RFP 73-26 SURFACE MOUNT RAIL TRUCK LIFTS
Solicitation number
BD-26-1206-40000-40000-129717
Issued by
Suffolk County, Massachusetts

About this file

This document is a technical requirements specification issued by the Massachusetts Bay Transportation Authority (MBTA) for the installation of two surface mount rail truck lifts at the Cabot Rail Carhouse facility located at 275 Dorchester Avenue, Boston, Massachusetts, under RFP 73-26. The project requires the furnishing and installation of two heavy-duty scissors style surface mount rail lifts specifically fabricated to withstand harsh environments at MBTA facilities. The scope of work is turn-key in nature and includes removal of existing lifts where applicable, structural preparation, complete installation of all lift systems including wiring, piping, and hydraulic equipment, demolition, disposal, and cleanup. All labor, materials, equipment, travel time, freight, and warranties are included in the contractor's pricing. The lifts must be rated for 30,000 pounds with at least five feet of vertical travel, 18 feet of rail per platform to accommodate MBTA Red line trucks, automatic foot guard protection, runway lighting, and remote pendant operation. The lifts must be Automotive Lift Institute (ALI) certified and similar in operation to the existing PKS PKSC-3-18-RL lift. The contractor must schedule work at least two weeks in advance and coordinate with MBTA garage supervision to minimize operational interruptions, with general work hours between 6:00 AM and 2:30 PM.

The contractor must be an ISO 9001-certified manufacturer authorized to service the lift system for a minimum of five years and provide valid documentation with the bid response. The lift system is warranted for a minimum of two years on labor and parts, with a five-year warranty on the hydraulic cylinder, and the manufacturer must warrant spare parts availability for 25 years from delivery. All equipment must be new and unused, with ALI certification and testing reports submitted at bid time. The contractor is responsible for all necessary permits and licenses, must have insurance meeting MBTA requirements, and cannot subcontract labor or equipment without MBTA approval. All contractor personnel must complete a free eight-hour Right of Way Safety Class before entering MBTA property and carry visible photo identification. Upon completion, the contractor shall provide three sets of operating and maintenance manuals in both hard copy and electronic format, conduct training for technicians and maintenance personnel on lift operation and maintenance, and coordinate final inspection and testing with MBTA mechanical and electrical personnel. The contractor must respond to emergency maintenance calls within two hours and normal work order requests within 24 hours for warranty issues.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASSACHUSETTS BAY

TRANSPORTATION AUTHORITY

Technical requirements for the installation of Two surface mount rail truck lifts (RFP 73-26) at

Cabot Rail Carhouse.

PREPARED BY:

Engineering and Maintenance Transit Facilities Maintenance

June 29, 2026

TABLE OF CONTENTS

1. Scope of services

2. Contractor Requirements

3. Execution

1. Scope of services

1.1. General

1.1.1. These specifications outline the MBTA's requirement for the furnishing and installation of two heavy duty scissors style surface mount rail lift.

1.1.2. Lifts must be specifically fabricated to withstand the harsh environments found at MBTA facilities.

1.1.3. Services to be provided under this contract shall consist of removing existing lift (where applicable), preparing any structure or substructure for installation and installations of all lift systems, wiring, piping, hydraulic system, and all mechanical, electrical equipment for operations.

1.1.4. The work includes all labor, equipment and materials to complete the installations, including travel time, freight, service charges, parts, material and warranties to complete the installations. Also included in this work is the demolition, proper transport/disposal, and clean up where applicable.

1.1.5. The work under these specifications shall be “TURN-KEY" such as the contractor will be required to complete the required work without any assistance from the MBTA.

1.1.6. Pricing for items not on bid list must be approved prior to commencement of work.

1.2. Location

1.2.1. Cabot RTL Facility, 275 Dorchester Ave, Boston, MA

1.3. Safety & Security

1.3.1. The contractor shall provide, place, and maintain suitable safety guards and barriers for the prevention of accidents during the course of the work under these specifications.

1.3.2. The contractor shall be responsible for the safety of MBTA employees and their employees during the work.

1.3.3. Contractor shall comply with all MBTA policies concerning security and protection of MBTA property from unauthorized person(s).

1.3.4. Photo identification must be carried and visible at all times.

1.3.5. Personnel may only enter MBTA property with prior permission.

1.3.6. Personnel may not carry weapons on MBTA property

1.3.7. All contractor personnel must attend a free 8-hour Right of Way Safety Class conducted by the MBTA before performing any work on MBTA property. Proof of this training must be provided to the MBTA for all personnel before they enter the property. The class is offered for free, but the time spent in class will not be reimbursed.

1.3.8. Contractor shall be responsible for securing and storing all materials, equipment, and tools off site unless prior arrangements are made with MBTA supervision for onsite storage in writing. Contractor shall be solely responsible for the security, and condition of all materials, equipment, and tools left on MBTA property.

1.4. Warrantee and Guarantee

1.4.1. Lift system shall be warranted for a minimum period of two (2) years labor and two (2) years parts, and the hydraulic cylinder shall be warranted for minimum five (5) years.

1.4.2. Manufacturer must warrantee in writing spare parts availability for twenty-five (25) years from date of delivery of the lift system.

1.4.3. Contractor shall supply all necessary labor and materials to perform warranty work without any additional cost to the MBTA on a 24-hour basis until all work is completed and the lift system is back in operation.

1.4.4. All parts and equipment supplied for warranty work shall be manufacturer’s original equipment or product of equal approved by MBTA.

1.4.5. Equipment shall be manufacturer new and unused including floor models. Used or demonstrator equipment shall not be acceptable.

This page intentionally blank

1.4.6. The supplier and installer of the required lifts shall be manufacturer authorized for a minimum of 5 years and shall submit valid documentation of the same, including customer references with a Bid Response.

1.4.7. Equipment shall comply with all applicable US Federal, State and local safety regulations. Entire lift system shall have been approved and certified by the ALI (Automotive Lift Institute) certification program. Proof of certification as well as testing report showing testing at the certified capacity of the lift must be submitted with bid at the time of bid.

1.5. Lift Specification

1.5.1. Lift shall be a double-scissors, four-cylinder style surface mount lift with 18 feet of rail mounted to each platform to allow for the lifting of MBTA Red line trucks. Lift should allow for two sets of trucks to be lifted together.

1.5.2. Lift must be rated for 30,000 pounds, have at least 5 feet of vertical travel, include automatic foot guard protection, runway lighting, remote pendant.

1.5.3. Lift safety mechanisms to include mechanical safety locks.

1.5.4. Lift should be a similar match for existing lift as far as operation and function, to allow maintenance personnel to use either lift at any time. Current existing lift is PKS PKSC-3-18-RL.

1.5.5. Lift must be Automotive Lift Institute (ALI) certified.

Remainder of this page intentionally blank.

2. Contractor Requirements

2.1. General

2.1.1. The company manufacturing the lift shall be certified to ISO 9001 and the ISO 9001 certificate shall accompany the bid.

2.1.2. Work hours shall generally be performed between the hours of 6:00 AM and 2:30 PM or other hours that may be agreed to in each work order.

2.1.3. The contractor shall respond to the site within 2 hours upon receipt of an emergency maintenance call and within 24 hours for normal work order requests as it pertains to warranty issues on these lifts.

2.1.4. All work shall be performed without impacting ongoing MBTA business activities.

2.1.5. Contractor must be an authorized inspector of the lift system they propose to install. Proof of authorization shall be supplied with the bid.

2.1.6. Contractor shall identify and provide training records for all employees working under this contract to the MBTA prior to the commencement of the contract. Only those employees identified by the contractor and the training records provided as having meet the state and federal training requirements will be allowed to work under this contract.

2.1.7. It shall be the contractor's responsibility to obtain all necessary permits, licenses, etc., as required under laws and regulations from Federal, State or local agencies for all work performed.

2.1.8. No bidder may subcontract labor or equipment without the approval of the MBTA.

2.1.9. Contractor shall have insurance equal or greater to the requirements set forth in the general purchasing/procurement terms and conditions. Proof of this insurance shall be provided with the initial bid package.

2.2. Site visit

2.2.1. Contractor shall be responsible for visiting the work site prior to commencing work to familiarize themselves with site conditions. No extras shall be allowed for Contractor's unfamiliarity with the site conditions.

2.2.2. It is the duty of the contractor to examine underfloor conditions using drawings, scanning equipment, or other means, to ensure no underground utilities or equipment will be harmed. Any damaged caused due to lack of due diligence in this realm will be the sole responsibility of the contractor.

2.3. Submittals

2.3.1. The contractor shall furnish catalog cuts, and other pertinent information, sufficiently complete to fully describe the work to be done and lifts to be installed.

2.3.2. In the event the MBTA rejects a submittal, the contractor shall make the necessary changes and resubmit a revised submittal for approval. If the contractor fails to submit materials or equipment that meet these specifications or the MBTA objects, then the MBTA shall have the right to dictate materials or equipment which it feels is suitable at no additional cost to the MBTA. The contractor shall not install material or equipment that has not been approved by the MBTA. If the contractor does install equipment or material which is not approved or is rejected by the MBTA, then it shall be removed and replaced with approved material or equipment at the contractor's expense.

2.3.3. The contractor must supply 3 sets of operating and maintenance manuals including a replacement parts list. Manual must also be submitted in electronic format.

3. Execution

3.1. General

3.1.1. Contractor shall supply all necessary labor (including travel), materials, tools, equipment, shipping, responsible hazardous waste removal, cleanup and any other ancillaries required to complete the work outlined in these specifications. Payment of contingencies must be pre-approved by MBTA.

3.1.2. Contractor shall coordinate work with the MBTA's Garage supervisor to minimize interruptions to the garage's normal activities and operations.

3.1.3. Contractor shall be responsible for securing the worksite whenever they are absent from it. Secure shall mean that all danger of an accident, such as falling into a hole, is prevented

3.1.4. All work shall be first class and meet all applicable codes.

3.1.5. Contractor is responsible for ensuring all lifts will work with all applicable MBTA buses.

3.1.6. Contractor shall schedule 2 weeks in advance actual work shifts with site supervision at garages.

They shall notify the MBTA's Engineer at least two weeks in advance of scheduled start of work.

3.1.7. Contractor shall not be allowed to commence any work until they have all materials on hand for each type of vertical lift in this contract. Once contractor has commenced work, the work shall continue uninterrupted until complete.

3.2. Demolition (where applicable)

3.2.1. Contractor shall demolish, as far as practical, the old unit and remove it from MBTA property.

3.2.2. Contractor shall remove all hydraulic oil and other hazardous waste from MBTA property in the proper manner.

3.2.3. Contractor shall remove from MBTA property all materials demolished on the same day they were removed. No MBTA dumpster or waste receptacle shall be used to dispose of any materials demolished or used in this work.

3.2.4. Contractor shall properly transport and dispose applicable items in accordance with applicable laws.

3.3. Installation

3.3.1. Do not begin installation until supporting structures have been properly prepared.

3.3.2. Install in strict accordance with manufacturer instructions and in proper relationship with adjacent construction.

3.3.3. Electrical equipment and controls shall meet the requirements of UL 201.

3.3.4. All electrical should be installed in hard piped rigid steel conduit.

3.3.5. All electrical work shall comply with NEMA standards, state and local electrical codes with permits.

The contractor shall obtain and pay for any and all permits required.

3.3.6. The contractor shall assign experienced and duly qualified trade technicians/mechanics to perform the work.

3.3.7. Wiring for both lifts will be completed by the MBTA up to and including the service disconnect. Post-disconnect wiring to be completed by vendor. Applicable electrical work shall only be performed by Massachusetts licensed electricians.

3.3.8. For Rotary Advantage lift being replaced

3.3.8.1. All components, wiring, hydraulics, pneumatics, etc, must be installed through current underground conduit. No items can be surface mounted

3.3.9. For new lift install lift (no replacement)

3 . 3 . 1 0 Components, wiring, hydraulics, pneumatics, etc, may be surface mounted, but must be covered and protected by a bolt down low-profile conduit cover.

3.4. Testing

3.4.1. Upon completion of the work, Contractor shall notify the MBTA Mechanical Engineer, MBTA Machinist Foreman and MBTA Electrical Inspector who then shall perform a final inspection and test of the lifts system. The Lift system shall be demonstrated to be fully operational and in accordance with these specifications and all proprietary software be turned over before final acceptance is made.

3.4.2. An Automotive Lift Institute (ALI) certificate will be placed on each lift that it was inspected and certified as per ALI standards as of that date. Also furnish a written and/or electronic report documenting that the inspection was completed and detailing all findings and recommendations.

3.4.3. Provide the Inspection Checklist following manufacturer's instruction, including Structural, Electrical, Mechanical/ Operational Inspection details

3.5. Training

3.5.1. General lift operation training shall be provided to technicians and maintenance personnel who will be using the equipment during the course of everyday work. Personnel operating the equipment are generally mechanics with the associated skillset.

3.5.2. General lift maintenance from an electrical trade standpoint shall be provided for typical problem troubleshooting and typical electrical design of the system. All electrical component safeties shall be identified to the extent practical. All personnel to be trained will be licensed electricians by trade or engineers.

3.5.3. General lift maintenance from a mechanic/machinist trade side shall be provided for typical problem troubleshooting and typical mechanical systems. All mechanical safeties will be identified along with typical wear parts, typical grease points and typical failure points. All personnel to be trained will be mechanics or machinists by trade or engineers.

Remainder of page intentionally blank.