TE-A.6.1 Consolidated Contractor Plans.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Ft Carson BASOPS (Base Operations Services)
- Solicitation number
- W5168W-24-R-0009
- Issued by
-
Department of the Army
About this file
This document is an Excel spreadsheet titled "TE-A.6.1 Consolidated Contractor Plans" that lists the various contractor plans required for a federal contract opportunity. The plans include a Transition Plan, Contingency Plans, Safety Plan, Spill Plan, Quality Control Plan, Snow Plan Revisions, Service Plans, Freeze Prevention Plan, Emergency Utilities Plan, and several other facility-related plans. The plans must be submitted within specified timeframes, typically 10-30 business days prior to contract award, and be distributed to the Contracting Officer (KO) and/or Contracting Officer's Representative (COR).
The federal contract opportunity referenced is for Fort Carson BASOPS (Base Operations Services), Solicitation Number W5168W-24-R-0009. This is a solicitation for a contractor to provide base operations support services at U.S. Army Fort Carson, Colorado, including grounds maintenance, pavement clearance, facility maintenance, heating and cooling services, and wastewater services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TE-A.6.1 | ||||||
| Consolidated Contractor Plans | ||||||
| 1-Jan-23 | ||||||
| Plan Number | Title | Minimum Requirements | Date Required | Format | Distribution | Special instructions |
| A.2.1.2.1 | Transition Plan | See para A.2.1.2.1 - A.2.1.2.2 for requirements. | NLT 10 Business days preceding contract award | Electronic | COR/KO | N/A |
| A.2.1.13 | Contingency Plan (Manual Operations) | Plan addressing manual operations in the event of power loss or other technical difficulties | NLT 15 Business days preceding contract award | Electronic | COR/KO | N/A |
| A.2.5.3.1 | Safety Plan | See para A.2.5.3.1 for requirements | NLT 10 Business days preceding contract award | Electronic | COR | Includes any installation specific requirements |
| A.2.5.5.4 | Spill Plan | See para A.2.5.5.4 for requirements | NLT 30 Business days preceding contract award | Electronic | COR | Must comply with DPW-ED Spill plan |
| A.2.5.6.2 | Contigency Plan (Mobilization) | See para A.2.5.6.2 for requirements | NLT 30 Business days preceding contract award | Electronic | COR/KO | |
| A.2.5.6.3 | Contingency Plan (Disaster) | See para A.2.5.6.3 for requirements | NLT 30 Business days preceding contract award | Electronic | COR/KO | |
| A.2.5.6.4 | Contingency Plan (Labor Disputes) | See prar A.2.5.6.4 for requirements | NLT 30 Business days preceding contract award | Electronic | COR/KO | |
| A.3.3 | Quality Control Plan | See para A.3.3 - A.3.5 for requirements | NLT 30 Business days preceding contract award | Electronic | COR/KO | |
| F.2.2.4.1 | Fertilization Plan | See para F.2.2.4.1 | NLT 30 Business days preceding contract award | Electronic | COR | |
| G.1.2 | Snow Plan Revisions | See para G.1.2 | Within 60 Days of contract award | Electronic | KO/COR | Updated NLT 30 Sep Annually |
| H.1.3.1.1 | Service Plans | See para H.1.3.1.1 | Within 30 Days of award | Electronic | COR | |
| H.1.3.1.1.1 | High Risk Utilities Plan | See para H.1.3.1.1.1 | Within 30 Days of award; Annual Updates | Electronic | COR | Updates are due NLT 30 days prior to PoP expiration |
| H.1.3.1.2 | Freeze Prevention Plan | See para H.1.3.1.1.3 | Within 15 days of contract award | Electronic | COR | |
| H.1.3.1.2 | Emergency Utilities Plan | See para H.1.3.1.2 | Within 15 days of contract award | Electronic | COR | |
| H.2.10.8.1.1 | Confined Space Entry | See para H.2.10.8.1.1 | Within 30 days of contract award | Electronic | COR | Site specific as required |
| H.2.11.4 | Sanitary Wastewater Collection and Treatment Plan | See para H.2.11.4 | Within 30 days of contract award | Electronic | COR | |
| H.2.12.3 | IWTP Maintenance Plan | See para H.2.12.3 | Within 30 days of contract award | Electronic | COR | |
| H.2.14.1.1 | Vacant Facility Plan | See para H.2.14.1.1 | Within 30 days of contract award | Electronic | COR | |
| H.2.28 | PM Plan, Pools and Spas | See para H.2.26 | Within 30 days of contract award | Electronic | COR | Built in GFEBS |
| H.2.30.2 | PM Plan, Overhead Lift Devices | See para H.2.30.2 | Within 30 days of contract award | Electronic | COR | Built in GFEBS |
| H.4.1 | Self Help Program Plan | See para H.4.1 | Within 30 days of contract award | Electronic | COR | |
| H.9.3 | PM Plan, Traffic Control | See para H.9.3 | Within 15 days of contract award | Electronic | COR | Built in GFEBS |
| H.9.5 | PM Plan, Airfield Lighting | See para H.9.5 | Within 15 days of contract award | Electronic | COR | Built in GFEBS |
| H.16.2 | Stormwater Collection System Maint Plan | See para H.16.2 | Within 15 days of contract award | Electronic | COR | |
| H.17.3 | Stormwater Maintenance Plan | See para H.17.3 | Within 15 days of contract award | Electronic | COR | |
| H.17.5 | ICP for Spill Response | See para H.17.5 | Within 30 days of Contract Award | Electronic | COR | |
| H.17.6 | Wastewater and Stormwater Safeguard Plan | See para H.17.6 | Within 30 days of contract award | Electronic | COR | |
| J.1.2.1.1d | Surfaced area maint Plan | See Para J.1.2.1.1d | Within 30 days of contract award | Electronic | COR | |
| J.1.2.1.1d | Overarching Traffic Control Plan | See para J.1.2.1.1d | Within 30 days of contract award | Electronic | COR | |
| J.2.1.7.1 | Airfield Maint Plan | See para J.2.1.7.1 | Within 30 days of award | Electronic | COR | Includes BAAF, Red Devil, PCMS and Helipads |
| K.2.3 | Heat Plant Operations Plan | See Annex K | Within 30 days of award | Electronic | KO/COR | |
| L.1.3.1.1 | Sanitary Wastewater System Operations Plan | See Annex L | Within 30 days of award | Electronic | KO/COR |
File details come from the government source that posted it. Updated .