TE 2 Snow removal check off sheet Jan 2023.doc
DOC document 45 KB Posted
- Attached to
- Snow Removal Services at Coast Guard Academy
- Solicitation number
- 70Z008425QDL952009
About this file
This document is a Technical Exhibit detailing snow removal procedures and checklist for the Coast Guard Academy. The comprehensive checklist outlines specific snow removal requirements for multiple campus locations, including main roads, parking lots, loading docks, housing units, access gates, and critical areas like the Child Development Center. Contractors are required to log arrival times, number of drivers, and methodically clear and treat designated areas, with specific instructions such as clearing the Flagpole parking area before 7:30 AM and sunset, and ensuring trash hauler access is not blocked. The checklist serves as a detailed operational guide for snow removal contractors, providing a structured approach to documenting snow removal services across the academy's campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE 3 - Cadet Memorial Field Diagram.jpg | JPG image | |
| Rough Order of Magnitude - USCGA Snow Removal Services.xlsx | XLSX spreadsheet | |
| PWS Snow Removal.pdf | ||
| TE 1 Pavement Snow Removal Areas.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 2
SNOW PLOWING CHECK OFF SHEET – Revised January 2023 The following procedures shall be followed during all Snow removal Contractor mobilizations:
1. Check in with the main gate upon arrival, log actual arrival time and number of plow trucks on scene.
2. Clear and treat Child Development Center and Deshon St Gate 1 hour prior to anticipated base opening.
3. Clear and treat the Flagpole parking are prior to 0730 AM and sunset.
4. Prior to checking out with the Academy Snow Removal Officer or his designated representative, provide the completed check-off sheet: Initial all areas identified below insuring these areas have been plowed, cleared and/or treated prior to departure.
Date_________
Arrival Time _____
Number Drivers Onsite and arrival Times_____/_____/_____/_____/_____/_____/_____/
Time Complete_______
All Main Roads and Main Parking lots as identified on the contract drawing, Technical Exhibit 1
Chase Hall Center Quad area (off Bear Dr): ____
U-Lot parking area: ____
Chase B Galley Loading Dock: ____
Michel Hall Loading Dock: ____
Chase C Clothing Locker Entrance, Loading Dock and North Quad areas: ____
Hamilton Hall East Side Garage Door and Parking area: ____
Trash Storage areas – Do Not Block Trash Hauler’s Access to Dumpsters: ____
Billard Garage door: ____
Housing Units - Back Road and Garage Parking areas: ____
Lower Base Railroad Crossings (2): ____
Boiler Plant Front and Back Parking areas: ____
Johnson Hall Loading Dock: ____
MCOE Garage doors and Storage areas: ____
Yeaton Hall, Consolidated Club Trash area: ____
Munro Parking Circle: ____
Cadet Memorial Field, when applicable: _____
Access Gates – Do Not Pile Snow Around Gates: ____