given time during the Project. Contractor shall allow parking in areas where Work is not being performed.
Contractor must maintain or update information contained on the signs on a daily basis.
The cost of furnishing, installing, maintaining and removing signs, sign covers, lights, flares, temporary railing, barricades, flaggers, guards and all construction area traffic control devices will be borne by Contractor.
10-1.09 MAINTAINING TRAFFIC
Contractor must comply with Sections 7-1.03, "Public Convenience" and 12-4, “Maintaining Traffic,” of the Caltrans 2025 Standard Specifications and the section titled, "Public Safety," of these Technical Specifications. Nothing in this Section 10-1.09 will be construed as relieving Contractor from the responsibilities specified in the Section 7-1.03 and 12-4 of the Caltrans 2025 Standard Specifications.
Contractor must furnish and erect Standard W20-1 “Road Work Ahead” and Standard G20-2 “End Road Work” signs to provide advance warning to the traffic at the Project site. W20-1 and G20-2 signs must also be installed along all side streets entering the Work area. Contractor must submit a traffic control plan that includes the exact locations of the signs.
Prior to saw cutting of existing curb, gutter, sidewalk, driveway, and asphalt concrete for removal and up to the time the new improvements are opened to the public, Contractor must erect and maintain necessary signs and barricades as required in these Technical Specifications.
Contractor shall not perform work requiring a lane closure unless approved by the Engineer.
Approval from Engineer at minimum will require an approved traffic control plan, encroachment permit, and evidence of notification to residents. Lane closures must conform to the provisions in the section titled "Traffic Control System for Lane Closure" of these Technical Specifications. The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or connector lanes, within a single traffic control system. Bicycle traffic must be maintained per these Technical Specifications.
Contractor must provide for the safe and orderly movement of traffic at all times during construction.
On all streets, one (1) lane in each direction must be maintained at all times. Temporary street closures or providing only one (1) lane for both directions may be approved by the Engineer provided adequate circulation is maintained and/or adequate flaggers and signage is satisfactory.
Any lane closures must be limited to the hours of 9:00 AM to 3:00 PM unless approved by the Engineer.
No street closures will be allowed unless directed by the Engineer. If Contractor desires a street closure, Contractor must submit a written request, accompanied with a traffic control plan, to the Engineer for review and approval. The request must state the reason, locations, and times for the closure, and must be submitted a minimum of five (5) working days prior to the requested closure.
If the street closure request is approved by the Engineer, then Contractor must notify the Police and Fire Department of the City, the Division of Forestry, local ambulance services, the V.I.N.E.
Bus Service, Napa Garbage Service, Napa Valley Unified School District Transportation
WTR2026-0002 Page 5
Department, and the U.S. Post Office in writing, forty-eight (48) hours in advance of all lane/street closures and keep the Fire Department posted at all times regarding available access to the streets.
Contractor must also notify United Parcel Service (UPS), Federal Express, and other mail delivery services of planned lane/street closures and the current schedule.
No vehicular detours outside the City-approved traffic control plan will be allowed. Pedestrian detours, if required, must be clearly signed and included on the submitted traffic control plans.
No street closures will be allowed overnight.
Access for emergency vehicles must be provided for at all times.
Contractor must furnish, install, maintain, and remove barricades, lights and signs as required, and must provide flaggers and other facilities to safeguard adequately the general public, local pedestrian and vehicle traffic, and the Work as may be deemed necessary by the Engineer during working and non-working hours.
Traffic signs, flashing lights, lighted arrow boards, barricades, temporary railings, and other traffic safety devices used to control traffic must conform to the requirements of the section titled, “Temporary Traffic Control,” of these Technical Specifications and the current edition of the Manual of Uniform Traffic Control Devices (including the California Supplement). Flashing lights must be provided on each barricade. Contractor must inspect all safety devices at the beginning of each workday.
Contractor must take extra care to minimize disruption to the adjacent residences/businesses during the progress of Work. Contractor must provide access to all residences and/or businesses at all times during the progress of the Work. It may be necessary for Contractor to provide and place steel plating in order to provide access for vehicular traffic. Contractor must phase the Work to ensure that access to each residence and business is provided at all times. Commercial driveways must be provided with at least ten (10) feet wide of unobstructed opening at all times, except as outlined below.
Subject to the notification of property owners and advance written approval of the Engineer, temporary closure of driveways may be allowed per these Technical Specifications. However, unless a driveway is being reconstructed, a driveway must not remain closed outside of the authorized workdays and work hours specified in the Special Conditions, unless otherwise authorized by the Engineer. If a property has more than one (1) driveway, no more than one (1) driveway closure will be allowed at any time unless otherwise approved by the Engineer. In the case of driveway reconstruction, a driveway must not remain closed or inaccessible for more than five (5) continuous working days (beginning on a Monday), to allow for demolition, preparation, plain cement concrete (PCC) installation and, unless otherwise authorized by the Engineer. Prior to closure of driveways, Contractor must coordinate and notify the property owner or resident at least twice of such closure. Closure notices must be given to the property owner and/or resident twenty-four (24) hours and one (1) hour prior to each closure. A copy of the closure notice must be furnished to the Engineer for review and approval prior to each closure.
Contractor must file, with the Engineer and Police Department, the name and telephone number of his representative (provide minimum two contacts) to be notified after normal working hours and on weekends, in case of emergency. This information must be provided at the preconstruction conference.
At the end of each working day, if a difference in excess of 0.17-foot exists between the elevation of the existing pavement and the elevation of any excavation within eight (8) feet of the traveled way, material must be placed and compacted against the vertical cuts adjacent to the traveled way.
During excavation operations, native material may be used for this purpose. The material must be placed to the level of the elevation of the top of the existing pavement and tapered at a slope of 4:1 or flatter to the bottom of the excavation. In the case of PCC curb ramps, there must be no difference between the elevation of the existing bottom of ramp and the elevation of the existing pavement; ADA compliance must be maintained for areas open to the public.
WTR2026-0002 Page 6
Traffic control restrictions are required in school zones when student classes are in-session, per current NVUSD Student Calendar. Please use the following link to access the posted school calendar: https://valleyoak.nvusd.org/our-school/calendars. One half hour before and after pickup and drop off bell times, one lane of traffic in either direction shall be required.
If you desire to work on Saturdays, Sundays, City holidays, or hours beyond those stated above, you must submit a written request to the Engineer for approval. The request must state the reason for the change in the working day or schedule and must be submitted a minimum of five (5) working days prior to the requested change.
The Engineer will approve or deny the request within three (3) working days and advise you in writing of his decision. The Engineer’s decision will be final. If the request is approved, you will be required to pay the cost of providing inspection services for the work being performed. If inspection services are not available for the requested change, the Engineer may deny the request.
10-1.10 LANE CLOSURE REQUIREMENTS AND CONDITIONS
Lane closures, if approved by the Engineer, must conform to the provisions in the section titled, "Maintaining Traffic," of these Technical Specifications.
The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or connector lanes, within a single traffic control system.
LANE CLOSURE SCHEDULE
By noon Monday, Contractor must submit a written schedule of planned closures accompanied with a traffic control plan for the following week period, defined as Friday noon through the following Friday noon.
The Closure Schedule must show the locations and times when the proposed closures are to be in effect. Closure Schedules submitted to the Engineer with incomplete, unintelligible or inaccurate information will be returned for correction and resubmittal. Contractor will be notified of disapproved closures or closures that require coordination with other parties as a condition of approval.
Amendments to the Closure Schedule, including adding additional closures, must be submitted to the Engineer, in writing, at least three (3) working days in advance of a planned closure. Approval of amendments to the Closure Schedule will be at the discretion of the Engineer.
No lane closures will be allowed overnight.
10-1.11 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE
A traffic control system for lane closures, if approved by the Engineer, will consist of closing traffic lanes and the provision of traffic detours, including but not limited to, furnishing, installing, maintaining and removal (when no longer required) of traffic control devises in accordance with the sections titled, “Maintaining Traffic”, and “Construction Area Signs,” of the Technical Specifications.
The provisions in this section will not relieve Contractor from the responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in the Contract Documents. The cost of furnishing, installing, maintaining and removing signs, sign covers, lights, flares, temporary railing, barricades, flagmen, guards and all construction area traffic control devises will be borne by you.
WTR2026-0002 Page 7
10-1.12 TEMPORARY PAVEMENT DELINEATION
Temporary pavement delineation must be furnished, placed, maintained, and removed in conformance with the requirements in these Technical Specifications and the provisions in Section 12-6, "Temporary Pavement Delineation," of the Caltrans 2025 Standard Specifications. Nothing in these Technical Specifications will be construed as reducing the minimum standards specified in the California Manual on Uniform Traffic Control Devices for Streets and Highways published by the Department of Transportation or as relieving Contractor from the responsibilities specified in the Contract Documents. Under this section, pavement delineation must also include pavement legends and crosswalks.
Whenever the Work causes obliteration of pavement delineation, or when no pavement delineation existed prior to Contractor’s operations but said operations alter the typical pattern of traffic, temporary or permanent pavement delineation must be in place prior to opening the traveled way to public traffic. Lane line, centerline, and crosswalk pavement delineation must be provided at all times for traveled ways open to public traffic. Contractor must provide for pavement delineation when traffic is allowed on aggregate base.
The temporary reflective pavement markers must be placed in conformance with the manufacturer's instructions and must be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive must not be used to place the pavement markers in areas where removal of the pavement markers will be required. For temporary pavement delineation of stop bars and crosswalks, Contractor must use reflective striping tape only.
10-1.13 CONSTRUCTION WATER
Water required for the Project must be taken through a hydrant meter supplied by the City. The backflow device provided with the hydrant meter must remain attached immediately behind the water meter with no exception. No direct connections to fire hydrants, use of unmetered water services, or unauthorized connections to the existing water system will be allowed.
Contractor shall submit the online Temporary Hydrant Meter Application, available on the City’s website at: https://www.cityofnapa.org/FormCenter/Water-Division-15/TEMPORARY-HYDRANT- METER-APPLICATION-LIMI-167, to the City for approval. Once approved, Contractor is responsible for paying the deposit and set fee charges associated with the use of the hydrant meter and backflow device. Fees are to be paid at the City of Napa’s Finance Department in City Hall at 955 School Street in Napa with the copy of the approved Temporary Hydrant Meter Application.
The current fees for construction water as of July 1, 2026, are as follows (prices may change without notice, see current fees on City’s website):
Connection Charges
Hydrant Meter Deposit (13.3.1) $1,750.00
Hydrant Meter Set Fee (non-refundable)(13.3.2) $140.00
Moving Meter within Project (if requested)(13.3.3) $438.00
Construction Water Rates
Each 1,000 gallons (13.14.19) $13.55
Monthly service charge (13.3.5) (prorated) $230
The City anticipates that it will set the meter within two (2) working days after receipt of payment.
This anticipated timeline is provided solely for scheduling purposes and does not bind the City to complete the set up within the anticipated time.
WTR2026-0002 Page 8
Contractor may not relocate a hydrant meter and backflow device. Contractor must additionally contact the Finance Department at (707) 257-9508 when they are finished with the hydrant meter and want to close the account. Upon return of the hydrant meter and backflow device in good working order and undamaged, the Hydrant Meter Deposit will be refunded to Contractor.
Contractor is fully responsible for protecting the meter, backflow device, and hydrant serving the hydrant meter from damages. Contractor’s deposit will not be returned if the equipment is lost, damaged, or stolen, and Contractor will be required to obtain a new working hydrant meter from the City with payment of a new deposit. Any repairs or damages to the hydrant meter and/or backflow device will be deducted from the deposit.
10-1.14 FINISHING WORK
Finishing Work must conform to the requirements of these Technical Specifications and Section 22, “Finishing Roadway,” of the Caltrans 2025 Standard Specifications.
Topsoil for filling and conform grading between the curb and sidewalk and filling, conform grading, and shaping behind the curb, sidewalk, and within the Project area must be in conformance with these Technical Specifications, Section 21-2.02C, “Imported Topsoil,” of the Caltrans 2025 Standard Specifications, and Section 4.02.06, “Landscaping Materials,” of the City’s Standard Specifications. Graded surfaces must not contain slopes greater than 2:1.
Contractor must test all repaired and/or replaced irrigation systems. Once complete, Contractor must demonstrate to the Engineer that the repaired and/or replaced facilities operate properly.
Contractor must clean the roadway of all construction debris at the end of each workday.
10-1.15 SUBMITTALS
Contractor must submit samples, drawings, and data for the Engineer's approval which will demonstrate fully that the Work, including the materials and equipment to be furnished as part of the Work, will comply with the provisions and intent of the Contract Documents. (See also General Conditions, Section 2.5, “Submittals.”)
Submit all samples, drawings and data as electronic PDFs unless specifically requested. Label each sample, naming the Project, the source of the material, and the proposed location of use on the Project.
Restrict each submittal to only one Specification Section or portion thereof. Unless otherwise specifically permitted by the Engineer, make all submittals in groups containing all associated items for complete systems. The Engineer may reject partial submittals as not complying with the provisions of the Contract Documents.
WTR2026-0002 Page 9
Specific items to be covered by submittals must include, as a minimum, the following:
1. Trench Sheeting and Shoring
2. Portland Cement Concrete Mix Design
3. Soil Mix if Needed
4. Recycled Aggregate Base Material
5. Water System Materials
6. Asphalt Concrete Mix Design
7. Erosion and Sediment Control Plan
8. Traffic Control Plan
9. Sand Backfill Material
10. Project Schedule
11. Asbestos Material Disposal Plan
12. Temporary Water Service Installation Plan
13. Disinfection and De-chlorination Plan
14. Injury and Illness Prevention Plan
15. Project As-Built
Where the Specifications indicate that Contractor must follow manufacturer’s instructions for installation of materials or equipment, those instructions must be submitted to the City as part of the material submittal whether or not instructions are listed specifically as a submittal.
Make all shop drawings accurately to a scale sufficiently large to show all pertinent features of the item and its method of connection to the Work. Make all shop drawing prints in blue or black line on white background. Reproductions of City drawings are not acceptable.
Contractor must not use red color marks on submittals. Duplicate all marks on all copies submitted and ensure marks are photocopy reproducible.
Include legible scale details, sizes, dimensions, performance characteristics, capacities, test data, anchoring details, installation instructions, storage and handling instructions, color charts, layout drawings, parts catalogs, rough-in diagrams, wiring diagrams, controls, weights, and other pertinent data. Provide, at a minimum, the detail provided in the Contract Documents.
Prior to submittal for Engineer's review, use all means necessary to fully coordinate all materials, including the following procedures:
1. Determine and verify all field dimensions and conditions, materials, catalog numbers, and similar data.
2. Coordinate as required with all trades and with all public agencies involved.
3. Secure all necessary approvals from public agencies and others and signify by stamp, or other means, that they have been secured.
Contractor must make all submittals far enough in advance of scheduled dates of installation to provide all required time for reviews, for securing necessary approvals, for possible revision and resubmittal, and for placing orders and securing delivery.
In scheduling, assume at least seven (7) calendar days for the Engineer's review, plus the transit time to and from the City office. This assumption is provided solely for scheduling purposes and does not bind the City to complete its review of any submittal within the assumed time.
WTR2026-0002 Page 10
At least one copy of each submittal will be returned to Contractor marked “Approved”, “Approved as Noted”, “Revise and Resubmit”, or “Rejected.” Submittals marked “Approved as Noted” need not be resubmitted, but the notes must be followed. If a submittal is rejected, it will be marked to indicate what is unsatisfactory. Resubmit revised drawings or data as indicated.
Approval of each submittal by the Engineer will be general only and must not be construed as:
1. Permitting any departure from the requirements in the Contract Documents.
2. Relieving Contractor of the responsibility for any errors and omissions in details, dimensions, or of other nature that may exist.
3. Approving departures from additional details or instructions previously furnished by the Engineer.
4. Relieving Contractor from verifying all field conditions and dimensions.
Any submittals which are returned to Contractor for resubmittal due to incompleteness or noncompliance more than once will cause additional review time and expense for the City.
Contractor must reimburse the City for all costs associated with the third and subsequent review of any submittals. The City reserves the right to deduct resubmittal review costs from amounts due to Contractor.
FORM OF SUBMITTAL
Before submitting, Contractor must provide the Engineer a template or example submittal form for the Engineers approval or Contractor may request a template from Engineer. The template can be provided to Contractor in Microsoft Word format if requested.
Contractor must completely identify each submittal and re-submittal by using one of the aforementioned forms and number submittals consecutively beginning with 1. Re-submittals must retain the original number with an added suffix starting with “A”. Said form must include the name of the Project Engineer and the Project Name. It must also clearly indicate the Item Description, Manufacturer, Specification Section Reference and Drawing Sheet Number(s) Reference. All submittals must be certified by Contractor for completeness and for compliance with the Contract Documents with the following Certification:
I hereby certify that all material submitted has been checked for completeness, for correctness, and for compliance with the Drawings and Specifications, that field dimensions and conditions have been verified, and that exceptions, if any are clearly noted.
Allow a 3” x 4” space on the form for the City’s Submittal Stamp.
Transmit all submittals to:
(digital copies)
Greg Arifian, Associate Engineer, garifian@cityofnapa.org
(hard copies when requested/required and material samples) City of Napa Utilities Department – Water Division Water Administration Office 1700 Second Street, Suite 100 Napa, CA 94559 Attn.: Greg Arifian, Water Division Associate Engineer
WTR2026-0002 Page 11
10-1.16 PAYMENTS TO THE CONTRACTOR
See Article 8 of the General Conditions for provisions pertaining to payment. The Bid Items for purposes of the Bid Schedule are described as follows:
Bid Items – General (All Drawing Sets)
Bid Item No. 1: Mobilization
This Bid Item includes all costs associated with preparatory Work and operations performed by the Contractor including, but not limited to, those necessary for the movement of its personnel, equipment, supplies and incidentals to the Project site; temporary fencing, field office and chemical toilets, permits, schedules, utility coordination and submittals, bonds and insurance, and costs for performing any administrative element of Work not included in other Bid Items. This Bid Item also includes removing all equipment, materials, and facilities, upon the completion of Work, that were necessary to do the Work, as well as overall Worksite cleanup and Project closeout procedures.
Bid Item No. 2: Control of Work
This Bid Item includes, but is not limited to, compliance with Laws, all health and safety requirements, injury illness and prevention plans, requirements pertaining to cleanliness of streets and Worksite(s), noise and vibration requirements, quality control, and disposal of materials required for the completion of the Work shown on the Plans and outlined in Article 7.
Bid Item No. 3: Traffic Control
This Bid Item includes traffic control plan submittal, traffic control, and temporary restriping, including, but not limited to furnishing, installing, maintaining, and removing all traffic control devices, including signs, barricades, lights, cones; providing flaggers, and all other Work necessary to provide vehicular and pedestrian traffic control in and around the construction sites as shown on the Plans and required by regulatory agencies including replacing any striping damaged during construction.
Bid Item No. 4: Potholing Existing Utilities
This Bid Item includes verification of utility depths, locations, material types and field dimensions prior to ordering materials and providing the necessary equipment, materials and labor needed to pothole, excavate, and restore areas needed to verify underground obstructions and utilities for the completion of the Work required by the Contract Documents.
Bid Item No. 5: Construction Staking
This Bid Item includes, but is not limited to, field surveys; measurements; and inspections as needed to ascertain materials and equipment ordered can be properly and legally installed within verified field conditions; notifying Engineer of any discrepancies found between conditions shown on Plans and field conditions and any appurtenant Work as required by Contract Documents.
Bid Item No. 6: Shoring
This Bid Item includes furnishing and installing all necessary excavation safety measures including, but not limited to constructing, removing and disposing of temporary sheeting, shoring and bracing
WTR2026-0002 Page 12 or equivalent method for protecting life and limb of workers in trenching or open excavations in conformance with applicable Laws, including safety orders, complete in place. This bid item also includes all shoring design and related Work.
Bid Item No. 7: Erosion & Sediment Control Plan
This Bid Item includes, but is not limited to, all labor, materials and equipment for compliance with Erosion and Sediment Control Plan: establishment of erosion control plan and reporting procedures; placement of erosion control measures; and monitoring, reporting and any appurtenant Work as required by the Contract Documents.
Bid Items - Drawing Set: W2026-018, Pueblo Ave Water Main Replacement: Main St to Soscol Ave
Bid Item No. 8: 12" C900 DR14 Pipe
This Bid Item includes furnishing and installing new 12” bell and Polyvinyl Chloride (PVC) C900 DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, CLSM cap, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 9: 8" C900 DR14 Pipe
This Bid Item includes furnishing and installing new 8” bell and Polyvinyl Chloride (PVC) C900 DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, Bid Item No. 10: 6" C900 DR14 Pipe
This Bid Item includes furnishing and installing new 6” bell and Polyvinyl Chloride (PVC) C900 DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, Bid Item No. 11: 2” Services – New
This Bid Item includes furnishing and installing new water services of size and type shown, including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
This bid item includes installing a new meter box to the sidewalk as indicated on the plans, relocating the existing meter, and connecting the new meter to the existing private-side pipeline.
WTR2026-0002 Page 13
Bid Item No. 12: 1” Services – New
This Bid Item includes furnishing and installing new water services of size and type shown, including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 13: 6” Fire Hydrant Assembly
This Bid Item includes furnishing and installing new fire hydrant per City Detail S-4A and W-8, including protecting existing utilities and surface improvements, control of surface waters, trench excavation, bedding, pipe, tee, gate valve, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, compaction, temp paving, HMA plug, testing, disinfection, concrete slab, surface restoration (sidewalk, curb, and gutter where removed), and cleanup. The installation of Fire Hydrant Pavement Markers, per City Detail W-21.
This Bid Item also includes removal and disposal of the existing hydrant and abandoning the existing hydrant lateral per City Standard Detail W-17.
Bid Item No. 14 (14.1 through 14.10): Tie-In
This Bid Item includes connections to existing pipe and PVC piping per Plans. This Bid Item also includes, but is not limited to, maintenance of water service to existing customers during tie-in; saw-cutting existing pavement, excavation; removal or abandonment of pipe, valves, or fittings in conflict with proposed tie-in; securing and making safe existing thrust blocks or influenced bearing soil disturbed; cutting or preparation of existing pipe; preparation of old surface to mate with new Work;
furnishing and installing pipe, valves, fittings, couplings, bolt sets, anodes (cathodic protection), bedding, backfill, testing, disinfection, compaction, aggregate base, temp paving, pavement seals, re-striping and any appurtenant Work as required by Contract Documents.
Bid Item No. 15: Abandon Valve Box
This Bid Item includes abandonment of G-5 valve box per City Detail W-17 when water facilities are removed (including but not limited to water meters and fire hydrants), contractor shall backfill hole with concrete (per City Detail S-4) if hole is located within sidewalk section, asphalt (per City Detail W-13A) if hole is located within street section, or soil compacted to 90% if hole is located within a landscape strip, including protecting existing utilities and surface improvements, control of surface waters, excavation, bedding, backfill, compaction, surface restoration, and cleanup.
Bid Item No. 16: 3" AC Trench Paving
This Bid Item shall be for the primary water main alignment (t-cut width) includes pavement preparation, variations of aggregate gradations, tack coat, placing and compacting HMA, trucking, dump fees, and sweeping, complete in place. This item will be paid based on square footage. The square footage shall be subject to measurement by the City upon completion.
WTR2026-0002 Page 14
Bid Item No. 17: 2" Overlay Asphalt Paving
This Bid Item shall include pavement preparation, variations of aggregate gradations, tack coat, placing and compacting HMA, trucking, dump fees, and sweeping, complete in place. This item includes the overly over the trench paving. This item will be paid based on square footage. The
Bid Item No. 18: Set and Adjust Utility Iron
This Bid Item includes furnishing and installing G-5 valve box, adjusting frames, covers, and boxes to grade including sanitary sewer, storm drains manholes, water valve boxes and monument boxes, including protecting existing utilities and surface improvements, concrete encasement per City Detail S-14A, control of surface waters, excavation, bedding, backfill, compaction, surface restoration, and cleanup. Note that this bid item includes the G-5 associated with the hydrant valve in the hydrant bid item, as well as the in-line gate valves included in other bid items.
Bid Items - Drawing Set: W2026-019, Pueblo Ave Water Main Replacement: California Blvd to Railroad
Bid Item No. 19: 12" C900 DR14 Pipe
This Bid Item includes furnishing and installing new 12” bell and Polyvinyl Chloride (PVC) C900 DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, Bid Item No. 20: 8" C900 DR14 Pipe
DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, Bid Item No. 21: 6” Service Reconnect
This Bid Item includes reconnecting water services of size and type shown, including protecting existing utilities and surface improvements, control of surface waters, excavation; and furnishing and installing service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
*When reconnecting a fire service, additional effort and/or fire watch and coordination shall take place.
Bid Item No. 22: 4” Service Reconnect existing utilities and surface improvements, control of surface waters, excavation; and furnishing and installing service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
WTR2026-0002 Page 15
*When reconnecting a fire service, additional effort and/or fire watch and coordination shall take place.
Bid Item No. 23: 1.5” Service Reconnect existing utilities and surface improvements, control of surface waters, excavation; and furnishing and installing service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 24: 2” Services – New including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 25: 1” Services – New including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 26: 6” Fire Hydrant Assembly including protecting existing utilities and surface improvements, control of surface waters, trench excavation, bedding, pipe, tee, gate valve, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, compaction, temp paving, HMA plug, testing, disinfection, concrete slab, surface restoration (sidewalk, curb, and gutter where removed), and cleanup. The installation of Fire Hydrant Pavement Markers, per City Detail W-21.
Bid Item No. 27 (27.1 through 27.4): Tie-In includes, but is not limited to, maintenance of water service to existing customers during tie-in; saw-cutting existing pavement, excavation; removal or abandonment of pipe, valves, or fittings in conflict with proposed tie-in; securing and making safe existing thrust blocks or influenced bearing soil disturbed; cutting or preparation of existing pipe; preparation of old surface to mate with new Work;
furnishing and installing pipe, valves, fittings, couplings, bolt sets, anodes (cathodic protection), WTR2026-0002 Page 16
Bid Item No. 28: Abandon Valve Box
This Bid Item includes abandonment of G-5 valve box per City Detail W-17 when water facilities are removed (including but not limited to water meters and fire hydrants), contractor shall backfill hole with concrete (per City Detail S-4) if hole is located within sidewalk section, asphalt (per City Detail W-13A) if hole is located within street section, or soil compacted to 90% if hole is located within a landscape strip, including protecting existing utilities and surface improvements, control of surface waters, excavation, bedding, backfill, compaction, surface restoration, and cleanup.
Bid Item No. 29: 3" AC Trench Paving preparation, variations of aggregate gradations, tack coat, placing and compacting HMA, trucking, Bid Item No. 30: 2" Overlay Asphalt Paving
This Bid Item shall include pavement preparation, variations of aggregate gradations, tack coat, placing and compacting HMA, trucking, dump fees, and sweeping, complete in place. This item
Bid Item No. 31: Set and Adjust Utility Iron to grade including sanitary sewer, storm drains manholes, water valve boxes and monument boxes, including protecting existing utilities and surface improvements, concrete encasement per City Detail S-14A, control of surface waters, excavation, bedding, backfill, compaction, surface
Bid Items - Drawing Set: W2026-020, Old Sonoma Road (3050-3100) Water Main Replacement
Bid Item No. 32: 6" C900 DR14 Pipe
This Bid Item includes furnishing and installing new 6” bell and Polyvinyl Chloride (PVC) C900 DR14 pipe including protecting existing utilities and surface improvements, control of surface waters, trench excavation, sand bedding, pipe, in-line valves, fittings, spools, joints, couplings, bolts, nuts, flanges, gaskets, saddles, outlets, thrust restraint, flange insulating kits, AB backfill, Bid Item No. 33: 12" Butterfly Valve
This Bid Item includes furnishing and installing 12” in-line butterfly valve, flange by flange (FL x FL), excluding all Tie-in related valves configured “in-line” with primary alignments. Bid item includes furnishing and installing fittings, bolt sets, couplings, or adapters necessary to connect to primary alignments or other fittings immediately adjacent to the valve indicated on plans. INSTALL on Existing PVC main in CLOSED position (new pressure zone break).
WTR2026-0002 Page 17
Bid Item No. 34: 6" Gate Valve
This Bid Item includes furnishing and installing 6” gate valves, flange by flange (FL x FL), excluding all Tie-in related valves configured “in-line” with primary alignments. Bid item includes furnishing and installing fittings, bolt sets, couplings, or adapters necessary to connect to primary alignments or other fittings immediately adjacent to the valve indicated on plans.
Bid Item No. 35: 2" Combination Air Valve
This Bid Item includes furnishing and installing new 2” combination (air release/vacuum) valve of size and type shown in Napa Standard Plan W-11B, including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, plumbing fittings, box, housing, cathodic protection, AB backfill, compaction, temp paving, HMA plug, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 36: 2" Blow Off Assembly
This Bid Item includes furnishing and installing new 2" blow-off assembly of size and type shown in the plans, including protecting existing utilities and surface improvements, control of surface waters, excavation, service saddle, corporation stop, service piping, curb stop, plumbing fittings, box, housing, cathodic protection, AB backfill, compaction, temp paving, HMA plug, testing, disinfection, surface restoration, and cleanup, as applicable.
Bid Item No. 37: 1” Services – Reconnect existing utilities and surface improvements, control of surface waters, excavation; and furnishing and installing service saddle, corporation stop, service piping, curb stop, sidewalk repair, AB backfill, compaction, temp paving, testing, disinfection, surface restoration, and cleanup.
Bid Item No. 38: Relocate Meter
This Bid Item includes relocating water meter of size and type shown, including protecting existing utilities and surface improvements, control of surface waters, excavation; and furnishing and installing meter box, copper K, AB backfill, compaction, testing, disinfection, surface restoration, and cleanup.
This is the start of the file's text. The full file is on GovTribe.