Summary of Tech & Health Network Equipment Solicitation
This is a General Solicitation (Addendum #2 Revision) issued by Mt. San Antonio Community College District for network equipment to support a new Technology and Health Building in Walnut, California. The District seeks bids for HPE Aruba network switches, modules, power supplies, transceivers, direct attach copper cables, mounting kits, Foundation Care support, fiber optic patch cables, wireless access points with mounting brackets and licensing, NETGEAR switches and modules for audiovisual systems, and freight services. The equipment will be installed across seven telecommunications rooms to provide network connectivity for instructional programs including internet access, campus computing resources, wireless networks, audiovisual systems, and virtual reality simulations, as well as building automated systems such as access controls, lighting controls, energy management, VoIP devices, digital signage, and cameras. Line items specify quantities ranging from 2 to 245 units depending on the component. The bid release date was October 18, 2025; questions must be submitted by November 7, 2025 at 2:00 p.m.; and bids are due November 14, 2025 at 2:00 p.m. via the District's eProcurement Portal. The contractor will be selected December 17, 2025. The facility is currently under construction with substantial completion anticipated by Fall 2027. No contract term or renewal options are specified in the solicitation.
All pricing must be submitted as NET prices, with unit prices prevailing in case of calculation discrepancies. California state sales tax and federal excise tax are excluded and will be added by the District where applicable. Prices are firm for ninety (90) calendar days from the date of receipt. The solicitation mandates that only NEW HPE Aruba equipment and NETGEAR components will be accepted; no substitutions, off-brands, compatibles, or refurbished equipment are permitted. The District reserves the right to reject any or all bids, adjust quantities based on available funding, and award the bid item-by-item to the lowest responsive bidder that meets all specifications and requirements. The project is part of a larger $78 million Technology and Health Replacement Project for a 270,000-square-foot, four-level building; state funding for preliminary plans, working drawings, and construction has been approved with approximately $78 million in reimbursement available. No specific set-asides or incumbent vendors are mentioned. Delivery is required to the Mt. San Antonio College Shipping and Receiving Department, Building 48, Entrance F, during specified hours, with all delivery costs borne by the bidder. Payment terms are Net 30 calendar days upon receipt and approval of invoice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tech_&_Health_Network_Equipment_(Addendum_#2_Revision).pdf | ||
| Tech_&_Health_Network_Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026-028
TECH & HEALTH NETWORK EQUIPMENT
Mt. San Antonio College
1100 N. Grand Ave.
Walnut, CA 91789
Mt. San Antonio College
GENERAL SOLICITATION
Tech & Health Network Equipment
I. Introduction II. Project Details
III. Vendor Questionnaire IV. Pricing Table
General Solicitation #2026-028 Title: Tech & Health Network Equipment
1. Introduction
1.1. Summary
The Mt. San Antonio Community College District (District) is in the process of constructing a new Technology and Health Building in Walnut, California. This new “tech-of-the-art” facility will include classrooms, collaboration rooms, medical simulation labs, machine shops, meeting rooms, office spaces, and support spaces that will support several programs in the Technology and Health Division.
The Mt. San Antonio College District is seeking Bids for the purchase of network equipment as described in the bid specification to provide networking services that will support instructional programs in the new Technology and Health Building to include access to the Internet, to campus computing resources, to wireless networks, to audiovisual systems and virtual reality simulations. The network equipment will also provide connectivity for building automated systems (access controls, lighting controls, and energy management systems), VoIP (voice of IP) devices, mass notification digital signage, and cameras.
1.2. Background
In July 2019, the Board of Trustees approved the Final Project Proposal to be submitted to the State
Chancellor's Office for the Technology and Health Replacement Project for a four-level, 270,000-square-foot building located at the center of the campus on the site of the former swimming pool and of the surrounding buildings 27A, 27B, 27C. In November 2020, the Board of Trustees approved the initial design contract. The project will construct new education facilities that will centralize, co-locate, and expand the programs currently housed in the existing Technology and Health facility (Building 28A and
28B), Design Technology Center (Building 13), and the Health Careers facility (Building 67A and
67B). State funding for preliminary plans, working drawings, and construction for the Technology and
Health Replacement project has been approved, and the College will be reimbursed approximately $78 million.
The new Building consists of:
• 65 classrooms (8 of which are combinable) – standard classrooms as well as specialty rooms supporting Aero Flight Simulation, CNET Computer rooms, Electronics lecture and labs, Nursing lecture and simulation labs with recording, Health Careers Resource Center (HCRC), Metal Shop, Radiology, and Respiratory.
• 4 meeting rooms - support larger group gatherings
• 9 offices suites and Division office
• 8 huddle rooms
• 29 digital signs – featuring campus managed announcements, guides, and emergency notifications
• A Virtual Reality (VR) Suite
• An amphitheater
The Technology and Health Replacement Project is separated into Increment 1 and Increment 2 to improve the project schedule and reduce construction costs. Increment 1 Bid Nos. 3482-3484 were approved on April 12, 2023 and Increment 2 Bid No. 2023-048 was approved on December 13, 2023.
Networking equipment represents a portion of additional bids that are required to complete the project.
Mt. SAC is one of the largest community colleges in California, serves nearly 20 local communities and has educated more than 1.2-million people since opening in 1946. The campus sits on 420 rolling acres in Walnut, California, located on the eastern edge of the Greater Los Angeles Area. We proudly serve more than 50,000 students from all walks of life. Roughly, half of the students are seeking degrees and certificates, the other half are enjoying community programs, workforce development classes and other non-credit courses.
• Mt. SAC is a Top 10 California Transfer College
• 240+ degree and certificate programs to choose from
• 200+ professional development and community courses
• Bachelor’s degrees Designed for Mt. SAC students
• State-of-the-art facilities, classrooms, and workshops
• Best technology and top-of-the-line equipment to help students learn
• More than 50 student clubs
• 22 athletic programs (with more than 60 state and national titles)
1.3. Timeline
Release Project Date October 18, 2025
Question Submission Deadline November 7, 2025, 2:00pm
Submission Deadline November 14, 2025, 2:00pm
Contractor Selection Date December 17, 2025
2. Project Details
2.1. Important Instructions for Electronic Submittal
NOTICE IS HEREBY GIVEN that the Board of Trustees of the Mt. San Antonio Community College District of Walnut, California is accepting electronic ONLY bids up to, but no later than Friday, November 14, 2025 at 2:00 pm via the District’s eProcurementPortal located on the District’s Website at https://procurement.opengov.com/portal/mtsac. Bid results will be available upon the close of this bid through the eProcurement Portal.
2.2. Scope of Work or Project Details
The successful bidder is responsible for providing Networking Equipment as identified in the Pricing
Table only. This equipment will be installed in seven (7) telecommunication rooms that will provide https://procurement.opengov.com/portal/mtsac network services (access to campus network resources and the Internet) in this new facility. This facility is currently under construction and is scheduled for substantial completion by the Fall of 2027.
2.3. Instructions and General Conditions
Bid Submission
Bids shall only be submitted electronically via Mt. San Antonio Community College District’s eProcurement Portal. No other forms of bid will be accepted. All bid items and statements shall be accurately and thoroughly completed. Partially completed bids or bids not conforming to these instructions and conditions may be deemed non-responsive and may be rejected.
It is the bidder's sole responsibility to ensure that their bid is submitted prior to the bid deadline. Bids that are received by the District after the deadline date for whatever reason, will not be considered for evaluation. Bid tabulations will be available after the bid closing through the eProcurement Portal.
The Mt. San Antonio Community College District is not bound to accept any bid, nor award a Purchase
Order, nor be responsible for any costs associated with a Bidder’s preparation and submission of a bid, regardless of the outcome or the manner of conducting the selection process.
The College reserves the right to reject any or all bids and to waive any irregularities and/or informalities.
Interpretation of Bid Documents - Request for Information (RFI)
If any bidder finds discrepancies in, or omissions from the bid documents or clarifications, he or she may submit a written request for clarification in eProcurement Portal on the Q&A tab, on or before Friday, November 7, 2025 at 2:00 pm and the response thereto will be issued to all bidders through the Q&A tab in OpenGov. The District will not be responsible for oral interpretations. All addenda issued during the time of bidding shall be incorporated into the bid. Bidder should not reach out to any Mt. San
Antonio Community College District employee to request information or answer questions during the bidding process via alternate contact methods.
Document Accompanying Bid Proposal and Signatures
All bid forms are located in the eProcurement Portal. Bids must be signed by an authorized officer of the company providing the response to the bid.
Bid Pricing
All prices are to be NET, if extended prices are called for unit price shall prevail in the event extended prices are incorrectly calculated. The College will not be responsible for errors or submissions in the Bid.
Taxes
Do not include CALIFORNIA STATE SALES OR USE TAX. Said tax will be added and paid by the College where applicable.
Do not include FEDERAL EXCISE TAX. The College is not subject to same. An exemption certificate will be furnished upon request.
Bid Validation Period
Prices quoted must be firm prices covering quantities specified for ninety (90) calendar days from date of receipt. In exceptional circumstances, the Mt. San Antonio College Community College District may request the bidders to extend the validation of the bid beyond the expiration date indicated on said bid.
At any time during the validation period of the bid, no price variation due to escalation, inflation, fluctuation in exchange rates, or any other market factors shall be accepted by the District after it has received the bid.
No bidder may withdraw their bid for a period of ninety (90) calendar days after the date set for the opening thereof. During this time all Bidders shall guarantee prices quoted in their respective Bid
Proposals.
Withdrawal of Bid Proposal
Any electronic bid may be withdrawn via the eProcurement Portal at any time prior to the scheduled closing time for receipt of bids.
Examination of Bid Documents
Each bidder shall fully acquaint himself with the terms of the complete contract as defined herein. The submission of a bid shall be taken as prima facie evidence of compliance with this section.
Technology Clause
The listing of equipment identifies equipment and components that have been designated as District standards through the District’s Information Technology Department and integrate with the District’s existing campus networking infrastructure. As technology and equipment changes, the District will work closely with the Bidder to adjust the list in order to respond to changes in manufacturer’s models of equipment, components and parts. This shall be addressed by allowing identical products that may be introduced in the future during the term of this bid. For discontinued models, the Bidder will be expected to furnish all equipment with manufacturer suggested replacements, using the same costing formula as per Bidder’s initial response.
Substitutions
Manufacture Brand Names and configuration specifications are set forth herein to match and integrate with existing networking equipment and technology used by the District and is not intended to preclude any vendor from responding. Only NEW HPE Aruba equipment and NETGEAR components and parts will be accepted. NO SUBSTITUTIONS, OFF-BRANDS, COMPATIBLES, or REFURBISHED equipment, components and parts will be accepted.
Modifications
Changes to the bid forms, which are not specifically called for or permitted by the District, may result in the District's rejection of the Bid Proposal as being non-responsive. No oral, telephonic, facsimile, Inconsistent or Illegible Bid Proposals. Errors and Corrections
Bid Proposals must not contain any erasures, interlineations or other corrections unless the same are suitably authenticated by affixing in the margin immediately opposite such erasure, interlineation or correction the surname(s) of the person(s) signing the Bid Proposal. Any Bid Proposal not conforming to the foregoing may be deemed by the District to be illegible, ambiguous or inconsistent, whether by virtue of any erasures, interlineations, corrections or otherwise, the District may reject such a Bid
Proposal as being non-responsive.
Bid Evaluation
Bids will be evaluated based upon completeness and compliance with the specifications and requirements.
The bid that complies with all of the specifications, requirements and offers the overall lowest price shall be selected. Any bid that does not meet the specification and requirements will be rejected. Partial bids will be rejected.
The District reserves the right of rejecting any and all bids, waiving any irregularities or informalities in any bid or in the bidding process and to be sole judge as to the merit, quality, and acceptability of materials proposed and their compliance to the specifications which in their opinion will best serve the interest of the District.
Award of Bid
The District reserves the right to reject any or all bids, to award on an item-by-item basis and to waive any irregularities and/or informalities in any bids or the bidding. The award of the bid, if made by the
District through action of its Board of Trustees, will be to the responsible Bidder submitting the lowest responsive Bid on the basis of the Base Bid. All bids shall remain open and valid and subject to acceptance ninety (90) days after the bid opening date.
Bidders will be notified as to the outcome of the bid process within ten (10) business days after the bid deadline date via the eProcurement Portal.
Discrepancy between the unit price and the total price (obtained by multiplying the unit price and quantity) shall be re-computed. The unit price shall prevail and the total price shall be corrected. If the vendor does not accept the final price based on the re-computation and correction, its bid will be rejected. The College is not responsible for errors or omissions in the bid.
The District anticipates funding will be available to purchase the products. Depending on the outcome of the bid result, the District reserves the right to reduce or increase quantities to fit available funding.
Any Purchase Order(s) issued as a result of this bid shall be subject to Mt. San Antonio Community
College’s Purchasing Department Terms and Conditions.
Invoice and Payment Terms
Invoices shall be submitted to the Mt. San Antonio Community College District Accounts Payable
Department via email to accountspayable@mtsac.edu with the following information: Purchase Order number, itemized description, quantity, and unit price with extended totals. The District will pay Net 30 calendar days upon receipt and approval of invoice or other terms agreed on accepted bid. State and local taxes in effect at time of billing will be added.
Delivery Terms
The bidder shall deliver all items on which bids are accepted to the location specified in the bid documents. All costs for delivery, drayage, freight, or packing are to be borne by the bidder unless otherwise specified.
Time of Delivery
Delivery dates must be stated in definite terms. If time varies on different items, bidder shall so state on his bid.
Place of Delivery
Deliveries are to be made to the Mt. San Antonio Community College Shipping and Receiving
Department located in Building 48, Entrance F at Temple Avenue and Bonita Drive, Walnut, California unless otherwise specified. Delivery hours are 8 a.m. to Noon and 1:00 p.m. to 4:00 p.m., Monday through Friday. Deliveries other than during these hours may be rejected. During summer months, the
Shipping and Receiving Department will be open Monday through Thursday ONLY. The College will work with the Vendor awarded this purchase on planning for an efficient and effective delivery schedule.
Remedies
Should a bidder be awarded a contract to supply materials or perform services and breaks the same, the
District may in its sole discretion purchase said materials or acquire said services on the open market without competitive bid and charge contractor with the difference between the bid price and purchase price for the material or services. This remedy is not exclusive and shall not operate to prejudice any other remedies, which the District may have in law or equity.
Termination
Either party through a thirty (30) day written notice under any of the following conditions may terminate this bid/contract:
1. Either party ceases to carry on business as a going concern, either party becomes the object of the instruction of voluntary or involuntary proceedings in bankruptcy or liquidation, or a receiver is appointed with respect to a substantial part of its assets.
2. It is determined by the District to be in the best interest of the District to terminate. Upon termination, the parties shall mutually agree as to the disposition of any outstanding purchase offers and product deliveries and prorated charges by the District for warranty and services not performed thereunder. All outstanding invoices shall become due within Net 30 payment terms for all products delivered and received by the Mt. San Antonio Community College District.
Anti-Discrimination
It is the policy of the Board of Trustees that in connection with all services performed for the Mt. San
Antonio Community College District there be no discrimination against any prospective or active employee engaged in the work because of race, color ancestry, national origin, religious creed, sex, age or marital status, and therefore, the bidder agrees to comply with applicable Federal and California law including, but not limited to, the California Fair Employment and Housing Act (Gov. Code Sec. 12900-
12993).
Evidence of Responsibility
Upon the request of the District, a bidder whose bid is under consideration for the award of the contract shall submit promptly satisfactory evidence of his financial resources, his experience, and the organization and equipment available for the performance of the contract.
Conformity to Law
The successful bidder shall conform to all federal and state laws, including all requirements of CAL/OSHA and the Federal Consumers Products Safety Act, and to all local ordinances and regulations covering equipment and/or services on this bid.
General
This agreement constitutes the complete and exclusive statement of agreement superseding all oral or written communications and any prior agreements between the parties relating to its subject matter.
The terms of the agreement will prevail not-withstanding any variance with the terms of any present or future order from the customer for machine maintenance services. The term “this Agreement” as used herein includes any future written amendments and modifications or supplements made in accordance herewith.
While engaged in carrying out the terms and conditions of the agreement, the contractor is not an officer, employee or agent of the College.
Prices quoted must be firm prices covering quantities set forth hereafter. All prices quoted herein shall be firm prices for the length of the contract.
The College reserves the right to reject any or all bids.
Warranty
The equipment shall be covered by manufacturer’s standard new equipment warranty. Your bid shall identify the equipment warranty period. Appropriate operating instruction and service manuals shall be provided at time of delivery.
Force Majeure
Neither party to this Agreement will be liable to the other for any failure or delay in performance under this Agreement due to circumstances beyond its reasonable control including without limitation, Acts of
God, accident, labor disruption, acts, omissions and defaults of third parties, and official, governmental and judicial action not the fault of the party failing or delaying in performance.
3. Vendor Questionnaire
3.1. Did you utilize a cooperative/piggybackable agreement for your pricing? * If yes, please identify the agreement name, contract number, and term dates. If no, please write N/A
*Response required
3.2. If you answered Yes to Question #1, please upload the contract here* Upload your the cooperative/piggybackable agreement you're utilizing for the pricing. If N/A, write N/A
*Response required
3.3. Vendor Packet*
Please download the below documents, complete, and upload.
• MT_SAC_VENDOR_PACKET_(5).pdf
*Response required
3.4. Acknowledgement*
I certify that I have downloaded, read, understood and agreed to all of the solicitation and contract documents herein
☐ Please confirm
*Response required
4. Pricing Table
HPE ARUBA NETWORK SWITCHES AND COMPONENTS
Line Item Product # Description Warranty
Period Quantity Unit of
Measure Unit Cost Total
HPE Aruba Switch Bundles
1 JL001A HPE Aruba 5412R 92GT PoE+ and 4-port
SFP+ (No PSU) v3 zl2 Switch - Includes: (1)
HPE 5400R zl2 Management Module
(J9827A) (1) HPE 5412R zl2 Switch Fan Tray
(J9832A) (3) HPE 24-port
10/100/1000BASE-T PoE+ MACsec v3 zl2
Module (J9986A) (1) HPE 20-port
10/100/1000BASE-T PoE+/4-port 1G/10
GbE SFP+ MACsec v3 zl2 Module (J9990A)
40 Each
2 S0E91A HPE Aruba Networking CX 6300M 48p
SR10 1G/2.5G/5G/10G PTP/AVB Class8 PoE and 4p 100G MACsec Switch
4 Each
3 JL626A HPE Aruba CX 8325-32C Supports 32 ports of 40G/100GbE QSFP+/QSFP28 Front-to-
Back 6 Fans and 2 PSU Bundle
4 Each
HPE Aruba Switch Modules
4 J9827A HPE Aruba 5400R zl2 Management Module 40 Each https://government-project.s3.us-west-2.amazonaws.com/32452/3f206827-dbc6-4b52-aa07-79cce96d539c_MT_SAC_VENDOR_PACKET_%285%29.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4N33JL4A3%2F20251103%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20251103T194317Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJv%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIQDDQRIZH6GCepIoysjRP1Tl0H2KpvVNUwWM%2FmoDBHcIWAIfIFAwM7MP6KF1hJBLAG5VAiZYyTdH4Yj0elLyYtk%2BaiqMBQhkEAIaDDg5MjM2NDY4NzY3MiIM8%2Fj2WI%2F5k3pP24UMKukEpOupP4bavfFsu7OL5gsu2T9i9Y4GjxhuBwjQiJRoNB3rmaJJcWcBSh1qz8180PYFzCmSJbDFQj80o35E8S397IjdhV7Re%2FI53OS9Dh6Hhwe2GEndj6GXAXEmt7wlkzG%2B3F81p6ZaZN24O3nHCZCQ1JbZJyA79hUpbS31C%2B3pux82ZX3q7K2QPT29R4BpHHN5dTSjJAyp2lsUU4fFTldoujFspEP4GZqAcForMfPl3u1SFQd8g5MQCnFA%2BImPWIPLsXCl8v6cuETuK9j2X%2BcdsXPz4ujOVUhufb7KcGbYCWUdK7T7Ox7v3isIUznuEEA3uu2dd68CdDRaE4mBkriqNpxjE%2Bi618wiDeVqfRpx%2BIV1CMm5auX3CSM6E5u4ujp2JDNKMaLGxyJXLiiBCDGzd8BXsnMtMUWqgkQeUCRjCwGk%2F8rVvACRuYY4nrSVN7SpbmrgzjtYmu81NmfiV0kkaQZs9BS8cjN4ADSaQGNx%2F%2F0S83m1MWsHEiFzf8ftRFno%2BEe46qqLayH%2BltfJayg16w9dfVLV7ZIp6hKokp7wymBkfGNb%2F6LDjMgIdjmuT3UmWsbeOAK1uT9fr2Yr%2FGtG0kJGQFN6hgt%2FHeWVFo0KYj7EV%2BHY%2FRwltgKoc3UckctcgiNLDI%2Fr2O1gpJEsWXh%2FuB9PVulhXJ22S9sgqmQDdp42dUPFI0%2Fy1Z%2FK2jmJyAkLU3Vol2HU6YuoNXj6gmfpr7bnJbnAjtLl86VqX1ALcKK9otRpMU7K4e5mZ2oJvFyvAv01konUUe996AFNBDAbWDGPtX7%2FXnaQklCkxrVx23bbYlTQHRRWYQkw%2BPWjyAY6mgFCDs1puWUFNQnqG%2FbGITCmBBuMsz%2BOYrRx0PixNsndKxRtI7LDRMEBl1ZMxp5xQ8pkK3sCrkN4%2F%2F4bjtY95%2BM6%2BO9qszYQLDVSrnNeRYTl36cn15MJG4WDcXllXzyP%2FNbseFHiwK6sbiiL2Wbni1HcHh0NY0ozLRStApwTtaeMZEclJqFjXJON5lQwdFeEPqUDx7ksUii5UBRW&X-Amz-Signature=db3d2690dd96706dcf27b7f8c36fc4e2dae135d5dca10304f9ba7b8355a5b6ab&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22MT_SAC_VENDOR_PACKET_%285%29.pdf%22&x-id=GetObject
Line Item Product # Description Warranty
Period Quantity Unit of
Measure Unit Cost Total
5 J9986A HPE Aruba 24-port 10/100/1000BASE-T
PoE+ MACsec v3 zl2 Module 172 Each
6 J9992A HPE Aruba 20-port 10/100/1000BASE-T
PoE+/1-port 40GbE QSFP+ MACsec v3 zl2
Module
40 Each
7 J9996A HPE Aruba 2-port 40GbE QSFP+ v3 zl2
Module 41 Each
8 J9995A HPE Aruba 8-port 1/2.5/5/10GBASE-T PoE+
MACsec v3 zl2 Module 71 Each
9 J9993A HPE Aruba 8-port 1G/10GbE SFP+ MACsec v3 zl2 Module 12 Each
HPE Aruba Internal Power Supplies
10 J9830B HPE Aruba 5400R 2750W PoE+ zl2 Power
Supply 160 Each
11 JL087A HPE Aruba Networking CX 6300M 1050W
36-72VDC Input PoE Power Supply 8 Each
HPE Aruba Transceivers and DACC
12 JH232A HPE X142 40G QSFP+ LC LR4 SMF
Transceiver 74 Each
13 JL310A HPE Aruba 100G QSFP28 LC LR4 10km SMF
2-strand Transceiver 8 Each
14 R0Z25A HPE Aruba 100G QSFP28 to QSFP28 1m
Direct Attach Copper Cable (DACC) 3 Each
15 JL307A HPE Aruba 100G QSFP28 to QSFP28 3m
Direct Attach Copper Cable (DACC) 3 Each
16 JH234A HPE X242 40G QSFP+ to QSFP+ 1m Direct
Attach Copper Cable (DACC) 5 Each
17 JH235A HPE X242 40G QSFP+ to QSFP+ 3m Direct
Attach Copper Cable (DACC) 41 Each
HPE Aruba Switch Mounting Kits
18 JL482C HPE Aruba 8325-32C 2-post Rack Mounting
Kit 2 Kit
19 JL483C HPE Aruba 8325-32C 4-post Tack Mounting
Kit 4 Kit
Line Item Product # Description Warranty
Period Quantity Unit of
Measure Unit Cost Total
HPE Aruba Foundation Care Support
20 HK6N4E HPE Aruba 5 Year Foundation Care Next
Business Day Exchange Education for 8325-
32 Switch Service
4 Each
Fiber Optic Patch Cables
21 N366-02M Tripp-Lite Duplex Singlemode Fiber Patch
Cable (LC/SC), 2M (6 ft.)
74 Each
TOTAL
HPE ARUBA WIRELESS ACCESS POINTS AND ACCESSORIES
Line Item Product # Description Quantity Unit of
Measure Unit Cost Total
HPE Aruba Wireless Access Points
22 R7J28A HPE Aruba Networking
AP-635 (US) Tri-radio
2x2:2 802.11ax Wi-Fi
6E Internal Antennas
Campus Access Point
245 Each
23 SOP55A HPE Aruba Networking
AP 677 (US) Tri Radio
2x2 Wi Fi 6E Internal
Directional Outdoor
Access Point
16 Each
HPE Aruba Wireless Access Point Mounting Brackets
24 Q9G69A Aruba AP-MNT-MP10-B
Campus AP Mount
Bracket Kit (10-pack)
Type B: Suspended
Ceiling Rail, Flat 15/16"
25 Each
25 Q9G71A Aruba AP-MNT-MP10-
D Campus AP Mount
Bracket Kit (10-pack)
Type D: Solid Surface
25 Each
Measure Unit Cost Total
26 R1C72A Aruba AP-MNT-MP10-E
Campus AP Mount
Bracket Kit (10-pack)
Type E: Wall-box
25 Each
27 JW054A Aruba AP-270-MNT-H1
AP-270 Series Outdoor
AP Hanging Bracket for horizontal/inclined surface/pole mounting
16 Each
HPE Aruba Wireless Access Point Licensing and Support
28 JW471AAE Aruba LIC-ENT
Enterprise (LIC-AP LIC-
PEF LIC-RFP and LIC-
AW) License Bundle
261 Each
29 H2XW4E Aruba EDU Support for
LIC-ENT (3 Year) 261 Each
NETGEAR SWITCHES AND COMPONENTS (AV SYSTEMS)
Measure Unit Cost Total
NETGEAR Switches and Modules (AV Systems)
30 M4350-
48G4XF
NETGEAR 4350 48x1G
PoE+ (236W base up to
1,440W) and 4xSFP+
Managed Switch
36 Each
31 APS2000W NETGEAR 2000W
Modular Power Supply
Unit for M4350-
48G4XF Switch
36 Each
Measure Unit Cost Total
32 M4350-
40F4C
NETGEAR 40 10BASE-X
SFP+ Ports with 4
100GBASE-X QSFP28
Uplinks
2 Each
33 AXM762 NETGEAR SFP+
Transceiver, 10GBase-
LR Single-Mode LC
Duplex Connector
11 Each
FREIGHT
Line Item Description Quantity Unit of
Measure Unit Cost Total
34 Freight 1 EA