Tech Rep Requirments.pdf

PDF 115 KB Posted

Attached to
Clean and Inspect RED FOX Marine Sanitation System, USCGC GREENBRIER
Solicitation number
70Z02925QNEWO0192
Issued by

About this file

This document is a technical requirements specification for a dockside availability for the USCGC GREENBRIER (WLR-75F) in FY2025, focusing on the Marine Sanitation Device (MSD) Model RF-500-FPCBPN-D. The key requirements include:

The contractor must provide a certified Technical Representative from Red Fox Environmental Services who will: 1) provide manufacturer's proprietary information, software, and tools, and 2) assist with proper repair methods while ensuring compliance with manufacturer's procedures during equipment disassembly, inspection, repair, modification, calibration, and reassembly. Additional requirements include installing protective coverings to prevent contamination, plugging inlet and outlet piping with an accountability log, handling potential interferences with piping and pumps, and conducting an initial operational pre-test of the system. The contractor is also responsible for removing and disposing of all tank contents, fluids, and residues in accordance with federal, state, and local regulations.

View the file

Other files

File Type Posted
75F-WLR_70_1_1_-_2.pdf PDF
3.c_SFLC-Std-Spec-0000 (2022).pdf PDF
NEW Fox Pac Manual.pdf PDF
SF1449-21 Sewage GREENBRIER.pdf PDF
SOW Sewage.pdf PDF
15-5189 New Orleans Service wages.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC GREENBRIER (WLR-75F) DOCKSIDE AVAILABILITY FY2025

89 (Rev-0)

3. REQUIREMENTS

3.1 General. The Contractor shall refer to Coast Guard Technical Publication 3174, Manufacturer’s Instruction Book – SWBS Group(s) 261-625, Marine Sanitation Device (MSD) - Model RF-500-FP- CBPN-D for guidance.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor shall provide the services of a certified Tech Rep, who is familiar with the Red Fox Marine Sanitation System Model RF-500-FP-CBPN-D to accomplish the following tasks on site:

Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.

Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.

3.1.2.1 Ensure the Tech Rep is a Certified Representative of Red Fox Environmental Services company.

3.1.2.2 Submit the Tech Rep’s name and résumé to the COR at the Arrival Conference.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.2 Plug all inlet and outlet piping in the tank(s) to prevent contaminants from entering. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings.

Maintain a plug accountability log outside the tank to prevent any of the installed temporary plugs from being lost inside the tank or forgotten inside at tank closure. Submit this log to the Coast Guard Inspector after completion of work item.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Piping.

Pump(s).

3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the system, to demonstrate existing operational condition. Submit a CFR.

3.2 Cleaning and inspection requirements. The Contractor shall do the following for the tank(s) listed in paragraph 1.1 (Intent):

3.2.1 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations

MTKadlec Highlight

MTKadlec Sticky Note Contractor shall be qualified as listed!

Cover page
Work item 18 Sewage

File details come from the government source that posted it. Updated .