About this file

This is a technical specifications document for a water infrastructure project in Dorchester County, Connecticut, involving the installation of a new water main system. The project requires construction of 2,300 linear feet of new 12-inch ductile iron water main and a pressure reducing/meter vault. A pre-bid conference is scheduled for 10:00 a.m. local time on March 31, 2026, at the Town Hall, Town Council Chambers, located at 240 Kensington Road, Berlin, Connecticut, 06037. While attendance at the pre-bid conference is highly encouraged, it is not mandatory. The technical specifications outline comprehensive construction requirements across multiple disciplines, including general construction requirements, mobilization and project closeout procedures, sedimentation control systems, traffic management and control, excavation work (rock and borrow materials), underground warning tape installation, fill and backfill operations, base and subbase preparation, trench patching (both temporary and permanent), water distribution system installation, fire hydrant assemblies, site restoration including grass surface restoration, erosion and sediment control measures, and pre-cast concrete structures.

The specifications document does not include explicit information regarding pricing terms, set-aside designations for disadvantaged business enterprises, incumbent contractors, or funding sources and amounts. The document focuses exclusively on technical and construction standards that bidders must meet to comply with project requirements. Contractors responding to this solicitation should review all technical specifications in detail, as they establish the minimum standards and procedures required for all work performed under the contract.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02-001 General Requirements for Construction

02-105 Mobilization and Project Closeout
02-122 Sedimentation Control Systems
02-150 Maintenance and Protection of Traffic-Loops
02-156 Trafficperson
02-205 Rock Excavation
02-207 Borrow
02-220 Excavation
02-230 Printed Underground Warning Tape
02-240 Compacted Granular Fill
02-250 Bedding and Backfill
02-260 Base and Subbase
02-501 Temporary Trench Patch
02-502 Permanent Paving and Trench Patch
02-660 Water Distribution System
02-663 Fire Hydrant Assemblies
02-910 Grass Surface Restoration
02-920 Erosion and Sediment Control Measures
03-110 Pre-Cast Concrete Structures

File details come from the government source that posted it. Updated .