Tech_Description_Boilermaker_Work_10-27-2025.docx

DOCX document 70 KB Posted

Attached to
Waste to Energy (WTE) Facility Boilermaker Services
Solicitation number
26-P-00035
Issued by
Hillsborough County, Florida

About this file

Technical Specifications for McKay Bay Waste to Energy Facility Boilermaker Services

This technical specification document outlines boilermaker services required by the City of Tampa for the McKay Bay Waste to Energy (WTE) Facility located at 107 North 34th Street, Tampa, Florida. The scope of work involves providing comprehensive boilermaker services including tube replacement, welding of pressure-retaining parts, pad welds, ductwork, shield/clip work, and refractory anchor and stud welding on four boilers. The contractor must be licensed in Florida with a minimum of five years' experience in boilermaker services for waste-to-energy facilities and must hold all necessary code stamp certifications for boiler repair work. Welders must pass qualification tests in accordance with ASME Section IX standards. The facility operates on a scheduled maintenance outage program consisting of eight outages per calendar year, including seven routine scheduled outages (estimated 1,200 hours each) and one cold iron outage. Routine outages occur Monday through Saturday for five days each, typically spanning February, March, April, August, and September. Additional unplanned work during outages is estimated at 1,920 hours across eight outages, and emergency work is estimated at 1,536 hours for up to eight unplanned outages with 12-hour response times required. Total estimated labor hours across all divisions are 9,600 hours for planned outages, plus additional hours for contingencies.

Bidding is structured into four divisions covering labor costs, mobilization and demobilization, personal protective equipment, per diem/travel/hotel expenses, and rental equipment. Contractors must submit detailed breakdowns of labor classifications including supervisor/foreman, certified welders, and boilermakers with separate rates for straight time, overtime, and double time. The contract requires contractors to furnish all supervision, labor, tools, materials, supplies, and necessary incidentals, with daily time sheet submissions and pre-approval from the City for all material purchases and overtime. The contractor must comply with comprehensive environmental, health, and safety requirements outlined in Attachment D, including OSHA standards, respiratory protection protocols for handling heavy metals exposure (arsenic, lead, cadmium, and hexavalent chromium), zero tolerance safety policies, and proper documentation procedures for incidents and injuries. Contractors are required to maintain valid licenses and certifications, participate in annual EHS orientations and task-specific briefings, and maintain their own drug and alcohol testing programs. A qualified welding supervision program and industrial hygiene assessments are mandatory, with contractors responsible for all worker safety compliance throughout the contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS FOR

MCKAY BAY WASTE TO ENERGY (WTE) FACILITY BOILERMAKER SERVICES

8. PERFORMANCE.

The Contractor will do all work, furnish all labor, materials, tools, construction equipment, transportation, supplies, supervision, permits, organization and other items of work and cost necessary for the proper execution and completion of the work described as in the below scope of work, attachments, and reference specifications.

The Firm must be licensed to do business in the State of Florida. The Firm must have five (5) years’ experience in Boilermaker Services for Waste To Energy Facilities. The Contractor shall hold all necessary code stamp certifications for boiler repair work. To qualify to weld pressure retaining parts a welder must pass a qualification test in accordance with ASME Sec IX Welding under the full supervision and control of the Contractor’s Welding Qualification Supervisor. The Qualification Supervisor shall be employed by a company under the following requirements listed below:

Personnel performing supervisory activities specified in this Section shall:

(a) be designated by the organization with responsibility for certifying qualification documents

(b) have a satisfactory level of competence with the organization’s quality program. As a minimum, they shall be qualified by education, experience, or training in the following areas:

(1) Knowledge of the requirements of this Section for the qualification of procedures and/or joining personnel

(2) Knowledge of the organization’s quality program

(3) The scope, complexity, or special nature of the activities to which oversight is to be provided

(c) have a record, maintained by the organization, containing objective evidence of the qualifications, training, or experience.

Due to the unique and expensive nature of the type of WTE Boiler repair work required, the City requires utilization of exclusively boilermakers with proven, current and substantiated historical successful experience with the similar unique type and style of the WTE boiler tubes responsible for processing varieties of material with vast inconsistencies of burning point. The Contractor shall provide a R-1 report after each scheduled/unscheduled/emergency outage.

8.1 General

The Contractor shall furnish all supervision, administration, labor, tools, materials and all necessary supplies and incidentals to complete the service described herein, unless other arrangements are agreed upon in specific work scope. Time sheets including date and shifts work was performed, names and job titles of those performing work, hours worked and under what pay code they were worked under (ST/OT/DT) will be submitted daily in electronic form unless otherwise agreed upon. The time sheet shall be submitted for the previous day prior to the next shift commencing. All time and material pay requests will be processed from these time sheets. All work will be discussed and agreed upon prior to start of work. For reimbursement purposes, any material or incidental purchasing and or procurement shall be pre-approved by the City prior to purchase. All time other than straight time must be pre-authorized by the City. The City and the Contractor will devise a plan acceptable to both parties on all points discussed here prior to work start, any deviations must be pre-authorized.

8.2 Service Description

Provide Boilermaker Services for the McKay Bay Waste to Energy (WTE) Facility located at 107 North 34th Street, Tampa, FL 33605. In addition, Contractor may be asked to perform miscellaneous repairs agreed upon by the City representative and Contractor. The Contractor must report to the Control Room located on the 5th floor daily prior to performing any service.

8.2.1 Boilermaker Services as outlined by the City of Tampa McKay Bay (WTE) Facility representative. A typical routine tube work outage consists of a work scope provided by a UT company based on the previous outage findings on that specific boiler. Each outage we plan to replace 7- row partial panels in either the back pass super heat sections and/or Economizer sections (Drawing Attached). The quantity of 7-row panels to be installed varies based on UT testing. The UT company does a complete boiler UT and finds discoverable work during the outage to include pad welds, Ducthman work, and shield/clip type work. The refractory company typically needs assistance welding anchors and studs on the tubes in the furnace. Bidders should bid the following project durations and manpower expectations based on past outage history. Emergency call-out response times should be within 12 hours.

8.3 Service Schedule:

Historically, based on annual tonnage of Municipal Solid Waste (MSW) received at the City of Tampa McKay Bay (WTE) Facility, the Facility conducts eight (8) scheduled maintenance-related outages per calendar year, of which one will be a Cold Iron outage. A routine scheduled outage is normally a period of 7 days where the boiler is taken off-line Saturday morning for operational cleaning to get the boiler ready for the contractors starting on Monday morning at 7 am. The outages are scheduled as follows:

Division I:

8.3.1Boiler 1 February (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.2Boiler 2 March (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.3Boiler 3 February (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.4Boiler 4 April (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.5Boiler 1 August (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.6Boiler 2 September (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.7Boiler 3 August (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)
8.3.8Boiler 4 September (Monday 0700 – Saturday 0700):
(Estimated ten (10) consecutive 12-hour Shifts of ten (10) workers = 1200 hrs)

Division II:

8.3.9 Unplanned Work During Outages (Estimated two (2) Additional 12-hour Consecutive Shifts of ten (10) workers x eight (8) outages = 1920 hrs) (This will be a continuation of the outage Saturday morning for tasks 8.3.1 through 8.3.8 for two additional weekend shifts.)

Division III:

8.3.10 Emergency Work/Unplanned Outages (Estimated four (4) 12-hour consecutive Shifts of four (4) workers x eight (8) unplanned outages = 1536 hrs) (Emergency work could be on a weekday and/or a weekend. Emergencies cannot be planned.)

Division IV:

8.3.11 Rental Equipment

In addition, services may be required during unscheduled outages.

City of Tampa McKay Bay (WTE) Facility reserves the right to change the dates of the work scope as needed.

To ensure clear communication Vendor shall be in communication with the Maintenance Planner and Maintenance Supervisor at least one month prior to each scheduled outage date to ensure clear communication as to what work will be performed and start dates/times.

8.4 Contractor Safety Requirements: See Attachment D -- “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Environmental, Health, and Safety Requirements”

8.5 Contractor Notice: See Attachment E – “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Arsenic, Lead, Cadmium, and Hexavalent Chromium Notice

BID RESPONSE FOR

MCKAY BAY WASTE TO ENERGY (WTE) FACILITY BOILERMAKER SERVICES

Please Print or Type

We the undersigned, as Bidders, hereby declare that we have carefully read this proposal or bid and the provisions, terms and conditions concerning the equipment, materials, supplies or services as called for, and with full knowledge and understanding of the requirements and conditions, do hereby agree to furnish and to deliver as indicated, FOB, City Facility Location, with all transportation charges prepaid, and for the prices quoted thereon as follows.

See below Bid Response Division Tables I, II, III, IV:

Bid Response for Division I: Labor Cost for Outages

Each Outage has an estimated time frame as listed below:

a.Boiler 1 February (Monday 0700 – Saturday 0700): 1200 hrs
b.Boiler 2 March (Monday 0700 – Saturday 0700): 1200 hrs
c.Boiler 3 February (Monday 0700 – Saturday 0700): 1200 hrs
d.Boiler 4 April (Monday 0700 – Saturday 0700): 1200 hrs
e.Boiler 1 August (Monday 0700 – Saturday 0700): 1200 hrs
f.Boiler 2 September (Monday 0700 – Saturday 0700): 1200 hrs
g.Boiler 3 August (Monday 0700 – Saturday 0700): 1200 hrs
h.Boiler 4 September (Monday 0700 – Saturday 0700): 1200 hrs

Total # of Hours: 9,600 hours Provide breakdown in below table.

Straight Time Rate
Overtime Rate
Double Time Rate
Labor Classification
Straight Time Rate
Estimate# of Hrs
Total Labor $
Overtime Rate
Estimate# of Hrs
Total Labor $
Double Time Rate
Estimate# of Hrs
Total Labor $

Supervisor/ Foreman

Certified Welder

Boilermaker

Other:

Other:

Other:

Other:

2. Mobilization and Demobilization (for all 8 outages in this Division): $

3. PPE (for all 8 outages in this division): $_____________________

4. Per Diem/Travel/Hotel (for all 8 outages in this division): $

Total Amount for Division I: $__________________________________

Bid Response for Division II: Labor Cost for Unplanned Work during Outages

The Department is estimating two consecutive additional 12-hour shifts for ten (10) workers x eight (8) outages = 1,920 hours:

Total # of Hours: 1,920 hours

Straight Time Rate
Overtime Rate
Double Time Rate
Labor Classification
Straight Time Rate
Estimate# of Hrs
Total Labor $
Overtime Rate
Estimate# of Hrs
Total Labor $
Double Time Rate
Estimate# of Hrs
Total Labor $

Supervisor/ Foreman

Certified Welder

Boilermaker

Other:

Other:

Other:

Other:

2. Mobilization and Demobilization (for all 8 outages in this Division): $__________________

3. PPE (for all 8 outages in this division): $__________________

4. Per Diem/Travel/Hotel (for all 8 outages in this division): $__________________

Total Amount for Division II: $_________________________________

Bid Response for Division III: Labor Cost for Emergency Work/Unplanned Outages

The Department is estimating four (4) 12-hour Consecutive Shifts for four (4) workers x eight (8) unplanned outages = 1536 hrs.

Total # of Hours: 1536 hours (Use OT Rate for this section)

Straight Time Rate
Overtime Rate
Double Time Rate
Labor Classification
Straight Time Rate
Estimate# of Hrs
Total Labor $
Overtime Rate
Estimate# of Hrs
Total Labor $
Double Time Rate
Estimate# of Hrs
Total Labor $

Supervisor/ Foreman

Certified Welder

Boilermaker

Other:

Other:

Other:

Other:

2. Mobilization and Demobilization (for all 8 outages in this Division): $_________________

3. PPE (for all 8 outages in this division): $_________________

4. Per Diem/Travel/Hotel (for all 8 outages in this division): $_________________

Total Amount for Division III: $_________________________________

Bid Response for Division IV: Rental Equipment for Eight Scheduled Outages

RENTALS COST MARKUP PERCENTAGE (Not to exceed 10%): _______% of $75,000: $_____________ Example: $3,500 (10% of $35,000) + $35,000 = $38,500

Grand Total of All Divisions (I, II, III, IV):

ATTACHMENT D

CITY OF TAMPA MCKAY BAY WASTE-TO-ENERGY FACILITY

CONTRACTOR ENVIRONMENTAL, HEALTH, AND SAFETY REQUIREMENTS

The below list of environmental, health, and safety (EH&S) requirements provides a background of general requirements that Contractors shall comply with while performing work at the McKay Bay Waste-to-Energy Facility (WTE Facility). This list is a general summary for informational purposes; at a minimum, City of Tampa (City) Contractors shall comply with all applicable state, federal and local laws, including the City’s EH&S rules, policies, and procedures..

Contractors will be responsible for maintaining their own industrial hygiene and respirator programs, as required by state, federal and local law. Contractors are encouraged to review potential exposure compared to the United States Department of Labor’s Occupational Safety and Health Administration’s (OSHA) Permissible Exposure Limits (PEL) for lead, cadmium, arsenic, silica, hexavalent chromium, and noise. The City will provide any such industrial hygiene information as is readily available to assist the Contractor in making informed decisions for the development of said procedures. At no time will the Contractor’s EH&S rules, policies, or procedures be less stringent than City’s EH&S rules, policies, and procedures. Specific Contractor employees that perform work at the WTE Facility will be required to view safety videos and sign affidavits that they are aware of and will follow the appropriate policies.

1. General Workplace Safety

1.1 Zero Tolerance for Unsafe Acts, Behaviors and Conditions

· Contractors working at the WTE Facility must understand that safety is paramount to the success of all work and that poor safety work practices will not be tolerated. Safety performance is a factor used when selecting Contractors for future work. Contractors must properly supervise their employees, agents and sub-contractors to ensure strict compliance with applicable federal, state and local regulations and Safety Rules at all times. Violators may be removed from the WTE Facility.

1.2 Contractor Safety and Environmental Evaluations

· Contractors must ensure that the WTE Facility’s safety and environmental requirements are clearly communicated to all Contractors’ and sub-contractors’ employees for the duration of the work. Contractors are responsible for designating one person per shift to provide safety and environmental supervision for their own employees, agents and sub-contractors, and that designated person or their designee must remain on-site while the Contractor is working.

· If the City of Tampa (City) observes safety hazards or environmental incidents caused by a Contractor which pose an imminent danger to people or the environment, the City will stop the work and require the Contractor's supervisor to take immediate corrective action to eliminate the hazard(s).

· Contractors shall advise the Control Room of any unanticipated hazardous conditions found during the Contractor's work that was not previously identified. Contractor shall not remove or further disturb such hazardous conditions until the City has provided Contractor with written instructions related thereto.

· Contractor’s employees who demonstrate an attitude of indifference towards safety or the environment may result in City staff removing them from the site or terminating the contract.

· If the City observes safety hazards or environmental incidents caused by a Contractor that do not pose an imminent danger, the hazards will be reported to the Contractor’s supervisor and to the WTE Facility Management.

· Contractors or Contractor’s employees who fail to perform work in compliance with the contract requirements may be permanently removed from the site.

1.3 Arriving at the WTE Facility – Security

· At the beginning of each working shift, the Contractor shall supply to City staff a list of all Contractors’ employees who are on-site during that shift. The list shall be updated whenever the Contractor’s employees leave the WTE Facility or if additional Contractor employees arrive on site.

· The City reserves the right to require each Contractor’s employee to register any daily entry and exit from the WTE Facility property upon manual or electronic systems provided by the City.

· The City reserves the right to require each Contractor’s employee to wear an identification badge provided by the WTE Facility.

· Contractors must have valid licenses and certificates applicable for the work being performed.

· On an annual basis, all representatives or employees of the contractor completing services on site shall participate in:

1) An (on-site or on-line) general EHS orientation and RCRA Awareness Training session.

2) An on-site task-specific EHS pre-job briefing (On-Site Declaration) conducted by City H&S staff. Hardhat stickers will be given to all attendees to verify participation. Verification of attendance will be made by signing an attendance form for all on-site sessions or by registering on-line for the general orientation.

1.4 Communications

· Communication to the Control Room must be available at all times as prescribed by the WTE Facility.

· The Contractor’s designated person must be able to converse with their employees in the language they can understand and must be able to communicate with City plant personnel.

1.5 First Aid and Medical Attention

· Each Contractor must have a first-aid kit available. bloodborne pathogen training and related equipment is the responsibility of the Contractor.

· Contractors are required to report all work-related injuries or illnesses that require an evaluation or treatment by a medical provider or hospital and serious near misses immediately to the Control Room.

· Where emergency services are required, the call will be made through the Control Room. Contact the Control Room for all emergencies. In general, Contractors should avoid dialing 911 from a cellular phone.

· Contractors shall familiarize themselves with the WTE Facility and know where the closest emergency eyewash and shower stations are located and how to operate them before starting a job assignment.

1.6 Incident Investigation and Reporting

· Contractors must complete an Incident Investigation Report, within 24 hours of occurrence of an incident. An incident is defined as a work-related injury or illness requiring an evaluation or treatment by a medical provider or hospital or any near miss that could have resulted in similar medical treatment or evaluation. The investigation shall contain, at a minimum, the information required on the Federal or State OSHA’s Recordkeeping Form (Federal OSHA Form 301) and the following: causal factor(s), root cause(s), corrective actions, and alternative solutions for preventing a re-occurrence of the event. The completed report shall be provided to the Control Room.

1.7 Drug and Alcohol Program

· All Contractors or subcontractors working at the WTE Facility must have a fully implemented drug and alcohol program. Elements of the program shall include, but not be limited to, the following:

1) A Contractor’s employee shall not show up for work at the WTE Facility while under the influence of drugs or alcohol;

2) A random drug and alcohol testing program and drug and alcohol testing when there is reasonable suspicion. The program must also provide that anyone who tests positive will be prohibited from working at the WTE Facility;

3) A method for communicating to the contactor when the Contractor’s employee is taking prescription medications that could influence work performance; and

4) Prohibits possession of illegal drugs and/or alcohol on Company property (and that possession is grounds for immediate and permanent removal from the site).

· The City of Tampa is not responsible for the administration of the program.

1.8 Unsafe Acts, Horseplay, Intoxicants, Firearms

· No unsafe acts, horseplay, intoxicants, or firearms are allowed on-site.

· Follow instructions in all posted areas—observe all warning signs!

1.9 Pre-Job Briefings

· Contractors shall provide pre-job safety briefings to their employees before the start of each new job. At a minimum, topics covered should include:

1) Hazards associated with the job

2) Work procedures involved

3) Special precautions

4) Energy source controls

5) Personal protective equipment (PPE) requirements

6) Location of eyewash/shower, fire extinguishers, plant phone, and or public address system

7) Closest point of egress from the work area

8) How to evacuate the WTE Facility based on where they are working in the WTE Facility and the designated muster point following the evacuation

1.10 Personal Hygiene

· The power plant ash contains varying concentrations of heavy metals (e.g., lead, cadmium, inorganic arsenic) and silica. Contractor’s employees are required to thoroughly wash their hands and face before eating or drinking and before leaving the WTE Facility.

· Contractor’s clothing and boots containing ash shall be removed or cleaned with a vacuum fitted with a high-efficiency particulate air (HEPA) filter before leaving the WTE Facility.

· Contractors may not enter lunchrooms or administrative areas with dirty or dusty protective work clothing or equipment.

1.11 Parking

· Park only in areas designated by the City.

· Never block building exits, emergency routes, fire lanes, or emergency or fire equipment.

1.12 Speed Limit

· All vehicles operated on City property shall obey posted speed limits and always provide pedestrians with the right-of-way.

· Adjust speed in response to reduced visibility or slippery conditions.

1.13 Barrier Tape

· Yellow Tape in the plant – Contractors can enter the area with caution.

· Red Tape in the plant – Do Not Enter.

1.14 Smoking, Eating and Drinking

· Smoking or chewing tobacco is only permitted in designated areas.

· Eating or drinking is not permitted at any time within the WTE Facility except in designated areas.

2. Personal Protective Equipment (PPE)

· Contractors must provide all required PPE to their employees, agents and sub-contractors and must provide full instruction and training on the proper use of PPE before the start of the work.

· Contractors are required to properly supervise all employees, agents and sub-contractors to ensure compliance in the use of protective equipment and clothing.

· All PPE shall be worn in accordance with manufacturer instructions (e.g., hard hats facing forward).

· Welding helmets are required to be fitted with hard hats.

· Unless otherwise designated, hard hats are required in all areas of the WTE Facility. The City reserves the right to require Contractors to wear hard hats of a specified color.

· Safety glasses with permanently-affixed side shields are required at all times on site except in designated areas. Mirrored safety glass lenses or shades of any color greater than 10% are not permitted while working indoors.

· Work boots with safety (steel, fiberglass) toes are required. Sneakers are not permitted.

· Gloves (e.g. chemical, needle resistant, etc.) shall be worn when needed to protect hands from chemical, physical (i.e., abrasions, heat, needle stick, sharp object, etc.) or other hazards.

· Hearing protection is required in all areas inside of the WTE Facility. Double hearing protection is required when working in areas where signs are posted.

· Face shields are required for all grinding and chemical transfer operations.

· Goggles are required when working, or around others working, in areas containing airborne ash/fly ash, dry chemical or dust hazards (e.g., windy conditions, positioned below ash-laden parts or equipment; ash or dry chemical handling such ash lime). Splash goggles and a full-face shield are required when conducting tasks where actual or potential liquid chemical splash hazards exist and in areas where dust, particulate and/or chemicals are present.

· Shaded eye protection is required while cutting, burning and welding.

· Hot Work activities require “leathers” or other appropriate protection. If using TYVEK-type suits, only those that are flame resistant or flame retardant shall be worn during Hot Work activities.

· Protective equipment is required for work involving chemical exposures.

· Use properly tested and rated electrical gloves and equipment for energized electrical work.

· Contractors are required to follow the instructions on all posted signs.

2.1 Respiratory Protection

· City employees are required to wear respiratory protection while performing specific tasks or while working in specific environmental conditions. Respiratory protection selection is based on air sampling data collected during these tasks and in various conditions.

· Contractors shall wear respiratory protection in all posted areas.

· Contractors must select the appropriate respiratory protection for their employee’s exposures. Contractors are welcome to review the City’s industrial hygiene air sampling data to assist in selecting the appropriate respiratory protection. However, the City’s air sampling data may not be relevant to the tasks the Contractor will be performing. Contractors are required under OSHA Standards to assess their employees’ exposure(s) to air contaminants. Contractors wanting to conduct air sampling on the WTE Facility site must coordinate these activities with the WTE Facility before they begin. A contractor air sampling plan will be required and approved by the City before any air sampling is performed. An example of an approved air sampling plan and associated field observation sheets can be provided upon request.

· Contractors using respiratory protection are required by Federal or State OSHA to have a respiratory protection program.

· In accordance with State or Federal OSHA Standards, Contractors wearing tight fitting respirators must not have any facial hair, including a one day’s growth, between the face-to-respirator seal or at a length to impact the exhalation valve operation.

2.2 Apparel

· Loose clothing shall not be worn around exposed rotating equipment or energized electrical parts.

· Do not wear loose-fitting clothing or jewelry around rotating tools and machinery.

· Do not wear conductive articles like jewelry, chains, watches, earrings, and key rings around exposed energized lines and equipment.

· Keep hair secured out of the way if it could become entangled in tools and machinery or obscure your vision.

· Full-length pants extending below the ankle are required.

· Long-sleeve shirts must be worn in those areas of the WTE Facility where Contractor’s employees are potentially exposed to thermal or chemical burns and cuts, scrape, and abrasion hazards. “Tank tops” are not permitted at any time.

· All clothing, including outer- (e.g., pants, shirts) and under-garments must meet State or Federal OSHA standards when working on or near exposed energized parts (i.e., 100% cotton or flame retardant/arc-rated materials, no synthetics).

2.3 Fall Protection

· Workers shall be protected from fall hazards, including, unprotected sides and edges which are 4 feet or more above a lower level, floor openings (an opening 12 inches or more in its least dimension) and wall openings (a gap or void 30 inches or more high and 18 inches or more wide) by the use of either:

1) Guardrail systems

2) Covers

3) Safety net systems

4) A personal fall arrest or restraint system consisting of a full body harness and lanyard with locking snap hooks attached to a secure and approved anchor point, or

5) Warning line systems, as determined by a qualified person

· Personal Fall Arrest Systems shall be rated for arc and shock protection for tasks on or near normally energized conductors/ parts/ wires.

· Contractors must pre-plan to provide for prompt rescue of workers in the event of a fall.

· Chains/safety gates on all work platforms must be closed when the platform is occupied.

· Excavation fall hazards must be eliminated by use of the fall protection methods described above, or a fence or barricade which restricts access to the excavation area.

3. Work Area Protection

3.1 Walking/Working Surfaces

· Keep all walking/working surfaces free of debris, trip hazards (cords, hoses and lines), slippery or spilled materials.

· Keep emergency/fire equipment, eyewash stations/safety showers clear at all times.

· Keep exits, stairways and corridors clear of obstructions at all times.

3.2 Materials Handling

· Do not store materials in a manner that restricts access, blocks emergency/fire equipment or obstructs views of roadways or walkways.

· Do not stack materials too high. Acceptable height is based on the stability of the materials being stacked.

· Materials must be able to be self-supported or by using vertical, horizontal, and diagonal braces.

· All materials stored in elevated areas must be securely fastened to prevent falling.

· Compressed gas cylinders (e.g., O2 and acetylene) shall be used in carts or properly secured.

3.3 Ladders

· Portable metal ladders and other portable conductive ladders may not be used near exposed energized lines or equipment.

· Portable ladders shall have nonconductive side rails if they are used where the employee or the ladder could contact exposed energized parts.

· Portable extension ladders must be extended 3 feet above the point of support and shall be tied off or held securely by another employee.

· Do not separate extension ladders for individual use.

· Portable “A frame” stepladders must be fully opened before use.

· Do not climb stepladders that are leaned against walls, tanks or other vertical surfaces.

· No damaged or modified ladders are permitted on-site.

· Do not use “job-built” ladders or make-shift ladders (like pallets).

· Face the ladder at all times and maintain three points of contact when climbing.

3.4 Scaffolding

· All scaffolding must comply with applicable State or Federal OSHA standards.

· Do not make changes to scaffolding unless coordinated through the designated scaffolding-competent person.

· All scaffolds over 6 feet must have a guardrail system (Top rail: 42 + 3", Mid rail, 4"-high toe board).

· Overhead protection is required beneath on-going work or in areas where debris may fall (e.g., inside boilers).

· Screened sides are required above walkways.

· A designated competent person must inspect erected scaffolding each shift.

1) Contractors shall report all deficiencies with the scaffolding to the Control Room.

2) If the designated competent person determines that it is safe for the scaffolding to be used, a “Safe to Use” (or similar wording) inspection tag shall be placed at all entrances of scaffolding. Similarly, incomplete or defective scaffolds shall also be identified through the use of an appropriate tag.

3) Contractor’s employees, agents and sub-contractors shall not access scaffolding unless a Safe to Use” (or similar wording) inspection tag is visible.

3.5 Restricted Areas

· Tipping Floor, Fuel Yards (e.g., wood, tires, waste coal/culm, and ash and metal recovery loading/unloading areas) are restricted to authorized persons.

· Contractors are not permitted to enter the restricted areas unless authorized by a City employee. Entry into the restricted areas must follow WTE Facility policy.

· Contractors are not permitted in warehouse areas unless accompanied by a City employee, or other arrangements are made with the WTE Facility Manager.

3.6 Nuclear Level Gauges

· Do not open, move or remove nuclear-level gauge devices. These devices are labeled specifying them as a radioactive hazard.

3.7 Magnetic Fields

· Metals recovery and other electrical systems generate magnetic fields that could affect pacemakers or similar devices. Contact City supervision with any concerns or questions.

3.8 Conveyor Safety

· Never ride conveyors. Cross over conveyors only at crosswalks or when the conveyor is de-energized and locked out.

· Do not walk on conveyor covers.

· Be aware of the location of emergency pull cords; use the pull cords to stop a conveyor in the case of an emergency.

· Do not use the emergency pull cord for situations other than emergencies (e.g., to work on conveyor).

· Keep hands clear from rollers and keep all guards in place when in service.

· Contractor’s employees shall not remove any guards without prior City approval.

· Do not clean pulleys or rollers when the belt is moving. Implement the lockout procedure before working on the conveyor.

4. Safe Work Procedures

4.1 Chemical Unloading and Transfer

· All chemical unloading shall comply with WTE Facility chemical unloading procedures, which specifies PPE for those involved and verification the closest eyewash station to the unloading is operating correctly. Contact the Control Room before unloading any delivery.

4.2 Hazard Communications

· Contractors will have an SDS for all chemicals they bring on-site. All SDSs must be available for on-site City review. Contractors will follow the WTE Facility chemical storage and disposal requirements; when in doubt, ask a City Shift Supervisor for clarification.

· Contractors must coordinate with the WTE Facility before storing any hazardous materials. Information such as: the quantity, location to drains and material compatibility will be addressed.

· Containers, lines and tanks are labeled at the WTE Facility. If you have a question, ask the Control Room.

· SDSs for all hazardous materials used on the site by the City are available from the operations staff. If you have a question about a hazardous material used at the site, contact the Control Room.

4.3 Lockout/Tagout (LOTO) Authorization

· Proper lockout/tagout authorization is required for all jobs with hazardous energy sources.

· Obtain proper authorization from the Control Room.

· Before starting tasks on or near normally energized conductors, parts, or wires the contractor is required to participate in zero energy verification with a City qualified electrical person.

· At a minimum, a Contractor’s supervisor shall use an individual identified lock on the City lock box to identify it as a Contractor’s lock for each work crew. Contractor’s employees shall also have some means of controlling access to the key of that lock following the Contractor’s LO/TO procedure.

· All guards and safety interlocks shall be replaced when work is completed.

· Notify the Control Room when work is completed.

4.4 Confined Spaces

· Permit Required Confined Spaces (PRCSs) exist at the WTE Facility and have been labeled as such. Contractors will not work in an area that has been labeled as a PRCS or which Contractors believe is a PRCS without first notifying the Control Room and obtaining proper authorization (i.e., City-issued PRCS permit). PRCSs that have been posted as a reclassified “Non-Permit Required” space do not require authorization to enter.

· A PRCS permit or “Safe Entry” reclassification notice is required to be posted for all confined space entry. When the PRCS entry is completed, Contractors will be required to complete a “Contractor Debriefing”.

· The City evaluates PRCSs for its employees. Contractors must have their own program in place, including attendants, appropriate retrieval devices, and a means for rescue, unless specific arrangements have been made with the WTE Facility. In all cases, Contractor entry and rescue procedures must be coordinated with the City.

· PRCS entry operations must be coordinated with the City Entry Supervisor and the Contractor when both City and Contractor employees will be working simultaneously in a PRCS. This is to ensure that there is no doubt by any entrant, attendant or the Entry Supervisor regarding who the controlling employer is and whose entry procedures are being followed, including air testing, physical hazard inspections, assigned attendants and rescue arrangements, and that no work is performed at the same time that could create a hazard to entrants.

· Unless other arrangements are made, both the City and the Contractor shall conduct air monitoring and physical condition inspections at the frequency specified on the PRCS Entry Permit or Safe Entry Certification Form (as applicable) to verify conditions remain safe for entry when working simultaneously in a PRCS.

4.5 Heat and Cold Stress

· Contractors shall establish and enforce precautions to prevent heat and cold related illness and injury to their employees.

4.6 Tools and Equipment

· All tools and equipment must be in good condition with safety devices.

· Do not use defective tools or equipment.

· Contractors are not allowed to use City tools or equipment unless specifically approved by the WTE Facility Manager.

· Compressed air cannot be used for cleaning (e.g., clothing, housekeeping).

4.7 Bins / Hoppers / Bunkers / Silos

· Never open doors or covers without authorization.

· Always assume all ash is hot.

4.8 Jacking

· Inspect the jack before using it.

· Do not use a jack that is leaking fluid.

· The jack set-up shall be stable before lifting the load.

4.9 Power Washers

· Electric power washers shall not be used unless GFCI-protected.

· Gasoline-, diesel- or propane-powered engines shall not be used inside building structures because of the exhaust emissions they generate, unless arrangements for the safe evacuation of exhaust emissions are made and the use is authorized by the City.

· Housekeeping is a continuous effort; Contractors are required to keep work areas clean and orderly.

5. Electrical Safety

5.1 Electrical

· The Control Room issues Lockout/Tagout authorizations for electrical work.

· Do not leave energized conductors exposed.

· Only “Qualified” electrical persons knowledgeable in the construction and operation of electric power generation and transmission equipment and the associated hazards may work on exposed energized lines or equipment operating at 50 volts or more.

· Keep areas in front of electrical panels clear for at least 36 inches.

· All electrical distribution panels, breakers, disconnects, switches, and junction box doors and covers shall be kept closed unless work requiring the doors or covers to be open is in progress.

· Use only non-conductive (such as plastic-cased) flashlights around electrical lines and equipment.

· Do not alter safety features of any electrical equipment.

· Use only 3-wire industrial extension cords rated for the work environment conditions. All extension cords must be in good condition. Spliced extension cords are not permitted.

· All cord and plug-connected equipment must be either double insulated or equipped with ground fault circuit interrupters (GFCIs).

· Avoid placing extension cords or welding leads in contact with wet areas; avoid creating trip hazards (e.g., string overhead where appropriate); avoid doorways and travel areas.

· Do not use wire to support welding leads.

· High voltage and energized line work must be coordinated with the Control Room and local power utility.

6. Vehicle and Equipment Operation

6.1 Mobile Equipment

· Contractors are not permitted to use any City equipment without express approval from the WTE Facility Manager. If Contractor’s employees are authorized to use City equipment, Contractor shall be responsible for training such employees to properly operate such equipment, and ensuring that such employees are familiar with all operating and safety procedures associated with the equipment.

· Only trained and authorized personnel shall operate equipment.

· Reverse alarms shall be operable on all equipment.

· All equipment shall be operated at a safe speed and as designated by the WTE Facility.

· No persons shall be exposed to “pinch point” locations.

· No persons are permitted to ride on the outside of vehicles.

· No mobile equipment is permitted on the site without a restraining device (e.g., seatbelt). Seatbelts must be used at all times while operating equipment.

6.2 Excavations

· When planning any excavation or scraping, coordinate with City site management and call “811”, the national ‘call before you dig’ phone number in advance of the scheduled dig, to allow time for possible site surveys and markings. Follow all state and local requirements.

· All excavations shall be covered or barricaded to restrict access.

· Excavated materials must be placed or stored at least 2 feet from the excavation and be safely sloped.

· For excavations or trenches over 5 feet deep a protective system such as sloping, shoring, shielding, or benching is required.

· When excavations are over 4 feet deep, test for atmospheric hazards where oxygen deficiency or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby.

· Sloping or benching for excavations greater than 20 feet deep shall be designed by a registered professional engineer.

6.3 Hoisting and Rigging

· Good rigging practices are to be used; no unstable loads are permitted.

· Clear communication between the signalperson and the operator must be maintained. If visual contact cannot be maintained, continuous radio communications shall be required. If continuous communications cannot be maintained, stop operations until the communications are re-established. Only designated signal persons who have documented 3rd party or employer certified qualifications shall direct movement and give signals.

· Hand signals to crane and derrick operators shall be those prescribed by ANSI for the type of crane in use. An illustration of the signals used by the Contractor shall be available for on-site City review.

· Crane work zones shall be designated. Where power lines are within designated work zones, encroachment prevention measures shall be implemented.

· Walking under loads is prohibited.

· Never put yourself in pinch point positions, such as between moving and stationary objects—particularly when hoisting materials or working around mobile equipment.

· Lifting materials over persons is not permitted.

· Persons are not allowed to work under the bullnose during overhead lifts.

· When two or more hoisting machines are lifting the same load, only one designated signal person will direct the movements. The operator shall acknowledge an emergency stop signal from anyone. The operator shall stop the lift if a signal is not understood.

· "Tag lines" must be used to control large loads.

· Only those slings and chains that have been inspected and are free from defects shall be used.

· All hoist and rigging, lifting chains and slings must have visible load rating tags.

· Never attach rigging or any lifting device to a stairway or platform railing (such as handrails/guardrails) for purposes of lifting or supporting a load.

· Do not allow the load to exceed the rated capacity of any individual component.

· Do not expose nylon slings to sharp edges or hot materials.

· All hoisting equipment, including chain falls and come-a-long must have a functional safety latch on the upper and lower hooks.

· Contractors are not permitted to use City hoisting or rigging equipment unless express permission is granted by the WTE Facility Manager.

7. Maintenance Activities: Hot Work

7.1 Hot Work-Fire Safety

· A Hot Work Permit is required for all jobs involving welding, cutting, heating, grinding, open flames, high temperatures, or other activities that generate sparks except for those jobs occurring in areas that have been designated by the WTE Facility as non-permit areas. A Hot Work Permit must be posted on the job.

· Obtain Hot Work Permits from the Control Room. When the work is completed, return the permit to the Control Room.

· Where practical, all combustibles shall be relocated beyond a 35 ft radius from the work area. Where relocation is impractical, combustibles shall be protected with metal or flameproof covers.

· Do not allow solvents or other flammable material in areas where Hot Work is being performed.

· Grate surfaces or openings which could allow cutting and welding sparks or spatter to drop onto lower levels shall be covered with fire-resistant material. Where not feasible, red-tape off the area below or use a fire watch.

· Persons performing fire watch duties shall:

1) Know and understand the communication method to be used for reporting a fire

2) Not perform other tasks that will interfere with the primary duty to monitor fires

3) When necessary, warn others of Hot Work activities and prevent unauthorized entry

4) Remain at the Hot Work area for at least 1 hour after work is complete unless specified by the hot work permit

5) Have fire extinguishing equipment capable of extinguishing a Hot Work-generated incipient fire and shall be available within 10 seconds of unobstructed travel time from the Hot Work.

· Cylinders must be used upright and secure at all times. A cylinder sling/cradle is required for hoisting.

· Unless cylinder carts are equipped with a 5-foot high separating plate specifically engineered to meet a 1/2 hour fire-resistance rating and prevent the spread of fire, remove regulators and cap cylinders and return them to storage if torch sets are to remain idle for periods greater than 24 hours.

· Spare cylinders of oxygen and acetylene, when not used within a 24-hour period, shall be stored separately at least 20 feet apart or by a non-combustible barrier at least 5 feet high having an engineered fire-resistance rating of at least 1/2 hour. All stored cylinders shall be secured with caps on.

· Smoking is permitted only in designated areas.

· DO NOT use torch sets unless combination reverse-flow check valves/flashback arrestors are installed on BOTH fuel gas and oxygen lines at the torch AND regulators.

8. Emergency Response

8.1 Communications

· In the event of an emergency, medical or otherwise, the Contractor is to contact the Control Room using the plant phone or paging system. In general, Contractors should not call 911 using a personal cellular phone.

8.2 Emergency Evacuations

· An evacuation alarm will be sounded for all emergencies requiring evacuation. When this alarm sounds, leave the WTE Facility immediately.

· If the evacuation alarm sounds, know your escape route. Do not use the elevator.

· Use stairwells and follow the exit signs.

· The primary assembly point for any evacuation is at the administrative building parking lot, unless otherwise instructed. The secondary assembly point for the WTE Facility is near the WTE Facility entrance gate. During an emergency, the Control Room will announce the assembly point over the loudspeaker.

9. Environmental

· Leaks or spills to the ground are not permitted. If you observe a leak or spill of any quantity, immediately notify the Control Room.

· All temporary fuel and chemical storage tanks shall have a means of secondary containment.

· Never release chemicals, oils, fuels, solvents, etc. into plant drains, sinks or sewers.

· No hazardous waste is to be generated unless specified in the Contractor's Service Agreement with the City.

· Do not dispose of waste generated on-site onto the Tipping Floor unless disposal has been previously approved by WTE Facility management.

· For waste materials generated by Contractors, use the drums or containers provided or approved by the City. Do not store waste at the WTE Facility without notifying plant management of its type, quantity, and location. Do not remove waste materials from the WTE Facility.

· When performing work that uses liquid chemicals or oil within 20 feet of drains, install temporary drain covers before beginning.

· Clean tools and equipment of ash inside the plant structure before leaving property.

· Notify WTE Facility management before undertaking any work on equipment that might release ash to the environment (e.g., conveyors, air pollution control equipment). This includes any outdoor work where ash could be released as fugitive dust or released to the ground (including release as a wastewater or wash water component). The Contractors Scope of Services will specify the controls necessary to prevent ash releases to the environment. For outdoor work, temporary enclosure will be constructed to prevent potential releases.

· Immediately notify WTE Facility management if in the course of your work outside the building structures, ash is released to the ground or causes visible dust emissions.

· Contractors must not dispose of ash or otherwise remove ash from the plant site.

· Used boiler tubes, used conveyor parts and other used equipment partially coated with ash must be stored indoors or if stored outdoors, must be placed on pallets and covered to prevent ash dispersion and stormwater contact.

· If outdoors, ash containers must be covered and be leak-tight (e.g., roll-off boxes, bins, wash tanks, etc.).

9.1 Hazardous Materials including Hazardous Waste

· Many waste materials generated during the course of work at the WTE Facility has the potential for being classified, through testing and analysis, as a hazardous waste. Contractor Health and Safety Programs required in the Service Agreement address the handling of these hazardous waste materials.

· For Companies providing spill response (containment) and clean-up of materials determined to be a hazardous waste must be handled by individuals who have received training in accordance with State and Federal Hazardous Waste Regulations (40 CFR 265.16 and OSHA Standard 1910.120 (q) or (p)(8)).

· Trained contractors will handle hazardous waste as described in the Scope of Services, at the WTE Facility by placing the material into City-approved or provided containers and then moving them to an approved on-site storage location as specified by WTE Facility management. At no time shall any hazardous waste be placed into storage or removed from the WTE Facility without authorization.

· Contractors are required to inform City management during the EHS orientation if they anticipate that their work will generate hazardous waste onsite. Contractors are required to inform City WTE Facility management when they actually generate any hazardous waste (notify during same shift that waste is generated). For multi-day jobs where hazardous waste generation is expected over an extended period (e.g., entire bag house change out) then only an initial notification of hazardous waste generation is required.

ATTACHMENT E

CITY OF TAMPA MCKAY BAY WASTE-TO-ENERGY FACILITY

CONTRACTOR ARSENIC, LEAD, CADMIUM, AND HEXAVALENT CHROMIUM NOTICE

The below information provides a background of general potential for heavy metals exposure that Contractors should be aware of while performing work at the McKay Bay Waste-to-Energy Facility (WTE Facility). Contractors will be required to comply with all applicable federal, state and local laws, including but not limited to U.S. Occupational Safety and Health Administration (OSHA) regulations. The purpose of this Notice is to inform Contractors of the potential for exposure to arsenic, lead, cadmium, and hexavalent chromium at the WTE Facility. It is not intended to be legal guidance on the federal, state and local laws that may apply to the Contractor’s operations.

Contractors will be responsible for maintaining their own industrial…